CN108205096A CN201711190036.0A CN201711190036A CN108205096A CN 108205096 A CN108205096 A CN 108205096A CN 201711190036 A CN201711190036 A CN 201711190036A CN 108205096 A CN108205096 A CN 108205096A
Authority
CN
China
Prior art keywords
prudential
station
time
master
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711190036.0A
Other languages
Chinese (zh)
Other versions
CN108205096B (en
Inventor
周震宇
殷建军
盛海华
杨建华
周宗庚
奚洪磊
江涌
杨振
吴佳毅
王黎敏
杨剑友
王化
梅宏
刘曦
陈晨
周毅
车印飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Wenzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711190036.0A priority Critical patent/CN108205096B/en
Publication of CN108205096A publication Critical patent/CN108205096A/en
Application granted granted Critical
Publication of CN108205096B publication Critical patent/CN108205096B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/088Aspects of digital computing

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of multi-source failure data analyzing methods based on active time adjustment, when Prudential Master actively initiates the network pair of each prudential sub-station, record the time difference of prudential sub-station and Prudential Master;When prudential sub-station initiates the network pair with station equipment, record prudential sub-station and protective device, the time difference of fault oscillograph;More than ten correction single deviations are generated, and be repeatedly averaged according to the time difference of front, form each equipment time complexity curve value;In grid collapses, Prudential Master is corrected the information of each secondary device received according to equipment time complexity curve value;Action of the Prudential Master to the protection equipment after correction, warning information, join protection and fault oscillograph reach recorded broadcast file, carry out the accident analysis of multi-source.Electric network fault data are rapidly and accurately obtained, greatly improve the analyzing and processing ability to electric network fault, contribute to fast recovery of power supply, mitigates breakdown loss, is provided a strong guarantee for grid operating monitoring.

Description

A kind of multi-source failure data analyzing method based on active time adjustment
Technical field
The invention belongs to relay protection of power system failure information system fields, and in particular to one kind is based on active time school Positive multi-source failure data analyzing method.
Background technology
The construction of domestic failure information system have passed through more than ten years constantly explore, improved process.The fault message of early stage System is mainly explored and is attempted, and the later stage by continuously improving, all realizes the work(of remotely monitor and information calling inquiry substantially Energy.Present circumstances is preferably regional, and Prudential Master, which comes into, improves practical rank that is horizontal, regulate and control integration operation Section, effectively realize to protection, the in-service monitoring of oscillograph and management, substantially increase electric network fault information Quick Acquisition, Analysis and processing capacity.The preferable area of present circumstances comes into and improves practical level, carries out regulating and controlling integration operation Stage.But from the whole country in general, also there are send inaccuracy in protection information for many existing failure information systems Even missing, send in information not in time, command response is slow, recorded wave file obtains that slow, protection communication natural rate of interest is not high, accident analysis The problems such as poor practicability, seriously constrains the application of function of failure information system.
It is researched and analysed according to various regions longtime running experience and user, producer, most problems are derived from plant stand end, main Want reason include protection, the information that externally provides of oscillograph is inadequate, information is lack of standardization, communication mode disunity, the equipment time not The deficiencies of accurate.Wherein due to protective device in substation, the inaccuracy of the equipment time of fault oscillograph, Prudential Master therefore When hindering data preparation, it can not be prepared according to the time of facility information, judge the accuracy of information, cause user that can not directly acquire Fault data is the principal element of accident analysis poor practicability.
Invention content
The purpose of the present invention is to provide a kind of multi-source failure data analyzing method based on active time adjustment, Neng Gouyou Effect solve substation in protective device, fault oscillograph the equipment time inaccuracy, Prudential Master when fault data arranges, It can not be prepared according to the time of facility information, judge the accuracy of information, cause user that can not directly acquire asking for fault data Topic.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions:One kind is based on the active time The multi-source failure data analyzing method of correction, includes the following steps successively:
Step 1:When Prudential Master actively initiates the network pair of each prudential sub-station, prudential sub-station and Prudential Master are recorded Time difference Δ t1;
Step 2:When Prudential Master proactive notification prudential sub-station carries out network pair to the secondary device in station, prudential sub-station The time difference Δ t2 of record and secondary device;
Step 3:Prudential sub-station will be sent on the time difference Δ t2 with secondary device each in station to Prudential Master, protects letter master The each secondary device of preservation of standing treats the time difference Δ t2 and time difference Δ t1 with prudential sub-station with prudential sub-station, protects letter in this way Main website just has the time difference Δ t3 with each secondary device, and Δ t3=Δ t1+ Δs t2;It will be Step 1: step 2 repeats Operation is multiple, calculates multiple Δ t3, and by average value three times, as the secondary device and the time adjustment number of Prudential Master It is worth Δ T;
Step 4:In grid collapses, secondary device can by prudential sub-station to sent in Prudential Master with this two The messages such as action, alarm, the recording bulletin message of secondary device time, and transmit corresponding recorded wave file;Prudential Master is to receiving Each secondary device information time of origin T, carry out time complexity curve, the modified time is denoted as:T '=T+ Δ T, and press According to the time T ' after correction, fault data arrangement and the accident analysis of multi-source are carried out;
Step 5:Prudential Master to the action of the protection equipment after correction, warning information and protection recorded wave file, The recorded wave file of fault oscillograph, electric network fault data preparation and analysis after being corrected;For the same of same primary fault Protective device recorded wave file in one substation, fault oscillograph recorded wave file carry out multi-source analysis, use different recorded wave files In same channels data carry out time unifying;Prudential Master is filled for the protection in the different substation of same primary fault Recorded wave file is put, fault oscillograph recorded wave file carries out multi-source analysis and carries out time unifying.
Preferably, it in the step 1, when the network pair with each prudential sub-station is actively initiated by Prudential Master, uses Network Time Protocol by Prudential Master, sends target message during with this equipment and is receiving initiation to prudential sub-station, prudential sub-station During the message at end, in addition the reception markers of prudential sub-station, and when returning to Prudential Master message, along with message leaves guarantor Believe the markers of substation, Prudential Master receives corresponding message timestamp, and calculate between Prudential Master and prudential sub-station when Between it is poor.
Preferably, in the step 2, prudential sub-station after message, is protected in the network pair for receiving Prudential Master proactive notification Believe substation according to, with protective device, the access network of fault oscillograph, when carrying out network pair, prudential sub-station only passes through in substation Message during network pair calculates prudential sub-station time and protection equipment, the time difference of fault oscillograph equipment time, it is impossible to protecting Protect equipment, the time of fault oscillograph equipment modifies.
Preferably, in the step 3, Prudential Master preserves each secondary device and is treated the time difference with prudential sub-station, Yi Jiyu The time difference of prudential sub-station, such Prudential Master has just calculated and the time adjustment single deviation of each secondary device;It calculates Prudential Master and protective device, the deviation of fault oscillograph need to carry out multiple calculating averaged, as each equipment Time complexity curve value, and also need to be modified each equipment time complexity curve value.
Preferably, in the step 4, in grid collapses, secondary device can be by prudential sub-station to Prudential Master On send the messages such as the action with this equipment time, alarm, recording bulletin, and generate corresponding recorded wave file;Prudential Master pair The time of origin of the information of each secondary device received carries out time complexity curve, and the correction time reaches second grade, and according to school Time after just carries out fault data arrangement and the accident analysis of multi-source.
Preferably, in the step 5, Prudential Master is according to time of one secondary device connection relation of power grid and information Sequential carries out the arrangement of electric network fault data, to the recording text of the action of the protection equipment after correction, warning information and protection Part, the recorded wave file of fault oscillograph, electric network fault data preparation and analysis after being corrected;When using in same substation Waveform carry out accident analysis when, due to the protective device in same primary fault, acted in a substation, Yi Jiji In the different recorded wave files for recording the fault oscillograph of this failure, some channel informations of identical equipment will necessarily be included;It uses The switch changed position information of same numbers channel and the difference of identical analog quantity channel, are handled, realize different sample frequencys The merging of lower recorded wave file is shown, for the use of user.
Preferably, in the step 5, Prudential Master is according to time of one secondary device connection relation of power grid and information Sequential carries out the arrangement of electric network fault data, to the recording text of the action of the protection equipment after correction, warning information and protection Part, the recorded wave file of fault oscillograph, electric network fault data preparation and analysis after being corrected;For line fault occurs When, when carrying out accident analysis using the waveform in Liang Ge substations, due to being related to Liang Ge substations, same equipment phase can not be used Data with channel are aligned, and need the parameter of the circuit preserved according to Prudential Master at this time, calculate circuit both end voltage Differential seat angle makes the Wave data at both ends realize time unifying, for user the Wave data at both ends with the differential seat angle into line displacement Use.
Compared with prior art, it is an advantage of the invention that:The present invention is based on active time adjustment mechanism, by Prudential Master master It is dynamic initiate with protective device, fault oscillograph network pair when, and preserve the time deviation of each equipment and Prudential Master.In event When barrier occurs, realize the information for automatically correcting the protective device of existence time deviation, sending on fault oscillograph, realize Prudential Master The compatible of the fault data of target existing equipment when containing inaccurate of access is arranged, rapidly and accurately obtains electric network fault number According to greatly improving the analyzing and processing ability to electric network fault, reference frame provided for scheduling decision, fast quick-recovery is contributed to supply Electricity mitigates breakdown loss, is provided a strong guarantee for grid operating monitoring.
Description of the drawings
Fig. 1 is the flow chart of the present invention
Fig. 2 is the schematic diagram for calculating single time deviation.
Fig. 3 is the schematic diagram that Prudential Master carries out failure data analyzing.
Specific embodiment
The embodiment of the present invention is described below in detail, the example of the embodiment is shown in the drawings.Below with reference to The embodiment of attached drawing description is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
It is a kind of embodiment of the multi-source failure data analyzing method based on active time adjustment of the present invention refering to Fig. 1, it should When method actively initiates the network pair with prudential sub-station by Prudential Master, the time difference of Prudential Master and prudential sub-station is recorded; Prudential sub-station is initiated with during the network pair of secondary device, recording prudential sub-station and the time difference of secondary device in station in station;Protect letter Main website is according to the time difference with prudential sub-station, the time difference of prudential sub-station and station equipment, generates the time of each secondary device Single deviation is corrected, and carries out repeatedly correction and is averaged, forms each secondary device time complexity curve value;In grid collapses When, Prudential Master is corrected the information of each secondary device received according to equipment time complexity curve value;Prudential Master passes through The action of protection equipment after correction, warning information, the recorded wave file of join protection device and the recording text of fault oscillograph Part carries out the accident analysis of multi-source.
Specifically, a kind of multi-source failure data analyzing method based on active time adjustment, includes the following steps successively:
Step 1:When Prudential Master actively initiates the network pair of each prudential sub-station, prudential sub-station and Prudential Master are recorded Time difference Δ t1;
When actively being initiated by Prudential Master with the network pair of each prudential sub-station, flow during network pair is as shown in Fig. 2, make Network Time Protocol by Prudential Master, sends the message with this equipment markers T1 to prudential sub-station, prudential sub-station is being received To originating end message when, in addition the reception markers T2 of prudential sub-station, and when returning to Prudential Master message, along with report Text leaves the markers T3 of prudential sub-station, and Prudential Master receives corresponding message timestamp T4, and calculates Prudential Master and protect and believe Time difference Δ t1 between substation:((T2-T1)+(T3-T4))/2.
Step 2:When Prudential Master proactive notification prudential sub-station carries out network pair to the secondary device in station, prudential sub-station The time difference Δ t2 of record and secondary device;
Prudential sub-station in the network pair for receiving Prudential Master proactive notification after message, prudential sub-station according in substation with The access network of protective device, fault oscillograph, when carrying out network pair, message when prudential sub-station is by network pair calculates Prudential sub-station time and protection equipment, the time difference of fault oscillograph equipment time, it is impossible to be set to protection equipment, fault oscillograph The standby time modifies.
Step 3:Prudential Master is according to the time difference with prudential sub-station, the time difference of prudential sub-station and station equipment, generation Time adjustment single deviation, and carry out repeatedly taking mean value, form each equipment time complexity curve value;
Wherein, prudential sub-station will be sent on the time difference Δ t2 with secondary device each in station to Prudential Master, Prudential Master It preserves each secondary device and treats the time difference Δ t2 and time difference Δ t1 with prudential sub-station with prudential sub-station, protect letter master in this way Stand the time difference Δ t3 just having with each secondary device, and Δ t3=Δ t1+ Δs t2;It will be Step 1: step 2 repeats to grasp Make multiple, calculate multiple Δ t3, and by average value three times, as the secondary device and the time adjustment numerical value of Prudential Master ΔT;
Due to all having deployed clock synchronization system in present substation, after clock synchronization system goes wrong, warp After crossing maintenance process recovery, the equipment in substation can be completed time synchronization and ensure the consistent of time, that is, protect equipment, failure The clock jitter of oscillograph equipment, it may occur that variation;Meanwhile protective device, there is likely to be certainly for fault oscillograph equipment It body time intrinsic some operation deviations and there may be the slower and slower of equipment clock operation or is getting faster, therefore, calculates Prudential Master and protective device, the deviation of fault oscillograph need to carry out multiple calculating averaged, as each equipment Time complexity curve value and it also requires according to certain rule and time interval, is modified each equipment time complexity curve value.
Step 4:In grid collapses, Prudential Master is to the information of each secondary device that receives, during according to equipment Between correction value be corrected;
In grid collapses, secondary device can by prudential sub-station to being sent in Prudential Master with this secondary device when Between the messages such as action, alarm, recording bulletin message, and transmit corresponding recorded wave file;Prudential Master to receive each two The time of origin T of the information of secondary device carries out time complexity curve, and the modified time is denoted as:T '=T+ Δ T, and according to correction after Time T ', carry out fault data arrangement and the accident analysis of multi-source;
Prudential Master is corrected the information of each secondary device received according to equipment time complexity curve value.Due to net The limitation of stipulations and network transmission intrinsic network delay characteristic during network pair lead to the equipment time of the preservation of Prudential Master Correction value can only ensure the accuracy to second grade, while during the electric network fault data preparation of Prudential Master, according to power grid one or two times What the time sequential of equipment connecting relation and information carried out, the data time needed accurately reaches second grade or more.
Step 5:Action of the Prudential Master by the protection equipment after correction, warning information, the recording text of join protection The recorded wave file of part and fault oscillograph carries out the accident analysis of multi-source;
Prudential Master is to the recorded wave file of the action of the protection equipment after correction, warning information and protection, failure wave-recording The recorded wave file of device, electric network fault data preparation and analysis after being corrected;In the same substation for same primary fault Interior protective device recorded wave file, fault oscillograph recorded wave file carry out multi-source analysis, using identical in different recorded wave files The data of channel carry out time unifying;Prudential Master, for the protective device recording text in the different substation of same primary fault Part, fault oscillograph recorded wave file carry out multi-source analysis and carry out time unifying.
Prudential Master carries out electric network fault data according to the time sequential of one secondary device connection relation of power grid and information Arrangement, to the action of the protection equipment after correction, warning information and protection recorded wave file, the recording of fault oscillograph File, electric network fault data preparation and analysis after being corrected.In for same failure wave file analyze, need to not With recorded wave file time be aligned after, user could be facilitated to the accurate analysis of failure and grasped as shown in Figure 3.
When the waveform in same substation is used to carry out accident analysis, due in same primary fault, a substation In the interior protective device acted and the different recorded wave files for the fault oscillograph for recording this failure, it will necessarily include Some channel informations of identical equipment;Use the switch changed position information of same numbers channel and the difference of identical analog quantity channel Value, is handled, realizes that the merging of recorded wave file under different sample frequencys is shown, for the use of user.
During for line fault occurs, when carrying out accident analysis using the waveform in Liang Ge substations, due to being related to two Substation can not use the data of same equipment same channels to be aligned, need the circuit preserved according to Prudential Master at this time Parameter, calculate circuit both end voltage differential seat angle, the wave at both ends is made into line displacement to the Wave data at both ends with the differential seat angle Graphic data realizes time unifying, for the use of user.
Technical characteristic the foregoing is merely specific embodiments of the present invention, but the present invention is not limited thereto, Ren Heben The technical staff in field in the field of the invention, all cover among the scope of the claims of the present invention by the variation or modification made.

Claims (7)

  1. A kind of 1. multi-source failure data analyzing method based on active time adjustment, it is characterised in that:Include the following steps successively:
    Step 1:When Prudential Master actively initiates the network pair of each prudential sub-station, record prudential sub-station and Prudential Master when Between poor Δ t1;
    Step 2:When Prudential Master proactive notification prudential sub-station carries out network pair to the secondary device in station, prudential sub-station record With the time difference Δ t2 of secondary device;
    Step 3:Prudential sub-station will be sent on the time difference Δ t2 with secondary device each in station to Prudential Master, and Prudential Master is protected It deposits each secondary device and treats the time difference Δ t2 and time difference Δ t1 with prudential sub-station, such Prudential Master with prudential sub-station Just have the time difference Δ t3 with each secondary device, and Δ t3=Δ t1+ Δs t2;It will be Step 1: step 2 repetitive operation Repeatedly, multiple Δ t3 is calculated, and by average value three times, as the secondary device and the time adjustment value, Δ of Prudential Master T;
    Step 4:In grid collapses, secondary device secondary can be set with this by prudential sub-station to being sent in Prudential Master The messages such as action, alarm, the recording bulletin message of standby time, and transmit corresponding recorded wave file;Prudential Master is every to what is received The time of origin T of the information of a secondary device carries out time complexity curve, and the modified time is denoted as:T '=T+ Δ T, and according to school Time T ' after just carries out fault data arrangement and the accident analysis of multi-source;
    Step 5:Prudential Master is to the recorded wave file of the action of the protection equipment after correction, warning information and protection, failure The recorded wave file of oscillograph, electric network fault data preparation and analysis after being corrected;In the same change for same primary fault Protective device recorded wave file in power station, fault oscillograph recorded wave file carry out multi-source analysis, using in different recorded wave files The data of same channels carry out time unifying;Prudential Master is recorded for the protective device in the different substation of same primary fault Wave file, fault oscillograph recorded wave file carry out multi-source analysis and carry out time unifying.
  2. 2. a kind of multi-source failure data analyzing method based on active time adjustment as described in claim 1, it is characterised in that: In the step 1, when actively being initiated by Prudential Master with the network pair of each prudential sub-station, the Network Time Protocol that uses, by Prudential Master, send with this equipment when target message to prudential sub-station, prudential sub-station in the message for receiving originating end, in addition The reception markers of prudential sub-station, and when returning to Prudential Master message, along with message leaves the markers of prudential sub-station, protect Letter main website receives corresponding message timestamp, and calculate the time difference between Prudential Master and prudential sub-station.
  3. 3. a kind of multi-source failure data analyzing method based on active time adjustment as described in claim 1, it is characterised in that: In the step 2, prudential sub-station is in the network pair for receiving Prudential Master proactive notification after message, and prudential sub-station is according to power transformation In standing with protective device, the access network of fault oscillograph, when carrying out network pair, prudential sub-station only by network pair when report Text calculates prudential sub-station time and protection equipment, the time difference of fault oscillograph equipment time, it is impossible to protection equipment, failure The time of oscillograph equipment modifies.
  4. 4. a kind of multi-source failure data analyzing method based on active time adjustment as described in claim 1, it is characterised in that: In the step 3, Prudential Master preserves each secondary device and treats time difference and the time with prudential sub-station with prudential sub-station Difference, such Prudential Master has just calculated and the time adjustment single deviation of each secondary device;Calculate Prudential Master and protection The deviation of device, fault oscillograph needs to carry out multiple calculating averaged, as each equipment time complexity curve value, and And it also needs to be modified each equipment time complexity curve value.
  5. 5. a kind of multi-source failure data analyzing method based on active time adjustment as described in claim 1, it is characterised in that: In the step 4, in grid collapses, secondary device can be by prudential sub-station to being sent in Prudential Master with this equipment The messages such as action, alarm, the recording bulletin of time, and generate corresponding recorded wave file;Prudential Master is each secondary to what is received The time of origin of the information of equipment carries out time complexity curve, and the correction time reaches second grade, and according to the time after correction, into Row fault data arranges and the accident analysis of multi-source.
  6. 6. a kind of multi-source failure data analyzing method based on active time adjustment as described in claim 1, it is characterised in that: In the step 5, Prudential Master carries out power grid event according to the time sequential of one secondary device connection relation of power grid and information Hinder the arrangement of data, to the recorded wave file of the action of the protection equipment after correction, warning information and protection, fault oscillograph Recorded wave file, electric network fault data preparation after being corrected and analysis;Event is carried out when using the waveform in same substation During barrier analysis, due to the protective device in same primary fault, acted in a substation and this failure is recorded In the different recorded wave files of fault oscillograph, some channel informations of identical equipment will necessarily be included;Use same numbers channel Switch changed position information and identical analog quantity channel difference, handled, realize recorded wave file under different sample frequencys Merge display, for the use of user.
  7. 7. a kind of multi-source failure data analyzing method based on active time adjustment as described in claim 1, it is characterised in that: In the step 5, Prudential Master carries out power grid event according to the time sequential of one secondary device connection relation of power grid and information Hinder the arrangement of data, to the recorded wave file of the action of the protection equipment after correction, warning information and protection, fault oscillograph Recorded wave file, electric network fault data preparation after being corrected and analysis;During for line fault occurs, two power transformations are used When waveform in standing carries out accident analysis, due to being related to Liang Ge substations, can not use the data of same equipment same channels into Row alignment needs the parameter of the circuit preserved according to Prudential Master at this time, the differential seat angle of circuit both end voltage is calculated, with the angle Difference into line displacement, makes the Wave data at both ends realize time unifying, for the use of user the Wave data at both ends.
CN201711190036.0A 2017-11-24 2017-11-24 Multisource fault data analysis method based on active time correction Active CN108205096B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711190036.0A CN108205096B (en) 2017-11-24 2017-11-24 Multisource fault data analysis method based on active time correction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711190036.0A CN108205096B (en) 2017-11-24 2017-11-24 Multisource fault data analysis method based on active time correction

Publications (2)

Publication Number Publication Date
CN108205096A true CN108205096A (en) 2018-06-26
CN108205096B CN108205096B (en) 2023-09-19

Family

ID=62604578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711190036.0A Active CN108205096B (en) 2017-11-24 2017-11-24 Multisource fault data analysis method based on active time correction

Country Status (1)

Country Link
CN (1) CN108205096B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109655692A (en) * 2018-12-28 2019-04-19 中国南方电网有限责任公司 A kind of transient state same source data comparison method based on recorded wave file
CN109709422A (en) * 2018-12-27 2019-05-03 中国南方电网有限责任公司 A kind of removing method and its device of clock drift
CN110300021A (en) * 2019-06-20 2019-10-01 广西电网有限责任公司 A kind of method and computing device calculating substation recording bulletin data processing time
CN110895321A (en) * 2019-12-06 2020-03-20 南京南瑞继保电气有限公司 Secondary equipment time mark alignment method based on recording file reference channel
CN111143622A (en) * 2019-12-28 2020-05-12 国网安徽省电力有限公司 Fault data set construction method based on big data platform
CN112014689A (en) * 2020-10-19 2020-12-01 国网江西省电力有限公司电力科学研究院 Method and device for diagnosing abnormity of current sampling loop

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103048589A (en) * 2012-12-18 2013-04-17 福建省电力有限公司 Device time mark fault-tolerance processing method in grid fault diagnosis
CN105093033A (en) * 2015-09-01 2015-11-25 华中电网有限公司 Power grid multi-source information-based fault integrated analysis system and analysis method
CN106950445A (en) * 2017-03-15 2017-07-14 北京四方继保自动化股份有限公司 A kind of step-out time analysis method between station based on fault recorder data
CN107566072A (en) * 2017-10-24 2018-01-09 广东电网有限责任公司电力调度控制中心 A kind of secondary device clock synchronizing method based on dual time correction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103048589A (en) * 2012-12-18 2013-04-17 福建省电力有限公司 Device time mark fault-tolerance processing method in grid fault diagnosis
CN105093033A (en) * 2015-09-01 2015-11-25 华中电网有限公司 Power grid multi-source information-based fault integrated analysis system and analysis method
CN106950445A (en) * 2017-03-15 2017-07-14 北京四方继保自动化股份有限公司 A kind of step-out time analysis method between station based on fault recorder data
CN107566072A (en) * 2017-10-24 2018-01-09 广东电网有限责任公司电力调度控制中心 A kind of secondary device clock synchronizing method based on dual time correction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
谢俊等: "基于多源信息的电网故障综合分析系统" *
陈祥文等: "一种基于多源信息的电网故障分析方法" *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109709422A (en) * 2018-12-27 2019-05-03 中国南方电网有限责任公司 A kind of removing method and its device of clock drift
CN109655692A (en) * 2018-12-28 2019-04-19 中国南方电网有限责任公司 A kind of transient state same source data comparison method based on recorded wave file
CN110300021A (en) * 2019-06-20 2019-10-01 广西电网有限责任公司 A kind of method and computing device calculating substation recording bulletin data processing time
CN110300021B (en) * 2019-06-20 2022-09-16 广西电网有限责任公司 Method and computing device for computing data processing time of recording bulletin of substation
CN110895321A (en) * 2019-12-06 2020-03-20 南京南瑞继保电气有限公司 Secondary equipment time mark alignment method based on recording file reference channel
CN110895321B (en) * 2019-12-06 2021-12-10 南京南瑞继保电气有限公司 Secondary equipment time mark alignment method based on recording file reference channel
CN111143622A (en) * 2019-12-28 2020-05-12 国网安徽省电力有限公司 Fault data set construction method based on big data platform
CN111143622B (en) * 2019-12-28 2023-06-09 国网安徽省电力有限公司 Fault data set construction method based on big data platform
CN112014689A (en) * 2020-10-19 2020-12-01 国网江西省电力有限公司电力科学研究院 Method and device for diagnosing abnormity of current sampling loop

Also Published As

Publication number Publication date
CN108205096B (en) 2023-09-19

Similar Documents

Publication Publication Date Title
CN108205096A (en) A kind of multi-source failure data analyzing method based on active time adjustment
CN105093033B (en) A kind of analysis method of the comprehensive analysis of fault system based on power network multi-source information
CN106253250B (en) A kind of intelligent distribution network distribution rapid protection system and guard method
CN106058831B (en) A kind of intelligent distributed quick protection of adaptive power distribution network and failure separation method
CN102270836B (en) Wide-area over-current protection method and system for power distribution network
CN103119821B (en) Multiterminal HVDC system coordination controls
CN102928741A (en) Satellite time synchronization based electric power line fault location system and method
US20130073108A1 (en) System and method for real-time monitoring of power system
KR20120096774A (en) Power supply system and method using distributed power system
CN201425705Y (en) Electric power system time synchronizer
CN107968486A (en) A kind of method for scheduling task of intelligent power distribution room monitoring system
CN102684169B (en) Differential protection signal synchronizing method for distribution network system
CN106647703A (en) Power fault intelligent analysis and inversion system and method
O'Brien et al. Use of synchrophasor measurements in protective relaying applications
CN108616111A (en) A kind of multiterminal T connection electric transmission line optical fibre differential protection methods synchronized based on interpolation
CN105044562A (en) Distribution network fault positioning method based on Bayes formula algorithm
CN104882962A (en) Information acquisition monitoring system based on BeiDou satellite and information acquisition method based on BeiDou satellite
Cirio et al. Wide area monitoring in the Italian power system: architecture, functions and experiences
CN108134453A (en) A kind of early warning alarm method of intelligent power distribution room monitoring system
CN107566072B (en) A kind of secondary device clock synchronizing method based on dual time correction
CN110031699A (en) It is a kind of for testing the method and system of protective relaying device remote operation function
CN103873178A (en) Concentrated inspection method for timing error of wide-area time synchronization system
CN103914789A (en) Simulation analysis system and method for power distribution network loss reduction
CN104950844B (en) Intelligent substation station domain Protection control system detection method and device
CN105721219B (en) Power line failure indicator with time synchronization function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant