CN108204207A - Sand control completion tubing string - Google Patents

Sand control completion tubing string Download PDF

Info

Publication number
CN108204207A
CN108204207A CN201711338315.7A CN201711338315A CN108204207A CN 108204207 A CN108204207 A CN 108204207A CN 201711338315 A CN201711338315 A CN 201711338315A CN 108204207 A CN108204207 A CN 108204207A
Authority
CN
China
Prior art keywords
integral joint
casing
joint casing
tubing string
box cupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711338315.7A
Other languages
Chinese (zh)
Inventor
张春堂
杨平阁
马海禹
张子卿
杨淼
丁磊
剪树旭
肖昌
于雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201711338315.7A priority Critical patent/CN108204207A/en
Publication of CN108204207A publication Critical patent/CN108204207A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/08Casing joints
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/04Casing heads; Suspending casings or tubings in well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection

Abstract

The invention discloses a kind of sand control completion tubing string, oil-gas mining technical field, completion tubular column includes:Original oil well casing;The extension hanger being suspended in original oil well casing, hanger is interior to have casing bruising rubber plug;The integral joint casing section being connected on extension hanger, integral joint casing section are formed by more casing connections, are connected through a screw thread between casing;Set is closed in the well cementation being connected in integral joint casing section, and well cementation closing set, which can realize integral joint casing section, is opened and closed and can connect the space between integral joint casing intersegmental part and the borehole wall and integral joint casing;The cement block piece being set in integral joint casing section;Be connected to integral joint casing section lower end without box cupling sieve tube segment, be connected between no box cupling sieve tube segment and integral joint casing section by screw thread.The application can ensure the internal diameter of completion tubular column, so that later stage production, well stimulation and workover treatment can be carried out.

Description

Sand control completion tubing string
Technical field
The present invention relates to oil-gas mining technical field, more particularly to a kind of sand control completion tubing string.
Background technology
For the oil well that tail pipe after window sidetracking and overhaul is reinforced, need to carry out it if original well shakes out phenomenon Secondary sand control treatment.After the prior art reinforces completion generally by advanced end of line pipe, then sand control construction is carried out, aforesaid operations Disadvantage is:1st, job execution is of high cost;2nd, the casing maximum of Φ 177.8mm (7 ") can hang Φ 139.7mm's (51/2 ") Liner completion, sand control is carried out in the tail pipe of Φ 139.7mm (51/2 ") can reduce drainage area, reduction oil well output;3rd, sand control The internal diameter of casing can be caused to reduce after operation so that major diameter measure tool all can not tripping in, limit the later stage production, increase Production measure and the implementation of workover treatment.Therefore, it is necessary to research and develop a kind of new completion tubular column to ensure the internal diameter of completion tubular column, so as to Ensure steam drive injection well demixing injection-production and big pump it is strong the realization of techniques such as take out and meet steam drive and the techniques such as demixing injection-production Scheme requirement.
Invention content
In order to overcome the drawbacks described above of the prior art, the technical problem to be solved is that provide one kind for the embodiment of the present invention Sand control completion tubing string can ensure the internal diameter of completion tubular column, so that later stage production, well stimulation and workover treatment can be able to Implement.
The specific technical solution of the embodiment of the present invention is:
A kind of sand control completion tubing string, the completion tubular column include:
Original oil well casing;
The extension hanger being suspended in original oil well casing, the hanger have casing bruising rubber plug;
The integral joint casing section being connected on the extension hanger, the diameter of the integral joint casing is less than described original The diameter of oil well casing, the integral joint casing section are formed by more casing connections, are connected through a screw thread between described sleeve pipe;
Set is closed in the well cementation being connected in the integral joint casing section, and set is closed in the well cementation can be to the no box cupling set Pipeline section, which is realized, is opened and closed and can connect the space between the integral joint casing intersegmental part and the borehole wall and the integral joint casing, institute Stating casing bruising rubber plug enables to the space between the integral joint casing intersegmental part and the borehole wall and the integral joint casing to break It opens;
The cement block piece being set in the integral joint casing section, the cement block piece can be by the no box cupling sets Gap between pipeline section and the borehole wall is isolated;
Be connected to the integral joint casing section lower end without box cupling sieve tube segment, the no box cupling sieve tube segment and the no box cupling It is connected between casing section by screw thread.
In a preferred embodiment, the cement block piece along far from the integral joint casing section direction simultaneously The extension of upward direction, the cement block piece can offset with the borehole wall.
In a preferred embodiment, the diameter of the no box cupling sieve tube segment and the diameter of the integral joint casing section It is equal.
In a preferred embodiment, the well cementation is closed set and is included:Well cementation close set main body, be arranged on it is described solid Well closes the closing valve covered in main body, the blind plate for being arranged on the closing valve lower end, and the closing valve can connect the no box cupling Inside the casing section and space between the borehole wall and the integral joint casing.
In a preferred embodiment, the maximum outside diameter of described sleeve pipe remains unchanged, the outside of described sleeve pipe upper end On wall there is the first stepped guiding surface, screw thread is offered on the first stepped guiding surface, described sleeve pipe lower end On madial wall there is the second stepped guiding surface, screw thread is offered on the second stepped guiding surface.
In a preferred embodiment, the cement block piece is located at below the well cementation closing set, the nothing connects Bind round sieve tube segment more than position.
In a preferred embodiment, the end of the no box cupling sieve tube segment is connected with guide shoe.
In a preferred embodiment, the no box cupling sieve tube segment and the integral joint casing section pass through drilling rod and side Drilling rod is lowered into the predeterminated position of oil well.
In a preferred embodiment, the no box cupling sieve tube segment and the integral joint casing section are by promoting short circuit It is connect with elevator.
In a preferred embodiment, as a diameter of 177.8mm of described sleeve pipe, the integral joint casing section Maximum outside diameter is 139.7mm, and maximum inner diameter 121.36mm, the maximum outside diameter of the no box cupling sieve tube segment is 139.7mm, maximum Internal diameter is 121.36mm.
A kind of operating method according to any of the above-described sand control completion tubing string includes the following steps:
The extension hanger connected, the integral joint casing section, the well cementation are closed by drilling rod and kelly bar Close set, the no box cupling sieve tube segment passes through the original oil well casing G.I.H precalculated position;
By high pressure liquid or lift the tubing string extension hanger and the original oil well casing anchoring;
Inject cement into the original oil well casing, the cement closes set from the well cementation and flows out to the borehole wall and described Space between integral joint casing, so that the cement block piece is close to Well-wall sealer;
Drilling rod with the drilling rod bruising rubber plug is headed into tubing string, makes the drilling rod bruising rubber plug and extension hanger On casing bruising rubber plug can and and lock, and block it is described well cementation close set so that the integral joint casing intersegmental part and the borehole wall Space between the integral joint casing disconnects;
The blind plate of the well cementation closing set is drilled so that the nothing by the drilling rod and the drill bit for being connected to drilling rod bottom Box cupling casing section is opened.
Technical scheme of the present invention has following notable advantageous effect:
Sand control completion tubing string in the application is by using integral joint casing section and the combination without box cupling sieve tube segment, maximum limit The internal diameter that ensure that completion tubular column of degree, i.e. integral joint casing section and the internal diameter without box cupling sieve tube segment, thereby may be ensured that steam The realization of the techniques such as drive injection well demixing injection-production and the strong pumping of big pump, meets the process programs such as steam drive and demixing injection-production to tubing string The requirement of internal diameter, the implementation that (increasing) production measure and workover treatment are given birth to for the later stage provide condition.Meanwhile casing and cement block piece Above well section can carry out well cementing of cement, can by after sidetracked hole and casing damaged well overhaul tail pipe reinforce well tail pipe reinforce and Sand control treatment is once completed, in this way, not only having reduced job execution cost, and having increased the intrinsic intensity of pit shaft but also can prevent upper strata from pushing up It alters under water, moreover it is possible to realize effective sand control of production well section.
With reference to following explanation and attached drawing, only certain exemplary embodiments of this invention is disclosed in detail, specifies the original of the present invention Reason can be in a manner of adopted.It should be understood that embodiments of the present invention are not so limited in range.In appended power In the range of the spirit and terms of profit requirement, embodiments of the present invention include many changes, modifications and are equal.For a kind of reality The feature that the mode of applying is described and/or shown can be made in a manner of same or similar in one or more other embodiments With, with the feature in other embodiment it is combined or substitute other embodiment in feature.
Description of the drawings
Attached drawing described here is only used for task of explanation, and is not intended to limit model disclosed by the invention in any way It encloses.In addition, shape and proportional sizes of each component in figure etc. are only schematical, the understanding of the present invention is used to help, and It is not the specific shape and proportional sizes for limiting each component of the present invention.Those skilled in the art under the teachings of the present invention, can Implement the present invention to select various possible shapes and proportional sizes as the case may be.
Fig. 1 is the structure diagram of sand control completion tubing string in the embodiment of the present invention;
Fig. 2 is the structure diagram of integral joint casing section in sand control completion tubing string in the embodiment of the present invention.
The reference numeral of the figures above:
1st, original oil well casing;2nd, extension hanger;3rd, integral joint casing section;31st, the first stepped guiding surface;32、 Second stepped guiding surface;4th, set is closed in well cementation;41st, valve is closed;42nd, blind plate;5th, cement block piece;6th, without box cupling screen casing Section;7th, guide shoe;8th, cement;9th, oil reservoir.
Specific embodiment
With reference to the drawings and the description of the specific embodiments of the present invention, the details of the present invention can clearly be understood.But It is the specific embodiment of invention described herein, is only used for explaining the purpose of the present invention, and cannot understands in any way Into being limitation of the present invention.Under the teachings of the present invention, technical staff is contemplated that the arbitrary possible change based on the present invention Shape, these are regarded as belonging to the scope of the present invention.It should be noted that when element is referred to as " being set to " another yuan Part, it can be directly on another element or there may also be elements placed in the middle.When an element is considered as " connection " Another element, it can be directly to another element or may be simultaneously present centering elements.Term " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be inside mechanical connection or electrical connection or two elements Connection, can be directly connected, can also be indirectly connected by intermediary, for the ordinary skill in the art, The concrete meaning of above-mentioned term can be understood as the case may be.Term as used herein " vertical ", " horizontal ", For illustrative purposes only, it is unique embodiment to be not offered as " on ", " under ", "left", "right" and similar statement.
Unless otherwise defined, all of technologies and scientific terms used here by the article and belong to the technical field of the application The normally understood meaning of technical staff is identical.The term used in the description of the present application is intended merely to description tool herein The purpose of the embodiment of body, it is not intended that in limitation the application.Term as used herein "and/or" includes one or more The arbitrary and all combination of relevant Listed Items.
In order to ensure the internal diameter of completion tubular column, so that later stage production, well stimulation and workover treatment can be able to reality It applies, proposes a kind of sand control completion tubing string in this application, Fig. 1 is the structural representation of sand control completion tubing string in the embodiment of the present invention Figure, as shown in Figure 1, the completion tubular column can include:Original oil well casing 1;The tail pipe being suspended in original oil well casing 1 hangs Hanging device 2;The integral joint casing section 3 being connected on the extension hanger 2, the diameter of the integral joint casing is less than described original The diameter of oil well casing 1, the integral joint casing section 3 are formed by more casing connections, are connected through a screw thread between described sleeve pipe; Set 4 is closed in the well cementation being connected in the integral joint casing section 3, and the well cementation closes set 4 and integral joint casing section 3 can be realized Opening and closing;The cement block piece 5 being set in the integral joint casing section 3, the cement block piece 5 can be by the no box cupling sets Gap between pipeline section 3 and the borehole wall is isolated;Be connected to 3 lower end of integral joint casing section without box cupling sieve tube segment 6, it is described It is connected between no box cupling sieve tube segment 6 and the integral joint casing section 3 by screw thread.
Sand control completion tubing string in the application is maximum by using integral joint casing section 3 and the combination without box cupling sieve tube segment 6 The internal diameter that ensure that completion tubular column of limit, i.e. integral joint casing section 3 and the internal diameter without box cupling sieve tube segment 6, thereby may be ensured that The realization of the techniques such as steam drive injection well demixing injection-production and the strong pumping of big pump, meets the process programs such as steam drive and demixing injection-production to pipe The requirement of the internal diameter of column, the implementation for later stage production, well stimulation and workover treatment provide condition.Meanwhile casing and cement The well section of more than 5 block piece can carry out well cementing of cement, and tail pipe after sidetracked hole and casing damaged well overhaul can be reinforced to the tail of well Pipe is reinforced and sand control treatment is once completed, in this way, not only having reduced job execution cost, and having increased the intrinsic intensity of pit shaft but also can prevent Only upper strata top is altered under water, moreover it is possible to realize effective sand control of production well section.
In order to be better understood from the sand control completion tubing string in the application, it will be further explained and said below It is bright.Sand control completion tubing string in the application is suitable for long well section, serious casing damaged well and sidetracked hole etc., as shown in Figure 1, this is complete Original oil well casing 1 in well casing column is the larger-size casing used in original oil well, and the production layer of original oil well is oil Layer 9, now in the original oil well uplifting window sidetracking so as to form sidetracked hole, and tripping in sand control pipe is right simultaneously in the sidetracked hole The tubing string is cemented the well, to form sand control completion tubing string.Extension hanger 2 is provided in the original oil well casing 1, the tail pipe There is casing bruising rubber plug, the lower end of extension hanger 2 is connected with integral joint casing section 3 in hanger 2.Extension hanger 2 Main operational principle is to generate powerful motive force by high pressure liquid or lift tubing string and back-off, so that extension hanger 2 is uniform The larger-size casing used in spreading slip insert, slip insert and original oil well plays the role of anchoring, real while anchoring It now gives up, equipped with releasing gadget is forced to ensure to be sent into smoothly putting aside between tubing string and completion tubular column, oil well upper end is drawn after giving up Angle diameter reaches maximum value, for example, the set of φ 139.7mm can be led to from the casing inner diameter of the original oil well of φ 177.8mm Bore, production operation tubing string after the tubing string completion to be facilitated smoothly to remove.
The diameter of integral joint casing section 3 is less than the diameter of original oil well casing 1, and integral joint casing section 3 is connected by more casings It connects, is connected through a screw thread between described sleeve pipe.In order to enable the diameter of integral joint casing section 3 is when two casings are connected It will not increase, i.e. the maximum outside diameter of described sleeve pipe remains unchanged, and has first stepped to lead on the lateral wall of described sleeve pipe upper end To inclined-plane 31, the reduced diameter of the first stepped guiding surface 31 is opened up on the first stepped guiding surface 31 There is screw thread, there is the second stepped guiding surface 32, the second stepped guiding surface 32 on the madial wall of described sleeve pipe lower end Reduced diameter, offer screw thread on the second stepped guiding surface 32.By the screw thread of this special step type, Without using box cupling when enabling to connect between casing and casing, and junction diameter will not increase when two casings are connected Greatly, in this way, it can directly pass through original oil well casing 1.
Well cementation is closed set 4 and is connected in the integral joint casing section 3, the set that can be connected in integral joint casing section 3 Between pipe and casing, it can also be connected at the end of integral joint casing section 3.Set 4 is closed in the well cementation can specifically include:Gu Well closes 4 main bodys of set, the closing valve 41 being arranged in well cementation closing 4 main bodys of set, is arranged on 41 lower end of the closing valve Blind plate 42, the closing valve 41 can connect 3 inside of integral joint casing section and the sky between the borehole wall and the integral joint casing Between.When closing the unlatching of valve 41, closing on valve 41, there is trepanning can make 3 inside of integral joint casing section and the borehole wall and the no box cupling Space between casing.When implementing cement operations, cement 8 is inputted in integral joint casing section 3, cement 8 is by closing valve 41 3 inside of integral joint casing section and the space between the borehole wall and the integral joint casing are flowed into be carried out to integral joint casing section 3 It is fixed.Blind plate 42 then can be used for stopping up when inputting cement 8 to integral joint casing section 3, and cement 8 is into no box cupling sieve tube segment 6. After entire tubing string is fixed, by drilling rod and the drill bit of drilling rod bottom can be connected to drill blind plate 42, so as to fulfill Tubing string it is unimpeded.
The hanger has casing bruising rubber plug, and described sleeve pipe bruising rubber plug and drilling rod bruising rubber plug are used cooperatively can So that 3 inside of integral joint casing section and the space between the borehole wall and the integral joint casing disconnect.When needs are to closing valve 41 when being closed, and drilling rod bruising rubber plug is set on drilling rod, and drilling rod bruising rubber plug is used cooperatively with casing bruising rubber plug, It is downward with 8 one road of cement in construction work, it, can be by the cement 8 in integral joint casing section 3 all by solid during downwards The closing valve 41 that well closes set 4 is pressed out to outside integral joint casing section 3.To finally the trepanning for closing valve 41 be blocked, so that boring Bar bruising rubber plug continues to play a part of to separate cementing concrete 8 and well killing fluid in casing with the cooperation of casing bruising rubber plug.Above-mentioned During well cementation, it can not stay residual cement 8 in the integral joint casing section 3 of 42 top of blind plate.
Cement block piece 5 is set in the integral joint casing section 3, and the cement block piece 5 is located at the well cementation and closes Less than 4 set, no more than 6 position of box cupling sieve tube segment.The cement block piece 5 is along the separate integral joint casing section 3 Direction and the extension of upward direction can be in substantially an inverted umbrella shape, can together lead to integral joint casing section 3 It crosses in the casing tripping in well of original oil well, when in well, the cement block piece 5 can offset with the borehole wall.In this way, when note When entering cement and being cemented the well, cement block piece 5 is constantly increased due to pressure and then is constantly expanded to borehole wall direction, and then be close to well Wall seals, and the gap of casing and the borehole wall prevents cementing concrete 8 from being downwardly into no box cupling sieve tube segment 6.Under the effect of the pressure, Cement 8 can be full of the space between the borehole wall of more than 5 cement block piece and the integral joint casing, and the process of above-mentioned well cementation is It can ensure do not occur the sky for not filling out cement 8 in the space between the borehole wall of more than 5 cement block piece and the integral joint casing Gap greatly improves well cementation success rate and cementing quality, and can prevent upper strata top from altering under water, realizes the effective of production well section Sand control.
No box cupling sieve tube segment 6 is connected to 3 lower end of integral joint casing section, can be connected directly between integral joint casing section The lower end of 3 final stage casings can also be connected to the lower end that set 4 is closed in well cementation.The no box cupling sieve tube segment 6 connects with the nothing It is connected between cuff pipeline section 3 by screw thread.There is the stepped guiding surface of third, the third on the lateral wall of the screen casing upper end The reduced diameter of stepped guiding surface offers screw thread, the screen casing lower end on the stepped guiding surface of third Madial wall on have quadravalence scalariform guiding surface, the reduced diameter of the fourth order scalariform guiding surface, the fourth order Screw thread is offered on scalariform guiding surface.By the screw thread of this special step type, enable to connect between screen casing and screen casing When without using box cupling, without using box cupling when being connected between screen casing and casing, and junction is straight when two screen casings are connected Diameter will not increase, in this way, alloing casing of the integral joint casing section 3 directly by original oil well, and make it as far as possible Greatest diametrical dimension may be used.For the ease of in no 6 tripping in oil well of box cupling sieve tube segment, in the end of no box cupling sieve tube segment 6 Guide shoe 7 can be connected with.
In a kind of specific embodiment, as a diameter of 177.8mm of original oil well casing 1, using in this application Technical solution, the maximum outside diameter of the integral joint casing section 3 can reach 139.7mm, maximum inner diameter 121.36mm, relatively It answers, the maximum outside diameter of the no box cupling sieve tube segment 6 can reach 139.7mm, maximum inner diameter 121.36mm.In above-mentioned internal diameter Under, it can eliminate due to the small influence to pump setting depth of 3 internal diameter of integral joint casing section, for later stage production, well stimulation and well workover The implementation of operation is provided convenience condition.
The operating process of sand control completion tubing string in the application can be as follows:Due to the integral joint casing and nothing in the application Box cupling is not present in box cupling screen casing, therefore, it is necessary to be connected by promoting short circuit with the elevator, then is carried out after being lifted by elevator Connection.The extension hanger 2 connected, integral joint casing section 3, well cementation are closed by set 4 by drilling rod and kelly bar, sieved without box cupling 6 G.I.H precalculated position of pipeline section.It generates powerful motive force by high pressure liquid again or lifts tubing string and be buckled to, so that tail tube hanging The larger-size original oil well casing 1 used in 2 uniform spreading slip insert of device, slip insert and original oil well plays anchoring and makees With, it realizes and gives up while anchoring, ensure to be sent into smoothly putting aside between tubing string and completion tubular column equipped with pressure releasing gadget, Oil well upper end draws angle diameter and reaches maximum value after giving up.Cement 8 is injected into original oil well casing 1 to carry out cement operations, Cement 8 enters integral joint casing section 3, and due to the presence of blind plate 42, cement 8 is flowed out from the closing valve 41 that well cementation is closed in set 4 Space to the borehole wall and the integral joint casing, when tripping in cement 8 is cemented the well, cement block piece 5 due to pressure not Disconnected to increase and then constantly expanded to borehole wall direction, and then be close to Well-wall sealer, the gap of casing and the borehole wall causes cementing concrete 8 not No box cupling sieve tube segment 6 can be downwardly into.Under the effect of the pressure, cement 8 can be full of the borehole wall and the institute of more than 5 cement block piece State the space between integral joint casing.Then it needs to close valve, by drilling rod rubber plug after cementing concrete all injection drilling rod It is interior and then downward with 8 one road of cement to insert people's drilling rod, during downwards, cement mortar in drilling rod is shaved, in hanger position with covering Pipe rubber plug can and and it is locked continue downward, the cement 8 in integral joint casing section 3 is all passed through to cement the well and closes the closing valve for covering 4 41 are pressed out to outside integral joint casing section 3.Finally can and and it be locked, while tripping in the casing bruising rubber plug on extension hanger 2 The trepanning for closing valve 41 is blocked, so that drilling rod bruising rubber plug rises with casing bruising rubber plug in casing separates cementing concrete 8 With the effect of well killing fluid.During above-mentioned well cementation, residual cement 8 is not stayed in the integral joint casing section 3 of 42 top of blind plate.When When needing to carry out later stage life (increasings) production measure and workover treatment etc., by drilling rod and the drill bit of drilling rod bottom is connected to by blind plate 42 drill, in this way, being connected inside entire tubing string.The well cementation carried out by above-mentioned steps to the part of no more than 6 box cupling sieve tube segment, It is primary complete tail pipe after casing damaged well overhaul and reinforce the tail pipe of well reinforce and sand control treatment, reduce job execution cost, again It ensure that the internal diameter of completion tubular column to greatest extent, and then can ensure the works such as steam drive injection well demixing injection-production and the strong pumping of big pump The realization of skill meets the scheme requirement of the techniques such as steam drive and demixing injection-production.
All articles and reference disclosed, including patent application and publication, for various purposes by quoting knot Together in this.Identified element, ingredient, component or step and reality should be included by describing the term " substantially by ... form " of combination Other elements, ingredient, component or the step of the basic novel feature of the combination are not influenced in matter.Using term "comprising" or " comprising " describes the combination of element here, ingredient, component or step it is also contemplated that substantially by these elements, ingredient, component Or the embodiment that step is formed.Here by using term " can with ", it is intended to it is described any to illustrate that " can with " includes Attribute is all optional.Multiple element, ingredient, component or step can be carried by single integrated component, ingredient, component or step For.Alternatively, single integrated component, ingredient, component or step can be divided into multiple element, ingredient, component or the step of separation Suddenly.Open "a" or "an" for describing element, ingredient, component or step do not say in order to exclude other elements, into Point, component or step.
Each embodiment in this specification is described by the way of progressive, the highlights of each of the examples are with The difference of other embodiment, just to refer each other for identical similar part between each embodiment.Above-described embodiment is only Illustrate the technical concepts and features of the present invention, its object is to allow person skilled in the art that can understand present disclosure And implement according to this, it is not intended to limit the scope of the present invention.All equivalence changes made according to spirit of the invention Or modification, it should be covered by the protection scope of the present invention.

Claims (11)

1. a kind of sand control completion tubing string, which is characterized in that the completion tubular column includes:
Original oil well casing;
The extension hanger being suspended in original oil well casing, the hanger is interior to have casing bruising rubber plug;
The integral joint casing section being connected on the extension hanger, the diameter of the integral joint casing are less than the original oil well The diameter of casing, the integral joint casing section are formed by more casing connections, are connected through a screw thread between described sleeve pipe;
Set is closed in the well cementation being connected in the integral joint casing section, and set is closed in the well cementation can be to the integral joint casing section It realizes and is opened and closed and can connect the space between the integral joint casing intersegmental part and the borehole wall and the integral joint casing, the set Pipe bruising rubber plug enables to the space between the integral joint casing intersegmental part and the borehole wall and the integral joint casing to disconnect;
The cement block piece being set in the integral joint casing section, the cement block piece can be by the integral joint casing sections Gap between the borehole wall is isolated;
Be connected to the integral joint casing section lower end without box cupling sieve tube segment, the no box cupling sieve tube segment and the integral joint casing It is connected between section by screw thread.
2. sand control completion tubing string according to claim 1, which is characterized in that the cement block piece is along far from the nothing The direction of the box cupling casing section and extension of upward direction, the cement block piece can offset with the borehole wall.
3. sand control completion tubing string according to claim 1, which is characterized in that the diameter of the no box cupling sieve tube segment with it is described The diameter of integral joint casing section is equal.
4. sand control completion tubing string according to claim 1, which is characterized in that the well cementation is closed set and included:Well cementation is closed Set main body, the closing valve being arranged in the well cementation closing set main body, the blind plate for being arranged on the closing valve lower end, the closing Valve can connect the space between the integral joint casing intersegmental part and the borehole wall and the integral joint casing.
5. sand control completion tubing string according to claim 1, which is characterized in that the maximum outside diameter of described sleeve pipe remains unchanged, On the lateral wall of described sleeve pipe upper end there is the first stepped guiding surface, spiral shell is offered on the first stepped guiding surface Line has the second stepped guiding surface on the madial wall of described sleeve pipe lower end, is opened up on the second stepped guiding surface There is screw thread.
6. sand control completion tubing string according to claim 1, which is characterized in that the cement block piece is located at the well cementation and closes It closes below set, the no box cupling sieve tube segment more than position.
7. sand control completion tubing string according to claim 1, which is characterized in that the end of the no box cupling sieve tube segment is connected with Guide shoe.
8. sand control completion tubing string according to claim 1, which is characterized in that the no box cupling sieve tube segment and the no box cupling Casing section is lowered into the predeterminated position of oil well by drilling rod and kelly bar.
9. sand control completion tubing string according to claim 1, which is characterized in that the no box cupling sieve tube segment and the no box cupling Casing section is connect by promoting short circuit with elevator.
10. sand control completion tubing string according to claim 1, which is characterized in that as a diameter of 177.8mm of described sleeve pipe When, the maximum outside diameter of the integral joint casing section is 139.7mm, maximum inner diameter 121.36mm, the no box cupling sieve tube segment Maximum outside diameter is 139.7mm, maximum inner diameter 121.36mm.
11. a kind of operating method of sand control completion tubing string according to claim 1, which is characterized in that include the following steps:
By drilling rod and kelly bar by the extension hanger connected, the integral joint casing section, the well cementation close set, The no box cupling sieve tube segment passes through the original oil well casing G.I.H precalculated position;
By high pressure liquid or lift the tubing string extension hanger and the original oil well casing anchoring;
Cement is injected into the original oil well casing, the cement flows out to the borehole wall from the well cementation closing set and the nothing connects Space between cuff pipe, so that the cement block piece is close to Well-wall sealer;
Drilling rod with the drilling rod bruising rubber plug is headed into tubing string, is made on the drilling rod bruising rubber plug and extension hanger Casing bruising rubber plug can and and lock, and block the well cementation and close and cover so that the integral joint casing intersegmental part and the borehole wall and institute The space stated between integral joint casing disconnects;
The blind plate of the well cementation closing set is drilled so that the nothing by the drilling rod and the drill bit for being connected to the drilling rod bottom Box cupling casing section is opened.
CN201711338315.7A 2017-12-14 2017-12-14 Sand control completion tubing string Pending CN108204207A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711338315.7A CN108204207A (en) 2017-12-14 2017-12-14 Sand control completion tubing string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711338315.7A CN108204207A (en) 2017-12-14 2017-12-14 Sand control completion tubing string

Publications (1)

Publication Number Publication Date
CN108204207A true CN108204207A (en) 2018-06-26

Family

ID=62604685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711338315.7A Pending CN108204207A (en) 2017-12-14 2017-12-14 Sand control completion tubing string

Country Status (1)

Country Link
CN (1) CN108204207A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905477A (en) * 2019-11-27 2020-03-24 赵景海 Oil well structure with double well completion pipe columns and well completion method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1572097C (en) * 1988-04-27 1994-11-30 Научно-производственная фирма "Геофизика" Method for driving horizontal wells
CN201254957Y (en) * 2008-09-25 2009-06-10 东营市中信石油机械制造有限公司 Non-coupling straight-connecting sleeve pipe
CN201292818Y (en) * 2008-10-30 2009-08-19 中国石油集团长城钻探工程有限公司 Integral hydraulic cement basket
WO2011092335A2 (en) * 2010-01-29 2011-08-04 Angelo Piasentin System and method for tapping geothermal energy from two or more reservoirs
CN202520244U (en) * 2012-03-31 2012-11-07 东营市中信石油机械制造有限公司 Direct connecting type coupling-free casing
CN202645511U (en) * 2012-02-23 2013-01-02 石云夫 Horizontal well segmental production string
CN204646194U (en) * 2015-05-06 2015-09-16 王立峰 A kind of Novel oil well sand prevention liner tube

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1572097C (en) * 1988-04-27 1994-11-30 Научно-производственная фирма "Геофизика" Method for driving horizontal wells
CN201254957Y (en) * 2008-09-25 2009-06-10 东营市中信石油机械制造有限公司 Non-coupling straight-connecting sleeve pipe
CN201292818Y (en) * 2008-10-30 2009-08-19 中国石油集团长城钻探工程有限公司 Integral hydraulic cement basket
WO2011092335A2 (en) * 2010-01-29 2011-08-04 Angelo Piasentin System and method for tapping geothermal energy from two or more reservoirs
CN202645511U (en) * 2012-02-23 2013-01-02 石云夫 Horizontal well segmental production string
CN202520244U (en) * 2012-03-31 2012-11-07 东营市中信石油机械制造有限公司 Direct connecting type coupling-free casing
CN204646194U (en) * 2015-05-06 2015-09-16 王立峰 A kind of Novel oil well sand prevention liner tube

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵旭: "塔河油田石炭系老井开窗侧钻完井方案研究", 《内蒙古石油化工》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905477A (en) * 2019-11-27 2020-03-24 赵景海 Oil well structure with double well completion pipe columns and well completion method thereof
CN110905477B (en) * 2019-11-27 2021-09-07 赵景海 Oil well structure with double well completion pipe columns and well completion method thereof

Similar Documents

Publication Publication Date Title
EP2715041B1 (en) High pressure multibore junction assembly
CN201705219U (en) Lateral drilling gravel pack completion string
CN201567960U (en) Floating casing pipe installing pipe series
CN103867119B (en) Coal seam reservoirs completion remodeling method
CN102979495A (en) Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof
CN201705276U (en) Well completion and flow string of horizontal well
CN108474242A (en) Annular barrier and downhole system for area of low pressure
CN102877812A (en) Method of balancing pressure for well cementation
CN107762451A (en) Well completion method is transformed in a kind of coal bed gas horizontal well payzone underbalance reaming
CN103452531A (en) Method for underbalanced tubing descending, non-well-killing gas lifting, rotary pumping, pump maintaining and tubing maintaining
CN106150428A (en) Split type exempting from bores plug completion tubular column and completion method thereof
CN108204207A (en) Sand control completion tubing string
CN107989572A (en) A kind of Slim Hole Cementing sand control completion integrated pipe column and construction method
US1834946A (en) Method and apparatus for operating wells
CN104963656B (en) A kind of casing programme and its installation method for natural petroleum gas field
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
CN104563872B (en) Blockage resisting self-filling-type float collar
CN101818619A (en) Well cementation and completion structure and process for cased branch well with temporarily-sealed opening
RU2167273C1 (en) Method of casing liner installation in well
CN108979583A (en) A kind of sidetracked hole layer and section cementing unit and application method
CN204571946U (en) A kind of casing programme for natural petroleum gas field
CN201225121Y (en) Oil gas well selective completion tool
CN107989578A (en) A kind of recyclable nitrogen jet current of coiled tubing pumps drainage system and method
CN106437618A (en) Subsection well completion tubular column, subsection reforming tubular column and oil well reforming device
CN208950557U (en) A kind of oil well reverse-filling tubing string

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180626

RJ01 Rejection of invention patent application after publication