CN110300021A - A kind of method and computing device calculating substation recording bulletin data processing time - Google Patents
A kind of method and computing device calculating substation recording bulletin data processing time Download PDFInfo
- Publication number
- CN110300021A CN110300021A CN201910536632.2A CN201910536632A CN110300021A CN 110300021 A CN110300021 A CN 110300021A CN 201910536632 A CN201910536632 A CN 201910536632A CN 110300021 A CN110300021 A CN 110300021A
- Authority
- CN
- China
- Prior art keywords
- substation
- time
- main website
- delay time
- recorder data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0631—Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
- H04L41/064—Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis involving time analysis
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/10—Protocols in which an application is distributed across nodes in the network
- H04L67/1095—Replication or mirroring of data, e.g. scheduling or transport for data synchronisation between network nodes
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/14—Session management
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Telephonic Communication Services (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The embodiment of the invention discloses a kind of methods and computing device, readable storage medium storing program for executing for calculating substation recording bulletin data processing time to reduce delay, save system resource for improving the treatment effeciency for calculating substation recording bulletin data processing time.The method comprise the steps that obtaining the link transmission delay time between the main website and the substation when main website and substation are established and communicated to connect;According to the link transmission delay time, the time adjusted value between protective device and the main website is obtained;According to the link transmission delay time and the time adjusted value, the delay time that the substation handles the time of current recorder data and reports the current recorder data to the main website is calculated, the current recorder data is the recorder data that the substation reports;Disconnect the communication connection of the main website Yu the substation.
Description
Technical field
The present invention relates to computer field more particularly to it is a kind of calculate substation recording bulletin data processing time method and
Computing device, readable storage medium storing program for executing.
Background technique
Relay protection and fault information system (system referred to as information-preserving) passes through the smart machines such as acquisition protective device, oscillograph
Information, monitoring and protection devices type operation and is analyzed electric network fault by the fault message that protective device reports, for operation
Personnel's judgement and disposition electric network fault provide necessary foundation, to improve relay protection and fault information system management and failure
The automatization level of information processing.
System information-preserving is made of main website and substation, handles and analyze failure, is an important process of system main website information-preserving.
The various protections of access and wave recording device are then responsible in substation, and information is summarized and uploads to main website, the timely upload of substation data, especially
It is protective device recorder data, is the most important data of this failure cause of detailed analysis and nature of trouble, by recording
Conclusion obtained from the analysis of data is the important evidence that auxiliary dispatching operations staff carries out operation decision.Therefore, fault moment
The timeliness that protection recorder data reports is to judge an important indicator of system implementation result information-preserving, and play system information-preserving
System effect, an essential condition for enabling main station side quickly to analyze failure, guarantee power grid operation.
The producer of domestic production prudential sub-station product is more, and the product of a producer also has different model and version, and stands
Interior protective device model be also it is varied, communication protocol may be also different, prudential sub-station access protective device effect
It is influenced by several factors, the performance to main website active reporting data is different.Based on protection recorder data to information-preserving
The importance of system, in the evaluation to prudential sub-station product quality, prudential sub-station processing protection recorder data simultaneously reports information
It is a very important index to the speed of main website speed.
In order to evaluate the performance of substation active reporting information, the timeliness especially reported to protection recorder data needs
The data such as the delay time of corresponding information reported are collected as analysis, the foundation judged.
Data are exchanged using 103 communication protocols between system boss station information-preserving, data are not transmitted in 103 communication protocols
Performance metric provide response support, and to 103 communication protocols carry out expand nor one be easy implement scheme, largely
The prudential sub-station of storage is implemented according to original 103 Communications Protocol Specification, and 103 communication protocols of modification need huge work
Work amount and capital investment are related to the links such as Consistency test, qualified detection, product up-gradation, field adjustable service.
Summary of the invention
The embodiment of the invention provides it is a kind of calculate substation recording bulletin data processing time method and computing device, can
Storage medium is read, for improving the treatment effeciency for calculating substation recording bulletin data processing time, delay is reduced, saves system money
Source.
In view of this, first aspect present invention provides a kind of method for calculating substation recording bulletin data processing time, it can
To include:
When main website and substation, which are established, to be communicated to connect, when obtaining the link transmission delay between the main website and the substation
Between;
According to the link transmission delay time, the time adjusted value between protective device and the main website is obtained;
According to the link transmission delay time and the time adjusted value, calculates the substation and handle current recorder data
Time and delay time of the current recorder data is reported to the main website, the current recorder data is on the substation
The recorder data of report;
Disconnect the communication connection of the main website Yu the substation.
Optionally, in some embodiments of the invention, the link obtained between the main website and the substation passes
Defeated delay time, comprising:
Record the time t that the main website sends request for test frame to the substation0, and the substation is received to the master
The time t of the confirmation test frame for feedback of standing1;
According to the time t of the request for test frame0With the time t of the exact p-value frame1, be calculated the main website and
Link transmission delay time T between the substationl。
Optionally, in some embodiments of the invention, described according to the link transmission delay time, obtain protection dress
Set the time adjusted value between the main website, comprising:
Obtain the markers t in the warning information and event information that the substation reports about the protective devicef, Yi Jisuo
State the receiving time t that main website receives the warning information and event informationm;
According to the link transmission delay time Tl, the markers tfAnd the receiving time tm, protection dress is calculated
Set the time adjusted value Δ T between the main website.
Optionally, in some embodiments of the invention, described according to the link transmission delay time and the time
Adjusted value calculates the substation and handles the time of current recorder data and report prolonging for the current recorder data to the main website
The slow time, comprising:
According to the markers tfWith the time adjusted value Δ T, protective device markers t adjusted is calculatedd;
According to the link transmission delay time Tl, the receiving time tmWith the protective device markers t adjustedd,
The time T that the substation handles current recorder data is calculated;
According to the receiving time tmWith the protective device markers t adjustedd, it is calculated to the main website and reports
The delay time T of the current recorder datadly。
Optionally, in some embodiments of the invention, the main website and substation, which are established, communicates to connect, comprising:
First, which is sent, to the substation by the main website establishes request;
Receiving establishing to described first for the substation transmission by the main website requests send first to be successfully established sound
It answers;
Alternatively,
Second, which is sent, to the main website by the substation establishes request;
Receiving establishing to described second for the main website transmission by the substation requests send second to be successfully established sound
It answers.
Second aspect of the present invention provides a kind of computing device, may include:
Transceiver module, for obtaining between the main website and the substation when main website and substation foundation communication connection
The link transmission delay time;
Processing module, for according to the link transmission delay time, obtain between protective device and the main website when
Between adjusted value;According to the link transmission delay time and the time adjusted value, calculates the substation and handle current recording number
According to time and report to the main website delay time of the current recorder data, the current recorder data is the substation
The recorder data reported;Disconnect the communication connection of the main website Yu the substation.
Optionally, in some embodiments of the invention,
The transceiver module, specifically for recording time t of the main website to substation transmission request for test frame0, with
And receive the time t of the confirmation test frame fed back to the main website substation1;According to the time t of the request for test frame0With
The time t of the exact p-value frame1, the link transmission delay time T between the main website and the substation is calculatedl。
Optionally, in some embodiments of the invention,
The processing module, specifically for obtaining in the warning information and event information that the substation reports about the guarantor
The markers t of protection unitfAnd the main website receives the receiving time t of the warning information and event informationm;According to the link
Propagation delay time Tl, the markers tfAnd the receiving time tm, be calculated between protective device and the main website when
Between adjusted value Δ T.
Optionally, in some embodiments of the invention,
The processing module is specifically used for according to the markers tfWith the time adjusted value Δ T, calculate adjusted
Protective device markers td;According to the link transmission delay time Tl, the receiving time tmWith the protective device adjusted
Markers td, the time T that the substation handles current recorder data is calculated;According to the receiving time tmAfter the adjustment
Protective device markers td, the delay time T that the current recorder data is reported to the main website is calculateddly。
Optionally, in some embodiments of the invention,
The transceiver module is also used to send first to the substation by the main website and establishes request;Pass through the master
Establishing to described first for reception of the standing substation transmission requests send first to be successfully established response;
Alternatively,
The transceiver module is also used to send second to the main website by the substation and establishes request;Pass through the son
Establishing to described second for reception of the standing main website transmission requests send second to be successfully established response.
Third aspect present invention provides a kind of computing device, may include:
Transceiver, processor, memory, wherein the transceiver, the processor and the memory are connected by bus
It connects;
The memory, for storing operational order;
The transceiver, for obtaining between the main website and the substation when main website and substation foundation communication connection
The link transmission delay time;
The processor, for calling the operational order, execute such as first aspect present invention and first aspect is any can
The step of selecting the method that recording bulletin data processing time in substation is calculated described in mode.
Fourth aspect present invention provides a kind of readable storage medium storing program for executing, is stored thereon with computer program, the computer
The calculating substation as described in first aspect present invention and first aspect any optional way is realized when program is executed by processor
The step of method of recording bulletin data processing time.
As can be seen from the above technical solutions, the embodiment of the present invention has the advantage that
In embodiments of the present invention, when main website and substation, which are established, to be communicated to connect, obtain the main website and the substation it
Between the link transmission delay time;According to the link transmission delay time, obtain between protective device and the main website when
Between adjusted value;According to the link transmission delay time and the time adjusted value, calculates the substation and handle current recording number
According to time and report to the main website delay time of the current recorder data, the current recorder data is the substation
The recorder data reported;Disconnect the communication connection of the main website Yu the substation.Substation recording bulletin data are calculated for improving
The treatment effeciency of time is handled, and the delay time for reporting the current recorder data to the main website is calculated, is reduced
System resource is saved in delay.
Detailed description of the invention
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to institute in embodiment and description of the prior art
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the timing diagram of alarm/event communication in the embodiment of the present invention;
Fig. 2 is the timing diagram of recording bulletin communication in the embodiment of the present invention;
Fig. 3 be the embodiment of the present invention fall into a trap operator station recording bulletin data processing time method embodiment schematic diagram;
Fig. 4 is the schematic diagram that the link transmission delay time between main website and substation is calculated in the embodiment of the present invention;
Fig. 5 is the schematic diagram that the time adjusted value between protective device and main website is calculated in the embodiment of the present invention;
Fig. 6 be the embodiment of the present invention fall into a trap operator station recorder data handle the time schematic diagram;
Fig. 7 is one embodiment schematic diagram of computing device in the embodiment of the present invention;
Fig. 8 is another embodiment schematic diagram of computing device in the embodiment of the present invention.
Specific embodiment
The embodiment of the invention provides it is a kind of calculate substation recording bulletin data processing time method and computing device, can
Storage medium is read, for improving the treatment effeciency for calculating substation recording bulletin data processing time, delay is reduced, saves system money
Source.
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical solution in the embodiment of the present invention are described, it is clear that described embodiment is only present invention a part
Embodiment, instead of all the embodiments.Based on the embodiments of the present invention, it should fall within the scope of the present invention.
On the basis of existing communication agreement, the present invention proposes a kind of feasible method of low cost, is not changing original son
Under the premise of soft and hardware and the overall system structure of standing, by designing new software algorithm in main station side, substation is handled to realize
Recorder data and the evaluation for reporting recording bulletin information performance.
Below for the embodiment of the present invention fall into a trap operator station recording bulletin data processing time principle explanation:
When grid collapses or device operation occur abnormal, prudential sub-station can be by the action message of device or abnormal letter
Breath is converted to 103 message formats, and active upload quickly handled after receiving information so as to main website to main website, to tune
Degree person and protection staff carry out the alarm prompts such as failure, exception, and provide necessary data for accident analysis and support.
Prudential sub-station can also be referred to as substation, sub-station device, and the information of active upload mainly includes warning information, event
Information and recording bulletin information are respectively that 1,2 and 12 application layer data units are reported and (can be used in the present embodiment with number
ASDU1/ASDU2/ASDU12 is indicated).Alarm, event information transfer mechanism and recording bulletin transfer mechanism it is different:
The warning information and event information that protective device generates, generally by station communication network, active reporting is to sub-station device, substation
Device should actively be transmitted to main website in the first time for receiving protective device information;The recording bulletin information that protective device generates,
Equally by station communication network, active reporting is answered after receiving the recording bulletin information of protection to sub-station device, sub-station device
Corresponding recorder data is called to protective device in time and is stored in the local memory device of substation, is then pushed to main station system
Recording bulletin information.
As shown in Figure 1, for the timing diagram of alarm/event communication in the embodiment of the present invention.As shown in Fig. 2, real for the present invention
Apply the timing diagram that recording bulletin communicates in example.
In timing diagram shown in Fig. 2, the delay that protective device wave-record chart reports is that failure record is generated from protective device
Wave information time tdStart, the time t of recording bulletin ASDU12 message is received to main websitemUntil, delay time TdlyAre as follows:
Tdly=tm-td
If the recording bulletin ASDU12 message time that substation receives protective device generation is ts1, recording letter is sent to main website
Reporting ASDU12 message time is ts2, the T of data network transmission delayl, then the time T of substation handling failure recorder data are as follows:
T=ts2-ts1=tm-ts1-Tl
Therefore, if main website can obtain protective device generate recorder data time and main website receive ASDU12 message when
Between, it can acquire the delay time that recording bulletin data report;If it is known that substation receive protective device information time and
Data network link delay, it can acquire the time used in substation processing data.Through due to the information that protective device generates and change
Power station local networks are transferred to substation, and the time for handling recorder data relative to substation and data network chain road delay time numerical value are very
Small (protective device reports information time to have special test), therefore for ease of calculation, it is believed that substation receives protective device
The time of fault message is approximately equal to the time that protective device generates fault data, the also approximately equal to time of failure generation, it may be assumed that
ts1≈td
In 103 communication protocol specifications, without special data network link delay test method, find after study, it can
To use link layer test frame to reach measurement TlPurpose.The time t for the request for test frame that record main website is sent respectively0With receive
The time t for the confirmation test frame that substation is answered1, then link transmission times can be calculated by following mode:
Tl=(t1-t0)/2
Protective device generates Fault Recorder Information time tdIt can be replaced with the time that failure occurs.Protective device is detecting
When to electric network fault, markers can be stamped to fault recorder data, which is generated by the clock that protective device is kept, and in recording
Sub-station device is transmitted in bulletin data, " fault time " domain section of the sub-station device in ASDU12 is filled in the markers and be reported to
Main website, the value are the markers t in protective device time systemf。
Since the time source of main website and substation and protective device is different, such as main website uses NTP in main station side net
Acquisition time in network, stand in protective device when generally using GPS or pulse synchronous signal, and in standing protective device exist by
The markers abnormal phenomenon caused by time source failure.Therefore, main website and protective device time are in different time system, lead
Cause main website that can not be computed correctly substation truthful data and report delay time, at the same also can not each substation of lateral comparison performance.
Therefore, main station side needs to be unified in markers in system at the same time, i.e., by tfIt is transformed into main station time td, with
Just it is calculated and is analyzed.According to code requirement, substation should pass the alarm/event information that protective device reports to main website immediately
It is defeated, therefore can use this characteristic, estimate the discrepancy delta T of the time system of protective device time system and main station system:
Δ T=tm-[tf+(ts2-ts1)+Tl]
Since the information is transmitted in substation immediately after receiving protective device information, can will receive protective device information to
The time that main website is sent between information ignores, it may be assumed that
ts2-ts1≈0
Then: Δ T=tm-(tf+Tl)
Δ T is brought into the time t for adjusting each recording bulletin and generating in protective devicef, have:
td=tf+ΔT
Thus, it is possible to calculate this recording bulletin data approximate processing time of substation T and approximate transmission delay Tdly。
Below by way of examples, technical solution of the present invention is described further, as shown in figure 3, for the present invention
Embodiment fall into a trap operator station recording bulletin data processing time method embodiment schematic diagram.In order to calculate substation recording bulletin
Data processing time, main station side are divided into 3 sub-function modules, are respectively as follows: link delay calculating, protective device markers adjusted value meter
It calculates and recording bulletin data processing time calculates.May include:
301, when main website and substation, which are established, to be communicated to connect, the link transmission obtained between the main website and the substation is prolonged
The slow time.
Wherein, the link transmission delay time obtained between the main website and the substation may include: record institute
State the time t that main website sends request for test frame to the substation0, and receive the confirmation fed back to the main website substation and survey
Try the time t of frame1;According to the time t of the request for test frame0With the time t of the exact p-value frame1, the master is calculated
The link transmission delay time T to stand between the substationl。
Illustratively, as shown in figure 4, when to calculate the link transmission delay between main website and substation in the embodiment of the present invention
Between schematic diagram.After main website and substation establish communication connection, that is, enter link delay time calculation stages, and through entire logical
Believe all processes of connection.Link delay is multiplexed the necessary test frame question answering process in the communication process of boss station, without additional
Increase communication overhead, mainly comprises the steps that
(a) question and answer counter is removed, question and answer frequency threshold value k, sliding window value w (w≤k), error threshold σ are set;
(b) main website timing sends request for test frame to substation, and records sending time t0;
(c) main website receives substation exact p-value frame, and records receiving time t1;
(d) cache-time is to (t0, t1), question and answer counter increases by 1;
(e) check whether question and answer counter reaches defined number k and such as not up to go to (b)
(f) (t is calculated1-t0)/2, and mean square error is used to calculate the error of each sample, remove greater than error threshold σ's
Sample;
(g) remaining sample is calculated into ∑ (t1-t0)/2 are simultaneously averaged, the length of delay T as current ink transmissionl;
(h) w sample before deleting, counter are set as k-w, go to (b).
302, according to the link transmission delay time, the time adjusted value between protective device and the main website is obtained.
Wherein, described according to the link transmission delay time, obtain the time tune between protective device and the main website
Whole value may include: the markers t obtained in the warning information and event information that the substation reports about the protective devicef,
And the main website receives the receiving time t of the warning information and event informationm;According to the link transmission delay time Tl、
The markers tfAnd the receiving time tm, the time adjusted value Δ T between protective device and the main website is calculated.
Illustratively, as shown in figure 5, to calculate the time adjusted value between protective device and main website in the embodiment of the present invention
Schematic diagram.On the basis of the link transmission delay time is calculated, main website can by ASDU1 that substation reports and
Protective device markers in ASDU2 message calculates the adjusted value Δ T with main station time.The calculating process runs through entire communication link
The all processes connect.Due to calculating the message information in the communication process of multiplexing boss station, opened without additional increase communication
Pin, calculating process mainly comprise the steps that
(a) count pick up device is removed, receive number threshold value k, sliding window value w (w≤k), error threshold σ are set;
(b) substation active reporting information is monitored;
Protective device markers t if (c) substation reports ASDU1 or ASDU2, in recorded messagefAnd when main website reception
Between tm;
(d) cache-time is to (tf, tm), it receives number device and increases by 1;
(e) check whether count pick up device reaches defined number k and such as not up to go to (b);
(f) the length of delay T of link transmission is checkedlWhether effectively, such as turn (i) in vain;
(g) t is calculatedm-(tf+Tl), the error of each sample is calculated using mean square error, removes the sample greater than error threshold σ
This;
(h) remaining sample is calculated into ∑ [tm-(tf+Tl)] and be averaged, as current protective device markers adjusted value Δ
T;
(i) w sample before deleting, counter are set as k-w, go to (b).
303, it according to the link transmission delay time and the time adjusted value, calculates the substation and handles current recording
The time of data and the delay time that the current recorder data is reported to the main website, the current recorder data are the son
The recorder data that station reports.
Wherein, described according to the link transmission delay time and the time adjusted value, it calculates the substation processing and works as
The time of preceding recorder data and the delay time that the current recorder data is reported to the main website, may include: according to
Markers tfWith the time adjusted value Δ T, protective device markers t adjusted is calculatedd;When according to the link transmission delay
Between Tl, the receiving time tmWith the protective device markers t adjustedd, the substation is calculated and handles current recording number
According to time T;According to the receiving time tmWith the protective device markers t adjustedd, it is calculated in the main website
Report the delay time T of the current recorder datadly。
Illustratively, as shown in fig. 6, for the embodiment of the present invention fall into a trap operator station recorder data handle the time schematic diagram.
On the basis of link delay time and protective device markers adjusted value is calculated, main website is estimated that receives substation every time
When reporting ASDU12, substation handles the time of this recorder data and reports the delay time of process, and calculating process mainly includes
Following steps:
(a) substation active reporting information is monitored;
Protective device markers t if (b) substation reports ASDU12, in recorded messagefAnd main website receiving time tm;
(c) the length of delay T of link transmission is checkedl, protective device markers adjusted value Δ T it is whether effective, if any of them
One invalid, then recording this recorder data of substation processing time and reporting delay time is null value, turns (a);
(d) device markers t adjusted is calculatedd=tf+ΔT;
(e) substation outlet recorder data time T=t is calculatedm-(td+Tl) and report delay time Tdly=tm-td;
(f) record this recorder data of substation handles the time and reports delay time, turns (a).
304, the communication connection of the main website and the substation is disconnected.
In embodiments of the present invention, when main website and substation, which are established, to be communicated to connect, obtain the main website and the substation it
Between the link transmission delay time;According to the link transmission delay time, obtain between protective device and the main website when
Between adjusted value;According to the link transmission delay time and the time adjusted value, calculates the substation and handle current recording number
According to time and report to the main website delay time of the current recorder data, the current recorder data is the substation
The recorder data reported;Disconnect the communication connection of the main website Yu the substation.Substation recording bulletin data are calculated for improving
The treatment effeciency of time is handled, and the delay time for reporting the current recorder data to the main website is calculated, is reduced
System resource is saved in delay.
As shown in fig. 7, may include: for one embodiment schematic diagram of computing device in the embodiment of the present invention
Transceiver module 701, for obtaining between the main website and the substation when main website and substation foundation communication connection
The link transmission delay time;
Processing module 702, for obtaining between protective device and the main website according to the link transmission delay time
Time adjusted value;According to the link transmission delay time and the time adjusted value, calculates the substation and handle current recording
The time of data and the delay time that the current recorder data is reported to the main website, the current recorder data are the son
The recorder data that station reports;Disconnect the communication connection of the main website Yu the substation.
Optionally, in some embodiments of the invention,
Transceiver module 701, specifically for recording time t of the main website to substation transmission request for test frame0, and
Receive the time t of the confirmation test frame fed back to the main website substation1;According to the time t of the request for test frame0And institute
State the time t of exact p-value frame1, the link transmission delay time T between the main website and the substation is calculatedl。
Optionally, in some embodiments of the invention,
Processing module 702, specifically for obtaining in the warning information and event information that the substation reports about the guarantor
The markers t of protection unitfAnd the main website receives the receiving time t of the warning information and event informationm;According to the link
Propagation delay time Tl, the markers tfAnd the receiving time tm, be calculated between protective device and the main website when
Between adjusted value Δ T.
Optionally, in some embodiments of the invention,
Processing module 702 is specifically used for according to the markers tfWith the time adjusted value Δ T, calculate adjusted
Protective device markers td;According to the link transmission delay time Tl, the receiving time tmWith the protective device adjusted
Markers td, the time T that the substation handles current recorder data is calculated;According to the receiving time tmAfter the adjustment
Protective device markers td, the delay time T that the current recorder data is reported to the main website is calculateddly。
Optionally, in some embodiments of the invention,
Transceiver module 701 is also used to send first to the substation by the main website and establishes request;Pass through the main website
Receiving establishing to described first for the substation transmission requests send first to be successfully established response;
Alternatively,
Transceiver module 701 is also used to send second to the main website by the substation and establishes request;Pass through the substation
Receiving establishing to described second for the main website transmission requests send second to be successfully established response.
As shown in figure 8, may include: for another embodiment schematic diagram of computing device in the embodiment of the present invention
Transceiver 801, processor 802, memory 803, wherein transceiver 801, processor 802 and memory 803 pass through
Bus connection;
Memory 803, for storing operational order;
Transceiver 801, for obtaining between the main website and the substation when main website and substation foundation communication connection
The link transmission delay time;
Processor 802, according to the link transmission delay time, obtains protective device for calling the operational order
Time adjusted value between the main website;According to the link transmission delay time and the time adjusted value, described in calculating
Substation handles the time of current recorder data and reports the delay time of the current recorder data to the main website, described current
Recorder data is the recorder data that the substation reports;Disconnect the communication connection of the main website Yu the substation.
Optionally, in some embodiments of the invention,
Transceiver 801, specifically for recording time t of the main website to substation transmission request for test frame0, Yi Jishou
The time t of the confirmation test frame fed back to the substation to the main website1;According to the time t of the request for test frame0With it is described
The time t of exact p-value frame1, the link transmission delay time T between the main website and the substation is calculatedl。
Optionally, in some embodiments of the invention,
Processor 802, specifically for obtaining in the warning information and event information that the substation reports about the protection
The markers t of devicefAnd the main website receives the receiving time t of the warning information and event informationm;It is passed according to the link
Defeated delay time Tl, the markers tfAnd the receiving time tm, the time between protective device and the main website is calculated
Adjusted value Δ T.
Optionally, in some embodiments of the invention,
Processor 802 is specifically used for according to the markers tfWith the time adjusted value Δ T, guarantor adjusted is calculated
Protection unit markers td;According to the link transmission delay time Tl, the receiving time tmWhen with the protective device adjusted
Mark td, the time T that the substation handles current recorder data is calculated;According to the receiving time tmWith it is described adjusted
Protective device markers td, the delay time T that the current recorder data is reported to the main website is calculateddly。
Optionally, in some embodiments of the invention,
Transceiver 801 is also used to send first to the substation by the main website and establishes request;It is connect by the main website
Receiving establishing to described first for the substation transmission requests send first to be successfully established response;
Alternatively,
Transceiver 801 is also used to send second to the main website by the substation and establishes request;It is connect by the substation
Receiving establishing to described second for the main website transmission requests send second to be successfully established response.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real
It is existing.When implemented in software, it can entirely or partly realize in the form of a computer program product.
The computer program product includes one or more computer instructions.Load and execute on computers the meter
When calculation machine program instruction, entirely or partly generate according to process or function described in the embodiment of the present invention.The computer can
To be general purpose computer, special purpose computer, computer network or other programmable devices.The computer instruction can be deposited
Storage in a computer-readable storage medium, or from a computer readable storage medium to another computer readable storage medium
Transmission, for example, the computer instruction can pass through wired (example from a web-site, computer, server or data center
Such as coaxial cable, optical fiber, Digital Subscriber Line (DSL)) or wireless (such as infrared, wireless, microwave) mode to another website
Website, computer, server or data center are transmitted.The computer readable storage medium can be computer and can deposit
Any usable medium of storage either includes that the data storages such as one or more usable mediums integrated server, data center are set
It is standby.The usable medium can be magnetic medium, (for example, floppy disk, hard disk, tape), optical medium (for example, DVD) or partly lead
Body medium (such as solid state hard disk Solid State Disk (SSD)) etc..
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In several embodiments provided by the present invention, it should be understood that disclosed system, device and method can be with
It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit
It divides, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components
It can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, it is shown or
The mutual coupling, direct-coupling or communication connection discussed can be through some interfaces, the indirect coupling of device or unit
It closes or communicates to connect, can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can be personal computer, server or the network equipment etc.) executes the complete of each embodiment the method for the present invention
Portion or part steps.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only
Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can store journey
The medium of sequence code.
The above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although referring to before
Stating embodiment, invention is explained in detail, those skilled in the art should understand that: it still can be to preceding
Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these
It modifies or replaces, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of method for calculating substation recording bulletin data processing time characterized by comprising
When main website and substation, which are established, to be communicated to connect, the link transmission delay time between the main website and the substation is obtained;
According to the link transmission delay time, the time adjusted value between protective device and the main website is obtained;
According to the link transmission delay time and the time adjusted value, calculate the substation handle current recorder data when
Between and report to the main website delay time of the current recorder data, the current recorder data substation reports
Recorder data;
Disconnect the communication connection of the main website Yu the substation.
2. the method according to claim 1, wherein the link obtained between the main website and the substation
Propagation delay time, comprising:
Record the time t that the main website sends request for test frame to the substation0, and to receive the substation anti-to the main website
The time t of the confirmation test frame of feedback1;
According to the time t of the request for test frame0With the time t of the exact p-value frame1, the main website and described is calculated
Link transmission delay time T between substationl。
3. according to the method described in claim 2, acquisition is protected it is characterized in that, described according to the link transmission delay time
Time adjusted value between protection unit and the main website, comprising:
Obtain the markers t in the warning information and event information that the substation reports about the protective devicefAnd the master
It stands and receives the receiving time t of the warning information and event informationm;
According to the link transmission delay time Tl, the markers tfAnd the receiving time tm, be calculated protective device with
Time adjusted value Δ T between the main website.
4. according to the method described in claim 3, it is characterized in that, it is described according to the link transmission delay time and it is described when
Between adjusted value, calculate the substation and handle the time of current recorder data and report the current recorder data to the main website
Delay time, comprising:
According to the markers tfWith the time adjusted value Δ T, protective device markers t adjusted is calculatedd;
According to the link transmission delay time Tl, the receiving time tmWith the protective device markers t adjustedd, calculate
Obtain the time T that the substation handles current recorder data;
According to the receiving time tmWith the protective device markers t adjustedd, be calculated reported to the main website it is described
The delay time T of current recorder datadly。
5. method according to any of claims 1-4, which is characterized in that communication link is established in the main website and substation
It connects, comprising:
First, which is sent, to the substation by the main website establishes request;
Receiving establishing to described first for the substation transmission by the main website requests send first to be successfully established response;
Alternatively,
Second, which is sent, to the main website by the substation establishes request;
Receiving establishing to described second for the main website transmission by the substation requests send second to be successfully established response.
6. a kind of computing device characterized by comprising
Transceiver module, for obtaining the link between the main website and the substation when main website and substation foundation communication connection
Propagation delay time;
Processing module, for obtaining the time tune between protective device and the main website according to the link transmission delay time
Whole value;According to the link transmission delay time and the time adjusted value, calculates the substation and handle current recorder data
Time and the delay time that the current recorder data is reported to the main website, the current recorder data are that the substation reports
Recorder data;Disconnect the communication connection of the main website Yu the substation.
7. computing device according to claim 6, which is characterized in that
The transceiver module, specifically for recording time t of the main website to substation transmission request for test frame0, and receive
The time t for the confirmation test frame that the substation is fed back to the main website1;According to the time t of the request for test frame0With it is described really
Recognize the time t of test frame1, the link transmission delay time T between the main website and the substation is calculatedl;
The processing module is filled specifically for obtaining in the warning information and event information that the substation reports about the protection
The markers t setfAnd the main website receives the receiving time t of the warning information and event informationm;According to the link transmission
Delay time Tl, the markers tfAnd the receiving time tm, the time tune between protective device and the main website is calculated
Whole value Δ T;
The processing module is specifically used for according to the markers tfWith the time adjusted value Δ T, protection adjusted is calculated
Device markers td;According to the link transmission delay time Tl, the receiving time tmWith the protective device markers adjusted
td, the time T that the substation handles current recorder data is calculated;According to the receiving time tmWith the guarantor adjusted
Protection unit markers td, the delay time T that the current recorder data is reported to the main website is calculateddly。
8. computing device according to claim 6 or 7, which is characterized in that
The transceiver module is also used to send first to the substation by the main website and establishes request;It is connect by the main website
Receiving establishing to described first for the substation transmission requests send first to be successfully established response;
Alternatively,
The transceiver module is also used to send second to the main website by the substation and establishes request;It is connect by the substation
Receiving establishing to described second for the main website transmission requests send second to be successfully established response.
9. a kind of computing device characterized by comprising
Transceiver, processor, memory, wherein the transceiver, the processor and the memory are connected by bus;
The memory, for storing operational order;
The transceiver, for obtaining the chain between the main website and the substation when main website and substation foundation communication connection
The road propagation delay time;
The processor executes calculating substation record according to any one of claims 1 to 5 for calling the operational order
The step of method of wave bulletin data processing time.
10. a kind of readable storage medium storing program for executing, is stored thereon with computer program, which is characterized in that the computer program is processed
Device realizes the step of the method according to any one of claims 1 to 5 for calculating substation recording bulletin data processing time when executing
Suddenly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910536632.2A CN110300021B (en) | 2019-06-20 | 2019-06-20 | Method and computing device for computing data processing time of recording bulletin of substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910536632.2A CN110300021B (en) | 2019-06-20 | 2019-06-20 | Method and computing device for computing data processing time of recording bulletin of substation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110300021A true CN110300021A (en) | 2019-10-01 |
CN110300021B CN110300021B (en) | 2022-09-16 |
Family
ID=68028333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910536632.2A Active CN110300021B (en) | 2019-06-20 | 2019-06-20 | Method and computing device for computing data processing time of recording bulletin of substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110300021B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110838760A (en) * | 2019-11-27 | 2020-02-25 | 中国南方电网有限责任公司 | Power grid fault data collection method and device |
CN114422408A (en) * | 2021-12-16 | 2022-04-29 | 深圳供电局有限公司 | Transformer substation monitoring method and device, computer equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103501047A (en) * | 2013-10-09 | 2014-01-08 | 云南电力调度控制中心 | Intelligent fault wave recording main station information management system |
CN107566072A (en) * | 2017-10-24 | 2018-01-09 | 广东电网有限责任公司电力调度控制中心 | A kind of secondary device clock synchronizing method based on dual time correction |
CN108205096A (en) * | 2017-11-24 | 2018-06-26 | 国网浙江省电力公司温州供电公司 | A kind of multi-source failure data analyzing method based on active time adjustment |
-
2019
- 2019-06-20 CN CN201910536632.2A patent/CN110300021B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103501047A (en) * | 2013-10-09 | 2014-01-08 | 云南电力调度控制中心 | Intelligent fault wave recording main station information management system |
CN107566072A (en) * | 2017-10-24 | 2018-01-09 | 广东电网有限责任公司电力调度控制中心 | A kind of secondary device clock synchronizing method based on dual time correction |
CN108205096A (en) * | 2017-11-24 | 2018-06-26 | 国网浙江省电力公司温州供电公司 | A kind of multi-source failure data analyzing method based on active time adjustment |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110838760A (en) * | 2019-11-27 | 2020-02-25 | 中国南方电网有限责任公司 | Power grid fault data collection method and device |
CN110838760B (en) * | 2019-11-27 | 2021-02-26 | 中国南方电网有限责任公司 | Power grid fault data collection method and device |
CN114422408A (en) * | 2021-12-16 | 2022-04-29 | 深圳供电局有限公司 | Transformer substation monitoring method and device, computer equipment and storage medium |
CN114422408B (en) * | 2021-12-16 | 2023-12-22 | 深圳供电局有限公司 | Substation monitoring method, device, computer equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN110300021B (en) | 2022-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110365529B (en) | Edge computing intelligent gateway service processing method and edge computing intelligent gateway | |
CN107819645B (en) | Internet of things testing method based on software simulation | |
CN104038371B (en) | A kind of electric power communication transmission network adaptive performance acquisition method | |
US20110185235A1 (en) | Apparatus and method for abnormality detection | |
CN101189895A (en) | Abnormality detecting method and system, and upkeep method and system | |
CN104468200B (en) | The Adaptive critic method of data center network apparatus health degree | |
EP3851973A1 (en) | Data collection and processing method, apparatus and system | |
CN106301837B (en) | Passive optical network alarm detection method and device | |
CN110728818A (en) | Electrical fire monitoring system based on cloud platform and early warning analysis method thereof | |
CN110300021A (en) | A kind of method and computing device calculating substation recording bulletin data processing time | |
CN106787169A (en) | A kind of method of multi-data source comparison techniques diagnosis transformer station remote measurement failure | |
CN106533791A (en) | End-to-end business quality optimization apparatus and method based on big data platform | |
CN112637006A (en) | Power communication gateway key node and influence domain analysis method | |
CN110730234A (en) | Electrical fire monitoring system and intelligent early warning analysis method thereof | |
CN105187554A (en) | Method and system for monitoring server performance | |
CN101364892A (en) | Time conversion method based on network element of different time zones | |
CN102082677B (en) | Alarm information processing method, device and system | |
CN111901134B (en) | Method and device for predicting network quality based on recurrent neural network model (RNN) | |
CN110275815A (en) | A kind of system exception alert processing method and device | |
WO2021249546A1 (en) | Network monitoring method, electronic device and storage medium | |
CN110675598A (en) | Data exchange method and platform for railway earthquake early warning | |
CN109963292B (en) | Complaint prediction method, complaint prediction device, electronic apparatus, and storage medium | |
CN103645417B (en) | A kind of pure internet access-prepositioneddata data acquisition method | |
CN108768995A (en) | Substation adaptive access main website method | |
CN111585350A (en) | Power control station communication and analysis system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |