CN108222081A - 一种分隔式橡胶水箱装置 - Google Patents
一种分隔式橡胶水箱装置 Download PDFInfo
- Publication number
- CN108222081A CN108222081A CN201810005641.4A CN201810005641A CN108222081A CN 108222081 A CN108222081 A CN 108222081A CN 201810005641 A CN201810005641 A CN 201810005641A CN 108222081 A CN108222081 A CN 108222081A
- Authority
- CN
- China
- Prior art keywords
- water tank
- water
- cellular
- type rubber
- tank device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
Abstract
本发明提供了一种分隔式橡胶水箱装置,包括水箱;所述水箱上端面的四边分别设有安装孔,水箱上端面的四角分别设有连接凹槽;所述水箱下端面的四角分别设有连接凸柱,水箱下端面的四边中的一边设有排水阀;所述安装孔内装有进水接管柱,在进水接管柱的进水口上设有密封盖。本发明采用容积为1×1×1m3或2×2×2m3的橡胶水箱,在载荷平台上进行连接组合;根据荷载大小安排相应数量的水箱,加载时注入水,卸载时,进行放水,只需使用基坑积水或自来水,不用运输砂袋和混凝土块,方便快速、安全、环保,降低了成本。
Description
技术领域
本发明涉及一种分隔式橡胶水箱装置,属于建筑工程基桩或地基基础检测技术与装置技术领域。
背景技术
静载荷试验:是指按桩的使用功能,分别在桩顶逐级施加轴向压力、轴向上拔力或在桩基承台底面标高一致处施加水平力,观测桩的相应检测点随时间产生的沉降、上拔位移或水平位移,根据荷载与位移的关系判定相应的单桩竖向抗压承载力、单桩竖向抗拔承载力或单桩水平承载力的试验方法,它是目前检验桩基承载力的各种方法中应用最广的一种,且被公认为试验结果最准确、最可靠,被列入各国桩基工程规范或规定中。该试验手段利用各种方法人工加荷,模拟地基或基础的实际工作状态,测试其加载后承载性能及变形特征。其显著的优点是受力条件比较接近实际,简单易用,试验结果直观而易于为人们理解和接受,但是试验规模及费用相对较大。
在现有技术中,静载荷试验是进行建筑基桩、地基基础试验的一种重要方法,广泛应用于住房、桥梁等行业,而当前广泛采用的载荷方式是砂袋、混凝土预制块堆载方式,这种方法成本高、效率低、不清洁环保、安全隐患高。
发明内容
为解决上述技术问题,本发明提供了一种分隔式橡胶水箱装置,该分隔式橡胶水箱装置解决载荷试验时,大量运输砂袋、混凝土产生的低效、污染环境、不安全等问题,使试验变得高效、环保、安全,且成本较低。
本发明通过以下技术方案得以实现。
本发明提供的一种分隔式橡胶水箱装置,包括水箱;所述水箱上端面的四边分别设有安装孔,水箱上端面的四角分别设有连接凹槽;所述水箱下端面的四角分别设有连接凸柱,水箱下端面的四边中的一边设有排水阀;所述安装孔内装有进水接管柱,在进水接管柱的进水口上设有密封盖。
所述安装孔设在侧边的中点。
所述水箱有若干个,若干个水箱之间相互连接,形成组合荷载水箱。
所述组合荷载水箱的一侧设有荷载台。
所述连接凹槽的直径大小与连接凸柱的直径大小相匹配。
所述若干个水箱之间分别通过连接凹槽和连接凸柱进行卡接。
还包括连接水管,若干个进水接管柱之间分别通过连接水管进行连接。
所述连接水管的两端均设有拧紧螺栓。
本发明的有益效果在于:采用容积为1×1×1m3或2×2×2m3的橡胶水箱,在载荷平台上进行连接组合;根据荷载大小安排相应数量的水箱,加载时注入水,卸载时,进行放水,只需使用基坑积水或自来水,不用运输砂袋和混凝土块,方便快速、安全、环保,降低了成本。
附图说明
图1是本发明的结构示意图;
图2是本发明的俯视图;
图3是图1的对角剖面图;
图4是图1的纵向剖面图;
图5是本发明组合荷载水箱结构示意图;
图6是本发明水管的结构示意图;
图中:1-水箱,2-进水接管柱,3-连接凹槽,4-连接凸柱,5-排水阀,6-连接水管,7-拧紧螺栓。
具体实施方式
下面进一步描述本发明的技术方案,但要求保护的范围并不局限于所述。
如图1~4所示,一种分隔式橡胶水箱装置,包括水箱1,水箱1的材质为纤维橡胶,容积为1×1×1m3或2×2×2m3;所述水箱1上端面的四边分别设有安装孔,水箱1上端面的四角分别设有连接凹槽3;所述水箱1下端面的四角分别设有连接凸柱4,水箱1下端面的四边中的一边设有排水阀5,在卸载或完成测试后,可打开排水阀5进行排水,方便快捷,避免危险,消除隐患;所述安装孔内装有进水接管柱2,在进水接管柱2的进水口上设有密封盖,不连接时保持密封状态,可以节约用水,达到环保的目的。
所述安装孔设在侧边的中点,方便与相邻水箱1进行连接,进行注水和水平连接,保持箱间安全稳定。
所述水箱1有若干个,若干个水箱1之间相互连接,形成组合荷载水箱,如图5所示,所述组合荷载水箱的一侧设有荷载台。
所述连接凹槽3的直径大小与连接凸柱4的直径大小相匹配,接凹槽3和连接凸柱4均进行加厚、加强设计,保证较强的抗拉能力。
所述若干个水箱1和水箱1之间分别通过连接凹槽3和连接凸柱4进行卡接,即每个水箱1顶面的连接凹槽3与另一个水箱1底部的连接凸柱4进行卡接,每个水箱1顶面的连接凹槽3与另一个水箱1底部的连接凸柱4的位置一一对应,方便上下层水箱1连接,保持堆载稳定。
还包括连接水管6,所述若干个进水接管柱2之间分别通过连接水管6进行连接,连接水管6为高压水管;所述连接水管6的两端均设有密封拧紧螺栓7,起到方便快速、降低成本的目的,如图6所示。
实施例
如上所述,本发明在贵阳白云区大川白金城进行了桩基静载试验,步骤如下:
1)在基桩地面搭建一个10m×10m的承载平台(载荷台),平台中心位于桩中心位置,平台四周作好平衡和支撑,在中心位置安置千斤顶、压力和位移传感器,连接仪器。
2)根据设计的最大载荷重量,在平台上布置相应的水箱1数量,平面上以千斤顶为中心对称布置并同时进行水箱1间的连接。
3)布置完一层水箱1后,进行注水,直到同一层水箱1全部注满,再进行其上层水箱1安装和连接,并注满水。
4)在注水时,按照设计荷载大小安排静载测试,直到达到最大荷载。
5)减载时,按照设计载荷值分层放水至要求荷载,完成全部试验。
综上所述,在现场测试时,根据荷载大,设计安装载荷台面积、水箱1数量和层数,再分层布置和连接水箱1,在顶层选择一个水箱1作安装注水管,根据载荷设计要求进行注水加载或排水卸载,直到试验完成。本发明可广泛应用于城乡、交通等行业基础结构、地基的载荷试验,水箱1可重复利用,质量轻便,环保经济。
Claims (8)
1.一种分隔式橡胶水箱装置,包括水箱(1),其特征在于:所述水箱(1)上端面的四边分别设有安装孔,水箱(1)上端面的四角分别设有连接凹槽(3);所述水箱(1)下端面的四角分别设有连接凸柱(4),水箱(1)下端面的四边中的一边设有排水阀(5);所述安装孔内装有进水接管柱(2),在进水接管柱(2)的进水口上设有密封盖。
2.如权利要求1所述的分隔式橡胶水箱装置,其特征在于:所述安装孔设在侧边的中点。
3.如权利要求1所述的分隔式橡胶水箱装置,其特征在于:所述水箱(1)有若干个,若干个水箱(1)之间相互连接,形成组合荷载水箱。
4.如权利要求3所述的分隔式橡胶水箱装置,其特征在于:所述组合荷载水箱的一侧设有荷载台。
5.如权利要求1所述的分隔式橡胶水箱装置,其特征在于:所述连接凹槽(3)的直径大小与连接凸柱(4)的直径大小相匹配。
6.如权利要求3所述的分隔式橡胶水箱装置,其特征在于:所述若干个水箱(1)之间分别通过连接凹槽(3)和连接凸柱(4)进行卡接。
7.如权利要求1所述的分隔式橡胶水箱装置,其特征在于:还包括连接水管(6),若干个进水接管柱(2)之间分别通过连接水管(6)进行连接。
8.如权利要求7所述的分隔式橡胶水箱装置,其特征在于:所述连接水管(6)的两端均设有拧紧螺栓(7)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810005641.4A CN108222081A (zh) | 2018-01-03 | 2018-01-03 | 一种分隔式橡胶水箱装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810005641.4A CN108222081A (zh) | 2018-01-03 | 2018-01-03 | 一种分隔式橡胶水箱装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108222081A true CN108222081A (zh) | 2018-06-29 |
Family
ID=62642766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810005641.4A Pending CN108222081A (zh) | 2018-01-03 | 2018-01-03 | 一种分隔式橡胶水箱装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108222081A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111350212A (zh) * | 2018-12-20 | 2020-06-30 | 中国建筑西北设计研究院有限公司 | 一种用于载荷试验的水箱结构、试验装置和试验方法 |
CN111350211A (zh) * | 2018-12-20 | 2020-06-30 | 中国建筑西北设计研究院有限公司 | 一种折叠水箱和载荷试验装置及其载荷试验方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070017086A (ko) * | 2006-12-27 | 2007-02-08 | (재)한국건설시험연구소 | 말뚝 재하 시험용 재하하중 장치 |
CN103279142A (zh) * | 2013-06-19 | 2013-09-04 | 江苏建筑职业技术学院 | 一种荷载试验智能控制水箱加载方法 |
CN204849856U (zh) * | 2015-08-05 | 2015-12-09 | 陆剑 | 专用于工程桩基检测压载试验用的配重装置 |
CN205662955U (zh) * | 2016-05-04 | 2016-10-26 | 云南省建设工程质量检测中心有限公司 | 一种基桩检测装置 |
CN207829033U (zh) * | 2018-01-03 | 2018-09-07 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种分隔式橡胶水箱装置 |
-
2018
- 2018-01-03 CN CN201810005641.4A patent/CN108222081A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070017086A (ko) * | 2006-12-27 | 2007-02-08 | (재)한국건설시험연구소 | 말뚝 재하 시험용 재하하중 장치 |
CN103279142A (zh) * | 2013-06-19 | 2013-09-04 | 江苏建筑职业技术学院 | 一种荷载试验智能控制水箱加载方法 |
CN204849856U (zh) * | 2015-08-05 | 2015-12-09 | 陆剑 | 专用于工程桩基检测压载试验用的配重装置 |
CN205662955U (zh) * | 2016-05-04 | 2016-10-26 | 云南省建设工程质量检测中心有限公司 | 一种基桩检测装置 |
CN207829033U (zh) * | 2018-01-03 | 2018-09-07 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种分隔式橡胶水箱装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111350212A (zh) * | 2018-12-20 | 2020-06-30 | 中国建筑西北设计研究院有限公司 | 一种用于载荷试验的水箱结构、试验装置和试验方法 |
CN111350211A (zh) * | 2018-12-20 | 2020-06-30 | 中国建筑西北设计研究院有限公司 | 一种折叠水箱和载荷试验装置及其载荷试验方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2013375773B2 (en) | Unitary barrel of steel plate and concrete composite structure, unitary group barrel, and offshore platform | |
CN108801873B (zh) | 一种高铁不同上覆荷载及可变水压下膨胀土渗透仪及其使用方法 | |
Blondet et al. | Using industrial materials for the construction of safe adobe houses in seismic areas | |
CN103398902A (zh) | 高地应力柔性加载瞬间卸载试验装置及试验方法 | |
CN108222081A (zh) | 一种分隔式橡胶水箱装置 | |
CN103422517A (zh) | 叠加式桩身自反力平衡荷载箱 | |
CN203758840U (zh) | 锚索应力腐蚀试验装置 | |
CN207829033U (zh) | 一种分隔式橡胶水箱装置 | |
CN114252389B (zh) | 一种井壁压力腐蚀试验系统 | |
Wu et al. | Design and application of hydro-mechanical coupling test system for simulating rock masses in high dam reservoir operations | |
CN105696457B (zh) | 可更换复合板内置耗能钢板的桥墩耗能与防压碎结构 | |
CN206754793U (zh) | 一种双膜气柜储气装置 | |
Koda et al. | Lateral cyclic loading tests of a full-scale GRS integral bridge model | |
CN109556951B (zh) | 一种板裂化硬岩水下倾倒变形体力学测试装置及方法 | |
CN203639957U (zh) | 一种打入桩基础静载试验加载结构 | |
CN203164062U (zh) | 土工压缩试验用多功能液压固结仪 | |
Gu et al. | Implementation and evaluation of the underwater crack repair in the hollow concrete block of the gravity wharf | |
CN103643702B (zh) | 一种打入桩基础静载试验加载结构及其施工方法 | |
CN203414356U (zh) | 高地应力柔性加载瞬间卸载试验装置 | |
Alhassani et al. | Performance of piled raft foundation supported by either connected or unconnected piles | |
CN219450472U (zh) | 一种桥梁施工用支撑设备 | |
Wang et al. | Study of a multi-element composite foundation of concrete columns and sand columns | |
Abd-Awn et al. | Pullout capacity of single pile in gypseous soil | |
CN105672120A (zh) | 可更换复合板内置防屈曲支撑的桥墩耗能与防压碎结构 | |
Graff et al. | Bottom-Supported Concrete Platforms: Overview |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180629 |
|
RJ01 | Rejection of invention patent application after publication |