CN108222017B - A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method - Google Patents

A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method Download PDF

Info

Publication number
CN108222017B
CN108222017B CN201810104977.6A CN201810104977A CN108222017B CN 108222017 B CN108222017 B CN 108222017B CN 201810104977 A CN201810104977 A CN 201810104977A CN 108222017 B CN108222017 B CN 108222017B
Authority
CN
China
Prior art keywords
board wall
prefabricated board
profile steel
anchor pole
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810104977.6A
Other languages
Chinese (zh)
Other versions
CN108222017A (en
Inventor
高路恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhubida Technology Co.,Ltd.
Original Assignee
Nantong Textile Vocational Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Textile Vocational Technology College filed Critical Nantong Textile Vocational Technology College
Priority to CN201810104977.6A priority Critical patent/CN108222017B/en
Publication of CN108222017A publication Critical patent/CN108222017A/en
Application granted granted Critical
Publication of CN108222017B publication Critical patent/CN108222017B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Abstract

The invention discloses a kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method, construction technology process includes: (1) surveying setting-out fixed pile;(2) it is in place to hang stake, corrects;(3) H profile steel stake is set;(4) layer and section excavates, pile body processing;(5) anchor pole is set " successively, paragraph by paragraph, by root " from top to bottom;(6) high-pressure injection concrete topping;(7) it is in place to hang stake for prefabricated board wall;(8) it is inserted into reinforcing rib, and secured with the binding of prefabricated board wall protruding bar;(9) node slightly expanded concrete is perfused;(10) joint treatment;(11) step (4)-(10) construction is repeated;(12) waist beam steel bar colligation, formwork erection, filling concrete;(13) acceptance.The present invention realizes foundation pit enclosure structure system prefabricated construction, can effectively save a certain amount of duration, securely and reliably, the double action with earth-retaining and sealing.

Description

A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method
Technical field
The present invention relates to a kind of foundation pit enclosure structure construction methods, and in particular to a kind of H profile steel anchor pole composite pile-prefabricated board Wall base pit enclosure construction method.
Background technique
In deep basal pit and other underground engineering constructions, it is commonly encountered deep foundation pit support problem, excavates that difficulty is big, the duration It is long, costly, the 10%-20% of basic civil engineering total cost is typically constituted from, the cost of big deep-foundation pit engineering becomes up to 30%-40% A critically important research topic in urban construction.Cause Construction of Deep Excavation Engineering cost high the type selecting of building enclosure How one of key factor, can be under the premise of guaranteeing deep basal pit safe construction, and saving construction cost to the greatest extent is The important directions that we need to study can be recycled all or part of building enclosure and recycle, from new technical measures and work Skill novel aspects, which are broken through, has certain realistic meaning to reduction Construction of Deep Excavation Engineering cost and duration.
Summary of the invention
Goal of the invention: the present invention aiming at the shortcomings in the prior art, proposes a kind of simple to operate, safe and reliable jail Gu realizing foundation pit enclosure structure system prefabricated construction, a certain amount of duration can be effectively saved, it is dual with earth-retaining and sealing The H profile steel anchor pole composite pile of effect-prefabricated board wall base pit enclosure construction method.
A kind of technical solution: H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure structure construction side of the present invention Method, including following below scheme step:
(1) surveying setting-out fixed pile: it is accurate first to survey the plan-position for setting H profile steel stake before foundation pit system construction, it puts down Surface error controls within 5mm, every H-type steel pile position is surveyed set after, carry out the safeguard measure in site, prevent it is artificial because Element influences the position deviation after later period pile body is set;
(2) it is in place to hang stake, corrects: before H profile steel stake is set, pile body being hung according to the pile cutoff that plant design makes rise just first Position, and the plan-position in site is checked, it waits pile body to set, the stake site for occurring more than design and code requirement is rectified in time Overgauge;
(3) H profile steel stake is set: the H profile steel stake of use makes in factory's centralized production, when live H profile steel stake is set, uses Static piling construction, 2m pile body of inspection is often set when pile body is set sets plane and perpendicularity deviation, wherein vertically Deviation control is spent within 1%, is corrected to there is the pile body that perpendicularity deviation is more than 1%, the pile pulling grout if being difficult to correct It beats again;
(4) layer and section excavates, and pile body processing: H profile steel stake, which is set, to be finished, layer and section excavation pit soil layer, every layer of digging Native depth is 2-3m, and the sand big for moisture content, silt, every layer of excavation thickness control is within 2m, soil layer stage excavation mistake Cheng Zhong, pile body are reinforced anchor pole and are set immediately, and side is cut the earth, while anchor pole is set, to reinforce the globality between pile body and soil layer;Separately On the one hand, anchor pole is cleaned out the attached soil of pile body, with cutting the earth before pile body is set on outer side wing edge plate in H profile steel stake in time Reserved bolthole in the soil body remove clean, in the case where there is boulder subcase, further to remove clean, use when necessary Drilling machine auxiliary cleaning;
(5) " successively, paragraph by paragraph, by root " sets anchor pole from top to bottom: anchor pole set follow from top to bottom " successively, paragraph by paragraph, by Root " is set, and in work progress, soil layer, which is excavated, sets two good harmony of work holding, strict control soil with pile body anchor pole The depth that layer excavates, there is not allowed that phenomenon of backbreaking;
(6) high-pressure injection concrete topping: to enhance the harmony of entire structural protective system stress and reaching water proof Effect sprays one of concrete topping on excavating soil layer vertical plane using high-pressure spray gun before hoisting prefabricated board wall, while The thickness of gunite concrete surface layer is depending on practical the case where excavating situation and the installation of prefabricated board wall later period in excavation face;
(7) it is in place to hang stake for prefabricated board wall: prefabricated board wall is prefabricated using producing in factory's centrality, effectively realizes assembled Application of the building technology in foundation pit enclosure, the prefabricated board wall of bottom of foundation ditch first segment lift, lower part in place from top vertical lifting The prefabricated board wall of human assistance is needed to nest into adjacent two H profile steels stake when the prefabricated board wall lifting of other sections;If foundation excavation is deep When degree≤6m, in the case where ensuring H profile steel stake earth-retaining bearing capacity, by all sections of prefabricated board wall from top lifting construction, Prefabricated board wall is excavated with soil layer, is sunk paragraph by paragraph in place by self weight and the heavy load set of upper end board wall lifting, two sections of left and right is pre- There are the rear pouring concrete section of 250-350mm between making sheet wall, after the adjacent two prefabricated board wall reinforcing bar in left and right that pours in section reliably connect It connects;
(8) it is inserted into reinforcing rib, and secured with the binding of prefabricated board wall protruding bar: for the globality for enhancing building enclosure, to After prefabricated board wall lifting construction in foundation pit, reinforcing rib is inserted at the connecting node between prefabricated board wall and H profile steel stake, The binding of the protruding bar of reinforcing rib and prefabricated board wall is secured;
(9) node slightly expanded concrete is perfused: in work progress, being filled at the node between H profile steel stake and prefabricated board wall Node slightly expanded concrete is infused, node concrete intensity is not less than C40, and than prefabricated board wall concrete strength at least high one etc. Grade;
(10) joint treatment: after to all of above work construction, to the tightness degree between prefabricated board wall and soil layer It is checked comprehensively, if find that prefabricated board wall and soil layer seam occur local untight, modulation cement mortar is filled Envelope, the intensity of cement mortar are not less than M15, and mortar slump controls between 100-150mm;
(11) step (4)-(10) construction is repeated;
(12) waist beam steel bar colligation, formwork erection, filling concrete: when the prefabricated board wall construction of two sections finishes, upper One cast-in-situ steel reinforced concrete waist rail is set between lower two sections of prefabricated board walls, waist rail reinforcing bar and prefabricated board wall protruding bar have connection, Waist rail longitudinal reinforcement uses the above steel of second level of diameter 8mm using the above reinforcing bar of three-level for being no less than 4 and diameter 20mm, stirrup Muscle, stirrup spacing is not more than 200mm, and in waist rail reinforcing bar process of binding, the prefabricated board wall protruding bar of two sections is anchored into waist rail Length be not less than 1.5LaE, waist rail reinforcing bar is welded at H profile steel stake using welding method and H profile steel stake web;
(13) acceptance.
Further, in step (3) under the premise of meeting foundation pit bearing capacity calculation, the edge of a wing board width of H profile steel stake is not It obtains and is less than 350mm, edge of a wing plate thickness is not less than 20mm, and the web height of H profile steel stake is bigger than the thickness of the prefabricated board wall of use 60mm, in order to the piecewise lifting construction of prefabricated board wall, while the web thickness of H profile steel stake is not less than 30mm.
Further, pile cutoff connection uses welded connecting in step (3).
It further, is the construction convenient for anchor pole in step (5), anchor pole replaces conventional anchor using steel strand wires, and anchor pole is straight Diameter is at least 10mm smaller than the preformed hole on flange plate on the inside of H profile steel stake, or using the opposite position of outer side wing edge plate in H profile steel stake The preformed hole for setting anchor bolt construction is stayed at the place of setting, and facilitates setting for later period anchor pole, and the preformed hole on interior outer side wing edge plate at least compares anchor The big 10mm of shank diameter.
Further, the design thickness of prefabricated board wall is not less than 100mm in step (7), and every section of board wall design width should compare Small (0.5 × H profile steel stake edge of a wing board width+50) mm of spacing between two neighboring H profile steel stake web.
Further, reinforcing rib diameter is not less than 20mm, and no less than 2 in step (8).
Further, in step (12) after the adjacent two sections of prefabricated board walls in left and right at pouring concrete, waist rail stirrup needs to encrypt, Encrypted area is not less than 600mm, and encrypted area stirrup spacing is not more than 100mm.
Further, in step (12) waist rail reinforcing bar at H profile steel stake using on H profile steel stake web preformed hole side Method, setting diameter are connected and fixed not less than the perforation reinforcing bar of 16mm with prefabricated board wall protruding bar, the radical of reinforcing bar of perforating according to Practical Project concrete condition is determined by calculation.
The utility model has the advantages that operation of the present invention is simple and convenient, and it is safe and reliable secured, realize foundation pit enclosure structure system assembling Construction, can effectively save a certain amount of duration, the double action with earth-retaining and sealing.
Specific embodiment
The present invention is further explained in the light of specific embodiments.
Embodiment
A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method, including following below scheme step:
(1) surveying setting-out fixed pile: it is accurate first to survey the plan-position for setting H profile steel stake before foundation pit system construction, it puts down Surface error controls within 5mm, every H-type steel pile position is surveyed set after, carry out the safeguard measure in site, prevent it is artificial because Element influences the position deviation after later period pile body is set;
(2) it is in place to hang stake, corrects: before H profile steel stake is set, pile body being hung according to the pile cutoff that plant design makes rise just first Position, and the plan-position in site is checked, it waits pile body to set, the stake site for occurring more than design and code requirement is rectified in time Overgauge;
(3) H profile steel stake is set: the H profile steel stake of use makes in factory's centralized production, when live H profile steel stake is set, uses Static piling construction, 2m pile body of inspection is often set when pile body is set sets plane and perpendicularity deviation, wherein vertically Deviation control is spent within 1%, is corrected to there is the pile body that perpendicularity deviation is more than 1%, the pile pulling grout if being difficult to correct It beats again;
Under the premise of meeting foundation pit bearing capacity calculation, the edge of a wing board width of H profile steel stake cannot be less than 350mm, flange plate Thickness is not less than 20mm, and the web height of H profile steel stake is 60mm bigger than the thickness of the prefabricated board wall of use, in order to prefabricated board wall Piecewise lifting construction, while the web thickness of H profile steel stake is not less than 30mm.Pile cutoff connection is using welded connecting.
(4) layer and section excavates, and pile body processing: H profile steel stake, which is set, to be finished, layer and section excavation pit soil layer, every layer of digging Native depth is 2-3m, and the sand big for moisture content, silt, every layer of excavation thickness control is within 2m, soil layer stage excavation mistake Cheng Zhong, pile body are reinforced anchor pole and are set immediately, and side is cut the earth, while anchor pole is set, to reinforce the globality between pile body and soil layer;Separately On the one hand, anchor pole is cleaned out the attached soil of pile body, with cutting the earth before pile body is set on outer side wing edge plate in H profile steel stake in time Reserved bolthole in the soil body remove clean, in the case where there is boulder subcase, further to remove clean, use when necessary Drilling machine auxiliary cleaning;
(5) " successively, paragraph by paragraph, by root " sets anchor pole from top to bottom: anchor pole set follow from top to bottom " successively, paragraph by paragraph, by Root " is set, and in work progress, soil layer, which is excavated, sets two good harmony of work holding, strict control soil with pile body anchor pole The depth that layer excavates, there is not allowed that phenomenon of backbreaking;
For the construction convenient for anchor pole, anchor pole replaces conventional anchor using steel strand wires, and bolt diameter is at least than on the inside of H profile steel stake The small 10mm of preformed hole on flange plate, or anchor bolt construction is set using staying at outer side wing edge plate relative position in H profile steel stake Preformed hole, facilitate setting for later period anchor pole, the preformed hole on interior outer side wing edge plate is at least 10mm bigger than bolt diameter.
(6) high-pressure injection concrete topping: to enhance the harmony of entire structural protective system stress and reaching water proof Effect sprays one of concrete topping on excavating soil layer vertical plane using high-pressure spray gun before hoisting prefabricated board wall, while The thickness of gunite concrete surface layer is depending on practical the case where excavating situation and the installation of prefabricated board wall later period in excavation face;
(7) it is in place to hang stake for prefabricated board wall: prefabricated board wall is prefabricated using producing in factory's centrality, effectively realizes assembled Application of the building technology in foundation pit enclosure, the prefabricated board wall of bottom of foundation ditch first segment lift, lower part in place from top vertical lifting The prefabricated board wall of human assistance is needed to nest into adjacent two H profile steels stake when the prefabricated board wall lifting of other sections;If foundation excavation is deep When degree≤6m, in the case where ensuring H profile steel stake earth-retaining bearing capacity, by all sections of prefabricated board wall from top lifting construction, Prefabricated board wall is excavated with soil layer, is sunk paragraph by paragraph in place by self weight and the heavy load set of upper end board wall lifting, two sections of left and right is pre- There are the rear pouring concrete section of 250-350mm between making sheet wall, after the adjacent two prefabricated board wall reinforcing bar in left and right that pours in section reliably connect It connects;
The design thickness of prefabricated board wall is not less than 100mm, and every section of board wall design width should be than two neighboring H profile steel stake web Between small (0.5 × H profile steel stake edge of a wing board width+50) mm of spacing.
(8) it is inserted into reinforcing rib, and secured with the binding of prefabricated board wall protruding bar: for the globality for enhancing building enclosure, to After prefabricated board wall lifting construction in foundation pit, reinforcing rib is inserted at the connecting node between prefabricated board wall and H profile steel stake, The binding of the protruding bar of reinforcing rib and prefabricated board wall is secured;Reinforcing rib diameter is not less than 20mm, and no less than 2.
(9) node slightly expanded concrete is perfused: in work progress, being filled at the node between H profile steel stake and prefabricated board wall Node slightly expanded concrete is infused, node concrete intensity is not less than C40, and than prefabricated board wall concrete strength at least high one etc. Grade;
(10) joint treatment: after to all of above work construction, to the tightness degree between prefabricated board wall and soil layer It is checked comprehensively, if find that prefabricated board wall and soil layer seam occur local untight, modulation cement mortar is filled Envelope, the intensity of cement mortar are not less than M15, and mortar slump controls between 100-150mm;
(11) step (4)-(10) construction is repeated;
(12) waist beam steel bar colligation, formwork erection, filling concrete: when the prefabricated board wall construction of two sections finishes, upper One cast-in-situ steel reinforced concrete waist rail is set between lower two sections of prefabricated board walls, waist rail reinforcing bar and prefabricated board wall protruding bar have connection, Waist rail longitudinal reinforcement uses the above steel of second level of diameter 8mm using the above reinforcing bar of three-level for being no less than 4 and diameter 20mm, stirrup Muscle, stirrup spacing is not more than 200mm, and in waist rail reinforcing bar process of binding, the prefabricated board wall protruding bar of two sections is anchored into waist rail Length be not less than 1.5LaE, waist rail reinforcing bar is welded at H profile steel stake using welding method and H profile steel stake web;
After the adjacent two sections of prefabricated board walls in left and right at pouring concrete, waist rail stirrup needs to encrypt, and encrypted area is not less than 600mm, Encrypted area stirrup spacing is not more than 100mm.The method that waist rail reinforcing bar uses the preformed hole on H profile steel stake web at H profile steel stake, Perforation reinforcing bar of the diameter not less than 16mm is arranged to be connected and fixed with prefabricated board wall protruding bar, the radical for reinforcing bar of perforating is according to reality Engineering concrete condition is determined by calculation.
(13) acceptance.
Operation of the present invention is simple and convenient, safe and reliable secured, realizes foundation pit enclosure structure system prefabricated construction, can have Effect saves a certain amount of duration, the double action with earth-retaining and sealing.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, though So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, but anything that does not depart from the technical scheme of the invention content, according to the technical essence of the invention Any simple modification, equivalent change and modification to the above embodiments, all of which are still within the scope of the technical scheme of the invention.

Claims (7)

1. a kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method, it is characterised in that: including to flow down Journey step:
(1) surveying setting-out fixed pile: before foundation pit system construction, accurate first to survey the plan-position for setting H profile steel stake, plane is missed Difference control after every H-type steel pile position survey is set, carries out the safeguard measure in site, prevents human factor shadow within 5mm Ring the position deviation after later period pile body is set;
(2) it is in place to hang stake, corrects: before H profile steel stake is set, pile body being hung according to the pile cutoff that plant design makes rise in place first, And the plan-position in site is checked, it waits pile body to set, the stake site for occurring more than design and code requirement is corrected in time Deviation;
(3) H profile steel stake is set: the H profile steel stake of use makes in factory's centralized production, when live H profile steel stake is set, using static(al) The construction of piling method, 2m pile body of inspection is often set when pile body is set sets plane and perpendicularity deviation, and wherein verticality is inclined Difference control is corrected, the pile pulling grout weight if being difficult to correct within 1% to there is the pile body that perpendicularity deviation is more than 1% It beats;
(4) layer and section excavates, and pile body processing: H profile steel stake, which is set, to be finished, layer and section excavation pit soil layer, and every layer of shoveling is deep Degree is 2-3m, and the sand big for moisture content, silt, every layer of excavation thickness control is within 2m, during soil layer stage excavation, Pile body is reinforced anchor pole and is set immediately, and side is cut the earth, while anchor pole is set, to reinforce the globality between pile body and soil layer;Another party Face, anchor pole are cleaned out the attached soil of pile body, with cutting the earth before pile body is set to pre- on outer side wing edge plate in H profile steel stake in time It stays the soil body in bolthole to remove clean, in the case where there is boulder subcase, further to remove completely, use drilling machine when necessary Auxiliary cleaning;
(5) set anchor pole " successively, paragraph by paragraph, by root " from top to bottom: anchor pole, which is set, to be followed from top to bottom " successively, paragraph by paragraph, by root " It sets, in work progress, soil layer, which is excavated, sets two good harmony of work holding with pile body anchor pole, and strict control soil layer is opened The depth of digging, there is not allowed that phenomenon of backbreaking;
(6) high-pressure injection concrete topping: to enhance the harmony of entire structural protective system stress and reaching water proof effect, Before hoisting prefabricated board wall, one of concrete topping is sprayed on excavating soil layer vertical plane using high-pressure spray gun, while excavating The thickness of gunite concrete surface layer is depending on practical the case where excavating situation and the installation of prefabricated board wall later period on face;
(7) it is in place to hang stake for prefabricated board wall: prefabricated board wall is prefabricated using producing in factory's centrality, effectively realizes assembled construction Application of the technology in foundation pit enclosure, the prefabricated board wall lifting of bottom of foundation ditch first segment is in place from top vertical lifting, lower part other The prefabricated board wall of human assistance is needed to nest into adjacent two H profile steels stake when the prefabricated board wall lifting of section;If foundation excavation Shen Du≤ It is prefabricated by all sections of prefabricated board wall from top lifting construction in the case where ensuring H profile steel stake earth-retaining bearing capacity when 6m Board wall is excavated with soil layer, is sunk paragraph by paragraph in place by self weight and the heavy load set of upper end board wall lifting, the two sections of prefabricated boards in left and right There are the rear pouring concrete section of 250-350mm between wall, after the adjacent two prefabricated board wall reinforcing bar in left and right that pours in section be reliably connected;
(8) it is inserted into reinforcing rib, and secured with the binding of prefabricated board wall protruding bar: for the globality for enhancing building enclosure, to foundation pit After interior prefabricated board wall lifting construction, it is inserted into reinforcing rib at the connecting node between prefabricated board wall and H profile steel stake, reinforces The binding of the protruding bar of muscle and prefabricated board wall is secured;
(9) node slightly expanded concrete is perfused: in work progress, section being perfused at the node between H profile steel stake and prefabricated board wall Point slightly expanded concrete, node concrete intensity are not less than C40, and a grade at least higher than prefabricated board wall concrete strength;
(10) joint treatment: after to all of above work construction, the tightness degree between prefabricated board wall and soil layer is carried out It checks comprehensively, if find that prefabricated board wall and soil layer seam occur local untight, modulation cement mortar is potted, water The intensity of cement mortar is not less than M15, and mortar slump controls between 100-150mm;
(11) step (4)-(10) construction is repeated;
(12) waist beam steel bar colligation, formwork erection, filling concrete: when the prefabricated board wall construction of two sections finishes, upper and lower two One cast-in-situ steel reinforced concrete waist rail is set between the prefabricated board wall of section, and waist rail reinforcing bar and prefabricated board wall protruding bar have connection, waist rail Longitudinal reinforcement uses the above reinforcing bar of second level of diameter 8mm using the above reinforcing bar of three-level for being no less than 4 and diameter 20mm, stirrup, Stirrup spacing is not more than 200mm, and in waist rail reinforcing bar process of binding, the prefabricated board wall protruding bar of two sections anchors into the length in waist rail Degree is not less than 1.5LaE, and waist rail reinforcing bar is welded at H profile steel stake using welding method and H profile steel stake web;
(13) acceptance.
2. a kind of H profile steel anchor pole composite pile according to claim 1-prefabricated board wall base pit enclosure construction method, Be characterized in that: in the step (3) under the premise of meeting foundation pit bearing capacity calculation, the edge of a wing board width of H profile steel stake must not be small In 350mm, edge of a wing plate thickness is not less than 20mm, and the web height of H profile steel stake is 60mm bigger than the thickness of the prefabricated board wall of use, with Convenient for the piecewise lifting construction of prefabricated board wall, while the web thickness of H profile steel stake is not less than 30mm.
3. a kind of H profile steel anchor pole composite pile according to claim 1-prefabricated board wall base pit enclosure construction method, Be characterized in that: pile cutoff connection is using welded connecting in the step (3).
4. a kind of H profile steel anchor pole composite pile according to claim 1-prefabricated board wall base pit enclosure construction method, It is characterized in that: being the construction convenient for anchor pole in the step (5), anchor pole replaces conventional anchor using steel strand wires, and bolt diameter is extremely It is few 10mm smaller than the preformed hole on flange plate on the inside of H profile steel stake, or use in H profile steel stake at outer side wing edge plate relative position The preformed hole for setting anchor bolt construction is stayed, setting for later period anchor pole is facilitated, the preformed hole on interior outer side wing edge plate is at least more straight than anchor pole The big 10mm of diameter.
5. a kind of H profile steel anchor pole composite pile according to claim 1-prefabricated board wall base pit enclosure construction method, Be characterized in that: reinforcing rib diameter is not less than 20mm, and no less than 2 in the step (8).
6. a kind of H profile steel anchor pole composite pile according to claim 1-prefabricated board wall base pit enclosure construction method, Be characterized in that: in the step (12) after the adjacent two sections of prefabricated board walls in left and right at pouring concrete, waist rail stirrup needs to encrypt, encryption Area is not less than 600mm, and encrypted area stirrup spacing is not more than 100mm.
7. a kind of H profile steel anchor pole composite pile according to claim 1-prefabricated board wall base pit enclosure construction method, It is characterized in that: the method that waist rail reinforcing bar uses the preformed hole on H profile steel stake web at H profile steel stake in the step (12), if It sets perforation reinforcing bar of the diameter not less than 16mm to be connected and fixed with prefabricated board wall protruding bar, the radical for reinforcing bar of perforating is according to practical work Journey concrete condition is determined by calculation.
CN201810104977.6A 2018-02-02 2018-02-02 A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method Active CN108222017B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810104977.6A CN108222017B (en) 2018-02-02 2018-02-02 A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810104977.6A CN108222017B (en) 2018-02-02 2018-02-02 A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method

Publications (2)

Publication Number Publication Date
CN108222017A CN108222017A (en) 2018-06-29
CN108222017B true CN108222017B (en) 2019-11-26

Family

ID=62669315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810104977.6A Active CN108222017B (en) 2018-02-02 2018-02-02 A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method

Country Status (1)

Country Link
CN (1) CN108222017B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808696A (en) * 2022-05-07 2022-07-29 广西欣港交通投资有限公司 Prefabricated and cast-in-place combined anchorage foundation enclosure structure and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4003207A (en) * 1974-12-19 1977-01-18 Ludwig Muller Method of and device for anchoring a reinforcement beam to a sheet piling
KR20110129657A (en) * 2010-05-26 2011-12-02 이득근 Retaining wall using frame structure and method of making retaining wall using thereof
CN105274998A (en) * 2015-11-19 2016-01-27 杭州江润科技有限公司 Construction method of assembled pile-plate-anchor-beam combination type batholith support
CN105464128A (en) * 2015-12-21 2016-04-06 上海嘉实(集团)有限公司 Assembly-type protective construction method for slab-pile wall through pre-stressed anchor cables
CN106498950A (en) * 2016-12-21 2017-03-15 大连交通大学 Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN107059882A (en) * 2017-04-17 2017-08-18 燕山大学 Arch anchor net and Anchor-Pile Retaining Structure structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4003207A (en) * 1974-12-19 1977-01-18 Ludwig Muller Method of and device for anchoring a reinforcement beam to a sheet piling
KR20110129657A (en) * 2010-05-26 2011-12-02 이득근 Retaining wall using frame structure and method of making retaining wall using thereof
CN105274998A (en) * 2015-11-19 2016-01-27 杭州江润科技有限公司 Construction method of assembled pile-plate-anchor-beam combination type batholith support
CN105464128A (en) * 2015-12-21 2016-04-06 上海嘉实(集团)有限公司 Assembly-type protective construction method for slab-pile wall through pre-stressed anchor cables
CN106498950A (en) * 2016-12-21 2017-03-15 大连交通大学 Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN107059882A (en) * 2017-04-17 2017-08-18 燕山大学 Arch anchor net and Anchor-Pile Retaining Structure structure

Also Published As

Publication number Publication date
CN108222017A (en) 2018-06-29

Similar Documents

Publication Publication Date Title
CN106907161B (en) A kind of tunnel slope caunches special construction method
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
CN112127900B (en) Construction method for hidden half-wall and half-arch protection structure of exposed arch of shallow-buried bias tunnel penetrating through accumulation body
CN102606162A (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN107605489A (en) Three line Large span tunnel inclined shafts enter positive cavity construction method
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN211144503U (en) High steep topography bridge tunnel meets section open cut tunnel and connects long structure
CN109630127A (en) A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft
CN107859523A (en) A kind of asymmetric supporting construction of Unevenly-pressured shallow tunnel and construction method
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN107700474A (en) A kind of existing construction foundation reinforcement means and campshed formula diaphram wall
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN206888994U (en) A kind of inclined shaft two serves as a contrast and pilot tunnel caunches device
CN108222017B (en) A kind of H profile steel anchor pole composite pile-prefabricated board wall base pit enclosure construction method
CN213574100U (en) Pass shallow dark half-wall semi-arch protection structure of making of bias voltage tunnel of burying of accumulation body
CN206800370U (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove
CN207554062U (en) A kind of asymmetric supporting construction of Unevenly-pressured shallow tunnel
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN203373753U (en) Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches
CN105840209A (en) Construction method for controlling deformation of anchor piles at barrel segment of tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231008

Address after: 230000 B-2704, wo Yuan Garden, 81 Ganquan Road, Shushan District, Hefei, Anhui.

Patentee after: HEFEI LONGZHI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Address before: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee before: Dragon totem Technology (Hefei) Co.,Ltd.

Effective date of registration: 20231008

Address after: 230000 floor 1, building 2, phase I, e-commerce Park, Jinggang Road, Shushan Economic Development Zone, Hefei City, Anhui Province

Patentee after: Dragon totem Technology (Hefei) Co.,Ltd.

Address before: 226000 No. 87 Youth Middle Road, Nantong City, Jiangsu Province

Patentee before: JIANGSU College OF ENGINEERING AND TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240407

Address after: 712000 meters north of Provincial Road 208, Zhengfeng Village, Xiyang Town, Sanyuan County, Xianyang City, Shaanxi Province

Patentee after: Shaanxi Zhubida Technology Co.,Ltd.

Country or region after: China

Address before: 230000 B-2704, wo Yuan Garden, 81 Ganquan Road, Shushan District, Hefei, Anhui.

Patentee before: HEFEI LONGZHI ELECTROMECHANICAL TECHNOLOGY Co.,Ltd.

Country or region before: China