CN107142852A - Bridge guardrail steel planting structure and its construction method - Google Patents

Bridge guardrail steel planting structure and its construction method Download PDF

Info

Publication number
CN107142852A
CN107142852A CN201710473992.3A CN201710473992A CN107142852A CN 107142852 A CN107142852 A CN 107142852A CN 201710473992 A CN201710473992 A CN 201710473992A CN 107142852 A CN107142852 A CN 107142852A
Authority
CN
China
Prior art keywords
hydraulic
drill bit
rotation
guide rail
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710473992.3A
Other languages
Chinese (zh)
Other versions
CN107142852B (en
Inventor
渠承明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Forestry Design Institute
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710473992.3A priority Critical patent/CN107142852B/en
Priority to CN201811185398.5A priority patent/CN109098085B/en
Publication of CN107142852A publication Critical patent/CN107142852A/en
Application granted granted Critical
Publication of CN107142852B publication Critical patent/CN107142852B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/16Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using gaseous fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses Bridge guardrail steel planting structure, including locomotive, the locomotive includes car body, and the corner of car body is provided with hydraulic parallel lifting column;It is characterized in that, it is provided with rear side of the car body and the hydraulic lift truck moved back and forth on guide rail pole is driven by hydraulic stem one, guide rail pole is arranged on the hydraulic lift truck, the threaded rod that motor drives rotation is installed, movable stand is arranged on the threaded rod in the guide rail pole (210);The contraction box that rotation is driven by motor one is installed on the movable stand, hydraulic lifting post two is arranged in contraction box, drill bit is installed on the hydraulic lifting post two, the intersection of the drill bit and hydraulic lifting post two is cased with nut connector, contraction box provided with the actuating unit for driving the rotation of hydraulic lifting post two;Beneficial effects of the present invention:Dynamicization degree of the invention is high, and automatic drilling, automatic hole-cleaning, automatic bar planting is installed for rear guardrail, and speed is fast, and construction is quick, is adapted to promote the use of.

Description

Bridge guardrail steel planting structure and its construction method
Technical field
The present invention relates to a kind of Bridge guardrail steel planting structure and its construction method, belong to road and bridge construction technical field.
Background technology
Guardrail is mainly used in the occasions such as house, highway, shopping centre, public place the guarantor to personal safety and installations and facilities Shield and protection.Guardrail is visible everywhere in we live.Guardrail is according to the difference of height, and the price of every meter of length also can be different.
Application No. CN104480857A discloses a kind of highway bridge outer rim Modular guardrail structure and its installation Method.A kind of highway bridge outer rim Modular guardrail structure, including multiple watch boxes mutually spliced, column penetrate solid in watch box It is fixed, guardrail has been crossed above the column, it is characterized in that, the watch box is non-closed rectangle integrated device, its shared corner one, Corner two, corner three and corner four, wherein:Corner three is extended with right angle flanging, and fastener one enters roadbed through right angle flanging Interior that it is vertical fixed, being provided with hinge one at corner one makes watch box foldable;The lower section of hinge two also links lateral plate, fastens Part three enters in roadbed that it is laterally fixed through lateral plate.Compared with prior art, it is an advantage of the invention that:By that will fasten Part is laid in roadbed by the spacing of design and existed, and is fixed on by one-piece type movable watch box in the present apparatus on the fastener preset Face, convenient disassembly is conveniently replaceable and safeguarded that it is substantially reduced using with maintenance cost.
The guardrail is when mounted, it is necessary to which the artificial mount point to guardrail is punched, and installation screw rod is so very inconvenient, Position and forbidden simultaneously, cause constructional difficulties.
The content of the invention
The problem of existing instant invention overcomes prior art, it is proposed that a kind of Bridge guardrail steel planting structure and its construction Method, present invention is specifically directed to the inconvenience in guardrail installation process in this, the application can with automatic drilling, automatic hole-cleaning, Automatic bar planting is installed for rear guardrail, and speed is fast, and construction is quick.
The concrete technical scheme of the present invention is as follows:
Bridge guardrail steel planting structure, including locomotive, the locomotive include car body, and the corner of car body is provided with liquid Flatten row lifting column;Driven characterized in that, being provided with rear side of the car body by hydraulic stem one on guide rail pole back and forth Mobile hydraulic lift truck, guide rail pole, which is arranged in the hydraulic lift truck, the guide rail pole (210) to be provided with motor and drive, to be revolved The threaded rod turned, movable stand is arranged on the threaded rod;
The contraction box that rotation is driven by motor one is installed, hydraulic lifting post two is arranged on contraction box on the movable stand It is interior, drill bit is installed, the intersection of the drill bit and hydraulic lifting post two is cased with nut connector on the hydraulic lifting post two, Provided with the actuating unit for driving the rotation of hydraulic lifting post two in contraction box;
The side of the contraction box, which is provided with T-shaped frame, the T-shaped frame, is provided with frame frame, is provided with the frame frame logical Cross and spring cup be installed on the screw case that motor two drives rotation, the screw case, the side of the screw case is provided with rod notch, It is provided with the top of the loop bar for entangling screw case inner screw, the loop bar and is provided with for nut connector above the rod notch Insertion drives the nut connection head insertion slot of loop bar rotation, and the both sides of the loop bar are provided with balancing spring post.
Preferentially, pushing block is installed, spring lever, which withstands pushing block, makes it travel forward in lead-screw case in the screw case Screw rod advance.
Preferentially, the opposite side of the screw case is provided with slip casting mechanism, and the slip casting mechanism includes being arranged on screw case It is provided with fixed column above, the fixed column in rotating disk, the fixed column and drives turntable rotation, described turn provided with motor three Air blowing lifting column and slip casting lifting column are installed on disk;The bottom of the air blowing lifting column and slip casting lifting column is separately installed with note Starch head and blow head;Casting head and blow head are connected with outside Grouting Pipe and air supply pipe respectively.
Based on said apparatus, Bridge guardrail steel planting construction method, it is characterised in that comprise the following steps:
1) locomotive is moved to specified location, is started by hydraulic parallel lifting column and car body is risen into stabilization;
2) drive guide rail pole movable by hydraulic stem one and hydraulic lift truck drives guide rail pole to move up and down movement Frame, which is adjusted to correct position, makes drill bit perpendicular to road bed;
3) bit is driven by the actuating unit in contraction box, started while hydraulic lifting post two drives drill bit to decline Concrete progress drilling to road bed forms vertical hole slot;
4) after the completion of drilling, hydraulic lifting post two drives drill bit to rise can be in contraction box, and motor two drives screw rod afterwards Case, which is rotated by 90 °, makes fixed column be overlapped with original bit location;
5) turntable rotation is driven to make air blowing lifting column being directed at vertical hole slot by motor three, air blowing lifting column, which drives, blows Head declines, and now external high pressure air pump is supplied to blow head blows down the sediment in vertical hole slot, and motor three drives afterwards Rotating disk rotates again makes casting head be directed at vertical hole slot, and glue slurry is conveyed to casting head by outside Grouting Pipe enters vertical Hole slot;
6) motor two drives screw case rotation 180 degree nut is connected the first bit location of head insertion slot arrival and overlapped, now Hydraulic lifting post two drives drill bit to lower into loop bar, and in now nut connector insertion nut connection head insertion slot, nut connects Joint rotation in the case where hydraulic lifting post two and actuating unit drive, which declines, to be made loop bar rotating down pressing to drive the spiral shell in screw case Bar declines rotation and squeezes into the vertical bar planting of completion in vertical hole slot;
7) continuous repeat step 3) -6), pass through hydraulic stem one and drive guide rail pole advance to complete vertical drilling hole;
8) drive contraction box to be rotated by 90 ° by motor one, and drive threaded rod to rotate by motor, while hydraulic lifting Car, which drives guide rail pole to move up and down adjustment correct position, makes drill bit and road bed usually, and now drill bit is directed at the side of road bed;
9) repeat step 3 again) -6), drive guide rail pole to advance by hydraulic stem one and complete the bar planting of road bed side, this When bar planting operation complete;
10) guardrail is installed, nut is manually screwed on screw rod and completes the installation of guardrail, construction is completed.
Beneficial effects of the present invention:Dynamicization degree of the invention is high, and automatic drilling, automatic hole-cleaning, automatic bar planting is protected for rear Column is installed, and speed is fast, and construction is quick, is adapted to promote the use of.
Brief description of the drawings
Schematic diagram when Fig. 1 is Bridge guardrail steel planting structure construction of the present invention;
Fig. 2 is the structural representation of Bridge guardrail steel planting structure;
Fig. 3 is the structural representation of guide rail pole;
Fig. 4 is the structural representation of the part on movable stand;
Fig. 5 is the schematic diagram of Fig. 4 another view direction.
Embodiment
As illustrated, Bridge guardrail steel planting structure, including locomotive 200, the locomotive 200 includes car body 201, The corner of car body 201 is provided with hydraulic parallel lifting column 202;The rear side of car body 201 is provided with to drive by hydraulic stem one and led The hydraulic lift truck 208 that rail bar 211 moves back and forth above, guide rail pole 210 is arranged on the hydraulic lift truck 208, the guide rail The threaded rod 212 that motor 209 drives rotation is installed, movable stand 203 is arranged on the threaded rod 212 in bar 210.Guide rail pole 210 can do movable by hydraulic stem one, can also be driven by hydraulic lift truck 208 and do oscilaltion movement to adjust The orientation of movable stand 203.The corner of locomotive 200 is also equipped with warning lamp and is used for carrying on construction work at night being warned.
The contraction box 204 that rotation is driven by motor 1 is installed, hydraulic lifting post 2 205 is installed on movable stand 203 In contraction box 204, drill bit 207, the drill bit 207 and hydraulic lifting post 2 205 are installed on the hydraulic lifting post 2 205 Intersection be cased with nut connector 240, provided with the actuating unit for driving the rotation of hydraulic lifting post 2 205 in contraction box 204.
The side of contraction box 204 is provided with T-shaped frame 216, the T-shaped frame 216 and is provided with frame frame 221, the frame frame 221 On the screw case 2079 that rotation is driven by motor 2 220 is installed, spring cup 2072 is installed on the screw case 2079, it is described The side of screw case 2079 is provided with rod notch 2075, and the top of the rod notch 2075, which is provided with, entangles in screw case 2079 The loop bar 2077 of screw rod, the top of loop bar 2077 is provided with inserts the spiral shell for driving loop bar 2077 to rotate for nut connector 240 Female connector slot 2078, the both sides of the loop bar 2077 are provided with balancing spring post 2076.216 liang of contraction box 204 and T-shaped frame Person can be driven by motor 1 and is rotated by 90 °, and make whole construction equipment select 90 degree to carry out side road bed to roadbed side Side 301 carries out bar planting.
Pushing block 2074 is installed, spring lever 2073, which withstands pushing block 2074, makes its lead-screw that travels forward in screw case 2079 Screw rod in case advances.Before construction, screw is uniformly arranged in screw case 2079, when a screw rod is laid it Afterwards, latter screw rod is just automatically pushed to foremost by pushing block 2074, and the principle is identical for pin principle with stapler, no longer goes to live in the household of one's in-laws on getting married herein State.During bar planting, nut connects head insertion slot 2078 and is caught in inside to drive loop bar 2077 to revolve by nut connector 240 Turn, and screw rod is blocked in the end of loop bar, therefore, when nut connector 240 rotates, screw rod is just got into bar planting hole It is interior.It can be returned automatically because the both sides of loop bar 2077 are that have balancing spring post 2076, therefore when after the ejection screw rod success of loop bar 2077 Bullet.
The opposite side of screw case 2079 is provided with slip casting mechanism 215, and the slip casting mechanism 215 includes being arranged on screw case It is provided with fixed column 2151 above 2079, the fixed column 2151 in rotating disk 2153, the fixed column 2151 and is provided with motor Three drive rotating disks 2153 are rotated, and air blowing lifting column 2155 and slip casting lifting column 2154 are provided with the rotating disk 2153;It is described to blow The bottom of gas lifting column 2155 and slip casting lifting column 2154 is separately installed with casting head 2157 and blow head 2158;Casting head 2157 It is connected respectively with outside Grouting Pipe and air supply pipe with blow head 2158.
Based on said apparatus, Bridge guardrail steel planting construction method comprises the following steps:
1) locomotive 200 is moved to specified location, is started by hydraulic parallel lifting column 202 and car body 201 is risen into stabilization;
2) drive guide rail pole 210 movable by hydraulic stem one and hydraulic lift truck 208 drives and moved down on guide rail pole 210 It is dynamic movable stand 203 is adjusted to correct position to make drill bit 207 perpendicular to road bed;
3) drive drill bit 207 to rotate by the actuating unit in contraction box 204, bored while hydraulic lifting post 2 205 drives First 207, which decline the concrete progress drilling started to road bed, forms vertical hole slot;
4) after the completion of drilling, hydraulic lifting post 2 205 drives drill bit 207 to rise and can arrived in contraction box 204, afterwards motor two 220 drive screw cases 2079, which are rotated by 90 °, makes fixed column 2151 be overlapped with original position of drill bit 207;
5) rotation of rotating disk 2153 is driven to make air blowing lifting column 2155 being directed at vertical hole slot, air blowing lifting column by motor three 2155 drive blow heads 2158 decline, and now external high pressure air pump is supplied to blow head 2158 by the sediment in vertical hole slot Blow down, motor three, which drives rotating disk 2153 to rotate again, afterwards makes casting head 2157 be directed at vertical hole slot, passes through outside Grouting Pipe Vertical hole slot is entered to the conveying glue slurry of casting head 2157;
6) motor 2 220 drives the rotation of screw case 2079 180 degree nut is connected head insertion slot 2078 and reaches first drill bit 207 Position is overlapped, and now hydraulic lifting post 2 205 drives drill bit 207 to lower into loop bar 2077, and now nut connector 240 is inserted Enter in nut connection head insertion slot 2078, nut connector 240 rotates in the case where hydraulic lifting post 2 205 and actuating unit drive to be declined Make the rotating down pressing of loop bar 2077 and complete vertical plant so as to drive the screw rod decline rotation in screw case 2079 to squeeze into vertical hole slot Muscle;
7) continuous repeat step 3) -6), pass through hydraulic stem one and drive the advance of guide rail pole 210 to complete vertical drilling hole;
8) drive contraction box 204 to be rotated by 90 ° by motor 1, and drive threaded rod 212 to rotate by motor 209, Hydraulic lift truck 208, which drives guide rail pole 210 to move up and down adjustment correct position, simultaneously makes drill bit 207 and road bed usually, now Drill bit 207 is directed at the side of road bed;
9) repeat step 3 again) -6), pass through hydraulic stem one and drive guide rail pole 210 to advance and complete road bed side 301 Bar planting, now bar planting operation is completed;
10) guardrail 100 is installed, nut is manually screwed on screw rod and completes the installation of guardrail, construction is completed.
In addition to the implementation, the present invention can also have other embodiment.All use equivalent substitution or equivalent transformation shape Into technical scheme, all fall within the protection domain of application claims.

Claims (3)

1. Bridge guardrail steel planting structure, including locomotive (200), the locomotive (200) include car body (201), car body (201) corner is provided with hydraulic parallel lifting column (202);
Driven characterized in that, being provided with rear side of the car body (201) by hydraulic stem one in guide rail pole (211) above back and forth Mobile hydraulic lift truck (208), guide rail pole (210) is arranged in the hydraulic lift truck (208), the guide rail pole (210) The threaded rod (212) that motor (209) drives rotation is installed, movable stand (203) is arranged on the threaded rod (212);It is mobile The corner of car (200) is also equipped with warning lamp;
The contraction box (204) that rotation is driven by motor one (213), hydraulic lifting post two are installed on the movable stand (203) (205) it is arranged in contraction box (204), drill bit (207), the drill bit (207) is installed on the hydraulic lifting post two (205) It is cased with the intersection of hydraulic lifting post two (205) in nut connector (240), contraction box (204) provided with drive hydraulic lifting The actuating unit of post two (205) rotation;The side of the contraction box (204) is provided with T-shaped frame (216), the T-shaped frame (216) On be provided be provided with frame frame (221), the frame frame (221) by motor two (220) drive rotation screw case (2079), Spring cup (2072) is installed, the side of the screw case (2079) is provided with rod notch (2075) on the screw case (2079), The loop bar (2077) for entangling screw case (2079) inner screw, the loop bar are installed above the rod notch (2075) (2077) top is provided with the nut connection head insertion slot that loop bar (2077) rotation is driven for nut connector (240) insertion (2078), the both sides of the loop bar (2077) are provided with balancing spring post (2076).
2. Bridge guardrail steel planting structure according to claim 1, it is characterised in that pacify in the screw case (2079) Equipped with pushing block (2074), spring lever (2073), which withstands pushing block (2074), makes its screw rod travelled forward in lead-screw case advance.
3. Bridge guardrail steel planting construction method, it is characterised in that comprise the following steps:
1) locomotive (200) is moved to specified location, is started by hydraulic parallel lifting column (202) and rise car body (201) surely It is fixed;
2) drive guide rail pole (210) movable by hydraulic stem one and hydraulic lift truck (208) is driven above and below guide rail pole (210) Movable stand (203) is adjusted to correct position by movement makes drill bit (207) perpendicular to road bed;
3) drill bit (207) is driven to rotate by the actuating unit in contraction box (204), while hydraulic lifting post two (205) drives Drill bit (207) declines the concrete progress drilling started to road bed and forms vertical hole slot;
4) after the completion of drilling, hydraulic lifting post two (205) drives drill bit (207) to rise and can arrived in contraction box (204), afterwards motor Two (220), which drive screw case (2079) to be rotated by 90 °, makes fixed column (2151) be overlapped with original drill bit (207) position;
5) rotating disk (2153) rotation is driven to make air blowing lifting column (2155) being directed at vertical hole slot, air blowing lifting column by motor three (2155) blow head (2158) is driven to decline, now external high pressure air pump is supplied in vertical hole slot to blow head (2158) Sediment blow down, motor three drives rotating disk (2153) rotation makes casting head (2157) be directed at vertical hole slot again afterwards, by outer The Grouting Pipe in portion conveys glue slurry to casting head (2157) and enters vertical hole slot;
6) motor two (220) drives screw case (2079) rotation 180 degree nut is connected head insertion slot (2078) and reaches first drill bit (207) position is overlapped, and now hydraulic lifting post two (205) drives drill bit (207) to lower into loop bar (2077), now nut In connector (240) insertion nut connection head insertion slot (2078), nut connector (240) is in hydraulic lifting post two (205) and moves Force mechanisms drive lower rotation decline to make loop bar (2077) rotating down pressing to drive the screw rod in screw case (2079) to decline rotation Squeeze into and vertical bar planting is completed in vertical hole slot;
7) continuous repeat step 3) -6), pass through hydraulic stem one and drive guide rail pole (210) advance to complete vertical drilling hole;
8) drive contraction box (204) to be rotated by 90 ° by motor one (213), and drive threaded rod (212) to revolve by motor (209) Turn, while hydraulic lift truck (208), which drives guide rail pole (210) to move up and down adjustment correct position, makes drill bit (207) and road bed Usually, now drill bit (207) is directed at the side of road bed;
9) repeat step 3 again) -6), pass through hydraulic stem one and drive guide rail pole (210) to advance and complete road bed side (301) Bar planting, now bar planting operation is completed;
10) guardrail (100) is installed, nut is manually screwed on screw rod and completes the installation of guardrail, construction is completed.
CN201710473992.3A 2017-06-21 2017-06-21 Bridge guardrail steel planting structure and its construction method Active CN107142852B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710473992.3A CN107142852B (en) 2017-06-21 2017-06-21 Bridge guardrail steel planting structure and its construction method
CN201811185398.5A CN109098085B (en) 2017-06-21 2017-06-21 Bridge guardrail drilling and bar planting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710473992.3A CN107142852B (en) 2017-06-21 2017-06-21 Bridge guardrail steel planting structure and its construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201811185398.5A Division CN109098085B (en) 2017-06-21 2017-06-21 Bridge guardrail drilling and bar planting structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN107142852A true CN107142852A (en) 2017-09-08
CN107142852B CN107142852B (en) 2019-07-30

Family

ID=59782651

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201811185398.5A Active CN109098085B (en) 2017-06-21 2017-06-21 Bridge guardrail drilling and bar planting structure and construction method thereof
CN201710473992.3A Active CN107142852B (en) 2017-06-21 2017-06-21 Bridge guardrail steel planting structure and its construction method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201811185398.5A Active CN109098085B (en) 2017-06-21 2017-06-21 Bridge guardrail drilling and bar planting structure and construction method thereof

Country Status (1)

Country Link
CN (2) CN109098085B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086663A (en) * 2018-02-05 2018-05-29 大荣建设集团有限公司 Interior architecture object top and wall column flank hole bar planting stent and its construction method
CN108221692A (en) * 2018-01-15 2018-06-29 广东省建筑工程机械施工有限公司 A kind of Landscape Bridge arch ring stone material bar planting method
CN108677761A (en) * 2018-06-13 2018-10-19 胡梦婷 A kind of bridge pier bar planting ruggedized equipment and its reinforcing construction process
CN111424589A (en) * 2020-04-08 2020-07-17 曾瑞云 Mounting equipment for road isolation curtain wall
CN112832160A (en) * 2021-01-29 2021-05-25 山西省交通规划勘察设计院有限公司 Highway guardrail bar planting device
CN112854808A (en) * 2021-02-05 2021-05-28 李凌哲 Architectural design engineering is with consolidating construction device
CN113417485A (en) * 2021-06-30 2021-09-21 浙江工业职业技术学院 Building support column adds muscle device

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700613B (en) * 2019-10-16 2021-10-08 高驰国际设计有限公司 Cast-in-situ bar-planting lifting type drilling vehicle
CN111535486B (en) * 2020-05-11 2021-08-20 中铁建设集团华东工程有限公司 Rear embedded part mounting device for curtain wall
CN111962405A (en) * 2020-07-07 2020-11-20 中铁六局集团太原铁路建设有限公司 Existing railway pier self-climbing operation platform without support or suspension

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10219625A (en) * 1997-02-10 1998-08-18 Daiko Bussan Kk Reinforcement engineering method of reinforced concrete bridge pier
CN102286921A (en) * 2011-05-25 2011-12-21 河南省九建工程有限公司 bridge widening splicing structure and construction method thereof
CN104047236A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Repair method of vehicle bump pavement of bridgehead
CN106168016A (en) * 2016-08-30 2016-11-30 东莞理工学院 Floorings ruggedized construction and floorings reinforcement means
CN106245542A (en) * 2016-08-24 2016-12-21 北京中交桥宇科技有限公司 Quickly cut bridge deck concrete construction technology

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0417483U (en) * 1990-05-31 1992-02-13
CN2403885Y (en) * 1999-12-16 2000-11-01 侯学志 Perforator far guard rail steel pipe pile of super highway
CN103362439A (en) * 2012-03-31 2013-10-23 南京金长江交通设施有限公司 Self-propelled pile driving, pile pulling and drilling integrated machine
CN104127026B (en) * 2014-07-31 2016-01-20 广州市一通数控科技有限公司 The synchronous all-in-one of wire brush drilling and hair-planting
CN204983725U (en) * 2015-08-10 2016-01-20 台州鑫洋市政建筑有限公司 Portable constructional column breast bar planting device
CN205134241U (en) * 2015-12-01 2016-04-06 蒋佳 Highway guardrail construction multi -function vehicle carries and rolls over arm platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10219625A (en) * 1997-02-10 1998-08-18 Daiko Bussan Kk Reinforcement engineering method of reinforced concrete bridge pier
CN102286921A (en) * 2011-05-25 2011-12-21 河南省九建工程有限公司 bridge widening splicing structure and construction method thereof
CN104047236A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Repair method of vehicle bump pavement of bridgehead
CN106245542A (en) * 2016-08-24 2016-12-21 北京中交桥宇科技有限公司 Quickly cut bridge deck concrete construction technology
CN106168016A (en) * 2016-08-30 2016-11-30 东莞理工学院 Floorings ruggedized construction and floorings reinforcement means

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221692A (en) * 2018-01-15 2018-06-29 广东省建筑工程机械施工有限公司 A kind of Landscape Bridge arch ring stone material bar planting method
CN108086663A (en) * 2018-02-05 2018-05-29 大荣建设集团有限公司 Interior architecture object top and wall column flank hole bar planting stent and its construction method
CN108677761A (en) * 2018-06-13 2018-10-19 胡梦婷 A kind of bridge pier bar planting ruggedized equipment and its reinforcing construction process
CN111424589A (en) * 2020-04-08 2020-07-17 曾瑞云 Mounting equipment for road isolation curtain wall
CN111424589B (en) * 2020-04-08 2022-01-18 江苏杰震建设科技有限公司 Mounting equipment for road isolation curtain wall
CN112832160A (en) * 2021-01-29 2021-05-25 山西省交通规划勘察设计院有限公司 Highway guardrail bar planting device
CN112854808A (en) * 2021-02-05 2021-05-28 李凌哲 Architectural design engineering is with consolidating construction device
CN113417485A (en) * 2021-06-30 2021-09-21 浙江工业职业技术学院 Building support column adds muscle device

Also Published As

Publication number Publication date
CN107142852B (en) 2019-07-30
CN109098085A (en) 2018-12-28
CN109098085B (en) 2020-01-10

Similar Documents

Publication Publication Date Title
CN107142852A (en) Bridge guardrail steel planting structure and its construction method
US9260929B2 (en) Mobile rig and method
US9540878B2 (en) Method and apparatus for inspecting and tallying pipe
CN206600769U (en) A kind of new adjustable traffic signal lamp support
CN1330844C (en) Drill head steering
CN207331518U (en) A kind of road height limiter
CN207379471U (en) A kind of existing vcehicular tunnel device
CN107424423A (en) A kind of emergency traffic lights
CN108316174B (en) Sound barrier overhauling equipment and method
CN105507843B (en) A kind of quick Wellhead butt joint device and application method
CN202359521U (en) Anti-collision vehicle stopping device
CN104763196A (en) Intelligent roadway receding-free stereo garage
CN214831538U (en) Practical device of mine underground movable rail car pusher
CN201443051U (en) Folding guardrail with adjustable bracket
CN204279501U (en) Telescopic road junction cross barrier machine
CN203698301U (en) Inclined roadway normally-closed pneumatic beam interlocking type trolley retaining device
CN106621339A (en) Roller coaster with rotary locking device
CN206591467U (en) Coal mine sloping lane transport warning bar
CN206267069U (en) A kind of detachable movable traffic guardrail
CN207862779U (en) One road and bridge protective device
CN208502436U (en) A kind of building engineering construction place warning rail
CN208055903U (en) Sound barrier repair apparatus
CN102493376B (en) Anti-collision vehicle interception device
CN216435110U (en) Voice bidirectional automatic alarm system
CN206110032U (en) Movable water mud way way hard shoulder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190617

Address after: Room 10602, Building 1, Wangjing International Building, Fengcheng Sixth Road, Xi'an Economic and Technological Development Zone, Shaanxi 710000

Applicant after: Shaanxi one intellectual property operation Co., Ltd.

Address before: 277524 No. 174, Bashangcun, Guanqiao Town, Tengzhou City, Zaozhuang City, Shandong Province

Applicant before: Qu Chengming

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200325

Address after: 150080 No. 189 Hexing Road, Nangang District, Heilongjiang, Harbin

Patentee after: HEILONGJIANG FORESTRY DESIGN INSTITUTE

Address before: Room 10602, Building 1, Wangjing International Building, Fengcheng Sixth Road, Xi'an Economic and Technological Development Zone, Shaanxi 710000

Patentee before: SHAANXI ZHUANYI INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

TR01 Transfer of patent right