CN108194131B - Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method - Google Patents
Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method Download PDFInfo
- Publication number
- CN108194131B CN108194131B CN201711317826.0A CN201711317826A CN108194131B CN 108194131 B CN108194131 B CN 108194131B CN 201711317826 A CN201711317826 A CN 201711317826A CN 108194131 B CN108194131 B CN 108194131B
- Authority
- CN
- China
- Prior art keywords
- slip casting
- cavity
- solution cavity
- pipe
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 230000003068 static effect Effects 0.000 title claims abstract description 22
- 239000002002 slurry Substances 0.000 claims abstract description 54
- 238000007789 sealing Methods 0.000 claims abstract description 48
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 37
- 239000004568 cement Substances 0.000 claims abstract description 31
- 238000000034 method Methods 0.000 claims abstract description 20
- 239000000463 material Substances 0.000 claims abstract description 11
- 239000000243 solution Substances 0.000 claims description 167
- 238000007569 slipcasting Methods 0.000 claims description 115
- 229910000831 Steel Inorganic materials 0.000 claims description 56
- 239000010959 steel Substances 0.000 claims description 56
- 239000004033 plastic Substances 0.000 claims description 41
- 229920003023 plastic Polymers 0.000 claims description 41
- 238000011049 filling Methods 0.000 claims description 36
- 241000220317 Rosa Species 0.000 claims description 27
- 239000007788 liquid Substances 0.000 claims description 27
- 239000002390 adhesive tape Substances 0.000 claims description 21
- 238000001914 filtration Methods 0.000 claims description 19
- 239000004576 sand Substances 0.000 claims description 17
- 239000002775 capsule Substances 0.000 claims description 16
- 238000000605 extraction Methods 0.000 claims description 16
- 230000008961 swelling Effects 0.000 claims description 15
- 239000012530 fluid Substances 0.000 claims description 14
- 238000005553 drilling Methods 0.000 claims description 12
- 238000003780 insertion Methods 0.000 claims description 12
- 230000037431 insertion Effects 0.000 claims description 12
- 238000001556 precipitation Methods 0.000 claims description 10
- 230000009977 dual effect Effects 0.000 claims description 8
- 238000002347 injection Methods 0.000 claims description 8
- 239000007924 injection Substances 0.000 claims description 8
- 239000002699 waste material Substances 0.000 claims description 8
- 241000196324 Embryophyta Species 0.000 claims description 7
- 238000002156 mixing Methods 0.000 claims description 7
- 238000012545 processing Methods 0.000 claims description 7
- 238000005086 pumping Methods 0.000 claims description 7
- 210000002966 serum Anatomy 0.000 claims description 7
- 208000002925 dental caries Diseases 0.000 claims description 6
- 239000000284 extract Substances 0.000 claims description 6
- 238000010248 power generation Methods 0.000 claims description 6
- 239000010802 sludge Substances 0.000 claims description 6
- 239000011440 grout Substances 0.000 claims description 5
- 241001669679 Eleotris Species 0.000 claims description 3
- 238000002360 preparation method Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 239000002893 slag Substances 0.000 claims description 2
- 238000009955 starching Methods 0.000 claims description 2
- 241001074085 Scophthalmus aquosus Species 0.000 claims 1
- 238000009434 installation Methods 0.000 claims 1
- 238000011835 investigation Methods 0.000 claims 1
- 230000007547 defect Effects 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 4
- 238000004064 recycling Methods 0.000 abstract description 4
- 238000012856 packing Methods 0.000 description 10
- 238000005516 engineering process Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 239000000835 fiber Substances 0.000 description 2
- 230000001376 precipitating effect Effects 0.000 description 2
- 239000013049 sediment Substances 0.000 description 2
- 206010067482 No adverse event Diseases 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 239000008235 industrial water Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000007873 sieving Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 210000005239 tubule Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention belongs to a material-saving closed recyclable static pressure grouting system for a karst cave at the bottom of a river and a construction method. The method comprises the steps of firstly sealing adjacent karst cave mouths by using a device for sealing the adjacent karst cave mouths, then sealing cement paste in a karst cave cavity by using a recyclable static pressure grouting device, and treating mud water in the karst cave cavity by using a circulating filter device for recycling. The method can effectively save materials and seal the karst cave at the bottom of the river, overcomes the defects of easy slurry leakage, pipe blockage, hole collapse and the like in the traditional process, and has the advantages of simple and practical method, low construction risk, low cost and construction period saving. The mud water is recycled and recycled on site, and the advantages of less pollution and good use effect are achieved.
Description
Technical field
The invention belongs to a kind of river bottom solution cavity material-savings to close recyclable static pressure grouting system and construction method.
Background technique
Solution cavity is the underground karst form that tunnel construction is often met, solution cavity according to charges in hole state and shape
Formula can be divided into packed type and non-filling-type Karst cave.Non- filling-type Karst cave is substantially without underground water and too many deposit, solution cavity wall
It is usually exposed;Filling-type Karst cave refers to that the entire hole body of solution cavity is largely full of by detrital sediment, chemical sediment or underground water.
Shield-tunneling construction meet solution cavity region (it includes numerous a solution cavity cavitys) construction when, especially solution cavity when on shield-tunneling construction line,
Easily there are accidents such as " planting head " " subsideing " " water burst " " prominent mud " " riverbed collapse " in Shield-type machinery.
For ensure shield machine safely, pass through solution cavity area, need to intrusion 1.5 times of hole diameters of tunnel main line within the scope of it is numerous
A solution cavity cavity is filled consolidation process with cement slurry, reduces the relative settlement between Different Strata to meet, reduces section of jurisdiction
Leakage, to guarantee the shield tunnel construction phase and run the safety of phase.Traditional solution cavity cavity packing technology uses steel sleeve guard aperture,
Intert the method for a Grouting Pipe in hole, basically as underwater concrete technology is poured, Grouting Pipe needs to be embedded to institute's injection slurry
Interior certain depth, it is intermittent with slip casting depth to promote Grouting Pipe upwards, finally with fast dry concrete by solution cavity packing.But this
There are many drawbacks for technology, cause collapse hole phenomenon to lead to the extremely difficult extraction of Grouting Pipe or pressure since hole wall stratum sandy gravel stratum is blocked up
It is unbalanced to cause solution cavity bottom boundaries spillage phenomenon.Especially its hole is close within the scope of 1.5 times of hole diameters of tunnel main line and work surface
The ultra-large type solution cavity that solution cavity cavity communicates can not only be consumed with the fast dry concrete solution cavity packing technology packing ultra-large type solution cavity
A large amount of injection slurry increases considerably filling cost, also tends to be difficult to achieve the purpose that solution cavity packing;Solution cavity packing is caused to lose
It loses, tunnel main line is relocated, and loss is serious.
Summary of the invention
The object of the present invention is to provide a kind of river bottom solution cavity material-savings to close recyclable static pressure grouting system and construction method, energy
The defects of effectively carrying out material-saving packing to river bottom solution cavity, solving easy spillage, the plugging, collapse hole of traditional handicraft has method letter
Just practical, construction risk is low, at low cost, saves the duration.Muddy water recycling recycles on the spot, and of low pollution and using effect are good
Advantage.
For this purpose, a kind of river bottom solution cavity material-saving of the invention closes recyclable static pressure grouting system, including boring drill and water
Upper job platform:
Operation at sea platform: it is made of the number one ship and No. second ship that are arranged side by side in spacing distance, number one ship
It is fixed as one on the front and rear part deck of No. second ship by two truss.The both ends for the several steel sleepers being distributed in interval distance
It takes on solid two hull decks between two truss, the steel sleeper of each hull is equipped with to be run on it for boring drill
Sliding rail.Two hull lower ends between two sliding rails are bore area, and the outside of hull is equipped with anchor ring, and hull deck is equipped with power generation
Area, material sections, circulation filter and pumping plant area.
Circulation filter makes clear for the quick filtering clarifying treatment of residue muddy water progress in the solution cavity cavity by extraction
Clear water recycles.Circulation filter is made of residue-filtering barrel, the first Rose Box and the second Rose Box.The top of residue-filtering barrel by
The first, second, third and fourth filter residue net tilting to side is successively arranged under.The mud extraction mouth of a river that mud pipe is returned in slip casting is located at
The upper end of first filter residue net.The residue-filtering barrel of each filter residue net low side is equipped with sludge outlet.Accept the inder pot position of each filter residue net residue
In sludge outlet lower end.The lower end of residue-filtering barrel is communicated by the first conduit and suction pump with the first Rose Box upper end.First filtering
Fibrous layer, coarse sands layer and layer of sand are from top to bottom successively arranged in case, the lower end of the first Rose Box passes through the second conduit and the second mistake
Filter box upper end communicates.Fine sand layer is equipped in second Rose Box, the lower end of the second Rose Box communicates header tank.
Recyclable static pressure grouting device: guard aperture is carried out to the hole that boring drill bores with steel sleeve.Three are equipped in steel sleeve
Plastic tube.Two are respectively Grouting Pipe and note sealing of hole liquid pipe for 25 × 3.5mm of φ thin plastic pipe, and one is 50 × 3.5mm's of φ
Thick plastic tube is that mud pipe is returned in slip casting.The bottom nozzle closing of mud pipe is returned in slip casting, and the bottom that mud pipe is returned in slip casting opens up crowd in spacing distance
The aperture of multiple φ 5mm.And aperture is externally provided with closing adhesive tape.The bottom that mud pipe is returned in slip casting is located at solution cavity cavity bottom.Grouting Pipe
Insertion slip casting is returned in mud pipe and one end is located at the interior bottom that mud pipe is returned in slip casting, and the other end is communicated with slip casting machine grout outlet.For
One end of the note sealing of hole liquid pipe of aperture sealing of hole is located above solution cavity mouth at the position 1m, and the other end of note sealing of hole liquid pipe communicates biliquid note
Pulp grinder.
Seal adjacent molten hole device: You Yigen filling medium plastic tube and a swelling bag are formed.The one of filling medium plastic tube
End is communicated with filling medium machine, and the other end of filling medium plastic tube is located in the swelling bag of sealing and penetrates on adjacent solution cavity mouth
In the steel sleeve of side, and carries swelling bag and extend at adjacent solution cavity mouth.
The first, second, third and fourth filter residue net is respectively 55~60 ° with the angle of horizontal plane.
The first filter residue net is from top to bottom laterally in the fire grate type filter residue net of spacing distance side by side, adjacent fire grate
Spacing is 2~3cm.
The mesh of described second, third and the 4th filter residue net is respectively 1 mesh, 3 mesh, 6 mesh.
The thickness ratio of fibrous layer, coarse sands layer and layer of sand is 2:1.5:1 in first Rose Box.
The slip casting goes back to the gap between mud pipe and Grouting Pipe and forms go back to muddy water channel.
The swelling bag is made of rubber material, and swelling bag is that medium limits capsule.
A kind of construction method realized river bottom solution cavity material-saving and close recyclable static pressure grouting system, includes the following steps:
(1) preparation of construction prepares operation at sea platform, installs boring drill, hull deck in the sliding rail of upper job platform
It is equipped with power generation area, material sections, circulation filter and pumping plant area, is surveyed according to construction access road combination geology and geomorphology original geotechnical engineering
Report is visited, drilling region is drawn, makes solution cavity mouth range of grouting, make adjacent molten openings position.
(2) hole location for marking injected hole guarantees a slip casting hole location narrow place on the outside of adjacent solution cavity mouth.
(3) hole operation of the large-scale solution cavity close to tunnel main line edge is closed:
(a) it drills above the solution cavity cavity at the first narrow place on the outside of the hole of adjacent large-scale solution cavity of boring drill;
(b) after pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located at solution cavity sky
Chamber upper end drills at 1.5m;
(c) slip casting of the Grouting Pipes of φ 25mm plastics insertion φ 50mm plastics is returned in mud pipe again, then by Grouting Pipe and note
Mud pipe to be starched back to be transferred out of steel sleeve to close to the solution cavity cavity bottom outside adjacent solution cavity mouth, mud pipe bottom end closure is returned in slip casting, under
Portion symmetrically opens up the aperture of φ 5mm, and aperture outer closure adhesive tape is closed, and the bottom end opening of Grouting Pipe is used for slip casting, Grouting Pipe
The other end is communicated with slip casting machine grout outlet, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net;
(d) one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end
At the square position 1m, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;
(e) it by one end insertion sealed expansion capsule of a filling medium plastic tube, transfers out of steel sleeve to adjacent solution cavity
On the outside of mouthful in the middle part of narrow place, one end of filling medium plastic tube is communicated with filling medium machine;
(f) filling medium machine is opened by filling medium plastic tube injected media into sealed expansion capsule, keeps sealed expansion capsule swollen
It is swollen to close adjacent solution cavity mouth;
(j) double-fluid grouting machine is opened by infusing sealing of hole liquid pipe to progress dual slurry note at the position solution cavity cavity upper end 1m
It penetrates, to orifice closing is carried out at the position solution cavity cavity upper end 1m, forms the enclosed environment in solution cavity cavity;
(l) it opens slip casting machine and injects cement slurry into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud pipe again
The aperture for returning mud bottom of the tube from slip casting breaks through closing adhesive tape blast hole outflow, and the cement slurry of outflow is filled out upwards from the bottom of solution cavity cavity
Solution cavity space is filled, while the residue muddy water in solution cavity cavity is extruded into solution cavity cavity internal upper part, is reserved from slip casting time mud pipe upper
The aperture in portion breaks through the gap that closing adhesive tape blast hole enters between Grouting Pipe and slip casting time mud pipe, the pressure generated according to serum recycle
It discharges it slip casting and returns mud pipe, until filling cement slurry in solution cavity cavity, the residue muddy water that discharge slip casting is returned outside mud pipe enters circulation
Filter device is filtered, precipitation process, and clarified solution is used for slurries mixing, and waste residue after precipitation is then uniformly transported at bank
Reason;
(i) it extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve;
(4) the bored grouting operation of other solution cavity cavitys in drilling region is carried out:
Boring drill first drills above solution cavity cavity;
After pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located on solution cavity cavity
At end drilling 1.5m;The slip casting of the Grouting Pipes of φ 25mm plastics insertion φ 50mm plastics is returned in mud pipe again, then by Grouting Pipe and
Slip casting is returned mud pipe and is transferred out of steel sleeve to solution cavity cavity bottom, and mud pipe bottom end closure is returned in slip casting, and lower part symmetrically opens up φ 5mm's
Aperture, and aperture outer closure adhesive tape is closed, the bottom end opening of Grouting Pipe, is used for slip casting, the other end and the slip casting machine of Grouting Pipe go out
Slurry mouth communicates, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net;
The one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end
At the position 1m, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;
Double-fluid grouting machine is opened by note sealing of hole liquid pipe to carrying out dual slurry injection at the position solution cavity cavity upper end 1m,
To orifice closing is carried out at the position solution cavity cavity upper end 1m, the enclosed environment in solution cavity cavity is formed;
It opens slip casting machine and injects cement slurry into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud Guan Zaicong note
The aperture for starching back mud bottom of the tube breaks through closing adhesive tape blast hole outflow, and the residue muddy water in solution cavity cavity is extruded into solution cavity cavity
Top, the aperture for going back to the reserved top of mud pipe from slip casting break through closing adhesive tape blast hole and enter between Grouting Pipe and slip casting time mud pipe
Gap, then slip casting is discharged it by serum recycle and returns mud pipe, until filling cement slurry in solution cavity cavity, discharge slip casting is returned outside mud pipe
Residue muddy water enter circulation filter be filtered, precipitation process, clarified solution be used for slurries mixing, waste residue after precipitation is then
Uniformly it is transported to bank processing;
It extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve.
(f) (j) step can carry out simultaneously in described (3) step, or sequence is exchanged.
The medium injected into sealed expansion capsule is air or water, or is cement slurry.
The above method has reached the purpose of the present invention.
The present invention effectively can carry out material-saving packing to river bottom solution cavity, solve the easy spillage of traditional handicraft, plugging, collapse hole etc.
Defect has method simple and practical, and construction risk is low, at low cost, saves the duration.Muddy water recycling recycles on the spot, of low pollution
The good advantage with using effect.
Compared with the prior art the present invention has the advantages that:
(1) using sealed expansion capsule technology can effectively quick blocking close to work surface adjacent ultra-large type solution cavity hole
Mouthful, it avoids a large amount of injection slurry from invalidly flowing into ultra-large type solution cavity, effectively operating area door solution cavity cavity can be sealed
It fills out, construction cost can be greatly lowered, accelerate speed of application.
(2) steel sleeve guard aperture is taken, the plastic tube of three different-diameters works together, and realizes guard aperture, slip casting and envelope
Effective combination in hole prevents river out of aperture intrusion hole, provides advantageous closed environment for slip casting.
(3) excessive by slurries blast hole in such a way that extra heavy pipe set tubule directly gos deep into solution cavity cavity bottom, from solution cavity sky
Bottom of chamber portion starts rapid closed boundary, effectively filling rock crack, prevents slip casting process from generating spillage phenomenon.
(4) Grouting Pipe does not need not needing to extract with slurries Synchronous lifting yet during slip casting, shortens process conversion
Time, and tubing is flexibility, passes through and has no adverse effects to shield machine.
(5) system is by serum recycle, by solution cavity cavity residue and muddy water by Grouting Pipe and slip casting return mud pipe
Between gap discharge, and aboard ship carry out waste pulp purified treatment, treated, and primary water can be used for slurries mixing, waste residue
It is then uniformly transported to bank processing, water resource is realized and recycles, reduce the pollution to river, water-saving result is significant, pollution treatment
It is at low cost.
Detailed description of the invention
Fig. 1 is operation at sea platform structure schematic diagram of the invention.
Fig. 2 is circulation filter structural schematic diagram of the invention.
Fig. 3 is the theory structure schematic diagram of recyclable static pressure grouting system of the invention to solution cavity cavity.
Fig. 4 is the hole operation theory structure schematic diagram of closing ultra-large type solution cavity of the invention.
Specific embodiment
As shown in Figures 1 to 4, a kind of river bottom solution cavity material-saving closes recyclable static pressure grouting system, including boring drill and
Operation at sea platform:
As shown in Figure 1, operation at sea platform: by 9 groups of number one ship 1 and No. second ship being arranged side by side in spacing distance
At.Number one ship and No. second ship are arranged side by side in spacing distance.By two on the front and rear part deck of number one ship and No. second ship
A truss 2 is fixed as one.Take solid two between two truss in the both ends for the several steel sleepers 11 being distributed in interval distance
On hull deck, to form a firm operation at sea platform.The steel sleeper of each hull is equipped with to exist for boring drill
The sliding rail 4 run thereon.Boring drill is located on sliding rail.Two hull lower ends between two sliding rails are bore area, and bore area is covered with
Drill hole location 3.The outside of hull is equipped with anchor ring 10, and anchor ring is for fixing operation at sea platform.Hull deck is equipped with: power generation area
5 for operation at sea platform power;Material sections 6 are for storing a variety of materials and equipment;Circulation filter 7 and pumping plant area 8,
Pumping plant area for drawing water, slip casting and operation.
As shown in Fig. 2, circulation filter is clear for quickly being filtered the residue muddy water in the solution cavity cavity of extraction
Clear processing makes to clarify water circulation use.Circulation filter is by 27 residue-filtering barrel 19, the first Rose Box 23 and the second Rose Box structures
At.The top of residue-filtering barrel is from top to bottom successively arranged to the first tilting filter residue net 18 of side, the second filter residue net 17, third filter residue
Net 15 and the 4th filter residue net 14.The mud extraction mouth of a river 12 that mud pipe is returned in slip casting is located at the upper end of the first filter residue net.Each filter residue net low side
Residue-filtering barrel is equipped with sludge outlet 16.The inder pot 13 for accepting each filter residue net residue is located at sludge outlet lower end.Described first,
Two, the third and fourth filter residue net is respectively 55~60 ° with the angle of horizontal plane.The first filter residue net is lateral from top to bottom
In the fire grate type filter residue net of spacing distance side by side, adjacent fire grate spacing is 2~3cm.Described second, third and the 4th filter residue
The mesh of net is respectively 1 mesh, 3 mesh, 6 mesh.
The lower end of residue-filtering barrel is communicated by the first conduit 20 and suction pump 21 with 23 upper end of the first Rose Box.First Rose Box
Inside from top to bottom it is successively arranged fibrous layer 22, coarse sands layer 24 and layer of sand 25.The lower end of first Rose Box by the second conduit 26 with
Second Rose Box, 27 upper end communicates.Fine sand layer 28 is equipped in second Rose Box, the lower end of the second Rose Box passes through 29 phase of communicating pipe
Logical header tank 30.
The thickness ratio of fibrous layer, coarse sands layer and layer of sand is 2:1.5:1 in first Rose Box.The fine sand layer by
The sand of 0.1~0.5mm of partial size is constituted.Sand bed is made of the sand of 0.6~0.8mm of partial size.Rough sand layer is by 0.8~1mm of partial size
Sand constitute.Filter fiber layer is that 2~4 layers of filter fiber cloth are constituted.
In use, the residue muddy water extracted out out of solution cavity cavity goes back to the mud extraction mouth of a river 12 of mud pipe from slip casting, residue-filtering barrel is fallen into
Different densities of the top successively through the first, second, third and fourth filter residue net mesh sieving, interior stone, slag particle and miscellaneous
Object is held on the net from each filter residue and is slid in residue-filtering barrel through sludge outlet, and disembarkation is cleaned.Muddy water is again through the first conduit and suction pump
Into the first Rose Box upper end, the fine sand layer of filtering and the second Rose Box successively through fibrous layer, coarse sands layer and layer of sand is refiltered
Afterwards, become available water purification, deposit header tank is used for industrial water.
As shown in figure 3, recyclable static pressure grouting device: carrying out guard aperture with the hole that steel sleeve 34 bores boring drill.Steel bushing
Three plastic tubes are equipped in pipe.Two are respectively Grouting Pipe 31 and note sealing of hole liquid pipe 32 for 25 × 3.5mm of φ thin plastic pipe.
One be 50 × 3.5mm of φ thick plastic tube be slip casting return mud pipe 33.The bottom nozzle closing of mud pipe, slip casting are returned in slip casting
The bottom for returning mud pipe opens up the aperture 39 of numerous a φ 5mm in spacing distance.And aperture is externally provided with closing adhesive tape.Mud pipe is returned in slip casting
Bottom be located at 41 bottom of solution cavity cavity.
Grouting Pipe insertion slip casting is returned in mud pipe and one end is located at the interior bottom that mud pipe is returned in slip casting, and the other end goes out with slip casting machine
Slurry mouth communicates.One end of note sealing of hole liquid pipe for aperture sealing of hole is located above solution cavity mouth at the position 1m, infuses the another of sealing of hole liquid pipe
One end communicates double-fluid grouting machine.
As shown in figure 4, the adjacent molten hole device of envelope: You Yigen filling medium plastic tube 46(can be the thin plastics of 25 × 3.5mm of φ
Pipe) and a swelling bag 47 formed.One end of filling medium plastic tube is communicated with filling medium machine, the other end position of filling medium plastic tube
In in the swelling bag of sealing and penetrating in the steel sleeve above adjacent solution cavity mouth, and carries swelling bag and extend to adjacent solution cavity mouth
At 44, adjacent solution cavity mouth communicates the adjacent solution cavity 45 of the ultra-large type outside work surface.
The slip casting goes back to the gap between mud pipe and Grouting Pipe and forms go back to muddy water channel 43.
The swelling bag is made of rubber material, and swelling bag is that medium limits capsule.
A kind of construction method realized river bottom solution cavity material-saving and close recyclable static pressure grouting system, includes the following steps:
(1) preparation of construction prepares operation at sea platform, installs boring drill, hull deck in the sliding rail of upper job platform
It is equipped with power generation area, material sections, circulation filter and pumping plant area, is surveyed according to construction access road combination geology and geomorphology original geotechnical engineering
Report is visited, drilling region is drawn, makes solution cavity mouth range of grouting, make adjacent molten openings position.
(2) hole location for marking injected hole guarantees a slip casting hole location narrow place on the outside of adjacent solution cavity mouth.
(3) hole operation of the large-scale solution cavity close to tunnel main line edge is closed.Steps are as follows:
(a) it drills above the solution cavity cavity at the first narrow place on the outside of the hole of adjacent large-scale solution cavity of boring drill.The hole drilled out
It is communicated after sequentially passing through mud 35, sandy gravel stratum 36 with the solution cavity cavity being located in intense weathering munstone 38.
(b) after pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located at solution cavity sky
Chamber upper end drills at 1.5m.
(c) slip casting of the Grouting Pipe insertion φ 50mm plastics of φ 25mm plastics is returned in mud pipe.Again by Grouting Pipe and slip casting
Mud pipe is returned to be transferred out of steel sleeve to close to 41 bottom of solution cavity cavity outside adjacent solution cavity mouth.Mud pipe bottom end closure is returned in slip casting, under
Portion symmetrically opens up the aperture of φ 5mm, and aperture outer closure adhesive tape is closed.The bottom end opening of Grouting Pipe is used for slip casting.Grouting Pipe
The other end is communicated with slip casting machine grout outlet.The mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net.
(d) one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end
At the position Fang Zhankong 1m, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine.
(e) will in one end insertion sealed expansion capsule of filling medium plastic tube 46, out of steel sleeve decentralization to solution cavity
On the outside of the adjacent solution cavity mouth of cavity in the middle part of narrow place, one end of filling medium plastic tube is communicated with filling medium machine.
(f) filling medium machine is opened by filling medium plastic tube injected media into sealed expansion capsule, keeps sealed expansion capsule swollen
It is swollen to close adjacent solution cavity mouth 44, so that a large amount of cement slurries are useless when can avoid using the solution cavity cavity in cement slurry packing work surface
Ground flows into adjacent large-scale solution cavity 45 from adjacent solution cavity mouth.
(j) double-fluid grouting machine is opened by infusing sealing of hole liquid pipe to progress dual slurry note at the position solution cavity cavity upper end 1m
It penetrates, to the drilling (closing the space at this between drilling and each plastic tube outer wall periphery) at the position solution cavity cavity upper end 1m
Orifice closing is carried out, the dual slurry quickly solidified forms closure 37, and the enclosed environment in solution cavity cavity is formed after closed orifices.
(l) it opens slip casting machine and injects cement slurry 40 into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud pipe
Break through closing adhesive tape blast hole outflow from the aperture that mud bottom of the tube is returned in slip casting again, the cement slurry of outflow from the bottom of solution cavity cavity 41 to
Upper filling solution cavity space, while the residue muddy water 42 in solution cavity cavity is extruded into solution cavity cavity internal upper part, it is pre- to return mud pipe from slip casting
The aperture on the top stayed breaks through the gap 43 that closing adhesive tape blast hole enters between Grouting Pipe and slip casting go back to mud pipe, produces according to serum recycle
Raw pressure discharges it slip casting and returns mud pipe, until filling cement slurry in solution cavity cavity.The mud extraction mouth of a river discharge of mud pipe is returned through slip casting
Slip casting return mud pipe outside residue muddy water enter circulation filter be filtered, precipitation process, clarified solution be used for slurries mixing.Through
Waste residue after precipitating is then uniformly transported to bank processing;
(i) it extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve.Repeatable step (3) close other
The large-scale solution cavity close to tunnel main line edge hole operation.
(4) the bored grouting operation for carrying out other solution cavity cavitys in drilling region, has the following steps:
Boring drill first drills above other solution cavity cavitys.
After pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located on solution cavity cavity
At end drilling 1.5m;The slip casting of the Grouting Pipes of φ 25mm plastics insertion φ 50mm plastics is returned in mud pipe again, then by Grouting Pipe and
Slip casting is returned mud pipe and is transferred out of steel sleeve to solution cavity cavity bottom, and mud pipe bottom end closure is returned in slip casting, and lower part symmetrically opens up φ 5mm's
Aperture, and aperture outer closure adhesive tape is closed, the bottom end opening of Grouting Pipe, is used for slip casting, the other end and the slip casting machine of Grouting Pipe go out
Slurry mouth communicates, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net.
The one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end
At the position 1m, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;Double-fluid grouting machine is opened by infusing sealing of hole liquid pipe to solution cavity
Dual slurry injection is carried out at the position cavity upper end 1m, to progress orifice closing, shape at the position solution cavity cavity upper end 1m
At the enclosed environment in solution cavity cavity.
It opens slip casting machine and injects cement slurry 40 into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud Guan Zaicong
The aperture that mud bottom of the tube is returned in slip casting breaks through closing adhesive tape blast hole outflow, and the cement slurry of outflow is filled out upwards from the bottom of solution cavity cavity 41
Solution cavity space is filled, while the residue muddy water 42 in solution cavity cavity is extruded into solution cavity cavity internal upper part, returns what mud pipe was reserved from slip casting
The aperture on top breaks through the gap 43 that closing adhesive tape blast hole enters between Grouting Pipe and slip casting go back to mud pipe, generates according to serum recycle
Pressure discharges it slip casting and returns mud pipe, until filling cement slurry in solution cavity cavity.Slip casting is discharged in the mud extraction mouth of a river for returning mud pipe through slip casting
Return mud pipe outside residue muddy water enter circulation filter be filtered, precipitation process, clarified solution be used for slurries mixing.Through precipitating
Waste residue afterwards is then uniformly transported to bank processing.
It extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve.It is repeated in step (4) to drilling region
The bored grouting operation of whole solution cavity cavitys is completed.
(f) (j) step can carry out simultaneously in described (3) step, or sequence is exchanged.
The medium injected into sealed expansion capsule is air or water, or is cement slurry.
The cement slurry and dual slurry of injection are conventional formulation, therefore are not repeated.
In short, the present invention effectively can carry out material-saving packing to river bottom solution cavity, solve the easy spillage of traditional handicraft, plugging,
The defects of collapse hole, has method simple and practical, and construction risk is low, at low cost, saves the duration.Muddy water recycling recycles on the spot,
Of low pollution and the good advantage of using effect.
Claims (10)
1. a kind of river bottom solution cavity material-saving closes recyclable static pressure grouting system, including boring drill and operation at sea platform, special
Sign is:
Operation at sea platform is made of, number one ship and the number one ship and No. second ship that are arranged side by side in spacing distance
It is fixed as one on the front and rear part deck of No. two ships by two truss, the both ends for the several steel sleepers being distributed in interval distance are taken solid
On two hull decks between two truss, the steel sleeper of each hull is equipped with the cunning run on it for boring drill
Rail, two hull lower ends between two sliding rails are bore area, and the outside of hull is equipped with anchor ring, and hull deck is equipped with power generation area, material
Expect area, circulation filter and pumping plant area;
Circulation filter, carrying out quickly filtering clarifying treatment for the residue muddy water in the solution cavity cavity by extraction makes primary water
Recycle, circulation filter is made of residue-filtering barrel, the first Rose Box and the second Rose Box, the top of residue-filtering barrel by up to
Under be successively arranged the first, second, third and fourth filter residue net tilting to side, the mud extraction mouth of a river that mud pipe is returned in slip casting is located at first
The residue-filtering barrel of the upper end of filter residue net, each filter residue net low side is equipped with sludge outlet, and the inder pot for accepting each filter residue net residue is located at filter
The lower end of slag exit lower end, residue-filtering barrel is communicated by the first conduit and suction pump with the first Rose Box upper end, in the first Rose Box
It is from top to bottom successively arranged fibrous layer, coarse sands layer and layer of sand, the lower end of the first Rose Box passes through the second conduit and the second Rose Box
Upper end communicates, and fine sand layer is equipped in the second Rose Box, the lower end of the second Rose Box communicates header tank;
Recyclable static pressure grouting device carries out guard aperture to the hole that boring drill bores with steel sleeve, is equipped with three plastics in steel sleeve
Pipe, two are respectively Grouting Pipe and note sealing of hole liquid pipe, a thick modeling for 50 × 3.5mm of φ for 25 × 3.5mm of φ thin plastic pipe
Expects pipe is that mud pipe is returned in slip casting, and the bottom nozzle closing of mud pipe is returned in slip casting, and the bottom that mud pipe is returned in slip casting opens up numerous in spacing distance
The aperture of φ 5mm, and aperture is externally provided with closing adhesive tape, the bottom that mud pipe is returned in slip casting is located at solution cavity cavity bottom, Grouting Pipe insertion
Slip casting is returned in mud pipe and one end is located at the interior bottom that mud pipe is returned in slip casting, and the other end is communicated with slip casting machine grout outlet, is used for aperture
One end of the note sealing of hole liquid pipe of sealing of hole is located above solution cavity mouth at the position 1m, and the other end of note sealing of hole liquid pipe communicates two fluid grouting
Machine;
Seal adjacent molten hole device, You Yigen filling medium plastic tube and a swelling bag are formed, one end of filling medium plastic tube with
Filling medium machine communicates, and the other end of filling medium plastic tube is located in the swelling bag of sealing and penetrates above adjacent solution cavity mouth
In steel sleeve, and carries swelling bag and extend at adjacent solution cavity mouth.
2. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described
First, second, third and fourth filter residue net is respectively 55~60 ° with the angle of horizontal plane.
3. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described
First filter residue net is from top to bottom laterally in the fire grate type filter residue net of spacing distance side by side, and adjacent fire grate spacing is 2~3cm.
4. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described
The mesh of second, third and the 4th filter residue net is respectively 1 mesh, 3 mesh, 6 mesh.
5. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described
The thickness ratio of fibrous layer, coarse sands layer and layer of sand is 2:1.5:1 in first Rose Box.
6. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described
Slip casting goes back to the gap between mud pipe and Grouting Pipe and forms go back to muddy water channel.
7. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described
Swelling bag is made of rubber material, and swelling bag is that medium limits capsule.
8. a kind of construction method realized river bottom solution cavity material-saving described in claim 1 and close recyclable static pressure grouting system,
It is characterized in that, includes the following steps:
(1) preparation of construction prepares operation at sea platform, on the sliding rail installation boring drill of upper job platform, hull deck
Equipped with power generation area, material sections, circulation filter and pumping plant area, according to construction access road combination geology and geomorphology original geotechnical investigation
Report draws drilling region, makes solution cavity mouth range of grouting, make adjacent molten openings position;
(2) hole location for marking injected hole guarantees a slip casting hole location narrow place on the outside of adjacent solution cavity mouth;
(3) hole operation of the large-scale solution cavity close to tunnel main line edge is closed:
(a) it drills above the solution cavity cavity at the first narrow place on the outside of the hole of adjacent large-scale solution cavity of boring drill;
(b) after pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located on solution cavity cavity
At end drilling 1.5m;
(c) slip casting of the Grouting Pipe insertion φ 50mm plastics of φ 25mm plastics is returned in mud pipe again, then Grouting Pipe and slip casting is returned
Mud pipe is transferred out of steel sleeve to close to the solution cavity cavity bottom outside adjacent solution cavity mouth, and mud pipe bottom end closure, lower part pair are gone back in slip casting
Claim to open up the aperture of φ 5mm, and aperture outer closure adhesive tape is closed, the bottom end opening of Grouting Pipe, be used for slip casting, Grouting Pipe it is another
End is communicated with slip casting machine grout outlet, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net;
(d) one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end 1m
At position, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;
(e) it by one end insertion sealed expansion capsule of a filling medium plastic tube, transfers out of steel sleeve to outside adjacent solution cavity mouth
In the middle part of the narrow place in side, one end of filling medium plastic tube is communicated with filling medium machine;
(f) filling medium machine is opened by filling medium plastic tube injected media into sealed expansion capsule, makes sealed expansion capsule expansion envelope
Close adjacent solution cavity mouth;
(j) double-fluid grouting machine is opened by note sealing of hole liquid pipe to carrying out dual slurry injection at the position solution cavity cavity upper end 1m,
To orifice closing is carried out at the position solution cavity cavity upper end 1m, the enclosed environment in solution cavity cavity is formed;
(l) it opens slip casting machine and injects cement slurry into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud Guan Zaicong note
The aperture for starching back mud bottom of the tube breaks through closing adhesive tape blast hole outflow, and the cement slurry of outflow is filled molten upwards from the bottom of solution cavity cavity
Hole space, while the residue muddy water in solution cavity cavity is extruded into solution cavity cavity internal upper part, the reserved top of mud pipe is gone back to from slip casting
Aperture breaks through closing adhesive tape blast hole and enters the gap that Grouting Pipe and slip casting are gone back between mud pipe, the pressure generated according to serum recycle by its
Slip casting is discharged and returns mud pipe, until filling cement slurry in solution cavity cavity, the residue muddy water that discharge slip casting is returned outside mud pipe enters circulating filtration
Device is filtered, precipitation process, and clarified solution is used for slurries mixing, and waste residue after precipitation is then uniformly transported to bank processing;
(i) it extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve;
(4) the bored grouting operation of other solution cavity cavitys in drilling region is carried out:
Boring drill first drills above solution cavity cavity;
After pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located at solution cavity cavity upper end brill
At the 1.5m of hole;The slip casting of the Grouting Pipes of φ 25mm plastics insertion φ 50mm plastics is returned in mud pipe again, then by Grouting Pipe and slip casting
It returns mud pipe to be transferred out of steel sleeve to solution cavity cavity bottom, mud pipe bottom end closure is returned in slip casting, and lower part symmetrically opens up the small of φ 5mm
Hole, and aperture outer closure adhesive tape is closed, the bottom end opening of Grouting Pipe, is used for slip casting, the other end and slip casting machine pulp of Grouting Pipe
Mouth communicates, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net;
The one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end 1m
Place is set, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;
Double-fluid grouting machine is opened by note sealing of hole liquid pipe to progress dual slurry injection at the position solution cavity cavity upper end 1m, to molten
Orifice closing is carried out at the position cavity upper end 1m of hole, forms the enclosed environment in solution cavity cavity;
It opens slip casting machine and injects cement slurry into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud Guan Zaicong slip casting time
The aperture of mud bottom of the tube breaks through closing adhesive tape blast hole outflow, and the cement slurry of outflow fills solution cavity sky from the bottom of solution cavity cavity upwards
Between, while the residue muddy water in solution cavity cavity is extruded into solution cavity cavity internal upper part, the aperture on the reserved top of mud pipe is returned from slip casting
The gap that closing adhesive tape blast hole enters between Grouting Pipe and slip casting go back to mud pipe is broken through, is discharged it according to the pressure that serum recycle generates
Mud pipe is returned in slip casting, until filling cement slurry in solution cavity cavity, the residue muddy water that discharge slip casting is returned outside mud pipe enters circulation filter
It is filtered, precipitation process, clarified solution is used for slurries mixing, and waste residue after precipitation is then uniformly transported to bank processing;
It extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve.
9. according to the method for claim 8, it is characterised in that: (f) (j) step can be simultaneously in described (3) step
It carries out, or sequence is exchanged.
10. according to the method for claim 8, it is characterised in that: the medium injected into sealed expansion capsule is sky
Gas or water, or be cement slurry.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711317826.0A CN108194131B (en) | 2017-12-12 | 2017-12-12 | Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711317826.0A CN108194131B (en) | 2017-12-12 | 2017-12-12 | Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108194131A CN108194131A (en) | 2018-06-22 |
CN108194131B true CN108194131B (en) | 2019-04-19 |
Family
ID=62574221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711317826.0A Active CN108194131B (en) | 2017-12-12 | 2017-12-12 | Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108194131B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203487528U (en) * | 2013-09-30 | 2014-03-19 | 中铁二十局集团有限公司 | Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area |
CN204960882U (en) * | 2015-10-09 | 2016-01-13 | 中煤科工集团重庆研究院有限公司 | Coal mine underground hydraulic fracturing drilling and hole sealing device |
CN103410564B (en) * | 2013-08-29 | 2016-04-06 | 中南大学 | A kind of Tunnel Gushing treatment structures and construction method thereof |
CN106837353A (en) * | 2017-01-22 | 2017-06-13 | 中南大学 | Filling karst tunnel construction treatment method |
CN106837351A (en) * | 2017-01-22 | 2017-06-13 | 中南大学 | Tunnel karst water detection and treatment method |
-
2017
- 2017-12-12 CN CN201711317826.0A patent/CN108194131B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103410564B (en) * | 2013-08-29 | 2016-04-06 | 中南大学 | A kind of Tunnel Gushing treatment structures and construction method thereof |
CN203487528U (en) * | 2013-09-30 | 2014-03-19 | 中铁二十局集团有限公司 | Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area |
CN204960882U (en) * | 2015-10-09 | 2016-01-13 | 中煤科工集团重庆研究院有限公司 | Coal mine underground hydraulic fracturing drilling and hole sealing device |
CN106837353A (en) * | 2017-01-22 | 2017-06-13 | 中南大学 | Filling karst tunnel construction treatment method |
CN106837351A (en) * | 2017-01-22 | 2017-06-13 | 中南大学 | Tunnel karst water detection and treatment method |
Also Published As
Publication number | Publication date |
---|---|
CN108194131A (en) | 2018-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105780793B (en) | A kind of high artesian stratum Foundation Pit Pouring emergency processing method | |
CN101638987B (en) | Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall | |
CN100591866C (en) | Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method | |
CN103603689B (en) | Curtain grouting construction method for treating mined-out areas | |
CN100510274C (en) | Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method | |
CN107489159A (en) | Deep & thick silt matter Soft Soil Layer vacuum tube well dewatering construction structure and its construction | |
CN101525881B (en) | Structure of karst strata pile holes protecting wall and method for constructing pile holes | |
CN101070704A (en) | Controllable one-well lamina precipitation construction method | |
CN103437339A (en) | Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum | |
LU500273B1 (en) | New comprehensive dewatering and drainage method and drainage device for mudstone subway station | |
CN114233385B (en) | Treatment method for mud-bursting water of inclined shaft | |
CN114016513B (en) | Time-sequence-sharing excavation method of complex foundation pit group supporting system | |
CN109519150A (en) | One kind being directed to the biggish plugging dewatering well device and method of water yield | |
CN110374068B (en) | Construction method of drain hole of bottom plate of sluice stilling pool capable of preventing blockage | |
CN106894428A (en) | Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation | |
CN110318410A (en) | A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method | |
CN108222043A (en) | A kind of curtain gushes husky processing method and curtain gushes husky processing pipe | |
CN107338789A (en) | A kind of construction method of down-the-hole percussion triple-pipe high pressure jet grouting stake | |
CN108867673A (en) | A kind of underwater prevention method in the foundation pit based on the curtain that draws water | |
CN110241837A (en) | A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions | |
CN109296322A (en) | Mine is soaked a kind ofly to fill out gravel well casing and fill out gravel method | |
CN108194131B (en) | Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method | |
CN109537612B (en) | Porous impact stirring underground diaphragm wall separation technology and construction method thereof | |
CN214741219U (en) | Disposable hole sealing structure | |
CN217175186U (en) | Road administration is with preventing stifled drainage structures that becomes silted up |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |