CN108189970A CN201711374806.7A CN201711374806A CN108189970A CN 108189970 A CN108189970 A CN 108189970A CN 201711374806 A CN201711374806 A CN 201711374806A CN 108189970 A CN108189970 A CN 108189970A
Authority
CN
China
Prior art keywords
bracket
cylinder pressure
annulus
gap
bearing wood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711374806.7A
Other languages
Chinese (zh)
Other versions
CN108189970B (en
Inventor
杨仁记
刘金峰
王佳颖
万忠
刘涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201711374806.7A priority Critical patent/CN108189970B/en
Publication of CN108189970A publication Critical patent/CN108189970A/en
Application granted granted Critical
Publication of CN108189970B publication Critical patent/CN108189970B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Abstract

The invention discloses a kind of Large LNG ship Type B containment system support devices, the support device includes the first cylinder pressure-bearing wood and the second cylinder pressure-bearing wood, the periphery that second cylinder pressure-bearing wood is set in the first cylinder pressure-bearing wood forms supportive body, the upper surface of supportive body is equipped with top panel, its lower face is equipped with lower panel, upper cross, which is equipped with, in the top panel upper surface intersects bracket, lower panel lower surface is equipped with lower part right-angled intersection bracket, upper support annulus and lower support annulus are respectively equipped on the outer wall of the second cylinder pressure-bearing wood, top annulus bracket is equipped in the outside of upper support annulus, top annulus bracket is fixed in the above plate lower surface, the outside of lower support annulus is equipped with lower part annulus bracket, lower part annulus bracket is fixed on lower panel upper surface.The present invention makes simply, easy for installation, which can transmit vertical and horizontal direction load simultaneously, can bear any level direction load, play the role of preventing roll and pitch.

Description

Large LNG ship Type B containment system support device and its installation method
Technical field
The invention belongs to shipbuilding fields, and in particular to a kind of Large LNG ship Type B containment system support device and its peace Dress method.
Background technology
The Type B containment system feature of Large LNG ship is independent self-holding type containment system, between containment system and hull structural member Only connected by support base.When ship rides the sea, by wave effect, the hulls such as rolling, pitching and heaving fortune can be generated Dynamic state, and cause wherein relatively independent containment system that relative motion, athletic meeting aggravation LNG liquid goods occurs with Ship Structure Rock, increase liquid goods evaporation rate, the more serious damage that may lead to containment system, destroy external insulation, cause low Geothermal liquid leaks.
To avoid the above problem, vertical supporting device, only rolling support device, only pitching need to be set in containment system periphery Support device is used to support the dead weight of containment system and resists relative motion, and need to arrange a large amount of support devices, causes to go along with sb. to guard him Gap is insufficient between system and Ship Structure, increases the difficulty that subsequent construction is safeguarded.The setting of a large amount of support device can also be broken The globality of bad external insulation increases the risk of cryogenic liquid leakage.Support device can cause low temperature to transmit, in Ship Structure More low-temperature region is generated, increases the usable floor area of cryogenic material.
Invention content
For problems of the prior art, the present invention provide a kind of Large LNG ship Type B containment system support device and Its installation method, the apparatus structure is simple, easily manufactured, function and service, purposes is various, stopping effect is good, effectively reduces liquid Goods evaporation rate, insulation performance are good, are very to have practical value.
To achieve the above object, the present invention is used with following technical scheme:
A kind of Large LNG ship Type B containment system support device, the support device include the first cylinder pressure-bearing wood and the second cylinder Body pressure-bearing wood, the first cylinder pressure-bearing wood are the cylinder pressure-bearing wood of lateral stratiform superposition, and the second cylinder pressure-bearing wood is The tubular cylinder pressure-bearing wood of longitudinal stratiform superposition, the second cylinder pressure-bearing wood are set in the periphery of the first cylinder pressure-bearing wood Supportive body is formed, is adhesively fixed between the inner wall of the second cylinder pressure-bearing wood and the outer wall of the first cylinder pressure-bearing wood,
The upper surface of supportive body is equipped with top panel, its lower face is equipped with lower panel, and top is equipped in the top panel upper surface Right-angled intersection bracket, lower panel lower surface is equipped with lower part right-angled intersection bracket, on the outer wall of the second cylinder pressure-bearing wood Upper support annulus and lower support annulus are respectively equipped with, top annulus bracket, top are equipped in the outside of upper support annulus Annulus bracket is fixed in the above plate lower surface, and the outside of lower support annulus is equipped with lower part annulus bracket, and lower part annulus bracket is consolidated Lower panel upper surface is scheduled on,
First gap is equipped between top panel and supportive body upper surface, between upper support annulus and the second cylinder pressure-bearing wood Equipped with Second gap, third gap, lower support annulus and the second cylinder are equipped between lower panel and supportive body lower face Be equipped with the 4th gap between pressure-bearing wood, the first gap, Second gap, third gap, pour into a mould in the 4th gap it is low temperature resistant Epoxy.
The first gap, Second gap, third gap, the 4th gap thickness be 10mm.
It is high-strength low-temperature-resistant that the top panel, upper cross, which intersect bracket, upper support annulus, top annulus bracket, Steel 9Ni steel, remaining is high-strength low-temperature-resistant carbon steel.
The low temperature resistant epoxy selects phillymasticTG-7B.
The upper cross intersects bracket and lower part right-angled intersection bracket is distributed on same vertical plane.
A kind of installation method of Large LNG ship Type B containment system support device, includes the following steps:
Step 1, Ship Structure is first put up, by lower part right-angled intersection bracket welding in Ship Structure,
Step 2, lower panel is welded on lower part right-angled intersection bracket, then successively justifies lower part annulus bracket and lower support Boxing is connected on the upper surface of lower panel, forms lower frame, in the low temperature resistant epoxy of the upper surface of lower panel laying 10mm Base resin layer,
Step 3, the supportive body that the first cylinder pressure-bearing wood and the second cylinder pressure-bearing wood form is put into lower support annulus In, the low temperature resistant epoxy group tree of 10mm thickness is squeezed into the 4th gap between lower support annulus and the second cylinder pressure-bearing wood Lipid layer,
Step 4, cabin structure is put up, upper cross is intersected into bracket welding on cabin structure,
Step 5, top panel is welded on upper cross to intersect on bracket, then successively justifies top annulus bracket and upper support Boxing is connected on the lower surface of top panel, forms upper frame,
Step 6, after containment system lifting in place, upper frame is buckled into the first cylinder pressure-bearing wood and the second cylinder pressure-bearing The upper end of the supportive body of wood composition, and passes through support element and supports upper frame to be formed, in the lower surface of top panel and The first gap of 10mm is reserved between the upper end of supportive body, the low temperature resistant epoxy group tree of 10mm thickness is squeezed into first gap Lipid layer, and the low temperature resistant epoxy of 10mm thickness is squeezed into the Second gap between upper support annulus and the second cylinder pressure-bearing wood Base resin layer will be fixed as one between entire support device and cabin structure and Ship Structure,
Step 7, finally, the insulation screen of 500mm thickness is laid in support device surrounding.
Compared with prior art, beneficial effects of the present invention are:
1. support device of the present invention includes the first cylinder pressure-bearing wood and the second cylinder pressure-bearing wood, wherein the first cylinder is held Pressed wood is the cylinder pressure-bearing wood of lateral stratiform superposition, and the second cylinder pressure-bearing wood is the tubular cylinder pressure-bearing of longitudinal stratiform superposition Wood, the cylinder pressure-bearing wood of lateral stratiform superposition are primarily subjected to vertical load, the tubular cylinder pressure-bearing wood master of longitudinal stratiform superposition Horizontal load is born, is tightly combined the two securely with strength adhesive among the two, the support of the composition of this design method Main body just has two-phase anti-pressure ability, when bearing load, frictional force and pressure-bearing wood between two parts pressure-bearing wood with up and down The frictional force of panel may be used to resist the movement of containment system.The device makes simple, easy for installation, such support master Body can transmit vertical and horizontal direction load simultaneously, can bear any level direction load, playing prevents roll and pitch Effect;2. vertical load can be born using right-angled intersection bracket in support device, play the dead weight of braced cuts system and subtracted The effect of light heaving can meet vertical support, only rolling and the only function of pitching, vdiverse in function, structure arrangement simultaneously Rationally, it can effectively meet structural strength and fatigue requires;3. support device of the present invention can reduce containment system support device Quantity, save containment system peripheral clearance, reduce temperature conduction, improve Ship Structure temperature field, improve containment system it is exhausted Edge layer integrality.
Support device of the present invention, when containment system generates relative vertical movement due to ship motion, containment system hangs down Pressure-bearing wood is transferred to, then be transferred to and be installed on plate below the lower support seat of Ship Structure by top panel to load, is utilized The structure counter-force that hull structural member generates resists the vertical load of containment system, it is final offset heaving and containment system from Weight.
When containment system since ship motion generates relative horizontal movement(Roll and pitch moves)When, containment system bottom Horizontal load(Horizontal and vertical load)Pressure-bearing wood is transferred to, then be transferred to and be installed on Ship Structure by upper support annulus Lower support seat lower support annulus, using hull structural member generate structure counter-force resist containment system horizontal load, It is final to offset roll and pitch movement.
General elasticity modulus difference of the woody body of pressure-bearing in resistance to compression direction and shearing resistance direction is larger, and permissible compression stress is long-range In permitting stress, it is believed that the compressive mechanical property of pressure-bearing wood is better than shearing resistance mechanical property.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention.
Fig. 2 is the B-B sectional views of Fig. 1.
Fig. 3 is the A-A sectional views of Fig. 1.
Fig. 4 is the C-C sectional views of Fig. 1.
Fig. 5 is the structure diagram after present invention installation.
Fig. 6 is support device individual tank installation site design sketch of the present invention.
Fig. 7 is distribution map of the support device of the present invention in LNG cargo tanks bottom.
Specific embodiment
As shown in Fig. 1-Fig. 7, the present embodiment Large LNG ship Type B containment system support device, the support device includes first Cylinder pressure-bearing wood 1 and the second cylinder pressure-bearing wood 2, cylinder of the first cylinder pressure-bearing wood 1 for lateral stratiform superposition Pressure-bearing wood, tubular cylinder pressure-bearing wood of the second cylinder pressure-bearing wood 2 for longitudinal stratiform superposition, the second cylinder pressure-bearing wood 2 The periphery for being set in the first cylinder pressure-bearing wood 1 forms supportive body, the inner wall and the first cylinder of the second cylinder pressure-bearing wood 2 It is adhesively fixed between the outer wall of pressure-bearing wood 1,
The upper surface of supportive body is equipped with top panel 5, its lower face is equipped with lower panel 9, is equipped in 5 upper surface of top panel upper Portion's right-angled intersection bracket 3,9 lower surface of lower panel is equipped with lower part right-angled intersection bracket 7, in the second cylinder pressure-bearing wood 2 Upper support annulus 4 and lower support annulus 8 are respectively equipped on outer wall, top annulus is equipped in the outside of upper support annulus 4 Bracket 6, top annulus bracket 6 are fixed in the above 5 lower surface of plate, and the outside of lower support annulus 8 is equipped with lower part annulus bracket 10, Lower part annulus bracket 10 is fixed on 9 upper surface of lower panel,
First gap, 4 and second cylinder pressure-bearing wood 2 of upper support annulus are equipped between top panel 5 and supportive body upper surface Between be equipped with Second gap, between lower panel 9 and supportive body lower face be equipped with third gap, lower support annulus 8 and second The 4th gap is equipped between cylinder pressure-bearing wood 2, the first gap, third gap, is poured into a mould in the 4th gap Second gap Low temperature resistant epoxy.
Preferably, first gap in the present embodiment, Second gap, third gap, the 4th gap thickness be 10mm.
As further preferred, top panel 5, upper cross intersection bracket 3, upper support annulus 4, top in the present embodiment Annulus bracket 6 is high-strength low-allow steel 9Ni steel.
As further preferred, the low temperature resistant epoxy selection phillymasticTG-7B of the present embodiment.
As still more preferably, the present embodiment upper cross intersects bracket 3 and lower part right-angled intersection bracket 7 is distributed in together On one vertical plane.
The installation method of the present embodiment Large LNG ship Type B containment system support device, includes the following steps:
Step 1, Ship Structure 11 is first put up, lower part right-angled intersection bracket 7 is welded in Ship Structure 11,
Step 2, lower panel 9 is welded on lower part right-angled intersection bracket 7, then successively by lower part annulus bracket 10 and lower part branch The upper surface that ring 8 is welded on lower panel 9 is held round, forms lower frame, in the resistance to low of the upper surface of the lower panel 9 laying 10mm Temperature epoxy base resin layer,
Step 3, the supportive body of 2 composition of the first cylinder pressure-bearing wood 1 and the second cylinder pressure-bearing wood is put into lower support circle In ring 8, the low temperature resistant ring of 10mm thickness is squeezed into the 4th gap between 8 and second cylinder pressure-bearing wood 2 of lower support annulus Oxygroup resin layer,
Step 4, cabin structure 12 is put up, upper cross intersection bracket 3 is welded on cabin structure 12,
Step 5, top panel 5 is welded on upper cross to intersect on bracket 3, then successively by top annulus bracket 6 and top branch The lower surface that ring 4 is welded on top panel 5 is held round, forms upper frame,
Step 6, after containment system lifting in place, upper frame is buckled into the first cylinder pressure-bearing wood 1 and the second cylinder is held The upper end for the supportive body that pressed wood 2 forms, and pass through support element and support upper frame to be formed, in the following table of top panel 5 The first gap of 10mm is reserved between face and the upper end of supportive body, the low temperature resistant epoxy of 10mm thickness is squeezed into first gap Base resin layer, and the resistance to low of 10mm thickness is squeezed into the Second gap between 4 and second cylinder pressure-bearing wood 2 of upper support annulus Temperature epoxy base resin layer will be fixed as one between entire support device and cabin structure 12 and Ship Structure 11,
Step 7, finally, the insulation screen 13 of 500mm thickness is laid in support device surrounding.
Although above-described embodiment makes the present invention specific descriptions, those of ordinary skill in the art are come It says, it is understood that can be modified within the spirit and scope for not departing from the present invention based on present disclosure Or improve, these modification and improvement are all within the spirit and scope of the present invention.

Claims (6)

1. a kind of Large LNG ship Type B containment system support device, which is characterized in that the support device is held including the first cylinder Pressed wood(1)With the second cylinder pressure-bearing wood(2), the first cylinder pressure-bearing wood(1)Cylinder for the superposition of lateral stratiform is held Pressed wood, the second cylinder pressure-bearing wood(2)For the tubular cylinder pressure-bearing wood of longitudinal stratiform superposition, the second cylinder pressure-bearing wood (2)It is set in the first cylinder pressure-bearing wood(1)Periphery formed supportive body, the second cylinder pressure-bearing wood(2)Inner wall and One cylinder pressure-bearing wood(1)Outer wall between be adhesively fixed,
The upper surface of supportive body is equipped with top panel(5), its lower face be equipped with lower panel(9), in the top panel(5)Upper surface Intersect bracket equipped with upper cross(3), lower panel(9)Lower surface is equipped with lower part right-angled intersection bracket(7), in second cylinder Body pressure-bearing wood(2)Outer wall on be respectively equipped with upper support annulus(4)With lower support annulus(8), in upper support annulus(4) Outside be equipped with top annulus bracket(6), top annulus bracket(6)Be fixed in the above plate(5)Lower surface, lower support annulus (8)Outside be equipped with lower part annulus bracket(10), lower part annulus bracket(10)It is fixed on lower panel(9)Upper surface,
Top panel(5)First gap, upper support annulus are equipped between supportive body upper surface(4)With the second cylinder pressure-bearing Wood(2)Between be equipped with Second gap, lower panel(9)Third gap, lower support annulus are equipped between supportive body lower face (8)With the second cylinder pressure-bearing wood(2)Between be equipped with the 4th gap, the first gap, Second gap, third gap, the 4th Low temperature resistant epoxy is poured into a mould in gap.
2. Large LNG ship Type B containment system support device according to claim 1, which is characterized in that described first is empty Gap, Second gap, third gap, the 4th gap thickness be 10mm.
3. Large LNG ship Type B containment system support device according to claim 1, which is characterized in that the top panel (5), upper cross intersect bracket(3), upper support annulus(4), top annulus bracket(6)It is high-strength low-allow steel 9Ni Steel.
4. Large LNG ship Type B containment system support device according to claim 1, which is characterized in that described low temperature resistant Epoxy selects phillymasticTG-7B.
5. according to any Large LNG ship Type B containment system support devices of claim 1-4, which is characterized in that on described Portion's right-angled intersection bracket(3)With lower part right-angled intersection bracket(7)It is distributed on same vertical plane.
A kind of 6. installation method of the Large LNG ship Type B containment system support device described in claim 5, it is characterised in that packet Include following steps:
Step 1, Ship Structure is first put up(11), by lower part right-angled intersection bracket(7)It is welded on Ship Structure(11)On,
Step 2, by lower panel(9)It is welded on lower part right-angled intersection bracket(7)On, then successively by lower part annulus bracket(10)With Lower support annulus(8)It is welded on lower panel(9)Upper surface, formed lower frame, in the lower panel(9)Upper surface apply If the low temperature resistant epoxy layer of 10mm,
Step 3, by the first cylinder pressure-bearing wood(1)With the second cylinder pressure-bearing wood(2)The supportive body of composition is put into lower part branch Hold round ring(8)In, in lower support annulus(8)With the second cylinder pressure-bearing wood(2)Between the 4th gap in squeeze into 10mm thickness Low temperature resistant epoxy layer,
Step 4, cabin structure is put up(12), upper cross is intersected into bracket(3)It is welded on cabin structure(12)On,
Step 5, by top panel(5)It is welded on upper cross and intersects bracket(3)On, then successively by top annulus bracket(6)With Upper support annulus(4)It is welded on top panel(5)Lower surface, formed upper frame,
Step 6, after containment system lifting in place, upper frame is buckled into the first cylinder pressure-bearing wood(1)With the second cylinder Pressure-bearing wood(2)The upper end of the supportive body of composition, and pass through support element and support upper frame to be formed, in top panel(5) Lower surface and supportive body upper end between reserve the first gap of 10mm, thick resistance to low of 10mm is squeezed into first gap Temperature epoxy base resin layer, and in upper support annulus(4)With the second cylinder pressure-bearing wood(2)Between Second gap in squeeze into The low temperature resistant epoxy layer of 10mm thickness, by entire support device and cabin structure(12)And Ship Structure(11)Between it is fixed It is integrated,
Step 7, finally, the insulation screen of 500mm thickness is laid in support device surrounding.
CN201711374806.7A 2017-12-19 2017-12-19 Large LNG ship Type B containment system support device and its installation method Active CN108189970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711374806.7A CN108189970B (en) 2017-12-19 2017-12-19 Large LNG ship Type B containment system support device and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711374806.7A CN108189970B (en) 2017-12-19 2017-12-19 Large LNG ship Type B containment system support device and its installation method

Publications (2)

Publication Number Publication Date
CN108189970A true CN108189970A (en) 2018-06-22
CN108189970B CN108189970B (en) 2019-10-11

Family

ID=62576884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711374806.7A Active CN108189970B (en) 2017-12-19 2017-12-19 Large LNG ship Type B containment system support device and its installation method

Country Status (1)

Country Link
CN (1) CN108189970B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109398599B (en) * 2018-10-31 2020-08-07 沪东中华造船(集团)有限公司 Installation method of planar insulation module for L NG shipboard containment system
CN117022548A (en) * 2023-10-08 2023-11-10 上海蓝魂环保科技有限公司 Secondary shielding system of B-type low-temperature liquid cargo containment system and ship body

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202082565U (en) * 2011-05-24 2011-12-21 大连船舶重工集团装备制造有限公司 Adjustable segment shoring device
KR20140068341A (en) * 2012-11-27 2014-06-09 에스티엑스조선해양 주식회사 Independent lng fuel tank (imo type b) considering container bench structure
CN203727613U (en) * 2013-12-18 2014-07-23 南通太平洋海洋工程有限公司 Novel marine LNG fluid tank saddle
CN104443283A (en) * 2014-11-26 2015-03-25 中国船舶工业集团公司第七〇八研究所 Local secondary screen bulkhead applied to B type independent cabin and boat or ocean structure
CN104986287A (en) * 2015-06-16 2015-10-21 沪东中华造船(集团)有限公司 Shaking stopping device for B-type enclosure system of large-scale LNG ship
CN205440772U (en) * 2015-12-21 2016-08-10 大连中远船务工程有限公司 LNG transport ship liquid goods jar base structure
CN106080961A (en) * 2016-06-14 2016-11-09 沪东中华造船(集团)有限公司 The LNG of Type B containment system bottom support bracket reveals catching device and installation procedure
KR20170064782A (en) * 2015-12-02 2017-06-12 대우조선해양 주식회사 Elastic supporting apparatus of lng cargo and lng cargo comprising the same

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202082565U (en) * 2011-05-24 2011-12-21 大连船舶重工集团装备制造有限公司 Adjustable segment shoring device
KR20140068341A (en) * 2012-11-27 2014-06-09 에스티엑스조선해양 주식회사 Independent lng fuel tank (imo type b) considering container bench structure
CN203727613U (en) * 2013-12-18 2014-07-23 南通太平洋海洋工程有限公司 Novel marine LNG fluid tank saddle
CN104443283A (en) * 2014-11-26 2015-03-25 中国船舶工业集团公司第七〇八研究所 Local secondary screen bulkhead applied to B type independent cabin and boat or ocean structure
CN104986287A (en) * 2015-06-16 2015-10-21 沪东中华造船(集团)有限公司 Shaking stopping device for B-type enclosure system of large-scale LNG ship
KR20170064782A (en) * 2015-12-02 2017-06-12 대우조선해양 주식회사 Elastic supporting apparatus of lng cargo and lng cargo comprising the same
CN205440772U (en) * 2015-12-21 2016-08-10 大连中远船务工程有限公司 LNG transport ship liquid goods jar base structure
CN106080961A (en) * 2016-06-14 2016-11-09 沪东中华造船(集团)有限公司 The LNG of Type B containment system bottom support bracket reveals catching device and installation procedure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109398599B (en) * 2018-10-31 2020-08-07 沪东中华造船(集团)有限公司 Installation method of planar insulation module for L NG shipboard containment system
CN117022548A (en) * 2023-10-08 2023-11-10 上海蓝魂环保科技有限公司 Secondary shielding system of B-type low-temperature liquid cargo containment system and ship body
CN117022548B (en) * 2023-10-08 2024-01-09 上海蓝魂环保科技有限公司 Secondary shielding system of B-type low-temperature liquid cargo containment system and ship body

Also Published As

Publication number Publication date
CN108189970B (en) 2019-10-11

Similar Documents

Publication Publication Date Title
CN205444972U (en) Big post foot reinforcing apparatus of ancient building
CN108189970A (en) Large LNG ship Type B containment system support device and its installation method
CN104925216B (en) Independent liquid tank transverse supporting structure
CN102963498B (en) Body section turn-over auxiliary tool
WO2016041291A1 (en) Method for the manufacture of a tubular steel pillar having a reinforcing internal wall structure
CN108974258B (en) Assembly method of B-type LNG ship containment system supporting device
CN209064296U (en) A kind of multi-functional anti-dumping of Type B LNG fuel compartment and vertical supporting device
CN104986287B (en) Large LNG ship Type B containment system only shakes device
CN110725406A (en) Connecting method of composite steel pipe concrete column and steel beam and integral type external reinforcing ring connecting node
CN107499463A (en) A kind of FS final spice sea-freight binding structural member and binding method
CN109018201B (en) B-type LNG ship containment system and supporting device thereof
CN109404380A (en) The big load anchor ear device of cylinder
CN207211367U (en) A kind of steel-structure beam-column node structure
CN206298994U (en) A kind of waveform energy-dissipating and shock-absorbing steel plate, rubber concrete compound shear wall
CN204647851U (en) A kind of deep cooling spherical tank support column structure
CN104709438A (en) Independent liquid tank supporting structure
CN203419417U (en) Large ocean structure roll-roll shipment and transportation frame
CN103803208B (en) Storage and transportation container
CN205677089U (en) There is coupled column and the base node structure of horizontal anti-seismic performance
CN211732879U (en) Pipeline auxiliary conveying device
CN202966585U (en) Ship body section turning-over auxiliary tool
CN206752790U (en) A kind of part combination beam with tie-rod
CN214404494U (en) Anti-seismic structure for installation of engineering equipment
CN206829360U (en) It is a kind of to be easy to fixed lightweight beam column of steel structure
CN201296902Y (en) Bearing anchor ear

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant