CN108196193A - A kind of method for safeguarding power matching network system worked well - Google Patents

A kind of method for safeguarding power matching network system worked well Download PDF

Info

Publication number
CN108196193A
CN108196193A CN201711403873.7A CN201711403873A CN108196193A CN 108196193 A CN108196193 A CN 108196193A CN 201711403873 A CN201711403873 A CN 201711403873A CN 108196193 A CN108196193 A CN 108196193A
Authority
CN
China
Prior art keywords
battery
fills
capacity
preset value
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711403873.7A
Other languages
Chinese (zh)
Inventor
林海
曾华峰
宋志敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Tuobao Science & Technology Co Ltd
Original Assignee
Xiamen Tuobao Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Tuobao Science & Technology Co Ltd filed Critical Xiamen Tuobao Science & Technology Co Ltd
Priority to CN201711403873.7A priority Critical patent/CN108196193A/en
Publication of CN108196193A publication Critical patent/CN108196193A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/385Arrangements for measuring battery or accumulator variables
    • G01R31/387Determining ampere-hour charge capacity or SoC

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)

Abstract

The present invention relates to a kind of method for safeguarding power matching network system worked well, primary complete three stage charging system cycle is carried out when new battery comes into operation, then discharged and counts initial discharge capacity Q0 puts, complete three stage charging system cycle is then carried out, and count the initial charge capacity Q of battery0 fills;After new battery comes into operation, battery capacity monitoring is carried out in the detection time of setting, counts the real-time discharge capacity Q of batteryN is putWith real time charging capacity QN fillsAs long as QN is put/Q0 putsOr QN fills/Q0 fillsLess than preset value, then it is judged as battery failure, and alarm, user is reminded more to renew battery, it is ensured that the normal work of system.

Description

A kind of method for safeguarding power matching network system worked well
Technical field
The present invention relates to power matching network systems, and in particular to a kind of method for safeguarding power matching network system worked well.
Background technology
In power matching network system, the supplying cell of the monitoring and control equipments such as DTU, FTU is chronically at floating charge state, to electricity Pond is actual capacity that is very unfavorable, and can not monitoring battery, can not judge whether battery has failed in time, work as distribution network systems When being out of order, battery can not provide scheduled stand-by time, it is possible to cause very big loss.
Invention content
The purpose of the present invention is to provide a kind of methods for safeguarding power matching network system worked well, being capable of periodic wake Supplying cell in power matching network system, while monitor the capacity of battery, it is ensured that the safety of system.
To achieve the above object, the technical solution adopted by the present invention is:
A kind of method for safeguarding power matching network system worked well, includes the following steps:
Battery is carried out primary complete three stage charging system cycle, and battery is made to be in the floating charge state regular hour by step 1;
Step 2 judges whether the battery first powers on, if battery does not first power on, is transferred to step 3;If battery is It first powers on, then the electric discharge of a fixed load is carried out to battery, stop electric discharge when being put into setting voltage, count the appearance of releasing Amount, is denoted as battery initial discharge capacity Q0 puts
Then battery is subjected to primary complete three stage charging system cycle, and battery is made to be in floating charge state for a period of time, counted Go out the capacity being charged into, be denoted as battery initial charge capacity Q0 fills
Step 3 judges whether the assay intervals time to setting, if having arrived the assay intervals time, carries out primary fixed negative The electric discharge of load stops electric discharge when being put into setting voltage, counts the capacity of releasing, is denoted as the real-time discharge capacity Q of batteryN is put
By QN is put/Q0 putsIt is compared with preset value, if QN is put/Q0 putsMore than or equal to preset value, then step 4 is transferred to;
If QN is put/Q0 putsLess than preset value, then long-range lasting alarm is carried out, until more renewing battery;After more renewing battery, jump to Step 1 continues to monitor;
Battery is carried out primary complete three stage charging system cycle, and floating charge state at battery is made for a period of time, to count by step 4 Go out the capacity being charged into, be denoted as the real time charging capacity Q of batteryN fills
By QN fills/Q0 fillsCompared with preset value, if QN fills/Q0 fillsMore than preset value, then step 3 is jumped to;
If QN fills/Q0 fillsLess than preset value, then carry out continuing remote alarms, until more renewing battery, after more renewing battery, jump to Step 1 continues to monitor.
After using the above scheme, the present invention carries out primary complete three stage charging system cycle when new battery comes into operation, Then it is discharged and counts initial discharge capacity Q0 puts, complete three stage charging system cycle is then carried out, and count the first of battery Beginning charging capacity Q0 fills;After new battery comes into operation, battery capacity monitoring is carried out in the detection time of setting, counts the reality of battery When discharge capacity QN is putWith real time charging capacity QN fillsAs long as QN is put/Q0 putsOr QN fills/Q0 fillsLess than preset value, then it is judged as battery failure, And alarm, user is reminded more to renew battery, it is ensured that the normal work of system.The maintenance power matching network system of the present invention is just The method often to work does not need to identification battery size in implementation process, does not influence the use of battery, the related data of battery APP, high in the clouds preservation can be uploaded to, analysis foundation is provided for battery performance analysis.
Description of the drawings
Fig. 1 is flow chart of the present invention.
Specific embodiment
Present invention is disclosed a kind of methods for safeguarding power matching network system worked well, include the following steps:
Battery is carried out primary complete three stage charging system cycle by step 1(CC-CV-CF), and battery is made to be in floating charge(CF)Shape The state regular hour.
Step 2 judges whether the battery first powers on, if battery does not first power on, is transferred to step 3;It is if electric Pond is to first power on, then the electric discharge of a fixed load is carried out to battery, stops electric discharge when being put into setting voltage, and statistics is released Capacity(WH or AH), it is denoted as battery initial discharge capacity Q0 puts
Then battery is subjected to primary complete three stage charging system cycle(CC-CV-CF), and battery is made to be in floating charge(CF)State For a period of time, which is the default time, counts the capacity being charged into(WH or AH), it is denoted as battery initial charge capacity Q0 fills
Step 3 judges whether the assay intervals time to setting, if having arrived the assay intervals time, carries out once solid The electric discharge of fixed load stops electric discharge when being put into setting voltage, counts the capacity of releasing(WH or AH), it is denoted as the real-time electric discharge of battery Capacity QN is put
By QN is put/Q0 putsIt is compared with preset value, if QN is put/Q0 putsMore than or equal to preset value, represent that the discharge capacity of battery is normal, Step 4 is transferred to continue to monitor;
If QN is put/Q0 putsLess than preset value, represent that battery discharge capacity is abnormal, battery failure carries out long-range lasting alarm, directly at this time To more renewing battery;After more renewing battery, jump to step 1 and continue to monitor;Wherein, warning message communicated by MODBUS/ GPRS etc. is uploaded to backstage, and user's battery is reminded to fail, needs replacing new battery.
Battery is carried out primary complete three stage charging system cycle by step 4(CC-CV-CF), and make floating charge at battery(CF) For a period of time, which is the default time to state, counts the capacity being charged into(WH or AH), it is denoted as filling in real time for battery Capacitance QN fills
By QN fills/Q0 fillsCompared with preset value, if QN fills/Q0 fillsMore than preset value, then it represents that battery charge capacity is normal, and battery still has Effect jumps to step 3 and is detected interval time judgement at this time;
If QN fills/Q0 fillsLess than preset value, then it represents that battery charge capacity is abnormal, and battery has failed, and is held at this time Continuous remote alarms, until more renewing battery, after more renewing battery, jump to step 1 and continue to monitor.
The present invention's it is critical that the primary complete three stage charging system of present invention progress when new battery comes into operation follows Then ring is discharged and counts initial discharge capacity Q0 puts, complete three stage charging system cycle is then carried out, and count battery Initial charge capacity Q0 fills;After new battery comes into operation, battery capacity monitoring is carried out in the detection time of setting, counts battery Real-time discharge capacity QN is putWith real time charging capacity QN fillsAs long as QN is put/Q0 putsOr QN fills/Q0 fillsLess than preset value, then it is judged as battery Failure, and alarm, user is reminded more to renew battery, it is ensured that the preset value of system.
The above is only the embodiment of the present invention, is not intended to limit the scope of the present invention, therefore every Any subtle modifications, equivalent variations and modifications that technical spirit according to the present invention makees above example still fall within this In the range of inventive technique scheme.

Claims (1)

  1. A kind of 1. method for safeguarding power matching network system worked well, it is characterised in that:Include the following steps:
    Battery is carried out primary complete three stage charging system cycle, and battery is made to be in the floating charge state regular hour by step 1;
    Step 2 judges whether the battery first powers on, if battery does not first power on, is transferred to step 3;If battery is It first powers on, then the electric discharge of a fixed load is carried out to battery, stop electric discharge when being put into the voltage of setting, count releasing Capacity is denoted as battery initial discharge capacity Q0 puts
    Then battery is subjected to primary complete three stage charging system cycle, and battery is made to be in floating charge state for a period of time, counted Go out the capacity being charged into, be denoted as battery initial charge capacity Q0 fills
    Step 3 judges whether the assay intervals time to setting, if having arrived the assay intervals time, carries out primary fixed negative The electric discharge of load stops electric discharge when being put into the voltage of setting, counts the capacity of releasing, is denoted as the real-time discharge capacity Q of batteryN is put
    By QN is put/Q0 putsIt is compared with preset value, if QN is put/Q0 putsMore than or equal to preset value, then step 4 is transferred to;
    If QN is put/Q0 putsLess than preset value, then long-range lasting alarm is carried out, until more renewing battery;After more renewing battery, jump to Step 1 continues to monitor;
    Battery is carried out primary complete three stage charging system cycle, and floating charge state at battery is made for a period of time, to count by step 4 Go out the capacity being charged into, be denoted as the real time charging capacity Q of batteryN fills
    By QN fills/Q0 fillsCompared with preset value, if QN fills/Q0 fillsMore than preset value, then step 3 is jumped to;
    If QN fills/Q0 fillsLess than preset value, then carry out continuing remote alarms, until more renewing battery, after more renewing battery, jump to Step 1 continues to monitor.
CN201711403873.7A 2017-12-22 2017-12-22 A kind of method for safeguarding power matching network system worked well Pending CN108196193A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711403873.7A CN108196193A (en) 2017-12-22 2017-12-22 A kind of method for safeguarding power matching network system worked well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711403873.7A CN108196193A (en) 2017-12-22 2017-12-22 A kind of method for safeguarding power matching network system worked well

Publications (1)

Publication Number Publication Date
CN108196193A true CN108196193A (en) 2018-06-22

Family

ID=62583640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711403873.7A Pending CN108196193A (en) 2017-12-22 2017-12-22 A kind of method for safeguarding power matching network system worked well

Country Status (1)

Country Link
CN (1) CN108196193A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102508170A (en) * 2011-11-09 2012-06-20 丁国营 Method for monitoring capacity of storage battery
CN104979880A (en) * 2015-07-23 2015-10-14 成都博德恒宝科技有限公司 Three-state overcharge protection method of multi-section-series-connection battery charging
CN105449299A (en) * 2015-11-17 2016-03-30 高新兴科技集团股份有限公司 Floating charge voltage based storage battery remote charge-discharge method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102508170A (en) * 2011-11-09 2012-06-20 丁国营 Method for monitoring capacity of storage battery
CN104979880A (en) * 2015-07-23 2015-10-14 成都博德恒宝科技有限公司 Three-state overcharge protection method of multi-section-series-connection battery charging
CN105449299A (en) * 2015-11-17 2016-03-30 高新兴科技集团股份有限公司 Floating charge voltage based storage battery remote charge-discharge method

Similar Documents

Publication Publication Date Title
CN104638718B (en) A kind of battery of electric vehicle intelligent management system and method
WO2018133230A1 (en) Control method and apparatus for micro-grid system
JP6486558B2 (en) Battery pack charge control apparatus and method
CN105790223B (en) A kind of battery under-voltage protection dynamic adjusting method and system
CN106364354B (en) A kind of automobile charge control system and automobile charge control method
CN207020287U (en) A kind of battery failures monitor acquisition module
CN202633996U (en) Intelligent management monitoring system of lithium battery pack
CN102288921A (en) Method and system for carrying out batch detection on batteries
CN104483633B (en) Lead-acid accumulator monitoring system
CN104183879A (en) Intelligent battery management system controlled by adopting single chip microcomputer
CN109546741A (en) The self-checking system of battery remote maintenance equipment
CN111856308A (en) Method for periodically and online activating nuclear capacity of storage battery of power supply equipment
CN101834467B (en) Intelligent shared battery pack UPS (Uninterrupted Power Supply) system and control method thereof
CN110112794B (en) Battery monitoring method and device, elevator remote monitoring terminal, system and storage medium
CN108306061A (en) A kind of activation of novel battery is safeguarded and detection method
CN108196193A (en) A kind of method for safeguarding power matching network system worked well
CN109346788B (en) BMS battery management system and control method thereof
CN204131151U (en) A kind of storage battery automatic on-line electric discharge device
CN204118821U (en) A kind of electric bike battery charge protection device
CN116278752A (en) Thermal runaway inspection method, thermal runaway inspection device, wake-up circuit, and nonvolatile storage medium
CN106684828B (en) A kind of over-charging of battery Cross prevention method and system
CN105140980B (en) Underwater monitoring platform multi-battery-pack alternate power supply system and method thereof
CN108075195A (en) A kind of accumulator remote monitoring system
CN113612269A (en) Battery monomer charging and discharging control method and system for lead-acid storage battery energy storage station
CN109921117B (en) Online pulse activation device and system for single storage battery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180622