CN108188903A - Stack device after a kind of aluminum pipe cutting - Google Patents
Stack device after a kind of aluminum pipe cutting Download PDFInfo
- Publication number
- CN108188903A CN108188903A CN201711475341.4A CN201711475341A CN108188903A CN 108188903 A CN108188903 A CN 108188903A CN 201711475341 A CN201711475341 A CN 201711475341A CN 108188903 A CN108188903 A CN 108188903A
- Authority
- CN
- China
- Prior art keywords
- aluminum pipe
- conveyer belt
- cutting
- opening layer
- transverse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B27/00—Other grinding machines or devices
- B24B27/06—Grinders for cutting-off
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B41/00—Component parts such as frames, beds, carriages, headstocks
- B24B41/005—Feeding or manipulating devices specially adapted to grinding machines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G57/00—Stacking of articles
- B65G57/02—Stacking of articles by adding to the top of the stack
- B65G57/03—Stacking of articles by adding to the top of the stack from above
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G57/00—Stacking of articles
- B65G57/02—Stacking of articles by adding to the top of the stack
- B65G57/16—Stacking of articles of particular shape
- B65G57/18—Stacking of articles of particular shape elongated, e.g. sticks, rods, bars
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)
Abstract
The present application relates to field of machining, stack device after being cut more particularly to a kind of aluminum pipe, including cabinet, the first conveyer belt is equipped in cabinet, first conveyer belt is equipped with transverse concave groove, the cutting mechanism being connected on cabinet is equipped with above first conveyer belt, cutting mechanism includes hydraulic stem and emery wheel cuts head, first conveyor belt ends are connected with rotating mechanism, the second conveyer belt is equipped with below the rotating mechanism, oblique plate is equipped with below second conveyer belt, stacking dressing mechanism is connected under the oblique plate.Cutting processing is carried out to aluminum pipe by cutting mechanism, carry out the direction that rotation changes aluminum pipe and moves to the aluminum pipe after cutting by rotating mechanism again, aluminum pipe enters stacking dressing mechanism by oblique plate, the stacking discharge of aluminum pipe is finally carried out in dressing mechanism is stacked, solve the randomness of the stacking of the aluminum pipe after cutting in the prior art, need manually to aluminum pipe carry out arrange put, it is time-consuming and laborious the problem of.
Description
Technical field
The present invention relates to field of machining more particularly to a kind of aluminum pipe collating units.
Background technology
Aluminum pipe is widely used in all trades and professions, such as:Automobile, steamer, space flight, aviation, electric appliance, agricultural, electromechanics, household etc., aluminium
Pipe in we life it is ubiquitous.Melted in high temperature furnace by aluminium block, cast using deep-well and pour molten aluminum
Cast aluminum pipe, aluminum pipe is further according to needing to be cut into a section small aluminum pipe, then pass through collection device and collect storage.Existing technology
Present in cut after aluminum pipe stack randomness, need manually to aluminum pipe carry out arrange put, it is time-consuming and laborious the problem of.
Invention content
The invention is intended to provide stack device after a kind of aluminum pipe is cut, to solve the aluminium after cutting in the prior art
Pipe stack randomness, need manually to aluminum pipe carry out arrange put, it is time-consuming and laborious the problem of.
It is stack device after a kind of aluminum pipe is cut in this programme, including a cabinet, the first conveyer belt is equipped in the cabinet,
First conveyer belt is equipped with transverse concave groove, and the cutting mechanism being connected on cabinet, institute are equipped with above first conveyer belt
It states cutting mechanism and includes hydraulic stem and emery wheel cuts head, first conveyor belt ends are connected with rotating mechanism, the whirler
Structure includes transverse opening layer, longitudinal opening layer and motor, and four connecting rods, four connecting rods are connected on the transverse opening layer
The other end be connected with top plate, the top plate upper end is connected with motor, and the transverse opening layer is located above longitudinal opening layer, institute
It states transverse opening layer with longitudinal opening layer coaxial rotating to be connected, the transverse direction in the opening of the transverse opening layer and the first conveyer belt
Slot opening is opposite, and the second conveyer belt is equipped with below the longitudinal opening layer, oblique plate, institute are equipped with below second conveyer belt
It states and stacking dressing mechanism is connected under oblique plate.
The technical principle of this programme:Aluminum pipe to be processed is put into the transverse concave groove on the first conveyer belt, it is to be processed
Aluminum pipe is transmitted to certain position, and cutting mechanism is started to work, hydraulic stem elongation, be connected to emery wheel cuts head on hydraulic stem also with
Decline aluminum pipe is cut, the aluminum pipe after cutting is moved into the transverse opening layer of rotating mechanism with the first conveyer belt,
Motor drives top plate rotation so as to which transverse opening layer be driven to rotate, when the transverse opening of transverse opening layer rotates to and longitudinal opening
When the longitudinal opening of layer overlaps, the aluminum pipe after cutting is fallen therewith, across longitudinal opening layer, is fallen on the second conveyer belt,
It falls to again on oblique plate, entering stacking dressing mechanism using oblique plate carries out stacking discharge.
The technique effect of this programme:Cutting processing carries out aluminum pipe, then by rotating mechanism to cutting by cutting mechanism
Aluminum pipe afterwards carries out the direction that rotation changes aluminum pipe movement, and the stacking discharge of aluminum pipe, solution are finally carried out in dressing mechanism is stacked
The randomness that aluminum pipe after cutting certainly in the prior art stacks needs manually aluminum pipe arrange to put, time-consuming to take
The problem of power.
It advanced optimizes:The stacking dressing mechanism includes heap stacked box, and the limiting arranged vertically is equipped in the heap stacked box
Plate, the heap stacked box is interior to be equipped with a partition board, and several horizontally arranged idler wheels are equipped between the partition board and stacking bottom plate, described
Idler wheel passes through partition board and a part is raised in heap stacked box, and the idler wheel is rotated to the direction far from limiting plate, the heap
Stacked box bottom is connected with several springs.Limiting plate limits the aluminum pipe after cutting, prevents the aluminum pipe after cutting into heap
Run-off the straight during stacked box, the aluminum pipe after pair of rollers cutting are transmitted, its direction away from limiting plate is made to carry out movement row
Row.When in heap stacked box after being paved with one layer of aluminum pipe, then into the arranged distribution of second layer aluminum pipe, since the rotation of idler wheel drives
First layer aluminum pipe rotate, then first layer aluminum pipe drive second layer aluminum pipe be transmitted, make its direction away from limiting plate into
Row movement arrangement.Spring is provided with due to stacking bottom portion, when the weight in heap stacked box becomes larger, then spring is due to being pressed
Power become large deformation degree become larger so that the position of heap stacked box continuously decreases, thus when in heap stacked box aluminum pipe arrange it is more,
Then camber of spring is more serious, keeps relative stability so as to maintain the distance between limiting plate and aluminum pipe.
It advanced optimizes:Transverse concave groove on first conveyer belt is the groove of arc section.There is provided arc sections
Groove, convenient for aluminum pipe engaging transport, be that aluminum pipe steadily transports on the first conveyer belt.
It advanced optimizes:The Opening length of the transverse opening layer and longitudinal opening layer and the aluminum pipe length phase after cutting
Together.Aluminum pipe after cutting is just engaged in transverse opening layer, and pass through longitudinal opening layer and fall to the second transmission
It takes.
It advanced optimizes:The stacking bottom portion is equipped with fixed rope, and the other end of fixed rope is connected with cabinet bottom.Pass through
Fixed rope is set, prevents heap stacked box unbalance stress when discharging aluminum pipe from causing to topple over.
It advanced optimizes:The hydraulic stem is equipped with timing chip, starts every n seconds primary.In conveyer belt transmission speed not
During change, realize and cutting of fixed quantity is carried out to aluminum pipe.
It advanced optimizes:The motor is equipped with timing chip, starts every n seconds once, and motor rotational angle is 180 °.Electricity
Machine is provided with the rotational frequency identical with cutting frequency, and rotational angle is 180 ° every time, has adapted to device requirements of one's work.
Description of the drawings
Fig. 1 is the schematic diagram of stack device embodiment after a kind of aluminum pipe cutting of the present invention.
Fig. 2 is rotating mechanism schematic diagram in Fig. 1.
Fig. 3 is the first conveyer belt sectional view in Fig. 1.
Specific embodiment
Below by specific embodiment, the present invention is described in further detail:
Reference numeral in Figure of description includes:Cabinet 1, the first conveyer belt 2, transverse concave groove 21, hydraulic stem 31, grinding wheel
Cutting head 32, transverse opening layer 41, transverse opening 411, longitudinal opening layer 42, longitudinal opening 421, top plate 43, motor 44, second
Aluminum pipe 8 after conveyer belt 5, oblique plate 6, heap stacked box 7, limiting plate 71, partition board 72, idler wheel 73, spring 74, fixed rope 75, cutting.
Embodiment is basic as shown in attached drawing 1, Fig. 2 and Fig. 3:Including a cabinet 1, the first conveyer belt is equipped in the cabinet 1
2, first conveyer belt 2 is equipped with transverse concave groove 21, and 2 top of the first conveyer belt is equipped with the cutting being connected on cabinet 1
Mechanism, the cutting mechanism include hydraulic stem 31 and emery wheel cuts head 32, and 2 end of the first conveyer belt is connected with whirler
Structure, the rotating mechanism include transverse opening layer 41, longitudinal opening layer 42 and motor 44, are connected on the transverse opening layer 41
Four connecting rods, the other end of four connecting rods are connected with top plate 43, and 43 upper end of top plate is connected with motor 44, the transverse direction
Opening layer 41 is located at 42 top of longitudinal opening layer, and the transverse opening layer 41 is connected with 42 coaxial rotating of longitudinal opening layer, described
Transverse concave groove 21 on 411 and first conveyer belt 2 of transverse opening of transverse opening layer 41 is open relatively, the longitudinal opening layer 42
Lower section is equipped with the second conveyer belt 5, and 5 lower section of the second conveyer belt is equipped with oblique plate 6, it is whole that stacking is connected under the oblique plate 6
Manage mechanism.The stacking dressing mechanism includes heap stacked box 7, and the limiting plate 71 arranged vertically, the heap are equipped in the heap stacked box 7
A partition board 72 is equipped in stacked box 7, several horizontally arranged idler wheels 73 are equipped between 7 bottom plate of the partition board 72 and heap stacked box, it is described
Idler wheel 73 passes through partition board 72 and a part to be raised in heap stacked box 7, the direction of rotation of the idler wheel 73 be far from limiting plate 71 into
Row rotation, 7 bottom of heap stacked box is connected with several springs 74.
For the first conveyer belt 2 equipped with arc section groove for engaging and transporting aluminum pipe, cutting mechanism includes hydraulic stem 31
With frosted cutting head 32, hydraulic stem 31 is equipped with timing chip, starts once every n seconds, realizes and carries out cutting of fixed quantity to aluminum pipe.
Rotating mechanism includes transverse opening layer 41 and longitudinal opening layer 42,411 and first conveyer belt 2 of transverse opening of transverse opening layer 41
The opening of upper arc section groove is opposite, and aluminum pipe 8 is sent into rotating mechanism after making the cutting being fastened on the first conveyer belt 2, electricity
Machine 44 drives top plate 43 to rotate, and the rotation of top plate 43 drives transverse opening layer 41 to rotate, when the transverse opening 411 of transverse opening layer 41
When Chong Die with the longitudinal opening 421 of longitudinal opening layer 42, aluminum pipe is fallen to across longitudinal opening layer 42 on the second conveyer belt 5.Electricity
Timing chip is equipped in machine 44, was started every n seconds once, the angle that motor 44 rotates is 180 °, has adapted to the need of equipment work
It will.
Limiting plate 71 is equipped in heap stacked box 7, limiting plate 71 prevents the aluminium after cutting to being limited to the aluminum pipe after cutting
The run-off the straight when entering heap stacked box 7 of pipe 8.Be equipped with idler wheel 73 in heap stacked box 7, idler wheel 73 to idler wheel 73 to the aluminum pipe after cutting into
Row transmission, its direction away from limiting plate 71 is made to carry out movement arrangement, prevent cutting after aluminum pipe 8 in heap stacked box 7 not
Rule accumulation.When 7 weight of heap stacked box is gradually increased, elastic deformation becomes larger spring 74, then spring 74 is due to being under pressure
Become large deformation degree become larger so that the position of heap stacked box 7 continuously decreases, thus when in heap stacked box 7 aluminum pipe arrange it is more,
Then spring 74 deforms more serious, keeps relative stability so as to maintain the distance between limiting plate 71 and aluminum pipe.
The specific embodiment of the present invention is as follows:Aluminum pipe to be processed is put into the transverse concave groove 21 on the first conveyer belt 2
In, certain position is transmitted to, cutting mechanism is started to work, and hydraulic stem 31 extends, the emery wheel cuts head being connected on hydraulic stem 31
32 also decline aluminum pipe are cut therewith, and the aluminum pipe after cutting is moved into the transverse direction of rotating mechanism with the first conveyer belt 2
Be open layer 41, and motor 44 drives top plate 43 to rotate so as to which transverse opening layer 41 be driven to rotate, when the transverse direction of transverse opening layer 41 is opened
Mouthfuls 411 rotate to when overlapping with the longitudinal opening of longitudinal opening layer 42 421, and aluminum pipe is fallen therewith, across longitudinal opening layer 42,
It falls on the second conveyer belt 5, then falls on oblique plate 6, enter heap stacked box 7 using oblique plate 6, limiting plate 71 is to cutting
Aluminum pipe afterwards is limited, and prevents the run-off the straight when entering heap stacked box 7 of the aluminum pipe after cutting, idler wheel 73 is to the aluminum pipe after cutting
It is transmitted, its direction away from limiting plate 71 is made to carry out movement arrangement.When in heap stacked box 7 be paved with one layer of aluminum pipe it
Afterwards, then into the arranged distribution of second layer aluminum pipe, since the rotation of idler wheel 73 drives the rotation of first layer aluminum pipe, then first layer aluminum pipe
Second layer aluminum pipe is driven to be transmitted, its direction away from limiting plate 71 is made to carry out movement arrangement.Due to 7 bottom of heap stacked box
There is provided spring 74, when the weight in heap stacked box 7 becomes larger, then spring 74 becomes large deformation degree and gradually becomes due to being under pressure
Greatly so that the position of heap stacked box 7 continuously decreases, so when in heap stacked box 7 aluminum pipe arrange it is more, then spring 74 deforms tighter
Weight, keeps relative stability so as to maintain the distance between limiting plate 71 and aluminum pipe, ensure that the continuous firing of heap stacked box 7.
Cutting processing is carried out, then the aluminum pipe 8 after cutting is rotated by rotating mechanism to aluminum pipe by cutting mechanism
Change the direction of aluminum pipe movement, the stacking discharge of aluminum pipe is finally carried out in dressing mechanism is stacked, solves to exist in the prior art
Cutting after aluminum pipe stack randomness, need manually to aluminum pipe carry out arrange put, it is time-consuming and laborious the problem of.
Above-described is only the embodiment of the present invention, and the common sense such as well known specific technical solution were not made herein in scheme
More descriptions.It should be pointed out that for those skilled in the art, under the premise of present invention knot technical solution is not departed from, also
Several modifications and improvements can be made, these should also be considered as protection scope of the present invention, these all do not interfere with of the invention real
The effect and practical applicability applied.The scope of protection required by this application should be based on the content of the claims, specification
In the records such as specific embodiment can be used for explaining the content of claim.
Claims (7)
1. a kind of stack device after aluminum pipe cutting, including a cabinet, it is characterised in that:The first conveyer belt is equipped in the cabinet,
First conveyer belt is equipped with transverse concave groove, and the cutting mechanism being connected on cabinet, institute are equipped with above first conveyer belt
It states cutting mechanism and includes hydraulic stem and emery wheel cuts head, first conveyor belt ends are connected with rotating mechanism, the whirler
Structure includes transverse opening layer, longitudinal opening layer and motor, and four connecting rods, four connecting rods are connected on the transverse opening layer
The other end be connected with top plate, the top plate upper end is connected with motor, and the transverse opening layer is located above longitudinal opening layer, institute
It states transverse opening layer with longitudinal opening layer coaxial rotating to be connected, on the transverse opening and the first conveyer belt of the transverse opening layer
Transverse concave groove opening is opposite, and the second conveyer belt is equipped with below the longitudinal opening layer, is equipped with below second conveyer belt oblique
Plate is connected with stacking dressing mechanism under the oblique plate.
2. stack device after aluminum pipe cutting according to claim 1, it is characterised in that:The stacking dressing mechanism includes heap
Stacked box, the heap stacked box is interior to be equipped with the limiting plate arranged vertically, and a partition board, the partition board and heap stacked box are equipped in the heap stacked box
Several horizontally arranged idler wheels are equipped between bottom plate, the idler wheel passes through partition board and a part is raised in heap stacked box, the rolling
It takes turns to the direction far from limiting plate and is rotated, the stacking bottom portion is connected with several springs.
3. stack device after aluminum pipe cutting according to claim 1, it is characterised in that:Transverse direction on first conveyer belt
Groove is the groove of arc section.
4. stack device after aluminum pipe cutting according to claim 1, it is characterised in that:The transverse opening layer and longitudinal direction are opened
The Opening length of mouth layer is identical with the aluminum pipe length after cutting.
5. stack device after aluminum pipe cutting according to claim 2, it is characterised in that:The stacking bottom portion, which is equipped with, to be fixed
Rope, the other end of fixed rope are connected with cabinet bottom.
6. stack device after aluminum pipe cutting according to claim 1, it is characterised in that:The hydraulic stem is equipped with timing core
Piece started primary every n seconds.
7. stack device after aluminum pipe cutting according to claim 6, it is characterised in that:The motor is equipped with timing chip,
Started every n seconds once, motor rotational angle is 180 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711475341.4A CN108188903A (en) | 2017-12-29 | 2017-12-29 | Stack device after a kind of aluminum pipe cutting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711475341.4A CN108188903A (en) | 2017-12-29 | 2017-12-29 | Stack device after a kind of aluminum pipe cutting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108188903A true CN108188903A (en) | 2018-06-22 |
Family
ID=62586187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711475341.4A Withdrawn CN108188903A (en) | 2017-12-29 | 2017-12-29 | Stack device after a kind of aluminum pipe cutting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108188903A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111055744A (en) * | 2019-12-20 | 2020-04-24 | 无锡市宏泰商品混凝土有限公司 | Storage and transportation trailer for concrete conveying pipe |
CN113697419A (en) * | 2021-07-02 | 2021-11-26 | 济宁矿业集团海纳科技机电股份有限公司 | Carrier roller flow production line frame body |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3901138A (en) * | 1972-09-06 | 1975-08-26 | D Bilt Pieter Arnoldus V | Turn table device |
CN201320636Y (en) * | 2008-12-29 | 2009-10-07 | 庄添财 | Full-automatic pipe cutter |
CN104401692A (en) * | 2014-11-20 | 2015-03-11 | 重庆天和玻璃有限公司 | Glass reversing conveying device |
CN106347980A (en) * | 2016-11-17 | 2017-01-25 | 无锡市麦杰机械工程有限公司 | Bottling line absorption type exchange device |
CN106586485A (en) * | 2016-12-16 | 2017-04-26 | 安徽普伦智能装备有限公司 | Bar reversing device used on processing line |
-
2017
- 2017-12-29 CN CN201711475341.4A patent/CN108188903A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3901138A (en) * | 1972-09-06 | 1975-08-26 | D Bilt Pieter Arnoldus V | Turn table device |
CN201320636Y (en) * | 2008-12-29 | 2009-10-07 | 庄添财 | Full-automatic pipe cutter |
CN104401692A (en) * | 2014-11-20 | 2015-03-11 | 重庆天和玻璃有限公司 | Glass reversing conveying device |
CN106347980A (en) * | 2016-11-17 | 2017-01-25 | 无锡市麦杰机械工程有限公司 | Bottling line absorption type exchange device |
CN106586485A (en) * | 2016-12-16 | 2017-04-26 | 安徽普伦智能装备有限公司 | Bar reversing device used on processing line |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111055744A (en) * | 2019-12-20 | 2020-04-24 | 无锡市宏泰商品混凝土有限公司 | Storage and transportation trailer for concrete conveying pipe |
CN113697419A (en) * | 2021-07-02 | 2021-11-26 | 济宁矿业集团海纳科技机电股份有限公司 | Carrier roller flow production line frame body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204822942U (en) | Spoke wire stock conveyor | |
CN102390699B (en) | Automatic cover finishing machine | |
CN204917253U (en) | Automatic receive board collating mechanism | |
CN108188903A (en) | Stack device after a kind of aluminum pipe cutting | |
CN103098615A (en) | Sugarcane combine-harvester with novel conveying manner | |
CN207025860U (en) | A kind of taro separator | |
CN104488451B (en) | A kind of collapsible scraper-type conveying arm for segmenting type sugar cane harvester | |
CN108177072A (en) | A kind of device for collecting aluminum pipe cutting and aluminum pipe arrangement | |
CN107214092A (en) | A kind of taro separator | |
CN205924945U (en) | Full -automatic mahjong machine | |
CN209125479U (en) | The automatic blanking device of centerless grinding machine | |
CN206639808U (en) | A kind of battery case induction system | |
CN207174160U (en) | A kind of packaging bag separates marking device | |
CN205686682U (en) | Powder ammonium phosphate packing scale charging gear | |
CN204473808U (en) | The sub-bottle of falling vial-type device | |
CN207312653U (en) | A kind of charging basket automatic docking device | |
CN207027085U (en) | A kind of double sides milling machine of self-emptying | |
CN208135390U (en) | A kind of machine shaft automatic discharging device | |
CN103171872B (en) | Rotary belt mechanism | |
CN207390365U (en) | A kind of lining-up machine preamble automatic turning mechanism | |
CN206967247U (en) | A kind of metal pipe material Quick cutter | |
CN205684723U (en) | A kind of automatic feeding device of lathe | |
CN205526472U (en) | Screw feeding mechanism and intelligent automatic screw detect machine | |
CN206502427U (en) | Material paves conveying arrangement | |
CN205366833U (en) | Rare earth mine mines conveyer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180622 |
|
WW01 | Invention patent application withdrawn after publication |