CN108221949A - Double glue mend film device and method to a kind of vacuum preloading under water - Google Patents
Double glue mend film device and method to a kind of vacuum preloading under water Download PDFInfo
- Publication number
- CN108221949A CN108221949A CN201810106799.0A CN201810106799A CN108221949A CN 108221949 A CN108221949 A CN 108221949A CN 201810106799 A CN201810106799 A CN 201810106799A CN 108221949 A CN108221949 A CN 108221949A
- Authority
- CN
- China
- Prior art keywords
- film
- diaphragm
- pressuring diaphragm
- under water
- spanner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 76
- 239000003292 glue Substances 0.000 title claims abstract description 67
- 238000000034 method Methods 0.000 title claims abstract description 33
- 239000004744 fabric Substances 0.000 claims abstract description 48
- 239000004576 sand Substances 0.000 claims abstract description 11
- 238000004026 adhesive bonding Methods 0.000 claims abstract description 5
- 230000009471 action Effects 0.000 claims description 3
- 239000012530 fluid Substances 0.000 claims description 2
- 239000000565 sealant Substances 0.000 claims description 2
- 241000209094 Oryza Species 0.000 claims 2
- 235000007164 Oryza sativa Nutrition 0.000 claims 2
- 235000009566 rice Nutrition 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 13
- 230000008901 benefit Effects 0.000 abstract description 11
- 230000000694 effects Effects 0.000 description 20
- 238000007789 sealing Methods 0.000 description 8
- 230000008439 repair process Effects 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 239000012528 membrane Substances 0.000 description 5
- 238000003825 pressing Methods 0.000 description 5
- 229910000838 Al alloy Inorganic materials 0.000 description 4
- 230000009189 diving Effects 0.000 description 4
- 230000001154 acute effect Effects 0.000 description 3
- 239000000956 alloy Substances 0.000 description 3
- 230000002742 anti-folding effect Effects 0.000 description 3
- 239000007788 liquid Substances 0.000 description 3
- 230000035882 stress Effects 0.000 description 3
- 239000004927 clay Substances 0.000 description 2
- 239000004746 geotextile Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000005201 scrubbing Methods 0.000 description 2
- 206010003445 Ascites Diseases 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000003900 soil pollution Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
Abstract
The invention discloses a kind of vacuum preloading, double glue mend film method under water, include the following steps:First flexible cloth pad and repairing film are shakeout, and fixed with geometrical clamp on pressuring diaphragm;With towel wiped clean, and being blocked holes filling with sand hill under water at hole;Vacuum diaphragm glue special is coated in the middle part of the lower section of repairing film, and underwater special seal gum is coated in the lower section surrounding of repairing film;Finally gluing at film merging hole will be repaired with pressuring diaphragm.The invention also discloses a kind of vacuum preloading, double glue mend film device under water, and including pressuring diaphragm, the bottom surface of the pressuring diaphragm is square, and both sides are respectively arranged with geometrical clamp, and the top of the pressuring diaphragm is equipped with barre, and the barre is flexibly connected with pressuring diaphragm.Using above device and its film method is mended, advantage is:Construction is simple will not cause claim for eot and construction cost significantly to increase;It can efficiently solve simultaneously and cover underwater benefit film problem of the water depth more than 0.3 meter or more.
Description
Technical field
The invention belongs to vacuum method soft foundation processing technical fields, are about a kind of vacuum preloading water specifically
Lower pair of glue mends film device and method.
Background technology
Vacuum method is to reinforce the effective ways of Soft Clay Foundation, in the treatment of soft foundation engineering of China's Coastal Areas
It is used widely.Effective sealing of earth's surface diaphragm seal is to obtain necessary condition that is lasting, stablizing vacuum degree, only guaranteed sealing
The sealing of film just can guarantee the effect and quality of vacuum preloading, so the leakproofness of diaphragm seal is vacuum preloading quality control
It is crucial.Vacuum preloading operation has following features:1st, vacuum pressure is big:Under-membrance vacuum degree generally reaches more than 80kPa, normal conditions
Under, vacuum preloading can be designed to cover water vacuum preloading, i.e., when under-membrance vacuum degree reaches design requirement to improve vacuum preloading quality
Afterwards, certain thickness water is covered on film toward contact, on the one hand increases upper load, on the other hand protect diaphragm seal, prevent
Film is because being exposed to the sun, severe cold due to aging rupture;2nd, suction surface domain is wide:The area of every piece of diaphragm seal is at 20,000 square metres or so;3rd, during vacuum
Between it is long:Essentially 3 months or so;4th, vacuum environment is complicated:Substantially vacuum is to carry out under field conditions (factors), have pedestrian, machinery,
The various external conditions such as weather, geological condition influence, and environment are caused to influence big.
Be based on more than feature, during vacuum preloading diaphragm seal rupture gas leakage can hardly be avoided.And once diaphragm seal ruptures, and will cause
Vacuum preloading fails.Therefore, the patch work of diaphragm seal is extremely important, once finding that diaphragm seal has rupture, should be repaiied in time
It is multiple, to ensure vacuum degree and construction quality.
There are mainly four types of the method for repairing and mending of existing diaphragm seal:
First, not covering water on film, conventional vacuum can be taken to mend membrane technology, be as follows:1st, it finds at hole
(under normal conditions, the hole of diaphragm seal is less than 10cm), about 30cm is cut off with blade, while optionally cut off geotextiles under film,
Such as vacuum suction forms pit-hole, it is preferably with clay that pit-hole is plain, and repair geotextiles covering;2nd, by double-layer seal at hole
Film must not have soil pollution and water stain residual respectively with paper handkerchief by its wiped clean;3rd, two pieces are cut respectively with scissors at least to cover
Hole periphery 20cm circles mend film, and hole film side and benefit film are coated vacuum diaphragm glue special respectively;4th, film difference is mended by two pieces
It mends inside and outside double fenestra holes, overlapping together, air-dries.
Water is covered second is that having on film, need to carry out mending film under water, sluicing method can be taken.This method is:Water whole will be covered in cofferdam
It takes away, leaks out film surface, then operated by above-mentioned conventional membrane technology of mending, after the completion of repairing, the ascites on diaphragm seal, insufficient again
Part is:A, claim for eot is caused;B, construction cost is high.
Water is covered third, having on film, need to carry out mending film under water, cofferdam method can be taken.This method is:Sand hill is used around hole
Water proof cofferdam has been built with earth bag, cofferdam internal water accumulation has been excluded, has been leaked out at diaphragm seal hole, has then routinely mended membrane technology operation,
Cofferdam is removed after repairing.Disadvantage is that:It is no longer applicable in when a, covering water more than 0.5 meter, the scope of application is small;B, water 0.3- is covered
At 0.5 meter, cofferdam water proof effect is poor, has ponding in cofferdam when mending film, and benefit film quality is caused to be difficult to ensure that;3rd, ability after draining is needed
Film is mended, is easy to cause delay duration of a project, the consequence for improving project cost.
Water is covered fourth, having on film, need to carry out mending film under water, diving method can be taken.This method for send someone to dive into the water shakeout it is soft
Property cloth pad and repairing film, mend film with conventional membrane technology of mending.Disadvantage is that:A, vacuum diaphragm glue special is having regimen condition
Under, 30% or so effect can only be played, it is ineffective to mend film;B, due to there is vacuum suction effect at hole, current scour is aspirated
Under effect, diaphragm seal is difficult to gluing with repairing film;C, winter submarine temperatures are low, therefore diving under water mends film constructional difficulties.
As it can be seen that existing vacuum preloading mend under water film method there are claim for eot, construction cost is high, mends film quality to be difficult to protect
The problem of card etc., it is therefore necessary to be improved.
Invention content
First purpose of the present invention is to provide a kind of vacuum preloading, and double glue mend film method under water, to solve existing vacuum
The problem of precompressed is mended that film method claim for eot, construction cost are high, mend film quality and is difficult to ensure that etc. under water.Second mesh of the present invention
A kind of vacuum preloading that is to provide double glue mend film devices under water, mended under water after film needs first draining with solving existing vacuum preloading
Film is mended again and mends the problem of film quality is difficult to ensure that.
To achieve the above object, the present invention uses following technical scheme:
Double glue mend film method to a kind of vacuum preloading under water, include the following steps:
Step A, flexible cloth pad and repairing film are shakeout, and fixed with geometrical clamp on pressuring diaphragm;
Step B, with towel wiped clean, and being blocked holes filling with sand hill under water at hole;
Step C, vacuum diaphragm glue special is coated in the middle part of the lower section of repairing film, and water is coated in the lower section surrounding of repairing film
Lower special seal gum so that underwater special seal gum is enclosed in the outside of vacuum diaphragm glue special, can be effectively isolated water to true
The effect of scrubbing of empty film glue special improves the underwater of vacuum diaphragm glue special and mends film effect;
Step D, gluing at film merging hole will be repaired with pressuring diaphragm, and will make repairing film close with waiting to mend under the action of pressuring diaphragm
Sealer is glued integral.
According to the present invention, the bottom surface of the pressuring diaphragm is square, and both sides are respectively arranged with geometrical clamp, are set above pressuring diaphragm
There is barre, push down hole for film and flexible cloth pad will to be repaired, the barre is flexibly connected with pressuring diaphragm.
According to the present invention, the geometrical clamp includes dop, Spring Card spanner, spring and spanner locator, and the dop is set
In on pressuring diaphragm, and it is parallel with pressuring diaphragm, for clamping repairing film and flexible cloth pad, the dop is connect with Spring Card spanner,
The lower section of the Spring Card spanner is equipped with the spring, under natural conditions, a β is formed between the Spring Card spanner and pressuring diaphragm
Angle, the spanner locator are equipped with a card slot, and the card slot matches with the Spring Card spanner.When spring is in nature shape
During state, Spring Card spanner drives dop to clamp repairing film and flexible cloth pad under the action of elastic force;When pressing Spring Card spanner, and
When Spring Card spanner is caught in the card slot of spanner locator, the dop rises, and the clamping face formed between pressuring diaphragm is opened,
Dop will unclamp repairing film and flexible cloth pad at this time.
Preferably, the β angles are acute angle.
Preferably, the dop fixes dop for flute profile, convenient for clamping repairing film and flexible cloth pad.
Preferably, the bottom surface of the pressuring diaphragm is square.
Further, the length of side of the pressuring diaphragm is 40cm-60cm, and the pressuring diaphragm uses aluminum alloy material.
Further, a length of 1.5-2.5 meters of the barre, the relatively good pressing pressuring diaphragm of the length.
Preferably, when pressuring diaphragm pushes down diaphragm seal to be repaired, the length of barre is at least higher by 50cm than the water surface, is convenient for
Staff on pneumatic float presses pressuring diaphragm.
Further, the top of the pressuring diaphragm is substantially in cone, and both sides are low, intermediate height, and the upper center of pressuring diaphragm is lived
It is dynamic to be connected with the barre, make pressuring diaphragm stress balance, while play the role of anti-folding.
According to the present invention, the length of side of the flexibility cloth pad and repairing film is bigger 10-20cm than the length of side of pressuring diaphragm respectively.It uses
Before, first flexible cloth pad and the additional part of repairing film are sandwiched on geometrical clamp, convenient for shakeouing flexible cloth pad and repairing film.It uses
When, first will cementing 10 minutes of repairing film and diaphragm seal to be repaired, then with foot press Spring Card spanner, and Spring Card spanner is consolidated
It is scheduled in the card slot of spanner locator, at this point, the dop of geometrical clamp is in releasing orientation, i.e., repairing film is in pressuring diaphragm and detaches
State, directly lifts the barre on pressuring diaphragm, and pressuring diaphragm can be just kept completely separate with repairing film and flexible cloth pad.
According to the present invention, before being blocked holes filling with sand hill of step B, further include and filled with braided fabrics such as woven bags
Hole, sand hill can not be filled up completely hole during solving the problem of that hole is excessive too deep.
Further, when loosening with worm hole phenomenon occurs in the gluing of step D, the step D is further included with underwater special
Glue rifle is repaired.
Double glue mend film device to a kind of vacuum preloading under water, and including pressuring diaphragm, the bottom surface of the pressuring diaphragm is square, both sides point
Geometrical clamp is not provided with, for flexible cloth pad and repairing film to be fixed on pressuring diaphragm, the top of the pressuring diaphragm is equipped with barre,
Hole is lived for membrane pressure will to be repaired, the barre is flexibly connected with pressuring diaphragm.
According to the present invention, the geometrical clamp includes dop, Spring Card spanner, spring and spanner locator, and the dop is set
In on pressuring diaphragm, and it is parallel with pressuring diaphragm, for clamping repairing film and flexible cloth pad, the dop is connect with Spring Card spanner,
The lower section of the Spring Card spanner is equipped with the spring, under natural conditions, a β is formed between the Spring Card spanner and pressuring diaphragm
Angle, the spanner locator are equipped with a card slot, and the card slot matches with the Spring Card spanner.When spring is in nature shape
During state, Spring Card spanner drives dop to clamp repairing film and flexible cloth pad under the action of elastic force;When pressing Spring Card spanner, and
When Spring Card spanner is caught in the card slot of spanner locator, the dop rises, and the clamping face formed between pressuring diaphragm is opened,
Dop will unclamp repairing film and flexible cloth pad at this time.
Preferably, the β angles are acute angle.
Preferably, the dop fixes dop for flute profile, convenient for clamping repairing film and flexible cloth pad.
Preferably, the bottom surface of the pressuring diaphragm is square.
Further, the length of side of the pressuring diaphragm is 40cm-60cm, and the pressuring diaphragm uses aluminum alloy material.
Further, a length of 1.5-2.5 meters of the barre, the relatively good pressing pressuring diaphragm of the length.
Preferably, when pressuring diaphragm pushes down diaphragm seal to be repaired, the length of barre is at least higher by 50cm than the water surface, is convenient for
Staff on pneumatic float presses pressuring diaphragm.
Further, the top of the pressuring diaphragm is both sides is low, intermediate high structure, substantially in cone, pressuring diaphragm it is upper
Side middle part is connected with the barre, makes pressuring diaphragm stress balance, while play the role of anti-folding.
According to the present invention, the lower section of the pressuring diaphragm is fixed with flexible cloth pad and repairing film successively, the flexibility cloth pad and
The size for repairing film is consistent, the big 10-20cm of the length of side of the side ratio pressuring diaphragm of the flexibility cloth pad and repairing film.
Further, vacuum diaphragm glue special, the lower section surrounding of the repairing film are coated in the middle part of the lower section of the repairing film
It is coated with underwater special seal gum so that underwater special seal gum is enclosed in the outside of vacuum diaphragm glue special, can be effectively isolated
Scrub effect of the water to vacuum diaphragm glue special improves the underwater of vacuum diaphragm glue special and mends film effect.
According to the present invention, the length of side of the flexibility cloth pad and repairing film is bigger 10-20cm than the length of side of pressuring diaphragm respectively.It uses
Before, first flexible cloth pad and the additional part of repairing film are sandwiched on geometrical clamp, convenient for shakeouing flexible cloth pad and repairing film.It uses
When, first will cementing 10 minutes of repairing film and diaphragm seal to be repaired, then with foot press Spring Card spanner, and Spring Card spanner is consolidated
It is scheduled in the card slot of spanner locator, at this point, the dop of geometrical clamp is in releasing orientation, i.e., repairing film is in pressuring diaphragm and detaches
State, directly lifts the barre on pressuring diaphragm, and pressuring diaphragm can be just kept completely separate with repairing film and flexible cloth pad.
Double glue benefit film methods and device, advantage are the vacuum preloading of the present invention under water:
1st, construction is simple will not cause claim for eot and construction cost significantly to increase;
2nd, it efficiently solves and covers underwater benefit film problem of the water depth more than 0.3 meter or more;
3rd, the lower section surrounding of repairing film is coated with underwater special seal gum, and the inner region of underwater special seal gum is coated with vacuum
Film glue special can both solve worm hole shape water hole between the current scour formation benefit film that benefit film is brought due to vacuum suction under water,
It can be effectively isolated scrub effect of the water to vacuum diaphragm glue special again, improve the underwater of vacuum diaphragm glue special and mend film effect,
It is embodied in:(1) the lower section surrounding of repairing film is coated with underwater special seal gum so that the surrounding for repairing film forms fluid sealant
Circle;(2) the cementing effect of first layer can be played, since diaphragm seal is PVC material, can will be repaiied using underwater special seal gum
It mends film and diaphragm seal to be repaired is cemented together;(3) underwater special seal gum has a cured effect that absorbs water, therefore can be with
The water at middle part below repairing film is absorbed, it is relatively dry at the repairing film of vacuum diaphragm glue special to be coated so as to make, so that it is guaranteed that
The benefit film effect of vacuum diaphragm glue special;(4) setting of underwater special seal gum, can be by the height of diaphragm seal to be repaired not
Flat place filling, so as to separate the water of outside, will not form flow;
4th, the setting of pressuring diaphragm can be such that repairing film effectively spreads out under water smooth, make underwater sealing film reparation construction more
It is simple and effective.
5th, winter can also operate, due to being equipped with for barre and pressuring diaphragm, as long as passing through as underwater staff
Foot, which is stepped on, to open the geometrical clamp on pressuring diaphragm, then treat it is cementing after ten minutes, repair film and diaphragm seal to be repaired it is cementing
Together, as long as lifting barre, you can separate pressuring diaphragm and repairing film, therefore staff only needs to wear wader and can make
Industry pulls the plug without entire people and shakeouts flexible cloth pad and repairing film, widened the applicability in season;
6th, barre is flexibly connected with pressuring diaphragm and has the following advantages that:(1) due to the surface irregularity of subgrade, using activity
The mode of connection is convenient for the place by out-of-flatness around diaphragm seal to flatten;(2) diaphragm seal to be repaired is pushed down convenient for pressuring diaphragm;
(3) underwater operation personnel repairing is not influenced;(4) it is easy to cementing, since vacuum diaphragm glue special is liquid, it is generally the case that
It needs the following table for repairing film is face-up, after applying glue, then rotates to lower section, therefore, using flexible connection, can make to repair
The lower surface for mending film is parallel with barre, convenient for cementing.
Description of the drawings
Fig. 1 is the use state diagram of the pressuring diaphragm of the present invention.
Fig. 2 is the structure diagram that underwater double glue are smeared.
Fig. 3 is that underwater double glue of the present invention mend the schematic diagram of film.
Fig. 4 is the structure diagram of geometrical clamp.
Fig. 5 is geometrical clamp clamping repairing film and the structure diagram of flexible cloth pad.
Specific embodiment
Below in conjunction with specific attached drawing, to vacuum preloading of the invention, double glue mend film methods under water and device work is further detailed
Explanation.
As shown in Figure 1, Figure 4 and Figure 5, for a kind of vacuum preloading of the present embodiment, double glue mend film device under water, including press mold
Plate 1, the bottom surface of the pressuring diaphragm 1 are square, and both sides are respectively arranged with geometrical clamp 2, for flexible cloth pad 4 and repairing film 5 to be consolidated
It is scheduled on pressuring diaphragm 1, the top of the pressuring diaphragm 1 is equipped with barre 3, and hole 9, institute are pushed down for that will repair film 5 and flexible cloth pad 4
Barre 3 is stated to be flexibly connected with pressuring diaphragm 1.
As shown in Figure 4 and Figure 5, the geometrical clamp 2 includes dop 21, Spring Card spanner 22, spring 23 and spanner locator
24, the dop 21 is set on pressuring diaphragm 1, and parallel with pressuring diaphragm 1, for clamping repairing film 5 and flexible cloth pad 4, the folder
Mouth 21 is connect with Spring Card spanner 22, and the lower section of the Spring Card spanner 22 is equipped with the spring 23, under natural conditions, the bullet
A β angles are formed between spring card spanner 22 and pressuring diaphragm 1, the β angles are preferably acute angle, and the spanner locator 24 is equipped with a card
Slot 25, the card slot 25 match with the Spring Card spanner 22.When spring 23 in the raw when, Spring Card spanner 22 exists
Dop 21 is driven to clamp repairing film 5 and flexible cloth pad 4 under the action of elastic force;When pressing Spring Card spanner 22, and Spring Card is pulled
When hand 22 is caught in the card slot 25 of spanner locator 24, the dop 21 rises, and the clamping face formed between pressuring diaphragm 1 is beaten
It opens, dop 21 will unclamp repairing film 5 and flexible cloth pad 4 at this time.
The dop 21 is preferably that flute profile fixes dop, convenient for clamping repairing film 5 and flexible cloth pad 4.
It should be understood that the other shapes such as rounded, polygon in bottom surface of the pressuring diaphragm 1.It is fixed for the ease of installation
Folder 2, the bottom surface of the pressuring diaphragm 1 is preferably square.
The length of side of the pressuring diaphragm 1 is 40cm-60cm, and the pressuring diaphragm 1 uses aluminum alloy material.
A length of 1.5-2.5 meters of the barre 3, the relatively good pressing pressuring diaphragm 1 of the length.
When pressuring diaphragm 1 pushes down diaphragm seal to be repaired, the length of barre 3 is at least higher by 50cm than the water surface, convenient for inflation
Staff on raft presses pressuring diaphragm 1.
The top of the pressuring diaphragm 1 is the structure that both sides are low, centre is high, and substantially in cone, the upper center of pressuring diaphragm 1 is lived
It is dynamic to be connected with the barre 3, make 1 stress balance of pressuring diaphragm, while play the role of anti-folding.
The lower section of the pressuring diaphragm 1 is fixed with flexible cloth pad 4 and repairing film 5, the flexibility cloth pad 4 and repairing film 5 successively
Size it is consistent, it is described flexibility cloth pad 4 and repairing film 5 side ratio pressuring diaphragm 1 the big 10-20cm of the length of side.
Vacuum diaphragm glue special 6 is coated in the middle part of the lower section of the repairing film 1, the lower section surrounding of the repairing film 5 is coated with water
Lower special seal gum 7 so that underwater special seal gum 7 is enclosed in the outside of vacuum diaphragm glue special 6, can be effectively isolated water pair
The effect of scrubbing of vacuum diaphragm glue special 6 improves the underwater of vacuum diaphragm glue special 6 and mends film effect.
The flexibility cloth pad 4 and the length of side of repairing film 5 are bigger 10-20cm than the length of side of pressuring diaphragm 1 respectively.Before use, first will
Flexible cloth pad 4 and 5 additional part of repairing film are sandwiched on geometrical clamp 2, convenient for shakeouing flexible cloth pad 4 and repairing film 5.It uses
When, first will cementing 10 minutes of repairing film 5 and diaphragm seal to be repaired, then, the staff for wearing wader operation foot press spring
Card spanner 22, and Spring Card spanner 22 is fixed in the card slot 25 of spanner locator 24, at this point, at the dop 21 of geometrical clamp 2
In releasing orientation, that is, repair film 5 and be in discrete state with pressuring diaphragm 1, directly lift the barre 3 on pressuring diaphragm 1, pressuring diaphragm 1 is just
It can be kept completely separate with repairing film 5 and flexible cloth pad 4.
As shown in Figs. 1-3, for a kind of vacuum preloading of the present invention, double glue mend film method under water, include the following steps:
Step A, flexible cloth pad 4 and repairing film 5 are shakeout, and fixed with geometrical clamp 2 on pressuring diaphragm 1;
Step B, with towel wiped clean, and hole 9 is filled closure with sand hill 8 under water at hole 9;
Step C, vacuum diaphragm glue special 6 is coated in the middle part of the lower section of repairing film 5, and is applied in the lower section surrounding of repairing film 5
Upper underwater special seal gum 7 so that underwater special seal gum 7 is enclosed in the outside of vacuum diaphragm glue special 6, can be effectively isolated
Scrub effect of the water to vacuum diaphragm glue special 6 improves the underwater of vacuum diaphragm glue special 6 and mends film effect;
Step D, with pressuring diaphragm 1 by repair film 5 be placed in gluing at hole 9, make under the action of pressuring diaphragm 1 repairing film 5 with
Diaphragm seal to be mended is glued integral.
Step B hole 9 is filled into closure with sand hill 8 before, further include with the braided fabrics such as woven bag fill hole, with solution
When certainly hole is excessive too deep, the problem of sand hill 8 can not be filled up completely hole 9.
When loosening with worm hole phenomenon occurs in the gluing of step D, the step D is further included to be repaired with underwater special glue rifle.
The underwater sealing special glue 7 of the present embodiment is paste, has the characteristics that water suction curing, is set under repairing film 5
Fang Sizhou, it is tentatively cementing for water proof;The vacuum diaphragm glue special 6 of the present embodiment is liquid, is set to the middle part of repairing film 5,
For flexible cementing, cementing good airproof performance.
Embodiment 1
First, 2 × 60MW grades of certain high and new technology industrial development zone Distribution of Natural formula energy source station project, basement process, which uses, covers water vacuum preloading,
1.5 meters of water height is covered, there is the fill stratum close to 4 meters under film, it is contemplated that 1.5 meters of preloading of construction, settling amount is big, causes diaphragm seal
Construction period relative displacement between monitoring pipe is close to 1.5 meters.Using hole mode pore-forming is drawn when being constructed due to drain bar, seal
There are many places hole under film, hole is most of before diaphragm seal is laid with to be handled with back-up sand tamping mode, but still has indivedual holes
Hole is in vacuum preloading, since vacuum is run, diaphragm seal is inhaled broken.Since broken hole is covering below water close to 1.5 meters, to diaphragm seal
Mending tape carrys out difficulty.Through studying repeatedly, handled using underwater double glue encapsulating methods of the present embodiment.Specific embodiment is such as
Under:
--- --- hole pretreatment --- smearing double glue --- is double for flexible cloth pad and the fixation for mending film for the making of pressuring diaphragm
Glue seals.
Detailed step is as follows:
1st, the making of pressuring diaphragm 1:Pressuring diaphragm 1 is aluminium alloy, and 40cm-60cm squares, the both sides of pressuring diaphragm 1, which are set, to be fixed
Folder 2, the top setting barre 3 of pressuring diaphragm 1, barre 3 are about 1.5 meters.
2nd, the fixation of flexible cloth pad 4 and repairing film 5:Select the flexible cloth pad 4 of identical size and repairing film 5, and flexible cloth
The length of side of pad 4 and repairing film 5 per side is bigger 10cm than the length of side of pressuring diaphragm 1 respectively, then by flexible cloth pad 4 and repairing film 5 simultaneously
It is fixed on the geometrical clamp 2 of pressuring diaphragm 1, and flexible cloth pad 4 and repairing film 5 is shakeout on pressuring diaphragm 1.
3rd, hole pre-processes:Diving or wader mode operation can be used, if hole 9 is excessive too deep, is blocked in sand hill 8
Before, can hole 9 be filled with braided fabrics such as woven bags in advance.
4th, double glue are smeared:Underwater sealing special glue 7 is paste, has the characteristics that water suction curing, is arranged under repairing film 5
Fang Sizhou, it is tentatively cementing for water proof;Vacuum diaphragm glue special 6 is liquid, is arranged in the middle part of the lower section of repairing film 5, belongs to soft
Cementing, the cementing good airproof performance of property.
5th, double glue sealings:It is constructed with modes such as wader, diving, pneumatic floats;With barre 3 hole is pushed down by film 5 is repaired
9, after being compacted repeatedly, geometrical clamp 2 is unclamped, compacting is shakeout by film 5 is repaired with flexible cloth pad 4;Then sand hill is placed on repairing film 5
8 compactings are fixed, and loosening and worm hole phenomenon are checked within 30 minutes, with underwater glue rifle reparation.
2nd, treatment effect
1st, the project supervises the underwater double glue of project use and mends film methods, in the case where covering 1.5 meters of water, it is unspent into
The repairing and sealing of submersible vacuum film are gone, construction is simple ensure that project progress, it is ensured that construction quality.
2nd, under normal circumstances, the vacuum degree at hole is 40-50KPa.It is directly repaired using vacuum diaphragm glue special 6 close
Sealer after tested, between vacuum degree can reach 70-80KPa, i.e., cannot reach and be fully sealed, slightly can also there are tiny
Hole.
And double glue mend film methods to the vacuum preloading of use the present embodiment under water, through measuring instrument test hole repair position hair
Existing, vacuum degree can reach more than 80KPa, i.e., reaches at hole repair and be fully sealed.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention.These improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (10)
1. double glue mend film method to a kind of vacuum preloading under water, which is characterized in that include the following steps:
Step A, flexible cloth pad and repairing film are shakeout, and fixed with geometrical clamp on pressuring diaphragm;
Step B, with towel wiped clean, and being blocked holes filling with sand hill under water at hole;
Step C, vacuum diaphragm glue special is coated in the middle part of the lower section of repairing film, and is coated under water specially in the lower section surrounding of repairing film
Use fluid sealant;
Step D, gluing at film merging hole will be repaired with pressuring diaphragm, repairing film and diaphragm seal to be mended is made under the action of pressuring diaphragm
It is glued integral.
2. double glue mend film method to vacuum preloading as described in claim 1 under water, which is characterized in that the bottom surface of the pressuring diaphragm is in
Rectangular, both sides are respectively arranged with geometrical clamp, and the top of pressuring diaphragm is equipped with barre, and the barre is flexibly connected with pressuring diaphragm.
3. double glue mend film method to vacuum preloading as claimed in claim 2 under water, which is characterized in that the geometrical clamp includes folder
Mouth, Spring Card spanner, spring and spanner locator, the dop is set on pressuring diaphragm, and parallel with pressuring diaphragm, the dop with
Spring Card spanner connects, and the lower section of the Spring Card spanner is equipped with the spring, under natural conditions, the Spring Card spanner and pressure
A β angles are formed between diaphragm plate, the spanner locator is equipped with a card slot, and the card slot matches with the Spring Card spanner.
4. double glue mend film method to vacuum preloading as described in claim 1 under water, which is characterized in that a length of 1.5- of the barre
2.5 rice.
5. double glue mend film method to vacuum preloading as described in claim 1 under water, which is characterized in that the flexibility cloth pad and repairing
The length of side of film is bigger 10-20cm than the length of side of pressuring diaphragm respectively.
6. double glue mend film methods to vacuum preloading as described in claim 1 under water, which is characterized in that step B with sand hill by hole
Before hole filling blocks, further include and fill hole with braided fabrics such as woven bags.
7. double glue mend film method to vacuum preloading as described in claim 1 under water, which is characterized in that when the gluing of step D occurs
When loosening with worm hole phenomenon, the step D is further included to be repaired with underwater special glue rifle.
8. double glue mend film device to a kind of vacuum preloading under water, which is characterized in that including pressuring diaphragm, the bottom surface of the pressuring diaphragm is in side
Shape, both sides are respectively arranged with geometrical clamp, and the top of the pressuring diaphragm is equipped with barre, and the barre is flexibly connected with pressuring diaphragm.
9. double glue mend film device to vacuum preloading as claimed in claim 8 under water, which is characterized in that the geometrical clamp includes folder
Mouth, Spring Card spanner, spring and spanner locator, the dop is set on pressuring diaphragm, and parallel with pressuring diaphragm, the dop with
Spring Card spanner connects, and the lower section of the Spring Card spanner is equipped with the spring, under natural conditions, the Spring Card spanner and pressure
A β angles are formed between diaphragm plate, the spanner locator is equipped with a card slot, and the card slot matches with the Spring Card spanner.
10. double glue mend film devices to vacuum preloading as described in claim 1 under water, which is characterized in that the barre it is a length of
1.5-2.5 rice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810106799.0A CN108221949B (en) | 2018-02-02 | 2018-02-02 | Vacuum pre-pressing underwater double-adhesive film supplementing device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810106799.0A CN108221949B (en) | 2018-02-02 | 2018-02-02 | Vacuum pre-pressing underwater double-adhesive film supplementing device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108221949A true CN108221949A (en) | 2018-06-29 |
CN108221949B CN108221949B (en) | 2023-12-19 |
Family
ID=62670367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810106799.0A Active CN108221949B (en) | 2018-02-02 | 2018-02-02 | Vacuum pre-pressing underwater double-adhesive film supplementing device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108221949B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020006081A (en) * | 2000-07-11 | 2002-01-19 | 이성우 | Rehabilitation of Concrete Structures with Composites by Vacuum Bag Method |
CN101139833A (en) * | 2007-07-20 | 2008-03-12 | 朱怡 | Compound vacuum precompressed soft foundation comprehensive strengthening method |
CN201071505Y (en) * | 2007-08-03 | 2008-06-11 | 王海鹏 | Vacuum-pre-pressing soft base processing underwater seal membrane compensating device |
US20130312874A1 (en) * | 2012-05-24 | 2013-11-28 | Michael Ray Kimble | Vacuum infused repair device and method for teak decks on boats, yachts and ships |
CN103643672A (en) * | 2013-11-12 | 2014-03-19 | 浙江江南春建设集团有限公司 | Vacuum preloading foundation treatment construction method |
CN105584744A (en) * | 2014-10-22 | 2016-05-18 | 中航贵州飞机有限责任公司 | Method for vacuum film negative-pressure glue reverse permeation repair of integral fuel tank of airplane |
CN205475195U (en) * | 2016-02-29 | 2016-08-17 | 中交天津港湾工程研究院有限公司 | Bloated joint vacuum preloading ground processing apparatus of bandlet side |
CN106337566A (en) * | 2016-08-26 | 2017-01-18 | 北海金匠水泥制品有限责任公司 | High-strength repairing method for hole of cement prefabricated component |
CN208009401U (en) * | 2018-02-02 | 2018-10-26 | 上海港湾基础建设(集团)股份有限公司 | Double glue mend film devices under water for a kind of vacuum preloading |
-
2018
- 2018-02-02 CN CN201810106799.0A patent/CN108221949B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020006081A (en) * | 2000-07-11 | 2002-01-19 | 이성우 | Rehabilitation of Concrete Structures with Composites by Vacuum Bag Method |
CN101139833A (en) * | 2007-07-20 | 2008-03-12 | 朱怡 | Compound vacuum precompressed soft foundation comprehensive strengthening method |
CN201071505Y (en) * | 2007-08-03 | 2008-06-11 | 王海鹏 | Vacuum-pre-pressing soft base processing underwater seal membrane compensating device |
US20130312874A1 (en) * | 2012-05-24 | 2013-11-28 | Michael Ray Kimble | Vacuum infused repair device and method for teak decks on boats, yachts and ships |
CN103643672A (en) * | 2013-11-12 | 2014-03-19 | 浙江江南春建设集团有限公司 | Vacuum preloading foundation treatment construction method |
CN105584744A (en) * | 2014-10-22 | 2016-05-18 | 中航贵州飞机有限责任公司 | Method for vacuum film negative-pressure glue reverse permeation repair of integral fuel tank of airplane |
CN205475195U (en) * | 2016-02-29 | 2016-08-17 | 中交天津港湾工程研究院有限公司 | Bloated joint vacuum preloading ground processing apparatus of bandlet side |
CN106337566A (en) * | 2016-08-26 | 2017-01-18 | 北海金匠水泥制品有限责任公司 | High-strength repairing method for hole of cement prefabricated component |
CN208009401U (en) * | 2018-02-02 | 2018-10-26 | 上海港湾基础建设(集团)股份有限公司 | Double glue mend film devices under water for a kind of vacuum preloading |
Also Published As
Publication number | Publication date |
---|---|
CN108221949B (en) | 2023-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11085161B2 (en) | Device and method for treating soft soil foundations | |
CN108008116B (en) | Vacuum preloading and electroosmosis combined test device | |
CN113404071B (en) | Water plugging method and device for gap water burst of steel sheet pile cofferdam | |
CN104805823B (en) | Large-scale model test device for supercharged vacuum prepressing and electro-osmosis combined treatment for soft soil foundation | |
CN102041800A (en) | Method for constructing PVC (polyvinyl chloride) composite geomembrane watertight core of earth-rockfill dam | |
CN107436140A (en) | The settling column test instrument and test method that vacuum preloading and piling prepressing are combined | |
CN206143827U (en) | Underground works crack repairing structure | |
CN205576888U (en) | Booster -type vacuum preloading consolidates soft soil foundation structure | |
CN208009401U (en) | Double glue mend film devices under water for a kind of vacuum preloading | |
CN108661044A (en) | A kind of construction method of plastic draining board and soft foundation discharge fixing | |
CN109060543A (en) | Directly measure the device and its measurement method of triaxial test rubber-oil-pipe sensor amount | |
CN112411518A (en) | Soft foundation section vacuum combined surcharge preloading construction method | |
US20120261052A1 (en) | Method of rehabilitating or remediating structures | |
CN108221949A (en) | Double glue mend film device and method to a kind of vacuum preloading under water | |
CN106522217A (en) | Steel conduit device and broken pile treatment construction method for cast-in-situ bored pile | |
CN103452081A (en) | Construction method for flexible composite impermeable layer of upstream face of high arch dam | |
CN209958531U (en) | Deformation joint leakage repairing structure | |
CN104895039A (en) | Construction method for water-saturated soft soil foundations | |
CN210347403U (en) | Waterproof material permeability testing device | |
CN207919608U (en) | A kind of high-low-position double-face vacuum preconsolidation weak soil experimental rig | |
CN102890046A (en) | Device and method for detecting seepage-proofing performance of seepage-proofing sand | |
CN107653842A (en) | A kind of geomembrane reservoir sloping core Seepage method | |
CN207050713U (en) | The settling column test instrument that vacuum preloading and piling prepressing are combined | |
CN102536270B (en) | Tunnel seepage protection method for soft soil stratum by existing shield method | |
CN209099343U (en) | A kind of underwater vacuum precompression system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |