CN108212273A - A kind of geological disaster stone crushing plant - Google Patents

A kind of geological disaster stone crushing plant Download PDF

Info

Publication number
CN108212273A
CN108212273A CN201711417073.0A CN201711417073A CN108212273A CN 108212273 A CN108212273 A CN 108212273A CN 201711417073 A CN201711417073 A CN 201711417073A CN 108212273 A CN108212273 A CN 108212273A
Authority
CN
China
Prior art keywords
fixedly connected
stent
strut
belt
belt wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711417073.0A
Other languages
Chinese (zh)
Inventor
陈小辉
张凡
邓文红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711417073.0A priority Critical patent/CN108212273A/en
Publication of CN108212273A publication Critical patent/CN108212273A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/02Jaw crushers or pulverisers
    • B02C1/04Jaw crushers or pulverisers with single-acting jaws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/02Jaw crushers or pulverisers
    • B02C1/10Shape or construction of jaws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/02Feeding devices

Abstract

The present invention relates to a kind of crushing plant more particularly to a kind of geological disaster stone crushing plants.The technical problem to be solved in the present invention is to provide a kind of machineries to replace man made geologic hazard stone crushing plant.In order to solve the above technical problem, the present invention provides such a geological disaster stone crushing plants, include pedestal, first support, second support, the second strut, first motor etc.;The first strut is fixedly connected with pedestal is symmetrical, rotary type is connected with first pulley on two the first struts, conveyer belt is connected between two first pulleys, is uniformly fixedly connected with the first conehead on a moving belt, the second belt wheel is fixedly connected in the first pulley of left side.The present invention has the function of to carry out stone broken, not only realizes the function of transmitting indirectly, but also also achieves the function that quick crashing is carried out to stone, and the present invention has the characteristics that easy to use, safe to use, easy to operate, to manufacture cost low.

Description

A kind of geological disaster stone crushing plant
Technical field
The present invention relates to a kind of crushing plant more particularly to a kind of geological disaster stone crushing plants.
Background technology
Head crusher be suitable for it is soft or it is hard and extremely hard material crush, shaping, be widely used in various ores, cement, Refractory material, bauxite clinker, diamond dust, glass raw material, mechanism building sand, building stones and various metallurgical slags, especially to carbon SiClx, diamond dust, sintered bauxite, the contour hard, ultrahard of U.S. sand and the other types of crusher yield work(of resistance to abrasion material ratio Imitate higher.
It after geological disaster occurs, needs that stone clear up to crush, existing crush all is manually using hammer Head crushes stone, manually stone is carried out using tup broken not only time-consuming and laborious, but also is manually using hammer It is abnormally dangerous when head carries out broken, it accidentally easily makes one to come to harm, therefore there is an urgent need for a kind of machinery instead of artificial geology calamity Evil stone crushing plant.
Invention content
(1) technical problems to be solved
The present invention needs that stone clear up to crush, existing crush all is to overcome after geological disaster occurs Manually stone is crushed using tup, manually stone is carried out using tup it is broken not only time-consuming and laborious, and And manually when tup is used to carry out broken, abnormally dangerous, the shortcomings that accidentally easily making one to come to harm, the present invention will solve Certainly the technical issues of, is to provide a kind of machinery and replaces man made geologic hazard stone crushing plant.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a geological disaster stone crushing plants, include Pedestal, the first strut, first pulley, conveyer belt, the first conehead, the second belt wheel, first support, second support, the second strut, One motor, turntable, pin rod, third strut, slotted disk, third belt wheel, the first belt, the second belt, the 4th strut, the first cam, 4th belt wheel, sliding rail, sliding block, the first spring, block, second spring, third stent, connecting rod, fixed plate and the second conehead, Pedestal is symmetrical to be fixedly connected with the first strut, and rotary type is connected with first pulley on two the first struts, two first Conveyer belt is connected between belt wheel, is uniformly fixedly connected with the first conehead on a moving belt, it is fixed in the first pulley of left side to connect The second belt wheel is connected to, first support is fixedly connected in the upper left of pedestal, is fixedly connected above the right side of first support There is second support, two struts are fixedly connected in the lower left of second support, is fixedly connected in the bottom of the second strut One motor, on the output shaft of the first motor interference be connected with turntable, turntable eccentric position be fixedly connected with pin rod, The lower left of two stents is fixedly connected with third strut, and third strut is located at the right side of the second strut, on a left side for third strut End rotary type is connected with slotted disk, and slotted disk coordinates with pin rod, and third belt wheel, third belt wheel and the second band are fixedly connected on slotted disk The first belt is connected between wheel, is fixedly connected with the 4th strut in the lower left of second support, the 4th strut is located at third The right side of strut is connected with the first cam in the lower rotation formula of the 4th strut, the 4th band is fixedly connected on the first cam Wheel, is connected with the second belt between the 4th belt wheel and third belt wheel, sliding rail is fixedly connected in the lower right of second support, Slidingtype is connected with sliding block on sliding rail, is fixedly connected with the first spring in the lower right of second support, the first spring, which is located at, to be slided The left side of rail is fixedly connected with block in the bottom of sliding rail, second spring is fixedly connected on block, fixed on sliding block to connect Third stent is connected to, the top of third stent is fixedly connected with the bottom end of the first spring, top and the third stent of second spring Bottom be fixedly connected, bottom be fixedly connected there are two connecting rod, the bottom of two connecting rods is fixedly connected with fixed plate, The second conehead is fixedly connected in fixed plate.
Preferably, support device has been further included, support device includes the 4th stent, the 5th stent and support plate, the bottom of at The 4th stent is fixedly connected on seat, the 4th stent is located at the left side of the first strut of right side, the 5th is fixedly connected on pedestal Stent, the 5th stent are located at the left side of the 4th stent, and support plate is fixedly connected on the top of the 4th stent and the 5th stent.
Preferably, mobile device has been further included, mobile device includes handle, wheel, the 5th belt wheel, the second motor, Six belt wheels and third belt, are fixedly connected with handle on the left of first support, the bottom end of pedestal it is symmetrical be equipped with wheel, The 5th belt wheel is fixedly connected on left-hand wheel, the second motor is fixedly connected in the bottom of pedestal, in the defeated of the second motor Interference is connected with the 6th belt wheel on shaft, and third belt is connected between the 6th belt wheel and the 5th belt wheel.
Preferably, the 6th stent, third motor and the second cam have been further included, has been fixedly connected on the left of the 5th stent 6th stent is fixedly connected with third motor in the left part of the 6th stent, on the output shaft of third motor interference be connected with Two cams, the second cam are contacted with conveyer belt.
Operation principle:When people need, in use, first broken stone is needed to be put on conveyer belt, then to restart First motor, the first motor drive turntable to rotate by output shaft, and turntable rotation drives slotted disk to rotate by pin rod, slotted disk rotation The rotation of third belt wheel is driven, the rotation of third belt wheel drives the second belt wheel to rotate by the first belt, and the rotation of the second belt wheel drives the One belt wheel rotates, and first pulley rotation drives conveyer belt rotation, so as to reach the function being transmitted to stone, third band rotation Dynamic the 4th belt wheel to be driven to rotate by the second belt, the rotation of the 4th belt wheel drives the rotation of the first cam, and the rotation of the first cam is to the Three stents are squeezed, and move down third stent, third stent move down drive connecting rod move down, connecting rod to Lower mobile the second conehead driven in fixed plate moves down, and the stone on conveyer belt is crushed so as to reach the second conehead Function, when the first cam rotation third stent is not squeezed when, because of the pulling force of the first spring and the bullet of second spring Power rises third stent, and broken function is carried out to continual stone so as to reach.
Because having further included support device, support device includes the 4th stent, the 5th stent and support plate, on pedestal The 4th stent is fixedly connected with, the 4th stent is located at the left side of the first strut of right side, and the 5th stent is fixedly connected on pedestal, 5th stent is located at the left side of the 4th stent, and support plate is fixedly connected on the top of the 4th stent and the 5th stent.So work as In use, because being fixedly connected with support plate on the top of the 4th stent and the 5th stent, stone is broken in the second conehead When broken, support plate plays the function being supported to conveyer belt.
Because having further included mobile device, mobile device includes handle, wheel, the 5th belt wheel, the second motor, the 6th band Wheel and third belt, first support on the left of be fixedly connected with handle, bottom end it is symmetrical be equipped with wheel, in left side The 5th belt wheel is fixedly connected on wheel, the second motor is fixedly connected in the bottom of pedestal, on the output shaft of the second motor Interference is connected with the 6th belt wheel, and third belt is connected between the 6th belt wheel and the 5th belt wheel.So when using mobile device, Start the second motor first, the second motor drives the 6th belt wheel to rotate by output shaft, and the rotation of the 6th belt wheel passes through third belt The 5th belt wheel is driven to rotate, the rotation of the 5th belt wheel drives wheel rotation, and mobile function is carried out so as to reach.
Because having further included the 6th stent, third motor and the second cam, is fixedly connected on the left of the 5th stent Six stents are fixedly connected with third motor in the left part of the 6th stent, on the output shaft of third motor interference be connected with second Cam, the second cam are contacted with conveyer belt.So when in use, starting third motor first, third motor passes through output shaft band Dynamic second cam rotation, the rotation of the second cam squeeze conveyer belt, the rubble clamped on conveyer belt are shaked off so as to reach Function.
(3) advantageous effect
The present invention has the function of to carry out stone broken, not only realizes the function of transmitting indirectly, but also also achieve The function of quick crashing is carried out to stone, the present invention has the spies such as easy to use, safe to use, easy to operate, manufacture cost is low Point.
Description of the drawings
Fig. 1 is the main structure diagram of the first of the invention.
Fig. 2 is the main structure diagram of support device of the present invention.
Fig. 3 is the main structure diagram of mobile device of the present invention.
Fig. 4 is main structure diagram second of the invention.
Label in attached drawing for:1- pedestals, the first struts of 2-, 3- first pulleys, 4- conveyer belts, the first coneheads of 5-, 6- Two belt wheels, 7- first supports, 8- second supports, the second struts of 9-, the first motors of 10-, 11- turntables, 12- pin rods, 13- third branch Bar, 14- slotted disks, 15- third belt wheels, the first belts of 16-, the second belts of 17-, the 4th struts of 18-, the first cams of 19-, 20- Four belt wheels, 21- sliding rails, 22- sliding blocks, the first springs of 23-, 24- blocks, 25- second springs, 26- third stents, 27- connecting rods, 28- fixed plates, the second coneheads of 29-, 30- support devices, the 4th stents of 301-, the 5th stents of 302-, 303- support plates, 31- are moved Dynamic device, 311- handles, 312- wheels, the 5th belt wheels of 313-, the second motors of 314-, the 6th belt wheels of 315-, 316- third belts, The 6th stents of 321-, 322- third motors, the second cams of 323-.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of geological disaster stone crushing plant, as shown in Figs 1-4, include pedestal 1, the first strut 2, first pulley 3, Conveyer belt 4, the first conehead 5, the second belt wheel 6, first support 7, second support 8, the second strut 9, the first motor 10, turntable 11, Pin rod 12, third strut 13, slotted disk 14, third belt wheel 15, the first belt 16, the second belt 17, the 4th strut 18, the first cam 19th, the 4th belt wheel 20, sliding rail 21, sliding block 22, the first spring 23, block 24, second spring 25, third stent 26, connecting rod 27, 28 and second conehead 29 of fixed plate is fixedly connected with the first strut 2 pedestal 1 is symmetrical, is rotated on two the first struts 2 Formula is connected with first pulley 3, and conveyer belt 4 is connected between two first pulleys 3, is uniformly fixedly connected on the transport belt 4 One conehead 5, is fixedly connected with the second belt wheel 6 in left side first pulley 3, and first is fixedly connected in the upper left of pedestal 1 Stent 7 is fixedly connected with second support 8 above the right side of first support 7, is fixedly connected in the lower left of second support 8 There are two struts, the first motor 10 is fixedly connected in the bottom of the second strut 9, the interference connection on the output shaft of the first motor 10 Have a turntable 11, turntable 11 eccentric position be fixedly connected with pin rod 12, be fixedly connected in the lower left of second support 8 Three struts 13, third strut 13 are located at the right side of the second strut 9, slotted disk 14 are connected in the left end rotary type of third strut 13, Slotted disk 14 coordinates with pin rod 12, and third belt wheel 15 is fixedly connected on slotted disk 14, is connected between 15 and second belt wheel 6 of third belt wheel The first belt 16 is connected to, is fixedly connected with the 4th strut 18 in the lower left of second support 8, the 4th strut 18 is located at third branch The right side of bar 13 is connected with the first cam 19 in the lower rotation formula of the 4th strut 18, is fixedly connected on the first cam 19 4th belt wheel 20 is connected with the second belt 17 between the 4th belt wheel 20 and third belt wheel 15, consolidate in the lower right of second support 8 Surely sliding rail 21 is connected with, slidingtype is connected with sliding block 22 on sliding rail 21, and is fixedly connected in the lower right of second support 8 One spring 23, the first spring 23 are located at the left side of sliding rail 21, block 24 are fixedly connected in the bottom of sliding rail 21, on block 24 Second spring 25 is fixedly connected with, third stent 26, the top of third stent 26 and the first bullet are fixedly connected on sliding block 22 The bottom end of spring 23 is fixedly connected, and the top of second spring 25 is fixedly connected with the bottom of third stent 26, bottom fix connect Connecting rod 27 there are two connecing, the bottom of two connecting rods 27 is fixedly connected with fixed plate 28, is fixedly connected in fixed plate 28 Second conehead 29.
Embodiment 2
A kind of geological disaster stone crushing plant, as shown in Figs 1-4, include pedestal 1, the first strut 2, first pulley 3, Conveyer belt 4, the first conehead 5, the second belt wheel 6, first support 7, second support 8, the second strut 9, the first motor 10, turntable 11, Pin rod 12, third strut 13, slotted disk 14, third belt wheel 15, the first belt 16, the second belt 17, the 4th strut 18, the first cam 19th, the 4th belt wheel 20, sliding rail 21, sliding block 22, the first spring 23, block 24, second spring 25, third stent 26, connecting rod 27, 28 and second conehead 29 of fixed plate is fixedly connected with the first strut 2 pedestal 1 is symmetrical, is rotated on two the first struts 2 Formula is connected with first pulley 3, and conveyer belt 4 is connected between two first pulleys 3, is uniformly fixedly connected on the transport belt 4 One conehead 5, is fixedly connected with the second belt wheel 6 in left side first pulley 3, and first is fixedly connected in the upper left of pedestal 1 Stent 7 is fixedly connected with second support 8 above the right side of first support 7, is fixedly connected in the lower left of second support 8 There are two struts, the first motor 10 is fixedly connected in the bottom of the second strut 9, the interference connection on the output shaft of the first motor 10 Have a turntable 11, turntable 11 eccentric position be fixedly connected with pin rod 12, be fixedly connected in the lower left of second support 8 Three struts 13, third strut 13 are located at the right side of the second strut 9, slotted disk 14 are connected in the left end rotary type of third strut 13, Slotted disk 14 coordinates with pin rod 12, and third belt wheel 15 is fixedly connected on slotted disk 14, is connected between 15 and second belt wheel 6 of third belt wheel The first belt 16 is connected to, is fixedly connected with the 4th strut 18 in the lower left of second support 8, the 4th strut 18 is located at third branch The right side of bar 13 is connected with the first cam 19 in the lower rotation formula of the 4th strut 18, is fixedly connected on the first cam 19 4th belt wheel 20 is connected with the second belt 17 between the 4th belt wheel 20 and third belt wheel 15, consolidate in the lower right of second support 8 Surely sliding rail 21 is connected with, slidingtype is connected with sliding block 22 on sliding rail 21, and is fixedly connected in the lower right of second support 8 One spring 23, the first spring 23 are located at the left side of sliding rail 21, block 24 are fixedly connected in the bottom of sliding rail 21, on block 24 Second spring 25 is fixedly connected with, third stent 26, the top of third stent 26 and the first bullet are fixedly connected on sliding block 22 The bottom end of spring 23 is fixedly connected, and the top of second spring 25 is fixedly connected with the bottom of third stent 26, bottom fix connect Connecting rod 27 there are two connecing, the bottom of two connecting rods 27 is fixedly connected with fixed plate 28, is fixedly connected in fixed plate 28 Second conehead 29.
Support device 30 is further included, support device 30 includes the 4th stent 301, the 5th stent 302 and support plate 303, the 4th stent 301 is fixedly connected on pedestal 1, the 4th stent 301 is located at the left side of the first strut of right side 2, in pedestal 1 On be fixedly connected with the 5th stent 302, the 5th stent 302 is located at the left side of the 4th stent 301, in the 4th stent 301 and the 5th The top of stent 302 is fixedly connected with support plate 303.
Embodiment 3
A kind of geological disaster stone crushing plant, as shown in Figs 1-4, include pedestal 1, the first strut 2, first pulley 3, Conveyer belt 4, the first conehead 5, the second belt wheel 6, first support 7, second support 8, the second strut 9, the first motor 10, turntable 11, Pin rod 12, third strut 13, slotted disk 14, third belt wheel 15, the first belt 16, the second belt 17, the 4th strut 18, the first cam 19th, the 4th belt wheel 20, sliding rail 21, sliding block 22, the first spring 23, block 24, second spring 25, third stent 26, connecting rod 27, 28 and second conehead 29 of fixed plate is fixedly connected with the first strut 2 pedestal 1 is symmetrical, is rotated on two the first struts 2 Formula is connected with first pulley 3, and conveyer belt 4 is connected between two first pulleys 3, is uniformly fixedly connected on the transport belt 4 One conehead 5, is fixedly connected with the second belt wheel 6 in left side first pulley 3, and first is fixedly connected in the upper left of pedestal 1 Stent 7 is fixedly connected with second support 8 above the right side of first support 7, is fixedly connected in the lower left of second support 8 There are two struts, the first motor 10 is fixedly connected in the bottom of the second strut 9, the interference connection on the output shaft of the first motor 10 Have a turntable 11, turntable 11 eccentric position be fixedly connected with pin rod 12, be fixedly connected in the lower left of second support 8 Three struts 13, third strut 13 are located at the right side of the second strut 9, slotted disk 14 are connected in the left end rotary type of third strut 13, Slotted disk 14 coordinates with pin rod 12, and third belt wheel 15 is fixedly connected on slotted disk 14, is connected between 15 and second belt wheel 6 of third belt wheel The first belt 16 is connected to, is fixedly connected with the 4th strut 18 in the lower left of second support 8, the 4th strut 18 is located at third branch The right side of bar 13 is connected with the first cam 19 in the lower rotation formula of the 4th strut 18, is fixedly connected on the first cam 19 4th belt wheel 20 is connected with the second belt 17 between the 4th belt wheel 20 and third belt wheel 15, consolidate in the lower right of second support 8 Surely sliding rail 21 is connected with, slidingtype is connected with sliding block 22 on sliding rail 21, and is fixedly connected in the lower right of second support 8 One spring 23, the first spring 23 are located at the left side of sliding rail 21, block 24 are fixedly connected in the bottom of sliding rail 21, on block 24 Second spring 25 is fixedly connected with, third stent 26, the top of third stent 26 and the first bullet are fixedly connected on sliding block 22 The bottom end of spring 23 is fixedly connected, and the top of second spring 25 is fixedly connected with the bottom of third stent 26, bottom fix connect Connecting rod 27 there are two connecing, the bottom of two connecting rods 27 is fixedly connected with fixed plate 28, is fixedly connected in fixed plate 28 Second conehead 29.
Support device 30 is further included, support device 30 includes the 4th stent 301, the 5th stent 302 and support plate 303, the 4th stent 301 is fixedly connected on pedestal 1, the 4th stent 301 is located at the left side of the first strut of right side 2, in pedestal 1 On be fixedly connected with the 5th stent 302, the 5th stent 302 is located at the left side of the 4th stent 301, in the 4th stent 301 and the 5th The top of stent 302 is fixedly connected with support plate 303.
Mobile device 31 is further included, mobile device 31 includes handle 311, wheel 312, the 5th the 313, second electricity of belt wheel Machine 314, the 6th belt wheel 315 and third belt 316 are fixedly connected with handle 311, at the bottom of pedestal 1 in the left side of first support 7 Hold it is symmetrical be equipped with wheel 312, the 5th belt wheel 313 is fixedly connected on left-hand wheel 312, is fixed in the bottom of pedestal 1 Be connected with the second motor 314, on the output shaft of the second motor 314 interference be connected with the 6th belt wheel 315, the 6th belt wheel 315 with Third belt 316 is connected between 5th belt wheel 313.
Embodiment 4
A kind of geological disaster stone crushing plant, as shown in Figs 1-4, include pedestal 1, the first strut 2, first pulley 3, Conveyer belt 4, the first conehead 5, the second belt wheel 6, first support 7, second support 8, the second strut 9, the first motor 10, turntable 11, Pin rod 12, third strut 13, slotted disk 14, third belt wheel 15, the first belt 16, the second belt 17, the 4th strut 18, the first cam 19th, the 4th belt wheel 20, sliding rail 21, sliding block 22, the first spring 23, block 24, second spring 25, third stent 26, connecting rod 27, 28 and second conehead 29 of fixed plate is fixedly connected with the first strut 2 pedestal 1 is symmetrical, is rotated on two the first struts 2 Formula is connected with first pulley 3, and conveyer belt 4 is connected between two first pulleys 3, is uniformly fixedly connected on the transport belt 4 One conehead 5, is fixedly connected with the second belt wheel 6 in left side first pulley 3, and first is fixedly connected in the upper left of pedestal 1 Stent 7 is fixedly connected with second support 8 above the right side of first support 7, is fixedly connected in the lower left of second support 8 There are two struts, the first motor 10 is fixedly connected in the bottom of the second strut 9, the interference connection on the output shaft of the first motor 10 Have a turntable 11, turntable 11 eccentric position be fixedly connected with pin rod 12, be fixedly connected in the lower left of second support 8 Three struts 13, third strut 13 are located at the right side of the second strut 9, slotted disk 14 are connected in the left end rotary type of third strut 13, Slotted disk 14 coordinates with pin rod 12, and third belt wheel 15 is fixedly connected on slotted disk 14, is connected between 15 and second belt wheel 6 of third belt wheel The first belt 16 is connected to, is fixedly connected with the 4th strut 18 in the lower left of second support 8, the 4th strut 18 is located at third branch The right side of bar 13 is connected with the first cam 19 in the lower rotation formula of the 4th strut 18, is fixedly connected on the first cam 19 4th belt wheel 20 is connected with the second belt 17 between the 4th belt wheel 20 and third belt wheel 15, consolidate in the lower right of second support 8 Surely sliding rail 21 is connected with, slidingtype is connected with sliding block 22 on sliding rail 21, and is fixedly connected in the lower right of second support 8 One spring 23, the first spring 23 are located at the left side of sliding rail 21, block 24 are fixedly connected in the bottom of sliding rail 21, on block 24 Second spring 25 is fixedly connected with, third stent 26, the top of third stent 26 and the first bullet are fixedly connected on sliding block 22 The bottom end of spring 23 is fixedly connected, and the top of second spring 25 is fixedly connected with the bottom of third stent 26, bottom fix connect Connecting rod 27 there are two connecing, the bottom of two connecting rods 27 is fixedly connected with fixed plate 28, is fixedly connected in fixed plate 28 Second conehead 29.
Support device 30 is further included, support device 30 includes the 4th stent 301, the 5th stent 302 and support plate 303, the 4th stent 301 is fixedly connected on pedestal 1, the 4th stent 301 is located at the left side of the first strut of right side 2, in pedestal 1 On be fixedly connected with the 5th stent 302, the 5th stent 302 is located at the left side of the 4th stent 301, in the 4th stent 301 and the 5th The top of stent 302 is fixedly connected with support plate 303.
Mobile device 31 is further included, mobile device 31 includes handle 311, wheel 312, the 5th the 313, second electricity of belt wheel Machine 314, the 6th belt wheel 315 and third belt 316 are fixedly connected with handle 311, at the bottom of pedestal 1 in the left side of first support 7 Hold it is symmetrical be equipped with wheel 312, the 5th belt wheel 313 is fixedly connected on left-hand wheel 312, is fixed in the bottom of pedestal 1 Be connected with the second motor 314, on the output shaft of the second motor 314 interference be connected with the 6th belt wheel 315, the 6th belt wheel 315 with Third belt 316 is connected between 5th belt wheel 313.
The 6th stent 321,322 and second cam 323 of third motor have been further included, has been fixed in the left side of the 5th stent 302 The 6th stent 321 is connected with, third motor 322 is fixedly connected in the left part of the 6th stent 321, in the defeated of third motor 322 Interference is connected with the second cam 323 on shaft, and the second cam 323 is contacted with conveyer belt 4.
Operation principle:When people need, in use, first broken stone is needed to be put on conveyer belt 4, then to open again Dynamic first motor 10, the first motor 10 drive turntable 11 to rotate by output shaft, and the rotation of turntable 11 drives slotted disk by pin rod 12 14 rotations, the rotation of slotted disk 14 drive third belt wheel 15 to rotate, and the rotation of third belt wheel 15 drives the second belt wheel 6 by the first belt 16 Rotation, the rotation of the second belt wheel 6 drive first pulley 3 to rotate, and the rotation of first pulley 3 drives conveyer belt 4 to rotate, so as to reach to stone The function that head is transmitted, the rotation of third belt wheel 15 drive the 4th belt wheel 20 to rotate by the second belt 17, the 4th 20 turns of belt wheel Dynamic that the first cam 19 is driven to rotate, the first cam 19, which rotates, squeezes third stent 26, moves down third stent 26, Third stent 26, which moves down, drives connecting rod 27 to move down, and connecting rod 27 moves down the second cone driven in fixed plate 28 First 29 move down, and broken function is carried out to the stone on conveyer belt 4 so as to reach the second conehead 29, when 19 turns of the first cam It is dynamic when not squeezing third stent 26, because the pulling force of the first spring 23 and the elastic force of second spring 25 make third stent 26 Rise, broken function is carried out to continual stone so as to reach.
Because having further included support device 30, support device 30 includes the 4th stent 301, the 5th stent 302 and support Plate 303 is fixedly connected with the 4th stent 301 on pedestal 1, and the 4th stent 301 is located at the left side of the first strut of right side 2, the bottom of at The 5th stent 302 is fixedly connected on seat 1, the 5th stent 302 is located at the left side of the 4th stent 301, in the 4th stent 301 and the The top of five stents 302 is fixedly connected with support plate 303.So when in use, because in the 4th stent 301 and the 5th stent 302 top is fixedly connected with support plate 303, so when the second conehead 29 crushes stone, support plate 303 is played to transmission The function being supported with 4.
Because having further included mobile device 31, mobile device 31 includes handle 311, wheel 312, the 5th belt wheel 313, Two motors 314, the 6th belt wheel 315 and third belt 316, the left side of first support 7 be fixedly connected with handle 311, Bottom end is symmetrical to be equipped with wheel 312, and the 5th belt wheel 313 is fixedly connected on left-hand wheel 312, is consolidated in the bottom of pedestal 1 Surely be connected with the second motor 314, on the output shaft of the second motor 314 interference be connected with the 6th belt wheel 315, the 6th belt wheel 315 Third belt 316 is connected between the 5th belt wheel 313.So when using mobile device 31, start the second motor first 314, the second motor 314 drives the 6th belt wheel 315 to rotate by output shaft, and the rotation of the 6th belt wheel 315 passes through 316 band of third belt Dynamic 5th belt wheel 313 rotates, and the rotation of the 5th belt wheel 313 drives wheel 312 to rotate, and mobile function is carried out so as to reach.
Because the 6th stent 321,322 and second cam 323 of third motor are further included, in the left side of the 5th stent 302 The 6th stent 321 is fixedly connected with, third motor 322 is fixedly connected in the left part of the 6th stent 321, in third motor 322 Output shaft on interference be connected with the second cam 323, the second cam 323 is contacted with conveyer belt 4.So when in use, opening first Dynamic third motor 322, third motor 322 drives the second cam 323 to rotate by output shaft, and the second cam 323 is rotated to transmission Band 4 is squeezed, so as to reach the function of being shaked off to the rubble clamped on conveyer belt 4.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (4)

1. a kind of geological disaster stone crushing plant, which is characterized in that include pedestal (1), the first strut (2), first pulley (3), conveyer belt (4), the first conehead (5), the second belt wheel (6), first support (7), second support (8), the second strut (9), One motor (10), turntable (11), pin rod (12), third strut (13), slotted disk (14), third belt wheel (15), the first belt (16), Second belt (17), the 4th strut (18), the first cam (19), the 4th belt wheel (20), sliding rail (21), sliding block (22), the first bullet Spring (23), block (24), second spring (25), third stent (26), connecting rod (27), fixed plate (28) and the second conehead (29), the first strut (2) is fixedly connected with pedestal (1) is symmetrical, rotary type is connected on two the first struts (2) One belt wheel (3) is connected with conveyer belt (4) between two first pulleys (3), first is uniformly fixedly connected on conveyer belt (4) Conehead (5) is fixedly connected with the second belt wheel (6) in left side first pulley (3), is fixedly connected in the upper left of pedestal (1) There is first support (7), second support (8) is fixedly connected with above the right side of first support (7), under second support (8) Side left side is fixedly connected with two struts, the first motor (10) is fixedly connected in the bottom of the second strut (9), in the first motor (10) interference is connected with turntable (11) on output shaft, turntable (11) eccentric position be fixedly connected with pin rod (12), The lower left of two stents (8) is fixedly connected with third strut (13), third strut (13) positioned at the right side of the second strut (9), Slotted disk (14) is connected in the left end rotary type of third strut (13), slotted disk (14) coordinates with pin rod (12), on slotted disk (14) Third belt wheel (15) is fixedly connected with, the first belt (16) is connected between third belt wheel (15) and the second belt wheel (6), second The lower left of stent (8) is fixedly connected with the 4th strut (18), the 4th strut (18) positioned at the right side of third strut (13), The lower rotation formula of 4th strut (18) is connected with the first cam (19), and the 4th belt wheel is fixedly connected on the first cam (19) (20), the second belt (17) is connected between the 4th belt wheel (20) and third belt wheel (15), the lower right in second support (8) Sliding rail (21) is fixedly connected with, slidingtype is connected with sliding block (22) on sliding rail (21), consolidates in the lower right of second support (8) Surely the first spring (23) is connected with, the first spring (23) is fixedly connected positioned at the left side of sliding rail (21) in the bottom of sliding rail (21) There is block (24), second spring (25) is fixedly connected on block (24), third stent is fixedly connected on sliding block (22) (26), the top of third stent (26) is fixedly connected with the bottom end of the first spring (23), the top of second spring (25) and third The bottom of stent (26) is fixedly connected, bottom be fixedly connected there are two connecting rod (27), the bottom of two connecting rods (27) Fixed plate (28) is fixedly connected with, the second conehead (29) is fixedly connected in fixed plate (28).
2. a kind of geological disaster stone crushing plant according to claim 1, which is characterized in that further included support device (30), support device (30) includes the 4th stent (301), the 5th stent (302) and support plate (303), solid on pedestal (1) Surely the 4th stent (301) is connected with, the 4th stent (301) is fixed on pedestal (1) positioned at the left side of the first strut of right side (2) The 5th stent (302) is connected with, the 5th stent (302) is positioned at the left side of the 4th stent (301), in the 4th stent (301) and The top of five stents (302) is fixedly connected with support plate (303).
3. a kind of geological disaster stone crushing plant according to claim 2, which is characterized in that further included mobile device (31), mobile device (31) includes handle (311), wheel (312), the 5th belt wheel (313), the second motor (314), the 6th band (315) and third belt (316) are taken turns, handle (311) is fixedly connected on the left of first support (7), in the bottom end of pedestal (1) It is symmetrical to be equipped with wheel (312), the 5th belt wheel (313) is fixedly connected on left-hand wheel (312), at the bottom of pedestal (1) Portion is fixedly connected with the second motor (314), on the output shaft of the second motor (314) interference be connected with the 6th belt wheel (315), Third belt (316) is connected between six belt wheels (315) and the 5th belt wheel (313).
4. a kind of geological disaster stone crushing plant according to claim 3, which is characterized in that further included the 6th stent (321), third motor (322) and the second cam (323), the 6th stent is fixedly connected on the left of the 5th stent (302) (321), third motor (322) is fixedly connected in the left part of the 6th stent (321), on the output shaft of third motor (322) Interference is connected with the second cam (323), and the second cam (323) is contacted with conveyer belt (4).
CN201711417073.0A 2017-12-25 2017-12-25 A kind of geological disaster stone crushing plant Pending CN108212273A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711417073.0A CN108212273A (en) 2017-12-25 2017-12-25 A kind of geological disaster stone crushing plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711417073.0A CN108212273A (en) 2017-12-25 2017-12-25 A kind of geological disaster stone crushing plant

Publications (1)

Publication Number Publication Date
CN108212273A true CN108212273A (en) 2018-06-29

Family

ID=62647806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711417073.0A Pending CN108212273A (en) 2017-12-25 2017-12-25 A kind of geological disaster stone crushing plant

Country Status (1)

Country Link
CN (1) CN108212273A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109123730A (en) * 2018-08-27 2019-01-04 河南东贵电子科技有限公司 A kind of step-by-step movement feed crushing device
CN112916092A (en) * 2020-12-28 2021-06-08 哈尔滨市阿城区兴盛腻子粉厂 But broken rubble device repeatedly
CN113634580A (en) * 2021-07-30 2021-11-12 中国化学工程第六建设有限公司 Environment-friendly treatment method for construction waste

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206543599U (en) * 2017-01-23 2017-10-10 天津荆楚建筑安装工程有限公司 A kind of automatic small indoor concrete disintegrating machine
CN107486286A (en) * 2017-08-02 2017-12-19 郭昌磊 A kind of thermal power generation crushes feeding integrated machine with coal cinder

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206543599U (en) * 2017-01-23 2017-10-10 天津荆楚建筑安装工程有限公司 A kind of automatic small indoor concrete disintegrating machine
CN107486286A (en) * 2017-08-02 2017-12-19 郭昌磊 A kind of thermal power generation crushes feeding integrated machine with coal cinder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109123730A (en) * 2018-08-27 2019-01-04 河南东贵电子科技有限公司 A kind of step-by-step movement feed crushing device
CN112916092A (en) * 2020-12-28 2021-06-08 哈尔滨市阿城区兴盛腻子粉厂 But broken rubble device repeatedly
CN113634580A (en) * 2021-07-30 2021-11-12 中国化学工程第六建设有限公司 Environment-friendly treatment method for construction waste

Similar Documents

Publication Publication Date Title
CN108212273A (en) A kind of geological disaster stone crushing plant
CN107377118A (en) A kind of building stones quick crashing screening plant for building
CN209271522U (en) A kind of barite ore dressing crushing device
CN208679765U (en) A kind of building stones vibration screening plant with weighing function
CN108325639A (en) A kind of road construction mixed mud crushing plant
CN213611881U (en) Grinding machine for preparing steel slag micro powder
CN108380279A (en) A kind of architectural engineering sandstone crushing plant
CN109453882A (en) One kind being used for particle coal grinding recovery gear
CN203508364U (en) Electric control sand screening device
CN112051163A (en) Automatic detection equipment for quality of ceramic tiles
CN106622510A (en) Efficient shredding device for medicinal materials for medical use
CN110254487A (en) A kind of civil engineering pipeline putting vehicle
CN209005808U (en) A kind of multiple crushing device of mineral products
CN106944209A (en) A kind of rare earth processing rare earth ore efficient pulverizing equipment
CN108283977A (en) A kind of Rare Earth Mine purifying technique crusher
CN108480012A (en) A kind of processing device for mineral products
CN208975877U (en) A kind of rare earth stone crushing device
CN209465321U (en) A kind of metallurgy vibrating screen
CN107930757A (en) A kind of bean product lapping device and production and preparation method thereof
CN207615181U (en) A kind of device for vibration screening
CN107999170A (en) A kind of chemical industry ore fast-crushing device
CN110802021A (en) Gravel and sand sieving mechanism
CN206778940U (en) One kind, which is smelted, uses blast furnace slag high-efficient treatment device
CN106269945B (en) A kind of hardware vee-block compaction apparatus
CN108295929A (en) A kind of rare earth mining site rare earth mineral aggregate promotion crushing plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629