CN108221692A - A kind of Landscape Bridge arch ring stone material bar planting method - Google Patents

A kind of Landscape Bridge arch ring stone material bar planting method Download PDF

Info

Publication number
CN108221692A
CN108221692A CN201810035389.1A CN201810035389A CN108221692A CN 108221692 A CN108221692 A CN 108221692A CN 201810035389 A CN201810035389 A CN 201810035389A CN 108221692 A CN108221692 A CN 108221692A
Authority
CN
China
Prior art keywords
stone material
bar planting
arch ring
landscape bridge
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810035389.1A
Other languages
Chinese (zh)
Inventor
贾全利
温文
叶德超
冉泽辉
杨凡
陈均壮
何明活
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201810035389.1A priority Critical patent/CN108221692A/en
Publication of CN108221692A publication Critical patent/CN108221692A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The present invention relates to technical field of building construction, more particularly relate to a kind of Landscape Bridge arch ring stone material bar planting method, which is characterized in that include the following steps:S1. line setting;S2. it drills;S3. borehole cleaning;S4. bar planting;S5. cure, protect;S6. it examines;S7. epoxy coating preservative treatment.Landscape Bridge arch ring stone material bar planting method provided by the invention can completely retain the mechanical structure of stone material, so that stone material can be adapted to practical in Landscape Bridge and reach preferable mechanical property on the basis of former stone material mechanical structure is not destroyed, in addition bar planting method provided by the invention is simple and convenient, it can ensure combining closely for reinforcing bar and stone material, prevent bar planting defect, influence the construction quality of Landscape Bridge, so as to ensure the safety of Landscape Bridge, in addition, the protection of stone material and reinforcing bar can be effectively ensured in bar planting method provided by the invention and maintenance method, be conducive to extend the service life of stone material and reinforcing bar, ensure Landscape Bridge durable.

Description

A kind of Landscape Bridge arch ring stone material bar planting method
Technical field
The present invention relates to technical field of building construction, more particularly relate to a kind of Landscape Bridge arch ring stone material bar planting method.
Background technology
Landscape is often referred to can be to people's natural beauty, the artificial beautiful and comfortable physical environment of life, it contains " scape " and " sight " Two independent concepts.Landscape Bridge can also be used as the mistake of other landscape nodes while can becoming a landscape node in itself Route is crossed, makes entire landscape moving-wire smooth and beautiful.Therefore Landscape Bridge becomes tradition and modern and city landscape design A significant design factor, especially arcuately Landscape Bridge, the camber line grace of arch is soft, simple and unsophisticated generous, has Chinese nation The artistic characteristics of arcuated architecture, also there is compatible places of cultural interest river natural landscape to coordinate beautiful characteristic for it.With on environmental harmony, The unification of arch bridge style, function and shape is more superior than other bridge types, and formalness and the rhythm variation of arch bridge curve more meet people Aesthetic feeling requirement so that arcuately bridge was suitable for cultural city and city and town with river system intersperses beautification, because of the conduct of arch ring stone material arcuately The significant design element of Landscape Bridge becomes the main points of Landscape Bridge design, and arch ring stone material of the prior art often uses original stone Material, it is difficult to adapt to the design requirement and mechanical requirements of Modern Landscape bridge.
Invention content
The present invention is overcomes at least one defect described in the above-mentioned prior art(It is insufficient), a kind of Landscape Bridge arch ring stone is provided Material bar planting method.
In order to solve the above technical problems, technical scheme is as follows:
A kind of Landscape Bridge arch ring stone material bar planting method, which is characterized in that include the following steps:
S1. line setting:Bar planting bore position and model are indicated on stone material by predetermined design requirement;
S2. it drills:Using boring of electric hammer, bore diameter 15mm, drilling depth 12mm;
S3. borehole cleaning:After drilling, check whether hole depth, aperture are qualified;If qualified, dust in hole is blown with compressed air Go out, then with hairbrush, cotton by hole wall outwash, compressed air aperture blowing, should be repeated 3 ~ 5 times again, until free from dust in hole Clast, by aperture temporary enclosed;If hole is unqualified, tamped after hole is cleaned out with anchoring adhesive;
S4. bar planting:Anchoring adhesive is packed into glue rifle, pulls glue rifle handle and squeezes out anchoring adhesive, bar planting glue color and luster complete one to be extruded During sample, the bottom that the mixed Jiao Zui ends of glue rifle are extended to hole carries out injecting glue, shrinks back while squeezing, to ensure not containing in hole Air;The reinforcing bar being made ready beforehand for is implanted into after injecting glue in hole;
S5. cure, protect:Curing, protection:After bar planting when temperature >=30 DEG C, reinforcing bar must not be disturbed in 6 hours after bar planting; When 15 DEG C≤temperature<At 30 DEG C, reinforcing bar must not be disturbed in 12 hours;Work as temperature after bar planting<At 15 DEG C, it must not be disturbed in 24 hours Reinforcing bar;To ensure the normal cure of anchoring adhesive;If have needs bar planting again compared with large disturbances;
S6. it examines:After curing, protection, test in 3 ~ 4 days, examine whether it meets design requirement;
S7. epoxy coating preservative treatment:Before epoxy coating is made, purified treatment, matter are carried out to rebar surface Amount should reach the requirement of GB8923-88 regulations, test to purified rebar surface quality, Surface Quality is satisfactory Reinforcing bar can carry out corrosion-inhibiting coating making.
Further, in the step S4, the safe performance indexes of the anchoring adhesive are as shown in the table:
The anchoring adhesive is the agent of modified epoxy gluing, modified ethenyl adhesive or modified urethane adhesive.
Further, in the step S1, in line setting, if predetermined set bore position and arch ring stress steel Muscle position conflicts, then bore position is avoided arch ring steel bar stress position and is adjusted.
Further, when being adjusted, the protective layer thickness on stone material side is reserved, subsequently stone material is broken caused by punching for prevention It splits.
Further, in the step S2, the prototype structure reinforcing bar avoided inside stone material is should be noted that in drilling.
Further, in the step S7, it is no more than 3 to interval time when making coating after the reinforcing bar purified treatment Hour, and the rebar surface after purified treatment does not have macroscopic oxidative phenomena.
Further, in the step S7, the thickness of the corrosion-inhibiting coating after curing is 0.18mm ~ 0.20mm.
Further, in the step S7, in the corrosion-inhibiting coating after curing, the thickness of at least 90% corrosion-inhibiting coating exists In the range of 0.18mm ~ 0.20mm, and the thickness without corrosion-inhibiting coating is less than 0.13mm.
Further, in the step S7, the corrosion-inhibiting coating should connect after maintenance, without cavity, gap, crackle or meat The visible holiday of eye;The number of the sightless pin hole of naked eyes is averagely no more than three to corrosion-inhibiting coating in every meter of length on reinforcing bar It is a.
Further, in the step S7, in bar bending, by the outer semicircle range inner anticorrosioning coating of moment reinforcement The crackle that is visible by naked eyes or the phenomenon that losing adhesion, occur.
Compared with prior art, the advantageous effect of technical solution of the present invention is:
Landscape Bridge arch ring stone material bar planting method provided by the invention can completely retain the mechanical structure of stone material, not destroy original So that stone material can be adapted to practical in Landscape Bridge and reach preferable mechanical property, in addition originally on the basis of stone material mechanical structure It invents that the bar planting method provided is simple and convenient, can ensure combining closely for reinforcing bar and stone material, prevent bar planting defect, influence The construction quality of Landscape Bridge, so as to ensure the safety of Landscape Bridge, in addition, bar planting method provided by the invention and maintenance method can The protection of stone material and reinforcing bar is effectively ensured, be conducive to extend the service life of stone material and reinforcing bar, it is ensured that Landscape Bridge durable.
Description of the drawings
Fig. 1 is the side structure perspective diagram of 1 stone material of embodiment.
Fig. 2 is the planar structure schematic diagram of embodiment 2.
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;It is attached in order to more preferably illustrate the present embodiment Scheme certain components to have omission, zoom in or out, do not represent the size of actual product;To those skilled in the art, The omitting of some known structures and their instructions in the attached drawings are understandable;The same or similar label corresponds to same or similar Component;The terms describing the positional relationship in the drawings are only for illustration, it is impossible to be interpreted as the limitation to this patent.
Specific embodiment
The following further describes the technical solution of the present invention with reference to the accompanying drawings and examples.
Embodiment 1
A kind of Landscape Bridge arch ring stone material bar planting method, the structure of the Landscape Bridge arch ring stone material 1 of the present embodiment as shown in Figs. 1-2, are wrapped Include following steps:
S1. line setting:Bar planting bore position and model are indicated on stone material by predetermined design requirement;
S2. it drills:Using boring of electric hammer 2, bore diameter 15mm, drilling depth 12mm;
S3. borehole cleaning:After drilling, check whether hole depth, aperture are qualified;If qualified, dust in hole is blown with compressed air Go out, then with hairbrush, cotton by hole wall outwash, compressed air aperture blowing, should be repeated 3 ~ 5 times again, until free from dust in hole Clast, by aperture temporary enclosed;If hole is unqualified, tamped after hole is cleaned out with anchoring adhesive;
S4. bar planting:Anchoring adhesive is packed into glue rifle, pulls glue rifle handle and squeezes out anchoring adhesive, bar planting glue color and luster complete one to be extruded During sample, the bottom that the mixed Jiao Zui ends of glue rifle are extended to hole carries out injecting glue, shrinks back while squeezing, to ensure not containing in hole Air;The reinforcing bar being made ready beforehand for is implanted into after injecting glue in hole;
S5. cure, protect:Curing, protection:After bar planting when temperature >=30 DEG C, reinforcing bar must not be disturbed in 6 hours after bar planting; When 15 DEG C≤temperature<At 30 DEG C, reinforcing bar must not be disturbed in 12 hours;Work as temperature after bar planting<At 15 DEG C, it must not be disturbed in 24 hours Reinforcing bar;To ensure the normal cure of anchoring adhesive;If have needs bar planting again compared with large disturbances;
S6. it examines:After curing, protection, test in 3 ~ 4 days, examine whether it meets design requirement;
S7. epoxy coating preservative treatment:Before epoxy coating is made, purified treatment, matter are carried out to rebar surface Amount should reach the requirement of GB8923-88 regulations, test to purified rebar surface quality, Surface Quality is satisfactory Reinforcing bar can carry out corrosion-inhibiting coating making.
Embodiment 2
The present embodiment is similar to embodiment 1, and further, in the step S4, the safe performance indexes of the anchoring adhesive are as follows Shown in table:
The anchoring adhesive is the agent of modified epoxy gluing, modified ethenyl adhesive or modified urethane adhesive.
Embodiment 3
The present embodiment is similar to embodiment 2, further, in the step S1, in line setting, if predetermined set brill Hole site conflicts with arch ring steel bar stress position, then bore position is avoided arch ring steel bar stress position and is adjusted;It is being adjusted When whole, the protective layer thickness on stone material side is reserved, subsequently stone material ruptures caused by punching for prevention;In the step S2, in drilling It should be noted that avoid the prototype structure reinforcing bar inside stone material.
Embodiment 4
The present embodiment is similar to embodiment 2, further, in the step S7, to making coating after the reinforcing bar purified treatment When interval time be no more than 3 hours, and the rebar surface after purified treatment does not have macroscopic oxidative phenomena;Curing The thickness of corrosion-inhibiting coating afterwards is 0.18mm ~ 0.20mm(Alternatively, curing after corrosion-inhibiting coating in, at least 90% corrosion-inhibiting coating Thickness is in the range of 0.18mm ~ 0.20mm, and the thickness without corrosion-inhibiting coating is less than 0.13mm);The corrosion-inhibiting coating is after maintenance It should connect, without cavity, gap, crackle or macroscopic holiday;Corrosion-inhibiting coating on reinforcing bar in every meter of length naked eyes not The number of visible pin hole is averagely no more than three;In bar bending, anti-corrosion applies in the range of the outer semicircle by moment reinforcement The crackle that is visible by naked eyes of layer or the phenomenon that losing adhesion, occur.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement made within the spirit and principle of invention etc., should be included in the claims in the present invention Protection domain within.

Claims (10)

  1. A kind of 1. Landscape Bridge arch ring stone material bar planting method, which is characterized in that include the following steps:
    S1. line setting:Bar planting bore position and model are indicated on stone material by predetermined design requirement;
    S2. it drills:Using boring of electric hammer, bore diameter 15mm, drilling depth 12mm;
    S3. borehole cleaning:After drilling, check whether hole depth, aperture are qualified;If qualified, dust in hole is blown with compressed air Go out, then with hairbrush, cotton by hole wall outwash, compressed air aperture blowing, should be repeated 3 ~ 5 times again, until free from dust in hole Clast, by aperture temporary enclosed;If hole is unqualified, tamped after hole is cleaned out with anchoring adhesive;
    S4. bar planting:Anchoring adhesive is packed into glue rifle, pulls glue rifle handle and squeezes out anchoring adhesive, bar planting glue color and luster complete one to be extruded During sample, the bottom that the mixed Jiao Zui ends of glue rifle are extended to hole carries out injecting glue, shrinks back while squeezing, to ensure not containing in hole Air;The reinforcing bar being made ready beforehand for is implanted into after injecting glue in hole;
    S5. cure, protect:After bar planting when temperature >=30 DEG C, reinforcing bar must not be disturbed in 6 hours after bar planting;When 15 DEG C≤temperature Degree<At 30 DEG C, reinforcing bar must not be disturbed in 12 hours;Work as temperature after bar planting<At 15 DEG C, reinforcing bar must not be disturbed in 24 hours;To protect Demonstrate,prove the normal cure of anchoring adhesive;If have needs bar planting again compared with large disturbances;
    S6. it examines:After curing, protection, test in 3 ~ 4 days, examine whether it meets design requirement;
    S7. epoxy coating preservative treatment:Before epoxy coating is made, purified treatment, matter are carried out to rebar surface Amount should reach the requirement of GB8923-88 regulations, test to purified rebar surface quality, Surface Quality is satisfactory Reinforcing bar can carry out corrosion-inhibiting coating making.
  2. 2. Landscape Bridge arch ring stone material bar planting method according to claim 1, which is characterized in that described in the step S4 The safe performance indexes of anchoring adhesive are as shown in the table:
    The anchoring adhesive is the agent of modified epoxy gluing, modified ethenyl adhesive or modified urethane adhesive.
  3. 3. Landscape Bridge arch ring stone material bar planting method according to claim 1, which is characterized in that in the step S1, fixed During the unwrapping wire of position, if the predetermined bore position that sets conflicts with arch ring steel bar stress position, bore position avoids arch ring stress Reinforcement location is adjusted.
  4. 4. Landscape Bridge arch ring stone material bar planting method according to claim 3, which is characterized in that when being adjusted, reserve The protective layer thickness on stone material side, subsequently stone material ruptures caused by punching for prevention.
  5. 5. Landscape Bridge arch ring stone material bar planting method according to claim 1, which is characterized in that in the step S2, boring It should be noted that the prototype structure reinforcing bar avoided inside stone material during hole.
  6. 6. Landscape Bridge arch ring stone material bar planting method according to claim 1, which is characterized in that described in the step S7 It is no more than 3 hours, and the rebar surface after purified treatment does not have meat to interval time when making coating after reinforcing bar purified treatment The visible oxidative phenomena of eye occurs.
  7. 7. Landscape Bridge arch ring stone material bar planting method according to claim 6, which is characterized in that in the step S7, curing The thickness of corrosion-inhibiting coating afterwards is 0.18mm ~ 0.20mm.
  8. 8. Landscape Bridge arch ring stone material bar planting method according to claim 6, which is characterized in that in the step S7, curing In corrosion-inhibiting coating afterwards, the thickness of at least 90% corrosion-inhibiting coating is in the range of 0.18mm ~ 0.20mm, and the thickness without corrosion-inhibiting coating Degree is less than 0.13mm.
  9. 9. according to claim 6-8 any one of them Landscape Bridge arch ring stone material bar planting methods, which is characterized in that the step S7 In, the corrosion-inhibiting coating should connect after maintenance, without cavity, gap, crackle or macroscopic holiday;Corrosion-inhibiting coating exists The number of the sightless pin hole of naked eyes is averagely no more than three in every meter of length on reinforcing bar.
  10. 10. according to claim 6-8 any one of them Landscape Bridge arch ring stone material bar planting methods, which is characterized in that the step In S7, in bar bending, in the crackle being visible by naked eyes by the outer semicircle range inner anticorrosioning coating of moment reinforcement or lose viscous The phenomenon that occurs.
CN201810035389.1A 2018-01-15 2018-01-15 A kind of Landscape Bridge arch ring stone material bar planting method Pending CN108221692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810035389.1A CN108221692A (en) 2018-01-15 2018-01-15 A kind of Landscape Bridge arch ring stone material bar planting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810035389.1A CN108221692A (en) 2018-01-15 2018-01-15 A kind of Landscape Bridge arch ring stone material bar planting method

Publications (1)

Publication Number Publication Date
CN108221692A true CN108221692A (en) 2018-06-29

Family

ID=62641108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810035389.1A Pending CN108221692A (en) 2018-01-15 2018-01-15 A kind of Landscape Bridge arch ring stone material bar planting method

Country Status (1)

Country Link
CN (1) CN108221692A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1382891A (en) * 2002-06-03 2002-12-04 刘宣传 Method for mounting anchor tendon penetrated mechanically
CN102322026A (en) * 2011-08-24 2012-01-18 重庆交通大学 Reinforcing method of masonry arch bridge
CN102486049A (en) * 2010-12-06 2012-06-06 上海伙隆实业有限公司 Filler wall masonry tie bar planting method
CN204039921U (en) * 2014-05-19 2014-12-24 赵燕 A kind of Construction Support without support bent cap
CN105888259A (en) * 2016-03-31 2016-08-24 张友谊 Concrete steel bar planting method
CN107142852A (en) * 2017-06-21 2017-09-08 渠承明 Bridge guardrail steel planting structure and its construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1382891A (en) * 2002-06-03 2002-12-04 刘宣传 Method for mounting anchor tendon penetrated mechanically
CN102486049A (en) * 2010-12-06 2012-06-06 上海伙隆实业有限公司 Filler wall masonry tie bar planting method
CN102322026A (en) * 2011-08-24 2012-01-18 重庆交通大学 Reinforcing method of masonry arch bridge
CN204039921U (en) * 2014-05-19 2014-12-24 赵燕 A kind of Construction Support without support bent cap
CN105888259A (en) * 2016-03-31 2016-08-24 张友谊 Concrete steel bar planting method
CN107142852A (en) * 2017-06-21 2017-09-08 渠承明 Bridge guardrail steel planting structure and its construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ADW83: ""银谷美泉窗拆除方案"", 《百度文库》 *
LIUJINGXIATIME: ""建筑植筋胶性能参数"", 《百度文库》 *

Similar Documents

Publication Publication Date Title
DE60020456D1 (en) Composite fiber composite wing structure and method of making the same
ES2148827T3 (en) ARTIFICIAL GLASS FIBERS AND THEIR PRODUCTION AND USE.
DE602005000767D1 (en) Carbon fiber reinforced metal matrix composite and method of making the same
AU2001249815A1 (en) Method of modeling of faulting and fracturing in the earth
EE200100273A (en) Stent and method of making a stent
DE60325672D1 (en) An absorbent core and method of making the same
EE200100175A (en) Coated stent and method to cover stent
DE60209148D1 (en) Coated object with improved barrier structure and method for its production
DE60018049D1 (en) IONIZATION STICK AND METHOD FOR THE PRODUCTION THEREOF
CN108221692A (en) A kind of Landscape Bridge arch ring stone material bar planting method
DE10084334T1 (en) String musical instrument and method for its production
HUP0301716A2 (en) Composition for coating sausages and hard cheeses
DE602004002231D1 (en) Bone-contacting implant with shock-absorbing properties and method for its production
DE602004030411D1 (en) A method of making a fiber reinforced metal matrix composite and cassette for use in manufacture
DE60311933D1 (en) Integrated high speed aircraft and method of making the same
DE69825064D1 (en) CONSTRUCTION PANEL AND METHOD AND DEVICE FOR THE PRODUCTION THEREOF
DE59805830D1 (en) TURBINE BLADE AND USE OF A KNOWN METHOD FOR THE PRODUCTION THEREOF
DE60220221D1 (en) Toe cap made of long fiber reinforced thermoplastic for safety shoes and process for its production
DE60200834D1 (en) FIXING AGENT IN THE FORM OF A SUSPENSION OR EMULSION OF THE OIL / WATER TYPE AND THE PRODUCTION THEREOF
DE60220620D1 (en) Hollow-cell core composite body and method of making the same
DE60201280D1 (en) Associated item and method of making the same
Borowsky et al. Vowel-length in Warray and weight identity
NO20030811D0 (en) Chromenone derivatives and their use in the treatment of diseases associated with 5-HTA1 receptors and / or dopamine D2 receptors
DE50004280D1 (en) LIQUID INITIATOR FOR THE ACCELERATED PERFORMANCE OF THE ANIONIC LACTAMPOLYMERISATION, METHOD FOR THE PRODUCTION AND USE THEREOF
ATA19172000A (en) Wall element, in particular for wooden houses and method for the production thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629