CN108182557A - Based on communications industry supply chain COM code method - Google Patents

Based on communications industry supply chain COM code method Download PDF

Info

Publication number
CN108182557A
CN108182557A CN201711184944.9A CN201711184944A CN108182557A CN 108182557 A CN108182557 A CN 108182557A CN 201711184944 A CN201711184944 A CN 201711184944A CN 108182557 A CN108182557 A CN 108182557A
Authority
CN
China
Prior art keywords
materials
bill
module
supply chain
classes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711184944.9A
Other languages
Chinese (zh)
Other versions
CN108182557B (en
Inventor
曾磊
杨冠强
杨建军
黄宇
贺延敏
王欣
辛朝
肖志立
宋亚丽
裴照华
杨继学
陈海伟
刘岩
陈健
高朗
韩志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sinobal Information Technology Ltd By Share Ltd
China Mobile Group Henan Co Ltd
Original Assignee
Beijing Sinobal Information Technology Ltd By Share Ltd
China Mobile Group Henan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sinobal Information Technology Ltd By Share Ltd, China Mobile Group Henan Co Ltd filed Critical Beijing Sinobal Information Technology Ltd By Share Ltd
Priority to CN201711184944.9A priority Critical patent/CN108182557B/en
Publication of CN108182557A publication Critical patent/CN108182557A/en
Application granted granted Critical
Publication of CN108182557B publication Critical patent/CN108182557B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention belongs to communications industry supply chain complex materials administrative skill fields, more particularly to a kind of to be based on communications industry supply chain COM code method, comprising:N number of segmentation attribute-bit is carried out according to material attribute classification, obtains attribute section combination, according to attribute section combination and sequence serial number generation base material coding;Module information and material information are included according to classes of supplies and configuration rule generation multi-layer bill of materials template, bill of materials template, wherein, classes of supplies includes A classes basic supplies and B classes supply goods and materials;For supply chain intermediate links, according to multistage bill of materials template, it is dynamically generated in the bill of materials of corresponding service link circulation application.The COM code of single static business scenario specific with supply chain with bill of material management pattern and link are combined by the present invention, the multi-layer of dynamic generation facing multiple users requirement, multiduty bill of materials, reduce the error rate in cataloged procedure, clear in structure, realization simply, has preferable application value.

Description

Based on communications industry supply chain COM code method
Technical field
The invention belongs to communications industry supply chain complex materials administrative skill fields, more particularly to a kind of to be based on the communications industry Supply chain COM code method.
Background technology
COM code is the foundation stone of supply chain management, the common processing method of the communications industry be exactly according to goods and materials classification and Attribute is encoded, but practical in use, for the different business processing step of different sectors of demand, supply chain, User is different to the cognition of material and processing mode.Due to recognizing the difference with business processing step, it will usually lead to object Money in demand, buying, packaging, shipping, the links such as use to bring many constant, information cognition angle disunity, not only at business It is low to manage efficiency, and error rate is also high.It formally in this context, can be from multidimensional there is an urgent need for a kind of technological treatment Angle reflects management requirement of the different user to goods and materials, and is dynamically realized by way of systematization, reduces artificial Governing factor to solve the whole efficiency of operation of supply chain, improves the quantity of operation of supply chain.Existing technical solution is all Essential attribute based on goods and materials first classifies to the classification of material, and the coding rule of material is embodied according to classifying rules.Object The level and structure for expecting inventory are all static, single structures, are applying to purchase, are purchasing, packing delivery, check and accepting storing, are receiving outbound Links be all a kind of form, for complicated handling of goods and materials, easily lead to circulation in kind and the stream of document information stream Turn disconnection, system information and the disconnection of practical business operation flow, financial management and service management to take off, and efficiency is low, error rate It is high.
Invention content
For deficiency of the prior art, the present invention provides one kind based on communications industry supply chain COM code method, will Classes of supplies is organically combined with service link, is dynamically generated bill of materials and is being applied to purchase, purchasing, receiving to meet supply chain The requirement of storage, the neck material different user of links such as outbound is general, efficiently and convenient for safeguarding.
According to designing scheme provided by the present invention, one kind is based on communications industry supply chain COM code method, comprising such as Lower content:
A N number of segmentation attribute-bit), is carried out according to material attribute classification, attribute section combination is obtained, is combined according to attribute section It is encoded with sequence serial number generation base material, wherein, N is material attribute classification number;
B multi-layer bill of materials template), is generated according to classes of supplies and configuration rule, bill of materials template includes module Information and material information, wherein, classes of supplies includes A classes basic supplies and B classes supply goods and materials;
C), for supply chain intermediate links, according to multistage bill of materials template, it is dynamically generated in the circulation of corresponding service link The bill of materials of application.
Above-mentioned, B) according to classes of supplies generate multi-layer bill of materials template, comprising:User is according to A class bases When money carries out the processing of procurement business link, according to setting buying characteristic value generation bill of materials;User is supplied according to B classes in goods and materials Base material coding needed for the product module and the product module that supplier provides carries out layering setting.
Above-mentioned, B) in module information include:Whether module title, module type and module must match information;Material information Comprising:Material whether based on match, COM code information, name of material, it is proposed that configuration quantity, maximum configured quantity, be configured quantity Whether can change, turn standing breath, catalogue, if it can deduct, tax rate information.
Above-mentioned, B) in configuration rule it is as follows:
A) according to supplier's determining module title, multiple or single materials under same module are selected;
B) from single choice, multiselect and determining module type in three Zhong Xuan races states is fixed;
If c) module type is stationary state, whether module must match information configuration for that must match whether state, material must match Information configuration is must match state, it is proposed that and configuration quantity set is more than 0 numerical value, and whether quantity, which can be changed, is set as to change, Maximum configured quantity is set as suggested quantity, and by whether configuration quantity can be changed is set as that state can not be changed;If module class Type selected as multiselect, then it is selection state that whether module, which must match information configuration, and whether material, which must match, is set as selection state, it is proposed that It is more than or equal to 0 numerical value that quantity set, which is configured, and whether quantity can change the selection state that is set as, and maximum configured quantity is set as building It discusses quantity, and whether configuration quantity can be changed that be set as can be with state;If whether module type selected as single choice, module must It is selection state with information configuration, whether material, which must match, is set as that state need not must be matched and gives tacit consent to and can not change, it is proposed that configuration number Amount is set greater than 0 numerical value, and whether quantity can change the selection state that is set as, and maximum configured quantity is set as suggested quantity, and Whether configuration quantity can be changed that be set as can be with state.
Preferably, the object of corresponding service link circulation application is dynamically generated in step C according to multistage bill of materials template Expect inventory, comprising:Characteristic value is purchased according to setting in A class basic supplies, automatically generates bill of materials, the material automatically generated is clear Single type includes:D1) apply to purchase or order link generation quotation bill of materials, d2) on the basis of bill of materials of offering according to B Class supply goods and materials in supplier provide delivery information generation delivery bill of materials, deliver bill of materials in be provided with case number (CN) coding, Component coding and sequence number, d3) claim outbound link generation receive bill of materials, receive and case number (CN) be provided in bill of materials Coding.
Preferably, the object of corresponding service link circulation application is dynamically generated in step C according to multistage bill of materials template Expect inventory, comprising:E1) applying to purchase or order link, the sale coding established according to both parties, static quotation bill of materials, Shipping list and corollary equipment apply to purchase list, change bill of materials template quotation bill of materials is configured;E2) in quotation bill of materials On the basis of according to supplier provide delivery information generation delivery bill of materials, deliver bill of materials in be provided with case number (CN) coding, portion Part encodes and sequence number, e3) bill of materials is received in application outbound link generation, it receives and case number (CN) volume is provided in bill of materials Code.
Beneficial effects of the present invention:
The present invention is by the COM code of single static and bill of material management pattern and the specific business scenario of supply chain and ring Section is combined, and the multi-layer of dynamic generation facing multiple users requirement, multiduty bill of materials are substantially reduced in cataloged procedure Error rate, and it is clear in structure, realize simple, reduce software programming complexity, improve code efficiency, be adapted to multi-service field Scape, multi-user's requirement, the dynamic material inventory processing of multi-service link, have preferable actual application value.
The present invention is with dynamic bill of materials pattern, and through each service link of supply chain management, bill of materials is not It is confined to static coding specification management again, but one is blended in system process flow, and in links autodifferentiation, But keep corresponding correlation and continuity;Using the user demand towards different supply chain links as foothold, solve well In each service link of supply chain of having determined because treatment effeciency is low, error rate is high caused by information asymmetry the problems such as;The present invention The COM code processing method of dynamic multidimensional can preferably promote supply chains, intelligent processing, promote supply chain operation Whole efficiency.
Description of the drawings:
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is coding rule schematic diagram in embodiment;
One of bill of materials generation schematic diagram in Fig. 3 embodiments;
Fig. 4 is bill of materials generates schematic diagram in embodiment two;
Fig. 5 is method business circuit schematic diagram in embodiment.
Specific embodiment:
Further clear, complete explanation is made to the present invention with technical solution below in conjunction with the accompanying drawings, it is clear that described reality It is only part of the embodiment of the present invention to apply example, instead of all the embodiments.Based on the embodiments of the present invention, this field is general All other embodiment that logical technical staff is obtained without creative efforts belongs to what the present invention protected Range.
To solve existing bill of materials because level and structure are static, single, applying to purchase, purchasing, packing delivery, surveying Library, the links for receiving outbound are all a kind of forms, for complicated handling of goods and materials, easily lead to circulation in kind and document The feelings that the circulation of information flow disconnects, system information disconnects with practical business operation flow, financial management and service management take off etc. Shape, the embodiment of the present invention one is shown in Figure 1, one kind is provided based on communications industry supply chain COM code method, comprising as follows Content:
101st, N number of segmentation attribute-bit is carried out according to material attribute classification, obtains attribute section combination, combined according to attribute section It is encoded with sequence serial number generation base material, wherein, N is material attribute classification number;
102nd, multi-layer bill of materials template is generated according to classes of supplies and configuration rule, bill of materials template includes module Information and material information, wherein, classes of supplies includes A classes basic supplies and B classes supply goods and materials;
103rd, for supply chain intermediate links, according to multistage bill of materials template, it is dynamically generated in corresponding service link stream Turn the bill of materials of application.
The COM code of single static and bill of material management pattern are carried out with the specific business scenario of supply chain and link With reference to the multi-layer of dynamic generation facing multiple users requirement, multiduty bill of materials substantially reduce the mistake in cataloged procedure Rate, and clear in structure, realization is simply.
Embodiment two, one kind include following content based on communications industry supply chain COM code method:
One) N number of segmentation attribute-bit is carried out according to material attribute classification, obtains attribute section combination, combined according to attribute section It is encoded with sequence serial number generation base material, wherein, N is material attribute classification number.
According to the attribute classification of material, segmentation is identified basic coding, categorical attribute section can according to service conditions into Row is freely expanded, and attribute section combination and sequence serial number collectively constitute basic coding, coding rule is as shown in Figure 2.
Two) multi-layer bill of materials template is generated according to classes of supplies and configuration rule, bill of materials template includes module Information and material information, wherein, classes of supplies includes A classes basic supplies and B classes supply goods and materials.
When user carries out the processing of procurement business link according to A classes basic supplies, according to setting buying characteristic value generation material Inventory;User supplies the base material coding needed for supplier provides in goods and materials product module and the product module according to B classes Carry out layering setting.
Module information includes:Whether module title, module type and module must match information;Material information includes:Material is Match based on no, COM code information, name of material, it is proposed that whether configuration quantity, maximum configured quantity, configuration quantity can be changed, Turn standing breath, catalogue, if it can deduct, tax rate information.
Configuration rule is as follows:
A) according to supplier's determining module title, multiple or single materials under same module are selected;
B) from single choice, multiselect and determining module type in three Zhong Xuan races states is fixed;
If c) module type is stationary state, whether module must match information configuration for that must match whether state, material must match Information configuration is must match state, it is proposed that and configuration quantity set is more than 0 numerical value, and whether quantity, which can be changed, is set as to change, Maximum configured quantity is set as suggested quantity, and by whether configuration quantity can be changed is set as that state can not be changed;If module class Type selected as multiselect, then it is selection state that whether module, which must match information configuration, and whether material, which must match, is set as selection state, it is proposed that It is more than or equal to 0 numerical value that quantity set, which is configured, and whether quantity can change the selection state that is set as, and maximum configured quantity is set as building It discusses quantity, and whether configuration quantity can be changed that be set as can be with state;If whether module type selected as single choice, module must It is selection state with information configuration, whether material, which must match, is set as that state need not must be matched and gives tacit consent to and can not change, it is proposed that configuration number Amount is set greater than 0 numerical value, and whether quantity can change the selection state that is set as, and maximum configured quantity is set as suggested quantity, and Whether configuration quantity can be changed that be set as can be with state.
Three) for supply chain intermediate links, according to multistage bill of materials template, it is dynamically generated in the circulation of corresponding service link The bill of materials of application.
The bill of materials of corresponding service link circulation application is dynamically generated according to multistage bill of materials template, comprising:A classes Characteristic value is purchased according to setting in basic supplies, automatically generates bill of materials, the bill of materials type automatically generated includes:d1) In the quotation bill of materials applied to purchase or order link generates, d2) it is supplied on the basis of bill of materials of offering according in B classes supply goods and materials Quotient is answered to provide delivery information generation delivery bill of materials, case number (CN) coding, component coding and sequence are provided in bill of materials of delivering Number, d3) claim outbound link generation receive bill of materials, receive be provided in bill of materials case number (CN) coding.
The bill of materials of corresponding service link circulation application is dynamically generated according to multistage bill of materials template, it also can basis The bill of materials template defined by changing template configuration, automatically generates bill of materials, and follow-up supply chain link according to The bill of materials automatically generated is developed, and automatically generates the bill of materials of corresponding supply chain link, comprising:E1) applying to purchase or Order link, the sale coding established according to both parties, static quotation bill of materials, shipping list and corollary equipment are applied to purchase It is single, bill of materials template is changed quotation bill of materials is configured;E2 it) is provided and sent according to supplier on the basis of bill of materials of offering Goods information generates delivery bill of materials, and case number (CN) coding, component coding and sequence number are provided in bill of materials of delivering;E3) in Shen Bill of materials is received in neck outbound link generation, receives and case number (CN) coding is provided in bill of materials.
According to classes of supplies in the present invention, multi-layer bill of materials template, the generation of multi-layer bill of materials template are generated Mode includes two kinds:A) when user is handled according to base material, progress procurement request or purchase order, according on purchase order Characteristic value, automatically generate bill of materials.Characteristic value can be by user's self-defining, but is derived from purchase order, such as (base Site type number, supplier information etc.).B) it is clear that material is voluntarily configured in user provides according to supplier product module, component, part Single mode plate when defining bill of materials, is layered according to the base material coding needed for the module of supplier's offer product, module Setting.Wherein determinant attribute includes:1) bill of materials includes:Module information and material information;2) module information includes:Module name Whether title, module type, module must match;Wherein module title is to be manually entered, and module type is single choice, multiselect, fixes three kinds Type;3) material information includes:Whether lead match, COM code, name of material, proposed arrangement quantity, maximum configured quantity, quantity Whether can change, turn money, catalogue, whether can deduct, the tax rate.Relevant configuration rule is as follows:According to supplier's add module, choosing Multiple or single materials under same module are selected, a raw module after determining;Module type is:Fixation, single choice, multiselect; If module type selection is fixed, whether module must match value for "Yes", and whether material must match value for "Yes", it is proposed that configuration quantity must Must be more than 0, quantity whether can revaluate be "No", maximum configured quantity is defaulted as suggested quantity, it is impossible to change;If module type selects Multiselect, then it is " please select " that whether module, which must match value, must be filled out, and it is " please select " that whether material, which must match value, must be filled out, it is proposed that configuration number Amount is had to be larger than equal to 0, if whether material must be yes with value, proposed arrangement quantity has to be larger than 0, quantity whether can revaluate be " please select ", must fill out, and maximum configured quantity is defaulted as suggested quantity, can change, maximum quantity is had to be larger than equal to suggested quantity; If module type selects single choice, it is " please select " that whether module, which must match value, must be filled out, and whether module must match value for "No", acquiescence, And can not change, it is proposed that configuration quantity has to be larger than 0, quantity whether can revaluate be " please select ", must fill out, maximum configured quantity is write from memory Think suggested quantity, can change, maximum quantity is had to be larger than equal to suggested quantity.
Towards supply chain intermediate links in the present invention, according to bill of materials template, dynamic generation bill of materials, and in difference Service link carry out circulation application.Bill of materials is divided into two kinds of situations in the dynamic generation of different links and use:
The first situation) it does not need to define bill of materials template, according to the attributive character value of purchase order, automatically generate object Expect inventory, and developed in follow-up supply chain link according to the bill of materials automatically generated, automatically generate corresponding supply chain link The bill of materials of section.The bill of materials type automatically generated includes three kinds, as shown in Figure 3:
1) quotation bill of materials:Applying to purchase or order link, automatically generated according to order characteristic value;
2) supplier's delivery bill of materials:On the basis of bill of materials of offering, according to the delivery receipt of supplier's offer, certainly It is dynamic to deduce, delivery bill of materials is automatically generated, the bill of materials more case number (CN) coding and plate codings and sequence number in level;
3) bill of materials is received:The environment of outbound is claimed in user, automatically generates and receives bill of materials, receive bill of materials Bill of materials is sent out than supplier, has lacked plate sequence number layer.
Second case) according to defining bill of materials template, by changing template configuration, bill of materials is automatically generated, And developed in follow-up supply chain link according to the bill of materials automatically generated, automatically generate the material of corresponding supply chain link Inventory, as shown in figure 4, in different business processing steps, similary there are three types of different material inventory correspondences:
1) quotation bill of materials:Applying to purchase or order link, automatically generated by changing list of templates;
2) supplier's delivery bill of materials:On the basis of bill of materials of offering, according to the delivery receipt of supplier's offer, certainly It is dynamic to deduce, delivery bill of materials is automatically generated, the bill of materials more case number (CN) coding and component coding and sequence numbers in level;
3) bill of materials is received:The environment of outbound is claimed in user, automatically generates and receives bill of materials, receive bill of materials Bill of materials is sent out than supplier, has lacked sequence number layer.
Whole system business circuit schematic diagram determines base material as shown in figure 5, by determining supplier and buying catalogue Coding, according to configuration rule, definition module type and relevant information, for example whether must match, whether proposed arrangement quantity, quantity may be used The data such as change, with postponing the corresponding nested structure of generation, dynamic generation bill of materials, outbound after being put in storage according to inventory scanning;In dynamic After generating bill of materials, nested structure title is returned to, convenient for being carried out in follow-up supply chain link according to the bill of materials automatically generated It develops, automatically generates the bill of materials of corresponding supply chain link.
It should be understood by those skilled in the art that, the embodiment of the present invention can be provided as method, system or computer program Product.Therefore, the embodiment in terms of complete hardware embodiment, complete software embodiment or combination software and hardware can be used in the present invention Form.It can be used moreover, the present invention can be used in one or more computers for wherein including computer usable program code The computer program product that storage medium is implemented on (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Form.
The present invention be with reference to according to the method for the embodiment of the present invention, the flow of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that it can be realized by computer program instructions every first-class in flowchart and/or the block diagram The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided The processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that the instruction performed by computer or the processor of other programmable data processing devices is generated for real The device of function specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction generation being stored in the computer-readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted Series of operation steps are performed on calculation machine or other programmable devices to generate computer implemented processing, so as in computer or The instruction offer performed on other programmable devices is used to implement in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
The foregoing description of the disclosed embodiments enables professional and technical personnel in the field to realize or using the application. A variety of modifications of these embodiments will be apparent for those skilled in the art, it is as defined herein General Principle can in other embodiments be realized in the case where not departing from spirit herein or range.Therefore, the application The embodiments shown herein is not intended to be limited to, and is to fit to and the principles and novel features disclosed herein phase one The most wide range caused.

Claims (6)

1. one kind is based on communications industry supply chain COM code method, which is characterized in that includes following content:
A N number of segmentation attribute-bit), is carried out according to material attribute classification, attribute section combination is obtained, is combined according to attribute section and suitable Sequence serial number generation base material coding, wherein, N is material attribute classification number;
B multi-layer bill of materials template), is generated according to classes of supplies and configuration rule, bill of materials template includes module information And material information, wherein, classes of supplies includes A classes basic supplies and B classes supply goods and materials;
C), for supply chain intermediate links, according to multistage bill of materials template, it is dynamically generated in the circulation application of corresponding service link Bill of materials.
2. it is according to claim 1 be based on communications industry supply chain COM code method, which is characterized in that B) according to object Category generation multi-layer bill of materials template is provided, comprising:When user carries out the processing of procurement business link according to A classes basic supplies, According to setting buying characteristic value generation bill of materials;User supplies the product module and be somebody's turn to do that supplier provides in goods and materials according to B classes Base material coding needed for product module carries out layering setting.
3. it is according to claim 1 be based on communications industry supply chain COM code method, which is characterized in that B) in module believe Breath includes:Whether module title, module type and module must match information;Material information includes:Material whether based on match, material Coding information, name of material, it is proposed that whether configuration quantity, maximum configured quantity, configuration quantity can be changed, and turn standing breath, product Catalogue, if it can deduct, tax rate information.
4. it is according to claim 3 be based on communications industry supply chain COM code method, which is characterized in that B) in configuration rule It is then as follows:
A) according to supplier's determining module title, multiple or single materials under same module are selected;
B) from single choice, multiselect and determining module type in three Zhong Xuan races states is fixed;
If c) module type is stationary state, whether module must match information configuration for that must match whether state, material must match information It is configured to that state must be matched, it is proposed that configuration quantity set is more than 0 numerical value, and whether quantity, which can be changed, is set as to change, maximum Configuration quantity is set as suggested quantity, and by whether configuration quantity can be changed is set as that state can not be changed;If module type selects Multiselect is selected as, then it is selection state that whether module, which must match information configuration, and whether material, which must match, is set as selection state, it is proposed that configuration Quantity set is more than or equal to 0 numerical value, and whether quantity can change the selection state that is set as, and maximum configured quantity is set as suggestion number Amount, and whether configuration quantity can be changed that be set as can be with state;If module type selected as single choice, whether module must match letter Breath is configured to selection state, and whether material, which must match, is set as that state need not must be matched and gives tacit consent to and can not change, it is proposed that configuration quantity is set It is set to more than 0 numerical value, whether quantity can change the selection state that is set as, and maximum configured quantity is set as suggested quantity, and will match Whether put quantity can change that be set as can be with state.
5. according to claim 1 be based on communications industry supply chain COM code method, which is characterized in that root in step C The bill of materials of corresponding service link circulation application is dynamically generated according to multistage bill of materials template, comprising:In A class basic supplies Characteristic value is purchased according to setting, automatically generates bill of materials, the bill of materials type automatically generated includes:D1) applying to purchase or ordering The quotation bill of materials of monocyclic section generation, d2) it is provided and sent according to supplier in B classes supply goods and materials on the basis of bill of materials of offering Goods information generates delivery bill of materials, and case number (CN) coding, component coding and sequence number, d3 are provided in bill of materials of delivering) in Shen Bill of materials is received in neck outbound link generation, receives and case number (CN) coding is provided in bill of materials.
6. according to claim 5 be based on communications industry supply chain COM code method, which is characterized in that root in step C The bill of materials of corresponding service link circulation application is dynamically generated according to multistage bill of materials template, comprising:E1) applying to purchase or ordering Monocyclic section, the sale coding established according to both parties, static quotation bill of materials, shipping list and corollary equipment apply to purchase list, Bill of materials template is changed quotation bill of materials is configured;E2) delivery is provided according to supplier on the basis of bill of materials of offering Information generates delivery bill of materials, and case number (CN) coding, component coding and sequence number are provided in bill of materials of delivering;E3 it) is claiming Bill of materials is received in the generation of outbound link, receives and case number (CN) coding is provided in bill of materials.
CN201711184944.9A 2017-11-23 2017-11-23 Supply chain material coding method based on communication industry Active CN108182557B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711184944.9A CN108182557B (en) 2017-11-23 2017-11-23 Supply chain material coding method based on communication industry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711184944.9A CN108182557B (en) 2017-11-23 2017-11-23 Supply chain material coding method based on communication industry

Publications (2)

Publication Number Publication Date
CN108182557A true CN108182557A (en) 2018-06-19
CN108182557B CN108182557B (en) 2021-12-10

Family

ID=62545203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711184944.9A Active CN108182557B (en) 2017-11-23 2017-11-23 Supply chain material coding method based on communication industry

Country Status (1)

Country Link
CN (1) CN108182557B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109118161A (en) * 2018-07-03 2019-01-01 武汉鼎筑腾技术有限公司 A kind of construction supply chain SAAS management method and system
CN109376976A (en) * 2018-08-15 2019-02-22 国家电网有限公司 Material information management method and terminal device
CN109740989A (en) * 2019-01-02 2019-05-10 京东方科技集团股份有限公司 A kind of method and system that material is assigned, computer equipment readable storage medium storing program for executing
CN110910192A (en) * 2019-09-25 2020-03-24 中国移动通信集团河南有限公司 Investment design and purchase cooperative processing method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080120198A1 (en) * 2001-01-08 2008-05-22 International Business Machines Corporation Storage medium for facilitating parts procurement and production planning across an extended supply chain
CN101241588A (en) * 2008-03-05 2008-08-13 浪潮集团山东通用软件有限公司 Technology and business combined inventory management system multidimensional material management method
CN101673373A (en) * 2009-09-16 2010-03-17 金蝶软件(中国)有限公司 Method and device for generating production order material-preparing journal entry
CN102142111A (en) * 2010-02-03 2011-08-03 上海市电力公司 Asset life information integrated control method and device suitable for power system
CN102201089A (en) * 2011-06-10 2011-09-28 张宪 Method for encoding and managing materials
US20130159146A1 (en) * 2008-02-28 2013-06-20 Sap Ag Managing consistent interfaces for business objects across heterogeneous systems
US20140244019A1 (en) * 2013-02-22 2014-08-28 Sap Ag System and Method for Bill-of-Materials Low-Level Code Harmonization
CN104657837A (en) * 2015-02-13 2015-05-27 国家电网公司 Team and group integrated operation management system based on storage ERP (enterprise resource planning)
CN105701645A (en) * 2016-01-05 2016-06-22 广州市天剑计算机系统工程有限公司 Material management method and device
CN105719119A (en) * 2016-01-22 2016-06-29 浪潮电子信息产业股份有限公司 Method for quickly creating and maintaining BOM module based on ERP system
CN106570668A (en) * 2016-11-02 2017-04-19 深圳效率科技有限公司 Bill-of-materials (BOM) information organizing method and BOM information organizing device
CN106651120A (en) * 2016-11-07 2017-05-10 成都科曦科技有限公司 Smart hotel material supply chain management and control system
CN107122947A (en) * 2017-05-04 2017-09-01 四川省红地科技有限责任公司 A kind of method of materiel code generation and management based on material catalogue

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080120198A1 (en) * 2001-01-08 2008-05-22 International Business Machines Corporation Storage medium for facilitating parts procurement and production planning across an extended supply chain
US20130159146A1 (en) * 2008-02-28 2013-06-20 Sap Ag Managing consistent interfaces for business objects across heterogeneous systems
CN101241588A (en) * 2008-03-05 2008-08-13 浪潮集团山东通用软件有限公司 Technology and business combined inventory management system multidimensional material management method
CN101673373A (en) * 2009-09-16 2010-03-17 金蝶软件(中国)有限公司 Method and device for generating production order material-preparing journal entry
CN102142111A (en) * 2010-02-03 2011-08-03 上海市电力公司 Asset life information integrated control method and device suitable for power system
CN102201089A (en) * 2011-06-10 2011-09-28 张宪 Method for encoding and managing materials
US20140244019A1 (en) * 2013-02-22 2014-08-28 Sap Ag System and Method for Bill-of-Materials Low-Level Code Harmonization
CN104657837A (en) * 2015-02-13 2015-05-27 国家电网公司 Team and group integrated operation management system based on storage ERP (enterprise resource planning)
CN105701645A (en) * 2016-01-05 2016-06-22 广州市天剑计算机系统工程有限公司 Material management method and device
CN105719119A (en) * 2016-01-22 2016-06-29 浪潮电子信息产业股份有限公司 Method for quickly creating and maintaining BOM module based on ERP system
CN106570668A (en) * 2016-11-02 2017-04-19 深圳效率科技有限公司 Bill-of-materials (BOM) information organizing method and BOM information organizing device
CN106651120A (en) * 2016-11-07 2017-05-10 成都科曦科技有限公司 Smart hotel material supply chain management and control system
CN107122947A (en) * 2017-05-04 2017-09-01 四川省红地科技有限责任公司 A kind of method of materiel code generation and management based on material catalogue

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
曹玉莲: "基于物联网的生产过程物料追踪系统规划研究", 《中国优秀硕士学位论文全文数据库经济与管理科学辑》 *
武志婷: "工程项目中物资可追溯流程建模与仿真", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
龚巍: "基于需求特性分类的电力物资库存控制与需求预测方法研究", 《中国优秀硕士学位论文全文数据库信息科技辑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109118161A (en) * 2018-07-03 2019-01-01 武汉鼎筑腾技术有限公司 A kind of construction supply chain SAAS management method and system
CN109118161B (en) * 2018-07-03 2022-05-20 武汉筑链科技有限公司 SAAS management method and system for supply chain in construction industry
CN109376976A (en) * 2018-08-15 2019-02-22 国家电网有限公司 Material information management method and terminal device
CN109740989A (en) * 2019-01-02 2019-05-10 京东方科技集团股份有限公司 A kind of method and system that material is assigned, computer equipment readable storage medium storing program for executing
CN109740989B (en) * 2019-01-02 2021-08-20 京东方科技集团股份有限公司 Material assignment method and system, and computer device readable storage medium
CN110910192A (en) * 2019-09-25 2020-03-24 中国移动通信集团河南有限公司 Investment design and purchase cooperative processing method

Also Published As

Publication number Publication date
CN108182557B (en) 2021-12-10

Similar Documents

Publication Publication Date Title
CN108182557A (en) Based on communications industry supply chain COM code method
Sheth et al. Blockchain and contract theory: modeling smart contracts using insurance markets
Consigli et al. Dynamic stochastic programmingfor asset-liability management
US7962372B2 (en) Product common object
Hariga et al. Storage constrained vendor managed inventory models with unequal shipment frequencies
CN107025559A (en) A kind of method for processing business and device
Elçi et al. Chance-constrained stochastic programming under variable reliability levels with an application to humanitarian relief network design
Avci et al. A Multi-objective, simulation-based optimization framework for supply chains with premium freights
US20200294038A1 (en) System and method for executing transactions on blockchain networks
CN106296243A (en) Service implementation method and device
CN107844588A (en) A kind of processing method of data dictionary, device, storage medium and processor
CN102216925A (en) Associating an entity with a category
US20070203854A1 (en) Electronic contracting
US20230298042A1 (en) System and method for carbon objects, carbon object databases and carbon platform application programming interface
CN107085605A (en) Method, device and the electronic equipment packed for data
CN107526817A (en) A kind of business personnel intellectual coded generation method, equipment and storage medium
CN111126929A (en) Intelligent contracting device and method
CN107980147B (en) Tracking data flows in a distributed computing system
CN116308826A (en) Insurance product online method, apparatus, equipment and storage medium
US20160180034A1 (en) Claim reimbursement valuation and remittance validation
CN110533524A (en) Lost contact restorative procedure and system based on business connection map
CN102323956A (en) Data management device and method
CN106920052A (en) Inventory type information processing method and processing device
CN116362800A (en) System for accelerating consumption feedback wetting
Jiang et al. Vendor managed inventory integration on pharmaceutical third-party logistics

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant