CN108194131B - Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method - Google Patents

Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method Download PDF

Info

Publication number
CN108194131B
CN108194131B CN201711317826.0A CN201711317826A CN108194131B CN 108194131 B CN108194131 B CN 108194131B CN 201711317826 A CN201711317826 A CN 201711317826A CN 108194131 B CN108194131 B CN 108194131B
Authority
CN
China
Prior art keywords
slip casting
cavity
solution cavity
pipe
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711317826.0A
Other languages
Chinese (zh)
Other versions
CN108194131A (en
Inventor
陈俐光
田辉
于艺林
赵钦
张洪亮
郭恒
邓美龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201711317826.0A priority Critical patent/CN108194131B/en
Publication of CN108194131A publication Critical patent/CN108194131A/en
Application granted granted Critical
Publication of CN108194131B publication Critical patent/CN108194131B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to a material-saving closed recyclable static pressure grouting system for a karst cave at the bottom of a river and a construction method. The method comprises the steps of firstly sealing adjacent karst cave mouths by using a device for sealing the adjacent karst cave mouths, then sealing cement paste in a karst cave cavity by using a recyclable static pressure grouting device, and treating mud water in the karst cave cavity by using a circulating filter device for recycling. The method can effectively save materials and seal the karst cave at the bottom of the river, overcomes the defects of easy slurry leakage, pipe blockage, hole collapse and the like in the traditional process, and has the advantages of simple and practical method, low construction risk, low cost and construction period saving. The mud water is recycled and recycled on site, and the advantages of less pollution and good use effect are achieved.

Description

River bottom solution cavity material-saving closes recyclable static pressure grouting system and construction method
Technical field
The invention belongs to a kind of river bottom solution cavity material-savings to close recyclable static pressure grouting system and construction method.
Background technique
Solution cavity is the underground karst form that tunnel construction is often met, solution cavity according to charges in hole state and shape Formula can be divided into packed type and non-filling-type Karst cave.Non- filling-type Karst cave is substantially without underground water and too many deposit, solution cavity wall It is usually exposed;Filling-type Karst cave refers to that the entire hole body of solution cavity is largely full of by detrital sediment, chemical sediment or underground water. Shield-tunneling construction meet solution cavity region (it includes numerous a solution cavity cavitys) construction when, especially solution cavity when on shield-tunneling construction line, Easily there are accidents such as " planting head " " subsideing " " water burst " " prominent mud " " riverbed collapse " in Shield-type machinery.
For ensure shield machine safely, pass through solution cavity area, need to intrusion 1.5 times of hole diameters of tunnel main line within the scope of it is numerous A solution cavity cavity is filled consolidation process with cement slurry, reduces the relative settlement between Different Strata to meet, reduces section of jurisdiction Leakage, to guarantee the shield tunnel construction phase and run the safety of phase.Traditional solution cavity cavity packing technology uses steel sleeve guard aperture, Intert the method for a Grouting Pipe in hole, basically as underwater concrete technology is poured, Grouting Pipe needs to be embedded to institute's injection slurry Interior certain depth, it is intermittent with slip casting depth to promote Grouting Pipe upwards, finally with fast dry concrete by solution cavity packing.But this There are many drawbacks for technology, cause collapse hole phenomenon to lead to the extremely difficult extraction of Grouting Pipe or pressure since hole wall stratum sandy gravel stratum is blocked up It is unbalanced to cause solution cavity bottom boundaries spillage phenomenon.Especially its hole is close within the scope of 1.5 times of hole diameters of tunnel main line and work surface The ultra-large type solution cavity that solution cavity cavity communicates can not only be consumed with the fast dry concrete solution cavity packing technology packing ultra-large type solution cavity A large amount of injection slurry increases considerably filling cost, also tends to be difficult to achieve the purpose that solution cavity packing;Solution cavity packing is caused to lose It loses, tunnel main line is relocated, and loss is serious.
Summary of the invention
The object of the present invention is to provide a kind of river bottom solution cavity material-savings to close recyclable static pressure grouting system and construction method, energy The defects of effectively carrying out material-saving packing to river bottom solution cavity, solving easy spillage, the plugging, collapse hole of traditional handicraft has method letter Just practical, construction risk is low, at low cost, saves the duration.Muddy water recycling recycles on the spot, and of low pollution and using effect are good Advantage.
For this purpose, a kind of river bottom solution cavity material-saving of the invention closes recyclable static pressure grouting system, including boring drill and water Upper job platform:
Operation at sea platform: it is made of the number one ship and No. second ship that are arranged side by side in spacing distance, number one ship It is fixed as one on the front and rear part deck of No. second ship by two truss.The both ends for the several steel sleepers being distributed in interval distance It takes on solid two hull decks between two truss, the steel sleeper of each hull is equipped with to be run on it for boring drill Sliding rail.Two hull lower ends between two sliding rails are bore area, and the outside of hull is equipped with anchor ring, and hull deck is equipped with power generation Area, material sections, circulation filter and pumping plant area.
Circulation filter makes clear for the quick filtering clarifying treatment of residue muddy water progress in the solution cavity cavity by extraction Clear water recycles.Circulation filter is made of residue-filtering barrel, the first Rose Box and the second Rose Box.The top of residue-filtering barrel by The first, second, third and fourth filter residue net tilting to side is successively arranged under.The mud extraction mouth of a river that mud pipe is returned in slip casting is located at The upper end of first filter residue net.The residue-filtering barrel of each filter residue net low side is equipped with sludge outlet.Accept the inder pot position of each filter residue net residue In sludge outlet lower end.The lower end of residue-filtering barrel is communicated by the first conduit and suction pump with the first Rose Box upper end.First filtering Fibrous layer, coarse sands layer and layer of sand are from top to bottom successively arranged in case, the lower end of the first Rose Box passes through the second conduit and the second mistake Filter box upper end communicates.Fine sand layer is equipped in second Rose Box, the lower end of the second Rose Box communicates header tank.
Recyclable static pressure grouting device: guard aperture is carried out to the hole that boring drill bores with steel sleeve.Three are equipped in steel sleeve Plastic tube.Two are respectively Grouting Pipe and note sealing of hole liquid pipe for 25 × 3.5mm of φ thin plastic pipe, and one is 50 × 3.5mm's of φ Thick plastic tube is that mud pipe is returned in slip casting.The bottom nozzle closing of mud pipe is returned in slip casting, and the bottom that mud pipe is returned in slip casting opens up crowd in spacing distance The aperture of multiple φ 5mm.And aperture is externally provided with closing adhesive tape.The bottom that mud pipe is returned in slip casting is located at solution cavity cavity bottom.Grouting Pipe Insertion slip casting is returned in mud pipe and one end is located at the interior bottom that mud pipe is returned in slip casting, and the other end is communicated with slip casting machine grout outlet.For One end of the note sealing of hole liquid pipe of aperture sealing of hole is located above solution cavity mouth at the position 1m, and the other end of note sealing of hole liquid pipe communicates biliquid note Pulp grinder.
Seal adjacent molten hole device: You Yigen filling medium plastic tube and a swelling bag are formed.The one of filling medium plastic tube End is communicated with filling medium machine, and the other end of filling medium plastic tube is located in the swelling bag of sealing and penetrates on adjacent solution cavity mouth In the steel sleeve of side, and carries swelling bag and extend at adjacent solution cavity mouth.
The first, second, third and fourth filter residue net is respectively 55~60 ° with the angle of horizontal plane.
The first filter residue net is from top to bottom laterally in the fire grate type filter residue net of spacing distance side by side, adjacent fire grate Spacing is 2~3cm.
The mesh of described second, third and the 4th filter residue net is respectively 1 mesh, 3 mesh, 6 mesh.
The thickness ratio of fibrous layer, coarse sands layer and layer of sand is 2:1.5:1 in first Rose Box.
The slip casting goes back to the gap between mud pipe and Grouting Pipe and forms go back to muddy water channel.
The swelling bag is made of rubber material, and swelling bag is that medium limits capsule.
A kind of construction method realized river bottom solution cavity material-saving and close recyclable static pressure grouting system, includes the following steps:
(1) preparation of construction prepares operation at sea platform, installs boring drill, hull deck in the sliding rail of upper job platform It is equipped with power generation area, material sections, circulation filter and pumping plant area, is surveyed according to construction access road combination geology and geomorphology original geotechnical engineering Report is visited, drilling region is drawn, makes solution cavity mouth range of grouting, make adjacent molten openings position.
(2) hole location for marking injected hole guarantees a slip casting hole location narrow place on the outside of adjacent solution cavity mouth.
(3) hole operation of the large-scale solution cavity close to tunnel main line edge is closed:
(a) it drills above the solution cavity cavity at the first narrow place on the outside of the hole of adjacent large-scale solution cavity of boring drill;
(b) after pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located at solution cavity sky Chamber upper end drills at 1.5m;
(c) slip casting of the Grouting Pipes of φ 25mm plastics insertion φ 50mm plastics is returned in mud pipe again, then by Grouting Pipe and note Mud pipe to be starched back to be transferred out of steel sleeve to close to the solution cavity cavity bottom outside adjacent solution cavity mouth, mud pipe bottom end closure is returned in slip casting, under Portion symmetrically opens up the aperture of φ 5mm, and aperture outer closure adhesive tape is closed, and the bottom end opening of Grouting Pipe is used for slip casting, Grouting Pipe The other end is communicated with slip casting machine grout outlet, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net;
(d) one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end At the square position 1m, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;
(e) it by one end insertion sealed expansion capsule of a filling medium plastic tube, transfers out of steel sleeve to adjacent solution cavity On the outside of mouthful in the middle part of narrow place, one end of filling medium plastic tube is communicated with filling medium machine;
(f) filling medium machine is opened by filling medium plastic tube injected media into sealed expansion capsule, keeps sealed expansion capsule swollen It is swollen to close adjacent solution cavity mouth;
(j) double-fluid grouting machine is opened by infusing sealing of hole liquid pipe to progress dual slurry note at the position solution cavity cavity upper end 1m It penetrates, to orifice closing is carried out at the position solution cavity cavity upper end 1m, forms the enclosed environment in solution cavity cavity;
(l) it opens slip casting machine and injects cement slurry into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud pipe again The aperture for returning mud bottom of the tube from slip casting breaks through closing adhesive tape blast hole outflow, and the cement slurry of outflow is filled out upwards from the bottom of solution cavity cavity Solution cavity space is filled, while the residue muddy water in solution cavity cavity is extruded into solution cavity cavity internal upper part, is reserved from slip casting time mud pipe upper The aperture in portion breaks through the gap that closing adhesive tape blast hole enters between Grouting Pipe and slip casting time mud pipe, the pressure generated according to serum recycle It discharges it slip casting and returns mud pipe, until filling cement slurry in solution cavity cavity, the residue muddy water that discharge slip casting is returned outside mud pipe enters circulation Filter device is filtered, precipitation process, and clarified solution is used for slurries mixing, and waste residue after precipitation is then uniformly transported at bank Reason;
(i) it extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve;
(4) the bored grouting operation of other solution cavity cavitys in drilling region is carried out:
Boring drill first drills above solution cavity cavity;
After pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located on solution cavity cavity At end drilling 1.5m;The slip casting of the Grouting Pipes of φ 25mm plastics insertion φ 50mm plastics is returned in mud pipe again, then by Grouting Pipe and Slip casting is returned mud pipe and is transferred out of steel sleeve to solution cavity cavity bottom, and mud pipe bottom end closure is returned in slip casting, and lower part symmetrically opens up φ 5mm's Aperture, and aperture outer closure adhesive tape is closed, the bottom end opening of Grouting Pipe, is used for slip casting, the other end and the slip casting machine of Grouting Pipe go out Slurry mouth communicates, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net;
The one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end At the position 1m, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;
Double-fluid grouting machine is opened by note sealing of hole liquid pipe to carrying out dual slurry injection at the position solution cavity cavity upper end 1m, To orifice closing is carried out at the position solution cavity cavity upper end 1m, the enclosed environment in solution cavity cavity is formed;
It opens slip casting machine and injects cement slurry into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud Guan Zaicong note The aperture for starching back mud bottom of the tube breaks through closing adhesive tape blast hole outflow, and the residue muddy water in solution cavity cavity is extruded into solution cavity cavity Top, the aperture for going back to the reserved top of mud pipe from slip casting break through closing adhesive tape blast hole and enter between Grouting Pipe and slip casting time mud pipe Gap, then slip casting is discharged it by serum recycle and returns mud pipe, until filling cement slurry in solution cavity cavity, discharge slip casting is returned outside mud pipe Residue muddy water enter circulation filter be filtered, precipitation process, clarified solution be used for slurries mixing, waste residue after precipitation is then Uniformly it is transported to bank processing;
It extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve.
(f) (j) step can carry out simultaneously in described (3) step, or sequence is exchanged.
The medium injected into sealed expansion capsule is air or water, or is cement slurry.
The above method has reached the purpose of the present invention.
The present invention effectively can carry out material-saving packing to river bottom solution cavity, solve the easy spillage of traditional handicraft, plugging, collapse hole etc. Defect has method simple and practical, and construction risk is low, at low cost, saves the duration.Muddy water recycling recycles on the spot, of low pollution The good advantage with using effect.
Compared with the prior art the present invention has the advantages that:
(1) using sealed expansion capsule technology can effectively quick blocking close to work surface adjacent ultra-large type solution cavity hole Mouthful, it avoids a large amount of injection slurry from invalidly flowing into ultra-large type solution cavity, effectively operating area door solution cavity cavity can be sealed It fills out, construction cost can be greatly lowered, accelerate speed of application.
(2) steel sleeve guard aperture is taken, the plastic tube of three different-diameters works together, and realizes guard aperture, slip casting and envelope Effective combination in hole prevents river out of aperture intrusion hole, provides advantageous closed environment for slip casting.
(3) excessive by slurries blast hole in such a way that extra heavy pipe set tubule directly gos deep into solution cavity cavity bottom, from solution cavity sky Bottom of chamber portion starts rapid closed boundary, effectively filling rock crack, prevents slip casting process from generating spillage phenomenon.
(4) Grouting Pipe does not need not needing to extract with slurries Synchronous lifting yet during slip casting, shortens process conversion Time, and tubing is flexibility, passes through and has no adverse effects to shield machine.
(5) system is by serum recycle, by solution cavity cavity residue and muddy water by Grouting Pipe and slip casting return mud pipe Between gap discharge, and aboard ship carry out waste pulp purified treatment, treated, and primary water can be used for slurries mixing, waste residue It is then uniformly transported to bank processing, water resource is realized and recycles, reduce the pollution to river, water-saving result is significant, pollution treatment It is at low cost.
Detailed description of the invention
Fig. 1 is operation at sea platform structure schematic diagram of the invention.
Fig. 2 is circulation filter structural schematic diagram of the invention.
Fig. 3 is the theory structure schematic diagram of recyclable static pressure grouting system of the invention to solution cavity cavity.
Fig. 4 is the hole operation theory structure schematic diagram of closing ultra-large type solution cavity of the invention.
Specific embodiment
As shown in Figures 1 to 4, a kind of river bottom solution cavity material-saving closes recyclable static pressure grouting system, including boring drill and Operation at sea platform:
As shown in Figure 1, operation at sea platform: by 9 groups of number one ship 1 and No. second ship being arranged side by side in spacing distance At.Number one ship and No. second ship are arranged side by side in spacing distance.By two on the front and rear part deck of number one ship and No. second ship A truss 2 is fixed as one.Take solid two between two truss in the both ends for the several steel sleepers 11 being distributed in interval distance On hull deck, to form a firm operation at sea platform.The steel sleeper of each hull is equipped with to exist for boring drill The sliding rail 4 run thereon.Boring drill is located on sliding rail.Two hull lower ends between two sliding rails are bore area, and bore area is covered with Drill hole location 3.The outside of hull is equipped with anchor ring 10, and anchor ring is for fixing operation at sea platform.Hull deck is equipped with: power generation area 5 for operation at sea platform power;Material sections 6 are for storing a variety of materials and equipment;Circulation filter 7 and pumping plant area 8, Pumping plant area for drawing water, slip casting and operation.
As shown in Fig. 2, circulation filter is clear for quickly being filtered the residue muddy water in the solution cavity cavity of extraction Clear processing makes to clarify water circulation use.Circulation filter is by 27 residue-filtering barrel 19, the first Rose Box 23 and the second Rose Box structures At.The top of residue-filtering barrel is from top to bottom successively arranged to the first tilting filter residue net 18 of side, the second filter residue net 17, third filter residue Net 15 and the 4th filter residue net 14.The mud extraction mouth of a river 12 that mud pipe is returned in slip casting is located at the upper end of the first filter residue net.Each filter residue net low side Residue-filtering barrel is equipped with sludge outlet 16.The inder pot 13 for accepting each filter residue net residue is located at sludge outlet lower end.Described first, Two, the third and fourth filter residue net is respectively 55~60 ° with the angle of horizontal plane.The first filter residue net is lateral from top to bottom In the fire grate type filter residue net of spacing distance side by side, adjacent fire grate spacing is 2~3cm.Described second, third and the 4th filter residue The mesh of net is respectively 1 mesh, 3 mesh, 6 mesh.
The lower end of residue-filtering barrel is communicated by the first conduit 20 and suction pump 21 with 23 upper end of the first Rose Box.First Rose Box Inside from top to bottom it is successively arranged fibrous layer 22, coarse sands layer 24 and layer of sand 25.The lower end of first Rose Box by the second conduit 26 with Second Rose Box, 27 upper end communicates.Fine sand layer 28 is equipped in second Rose Box, the lower end of the second Rose Box passes through 29 phase of communicating pipe Logical header tank 30.
The thickness ratio of fibrous layer, coarse sands layer and layer of sand is 2:1.5:1 in first Rose Box.The fine sand layer by The sand of 0.1~0.5mm of partial size is constituted.Sand bed is made of the sand of 0.6~0.8mm of partial size.Rough sand layer is by 0.8~1mm of partial size Sand constitute.Filter fiber layer is that 2~4 layers of filter fiber cloth are constituted.
In use, the residue muddy water extracted out out of solution cavity cavity goes back to the mud extraction mouth of a river 12 of mud pipe from slip casting, residue-filtering barrel is fallen into Different densities of the top successively through the first, second, third and fourth filter residue net mesh sieving, interior stone, slag particle and miscellaneous Object is held on the net from each filter residue and is slid in residue-filtering barrel through sludge outlet, and disembarkation is cleaned.Muddy water is again through the first conduit and suction pump Into the first Rose Box upper end, the fine sand layer of filtering and the second Rose Box successively through fibrous layer, coarse sands layer and layer of sand is refiltered Afterwards, become available water purification, deposit header tank is used for industrial water.
As shown in figure 3, recyclable static pressure grouting device: carrying out guard aperture with the hole that steel sleeve 34 bores boring drill.Steel bushing Three plastic tubes are equipped in pipe.Two are respectively Grouting Pipe 31 and note sealing of hole liquid pipe 32 for 25 × 3.5mm of φ thin plastic pipe.
One be 50 × 3.5mm of φ thick plastic tube be slip casting return mud pipe 33.The bottom nozzle closing of mud pipe, slip casting are returned in slip casting The bottom for returning mud pipe opens up the aperture 39 of numerous a φ 5mm in spacing distance.And aperture is externally provided with closing adhesive tape.Mud pipe is returned in slip casting Bottom be located at 41 bottom of solution cavity cavity.
Grouting Pipe insertion slip casting is returned in mud pipe and one end is located at the interior bottom that mud pipe is returned in slip casting, and the other end goes out with slip casting machine Slurry mouth communicates.One end of note sealing of hole liquid pipe for aperture sealing of hole is located above solution cavity mouth at the position 1m, infuses the another of sealing of hole liquid pipe One end communicates double-fluid grouting machine.
As shown in figure 4, the adjacent molten hole device of envelope: You Yigen filling medium plastic tube 46(can be the thin plastics of 25 × 3.5mm of φ Pipe) and a swelling bag 47 formed.One end of filling medium plastic tube is communicated with filling medium machine, the other end position of filling medium plastic tube In in the swelling bag of sealing and penetrating in the steel sleeve above adjacent solution cavity mouth, and carries swelling bag and extend to adjacent solution cavity mouth At 44, adjacent solution cavity mouth communicates the adjacent solution cavity 45 of the ultra-large type outside work surface.
The slip casting goes back to the gap between mud pipe and Grouting Pipe and forms go back to muddy water channel 43.
The swelling bag is made of rubber material, and swelling bag is that medium limits capsule.
A kind of construction method realized river bottom solution cavity material-saving and close recyclable static pressure grouting system, includes the following steps:
(1) preparation of construction prepares operation at sea platform, installs boring drill, hull deck in the sliding rail of upper job platform It is equipped with power generation area, material sections, circulation filter and pumping plant area, is surveyed according to construction access road combination geology and geomorphology original geotechnical engineering Report is visited, drilling region is drawn, makes solution cavity mouth range of grouting, make adjacent molten openings position.
(2) hole location for marking injected hole guarantees a slip casting hole location narrow place on the outside of adjacent solution cavity mouth.
(3) hole operation of the large-scale solution cavity close to tunnel main line edge is closed.Steps are as follows:
(a) it drills above the solution cavity cavity at the first narrow place on the outside of the hole of adjacent large-scale solution cavity of boring drill.The hole drilled out It is communicated after sequentially passing through mud 35, sandy gravel stratum 36 with the solution cavity cavity being located in intense weathering munstone 38.
(b) after pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located at solution cavity sky Chamber upper end drills at 1.5m.
(c) slip casting of the Grouting Pipe insertion φ 50mm plastics of φ 25mm plastics is returned in mud pipe.Again by Grouting Pipe and slip casting Mud pipe is returned to be transferred out of steel sleeve to close to 41 bottom of solution cavity cavity outside adjacent solution cavity mouth.Mud pipe bottom end closure is returned in slip casting, under Portion symmetrically opens up the aperture of φ 5mm, and aperture outer closure adhesive tape is closed.The bottom end opening of Grouting Pipe is used for slip casting.Grouting Pipe The other end is communicated with slip casting machine grout outlet.The mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net.
(d) one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end At the position Fang Zhankong 1m, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine.
(e) will in one end insertion sealed expansion capsule of filling medium plastic tube 46, out of steel sleeve decentralization to solution cavity On the outside of the adjacent solution cavity mouth of cavity in the middle part of narrow place, one end of filling medium plastic tube is communicated with filling medium machine.
(f) filling medium machine is opened by filling medium plastic tube injected media into sealed expansion capsule, keeps sealed expansion capsule swollen It is swollen to close adjacent solution cavity mouth 44, so that a large amount of cement slurries are useless when can avoid using the solution cavity cavity in cement slurry packing work surface Ground flows into adjacent large-scale solution cavity 45 from adjacent solution cavity mouth.
(j) double-fluid grouting machine is opened by infusing sealing of hole liquid pipe to progress dual slurry note at the position solution cavity cavity upper end 1m It penetrates, to the drilling (closing the space at this between drilling and each plastic tube outer wall periphery) at the position solution cavity cavity upper end 1m Orifice closing is carried out, the dual slurry quickly solidified forms closure 37, and the enclosed environment in solution cavity cavity is formed after closed orifices.
(l) it opens slip casting machine and injects cement slurry 40 into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud pipe Break through closing adhesive tape blast hole outflow from the aperture that mud bottom of the tube is returned in slip casting again, the cement slurry of outflow from the bottom of solution cavity cavity 41 to Upper filling solution cavity space, while the residue muddy water 42 in solution cavity cavity is extruded into solution cavity cavity internal upper part, it is pre- to return mud pipe from slip casting The aperture on the top stayed breaks through the gap 43 that closing adhesive tape blast hole enters between Grouting Pipe and slip casting go back to mud pipe, produces according to serum recycle Raw pressure discharges it slip casting and returns mud pipe, until filling cement slurry in solution cavity cavity.The mud extraction mouth of a river discharge of mud pipe is returned through slip casting Slip casting return mud pipe outside residue muddy water enter circulation filter be filtered, precipitation process, clarified solution be used for slurries mixing.Through Waste residue after precipitating is then uniformly transported to bank processing;
(i) it extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve.Repeatable step (3) close other The large-scale solution cavity close to tunnel main line edge hole operation.
(4) the bored grouting operation for carrying out other solution cavity cavitys in drilling region, has the following steps:
Boring drill first drills above other solution cavity cavitys.
After pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located on solution cavity cavity At end drilling 1.5m;The slip casting of the Grouting Pipes of φ 25mm plastics insertion φ 50mm plastics is returned in mud pipe again, then by Grouting Pipe and Slip casting is returned mud pipe and is transferred out of steel sleeve to solution cavity cavity bottom, and mud pipe bottom end closure is returned in slip casting, and lower part symmetrically opens up φ 5mm's Aperture, and aperture outer closure adhesive tape is closed, the bottom end opening of Grouting Pipe, is used for slip casting, the other end and the slip casting machine of Grouting Pipe go out Slurry mouth communicates, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net.
The one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end At the position 1m, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;Double-fluid grouting machine is opened by infusing sealing of hole liquid pipe to solution cavity Dual slurry injection is carried out at the position cavity upper end 1m, to progress orifice closing, shape at the position solution cavity cavity upper end 1m At the enclosed environment in solution cavity cavity.
It opens slip casting machine and injects cement slurry 40 into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud Guan Zaicong The aperture that mud bottom of the tube is returned in slip casting breaks through closing adhesive tape blast hole outflow, and the cement slurry of outflow is filled out upwards from the bottom of solution cavity cavity 41 Solution cavity space is filled, while the residue muddy water 42 in solution cavity cavity is extruded into solution cavity cavity internal upper part, returns what mud pipe was reserved from slip casting The aperture on top breaks through the gap 43 that closing adhesive tape blast hole enters between Grouting Pipe and slip casting go back to mud pipe, generates according to serum recycle Pressure discharges it slip casting and returns mud pipe, until filling cement slurry in solution cavity cavity.Slip casting is discharged in the mud extraction mouth of a river for returning mud pipe through slip casting Return mud pipe outside residue muddy water enter circulation filter be filtered, precipitation process, clarified solution be used for slurries mixing.Through precipitating Waste residue afterwards is then uniformly transported to bank processing.
It extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve.It is repeated in step (4) to drilling region The bored grouting operation of whole solution cavity cavitys is completed.
(f) (j) step can carry out simultaneously in described (3) step, or sequence is exchanged.
The medium injected into sealed expansion capsule is air or water, or is cement slurry.
The cement slurry and dual slurry of injection are conventional formulation, therefore are not repeated.
In short, the present invention effectively can carry out material-saving packing to river bottom solution cavity, solve the easy spillage of traditional handicraft, plugging, The defects of collapse hole, has method simple and practical, and construction risk is low, at low cost, saves the duration.Muddy water recycling recycles on the spot, Of low pollution and the good advantage of using effect.

Claims (10)

1. a kind of river bottom solution cavity material-saving closes recyclable static pressure grouting system, including boring drill and operation at sea platform, special Sign is:
Operation at sea platform is made of, number one ship and the number one ship and No. second ship that are arranged side by side in spacing distance It is fixed as one on the front and rear part deck of No. two ships by two truss, the both ends for the several steel sleepers being distributed in interval distance are taken solid On two hull decks between two truss, the steel sleeper of each hull is equipped with the cunning run on it for boring drill Rail, two hull lower ends between two sliding rails are bore area, and the outside of hull is equipped with anchor ring, and hull deck is equipped with power generation area, material Expect area, circulation filter and pumping plant area;
Circulation filter, carrying out quickly filtering clarifying treatment for the residue muddy water in the solution cavity cavity by extraction makes primary water Recycle, circulation filter is made of residue-filtering barrel, the first Rose Box and the second Rose Box, the top of residue-filtering barrel by up to Under be successively arranged the first, second, third and fourth filter residue net tilting to side, the mud extraction mouth of a river that mud pipe is returned in slip casting is located at first The residue-filtering barrel of the upper end of filter residue net, each filter residue net low side is equipped with sludge outlet, and the inder pot for accepting each filter residue net residue is located at filter The lower end of slag exit lower end, residue-filtering barrel is communicated by the first conduit and suction pump with the first Rose Box upper end, in the first Rose Box It is from top to bottom successively arranged fibrous layer, coarse sands layer and layer of sand, the lower end of the first Rose Box passes through the second conduit and the second Rose Box Upper end communicates, and fine sand layer is equipped in the second Rose Box, the lower end of the second Rose Box communicates header tank;
Recyclable static pressure grouting device carries out guard aperture to the hole that boring drill bores with steel sleeve, is equipped with three plastics in steel sleeve Pipe, two are respectively Grouting Pipe and note sealing of hole liquid pipe, a thick modeling for 50 × 3.5mm of φ for 25 × 3.5mm of φ thin plastic pipe Expects pipe is that mud pipe is returned in slip casting, and the bottom nozzle closing of mud pipe is returned in slip casting, and the bottom that mud pipe is returned in slip casting opens up numerous in spacing distance The aperture of φ 5mm, and aperture is externally provided with closing adhesive tape, the bottom that mud pipe is returned in slip casting is located at solution cavity cavity bottom, Grouting Pipe insertion Slip casting is returned in mud pipe and one end is located at the interior bottom that mud pipe is returned in slip casting, and the other end is communicated with slip casting machine grout outlet, is used for aperture One end of the note sealing of hole liquid pipe of sealing of hole is located above solution cavity mouth at the position 1m, and the other end of note sealing of hole liquid pipe communicates two fluid grouting Machine;
Seal adjacent molten hole device, You Yigen filling medium plastic tube and a swelling bag are formed, one end of filling medium plastic tube with Filling medium machine communicates, and the other end of filling medium plastic tube is located in the swelling bag of sealing and penetrates above adjacent solution cavity mouth In steel sleeve, and carries swelling bag and extend at adjacent solution cavity mouth.
2. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described First, second, third and fourth filter residue net is respectively 55~60 ° with the angle of horizontal plane.
3. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described First filter residue net is from top to bottom laterally in the fire grate type filter residue net of spacing distance side by side, and adjacent fire grate spacing is 2~3cm.
4. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described The mesh of second, third and the 4th filter residue net is respectively 1 mesh, 3 mesh, 6 mesh.
5. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described The thickness ratio of fibrous layer, coarse sands layer and layer of sand is 2:1.5:1 in first Rose Box.
6. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described Slip casting goes back to the gap between mud pipe and Grouting Pipe and forms go back to muddy water channel.
7. river bottom solution cavity material-saving according to claim 1 closes recyclable static pressure grouting system, it is characterised in that: it is described Swelling bag is made of rubber material, and swelling bag is that medium limits capsule.
8. a kind of construction method realized river bottom solution cavity material-saving described in claim 1 and close recyclable static pressure grouting system, It is characterized in that, includes the following steps:
(1) preparation of construction prepares operation at sea platform, on the sliding rail installation boring drill of upper job platform, hull deck Equipped with power generation area, material sections, circulation filter and pumping plant area, according to construction access road combination geology and geomorphology original geotechnical investigation Report draws drilling region, makes solution cavity mouth range of grouting, make adjacent molten openings position;
(2) hole location for marking injected hole guarantees a slip casting hole location narrow place on the outside of adjacent solution cavity mouth;
(3) hole operation of the large-scale solution cavity close to tunnel main line edge is closed:
(a) it drills above the solution cavity cavity at the first narrow place on the outside of the hole of adjacent large-scale solution cavity of boring drill;
(b) after pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located on solution cavity cavity At end drilling 1.5m;
(c) slip casting of the Grouting Pipe insertion φ 50mm plastics of φ 25mm plastics is returned in mud pipe again, then Grouting Pipe and slip casting is returned Mud pipe is transferred out of steel sleeve to close to the solution cavity cavity bottom outside adjacent solution cavity mouth, and mud pipe bottom end closure, lower part pair are gone back in slip casting Claim to open up the aperture of φ 5mm, and aperture outer closure adhesive tape is closed, the bottom end opening of Grouting Pipe, be used for slip casting, Grouting Pipe it is another End is communicated with slip casting machine grout outlet, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net;
(d) one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end 1m At position, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;
(e) it by one end insertion sealed expansion capsule of a filling medium plastic tube, transfers out of steel sleeve to outside adjacent solution cavity mouth In the middle part of the narrow place in side, one end of filling medium plastic tube is communicated with filling medium machine;
(f) filling medium machine is opened by filling medium plastic tube injected media into sealed expansion capsule, makes sealed expansion capsule expansion envelope Close adjacent solution cavity mouth;
(j) double-fluid grouting machine is opened by note sealing of hole liquid pipe to carrying out dual slurry injection at the position solution cavity cavity upper end 1m, To orifice closing is carried out at the position solution cavity cavity upper end 1m, the enclosed environment in solution cavity cavity is formed;
(l) it opens slip casting machine and injects cement slurry into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud Guan Zaicong note The aperture for starching back mud bottom of the tube breaks through closing adhesive tape blast hole outflow, and the cement slurry of outflow is filled molten upwards from the bottom of solution cavity cavity Hole space, while the residue muddy water in solution cavity cavity is extruded into solution cavity cavity internal upper part, the reserved top of mud pipe is gone back to from slip casting Aperture breaks through closing adhesive tape blast hole and enters the gap that Grouting Pipe and slip casting are gone back between mud pipe, the pressure generated according to serum recycle by its Slip casting is discharged and returns mud pipe, until filling cement slurry in solution cavity cavity, the residue muddy water that discharge slip casting is returned outside mud pipe enters circulating filtration Device is filtered, precipitation process, and clarified solution is used for slurries mixing, and waste residue after precipitation is then uniformly transported to bank processing;
(i) it extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve;
(4) the bored grouting operation of other solution cavity cavitys in drilling region is carried out:
Boring drill first drills above solution cavity cavity;
After pore-forming, the steel sleeve that φ 146mm is first transferred in hole carries out guard aperture, and the lower end of steel sleeve is located at solution cavity cavity upper end brill At the 1.5m of hole;The slip casting of the Grouting Pipes of φ 25mm plastics insertion φ 50mm plastics is returned in mud pipe again, then by Grouting Pipe and slip casting It returns mud pipe to be transferred out of steel sleeve to solution cavity cavity bottom, mud pipe bottom end closure is returned in slip casting, and lower part symmetrically opens up the small of φ 5mm Hole, and aperture outer closure adhesive tape is closed, the bottom end opening of Grouting Pipe, is used for slip casting, the other end and slip casting machine pulp of Grouting Pipe Mouth communicates, and the mud extraction mouth of a river that mud pipe is returned in slip casting is located at the upper end of the first filter residue net;
The one end for the note sealing of hole liquid pipe for being used for aperture sealing of hole is transferred out of steel sleeve to positioned at solution cavity cavity upper end 1m Place is set, the other end of note sealing of hole liquid pipe communicates double-fluid grouting machine;
Double-fluid grouting machine is opened by note sealing of hole liquid pipe to progress dual slurry injection at the position solution cavity cavity upper end 1m, to molten Orifice closing is carried out at the position cavity upper end 1m of hole, forms the enclosed environment in solution cavity cavity;
It opens slip casting machine and injects cement slurry into Grouting Pipe, cement slurry enters slip casting from Grouting Pipe bottom end and returns mud Guan Zaicong slip casting time The aperture of mud bottom of the tube breaks through closing adhesive tape blast hole outflow, and the cement slurry of outflow fills solution cavity sky from the bottom of solution cavity cavity upwards Between, while the residue muddy water in solution cavity cavity is extruded into solution cavity cavity internal upper part, the aperture on the reserved top of mud pipe is returned from slip casting The gap that closing adhesive tape blast hole enters between Grouting Pipe and slip casting go back to mud pipe is broken through, is discharged it according to the pressure that serum recycle generates Mud pipe is returned in slip casting, until filling cement slurry in solution cavity cavity, the residue muddy water that discharge slip casting is returned outside mud pipe enters circulation filter It is filtered, precipitation process, clarified solution is used for slurries mixing, and waste residue after precipitation is then uniformly transported to bank processing;
It extracts steel sleeve out, sealing of hole operation is carried out to the hole for detaching steel sleeve.
9. according to the method for claim 8, it is characterised in that: (f) (j) step can be simultaneously in described (3) step It carries out, or sequence is exchanged.
10. according to the method for claim 8, it is characterised in that: the medium injected into sealed expansion capsule is sky Gas or water, or be cement slurry.
CN201711317826.0A 2017-12-12 2017-12-12 Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method Active CN108194131B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711317826.0A CN108194131B (en) 2017-12-12 2017-12-12 Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711317826.0A CN108194131B (en) 2017-12-12 2017-12-12 Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method

Publications (2)

Publication Number Publication Date
CN108194131A CN108194131A (en) 2018-06-22
CN108194131B true CN108194131B (en) 2019-04-19

Family

ID=62574221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711317826.0A Active CN108194131B (en) 2017-12-12 2017-12-12 Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method

Country Status (1)

Country Link
CN (1) CN108194131B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203487528U (en) * 2013-09-30 2014-03-19 中铁二十局集团有限公司 Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area
CN204960882U (en) * 2015-10-09 2016-01-13 中煤科工集团重庆研究院有限公司 Coal mine underground hydraulic fracturing drilling and hole sealing device
CN103410564B (en) * 2013-08-29 2016-04-06 中南大学 A kind of Tunnel Gushing treatment structures and construction method thereof
CN106837353A (en) * 2017-01-22 2017-06-13 中南大学 Filling karst tunnel construction treatment method
CN106837351A (en) * 2017-01-22 2017-06-13 中南大学 Tunnel karst water detection and treatment method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410564B (en) * 2013-08-29 2016-04-06 中南大学 A kind of Tunnel Gushing treatment structures and construction method thereof
CN203487528U (en) * 2013-09-30 2014-03-19 中铁二十局集团有限公司 Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area
CN204960882U (en) * 2015-10-09 2016-01-13 中煤科工集团重庆研究院有限公司 Coal mine underground hydraulic fracturing drilling and hole sealing device
CN106837353A (en) * 2017-01-22 2017-06-13 中南大学 Filling karst tunnel construction treatment method
CN106837351A (en) * 2017-01-22 2017-06-13 中南大学 Tunnel karst water detection and treatment method

Also Published As

Publication number Publication date
CN108194131A (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN105780793B (en) A kind of high artesian stratum Foundation Pit Pouring emergency processing method
CN101638987B (en) Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN103603689B (en) Curtain grouting construction method for treating mined-out areas
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN107489159A (en) Deep & thick silt matter Soft Soil Layer vacuum tube well dewatering construction structure and its construction
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN101070704A (en) Controllable one-well lamina precipitation construction method
CN103437339A (en) Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN114016513B (en) Time-sequence-sharing excavation method of complex foundation pit group supporting system
CN109519150A (en) One kind being directed to the biggish plugging dewatering well device and method of water yield
CN110374068B (en) Construction method of drain hole of bottom plate of sluice stilling pool capable of preventing blockage
CN106894428A (en) Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN108222043A (en) A kind of curtain gushes husky processing method and curtain gushes husky processing pipe
CN107338789A (en) A kind of construction method of down-the-hole percussion triple-pipe high pressure jet grouting stake
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN109296322A (en) Mine is soaked a kind ofly to fill out gravel well casing and fill out gravel method
CN108194131B (en) Material-saving closed recyclable static pressure grouting system for river bottom karst cave and construction method
CN109537612B (en) Porous impact stirring underground diaphragm wall separation technology and construction method thereof
CN214741219U (en) Disposable hole sealing structure
CN217175186U (en) Road administration is with preventing stifled drainage structures that becomes silted up

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant