CN108180025A - A kind of circular cross section tunnel lining construction method three times - Google Patents

A kind of circular cross section tunnel lining construction method three times Download PDF

Info

Publication number
CN108180025A
CN108180025A CN201810093537.5A CN201810093537A CN108180025A CN 108180025 A CN108180025 A CN 108180025A CN 201810093537 A CN201810093537 A CN 201810093537A CN 108180025 A CN108180025 A CN 108180025A
Authority
CN
China
Prior art keywords
tunnel
lining
concrete
section
circular cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810093537.5A
Other languages
Chinese (zh)
Inventor
李世才
陈德国
田作华
王振田
朱斌
张喜刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 21st Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Original Assignee
China Railway 21st Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 21st Bureau Group Co Ltd, Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd filed Critical China Railway 21st Bureau Group Co Ltd
Priority to CN201810093537.5A priority Critical patent/CN108180025A/en
Publication of CN108180025A publication Critical patent/CN108180025A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of circular cross section tunnel lining construction method three times, includes the following steps:S1, tunnel advanced support;S2, Tunnel;S3, Tunnel Second Lining;S4, tunnel water proofing construction;The lining cutting three times of S5, tunnel;The present invention has many advantages, such as to remove temporary supporting system, construction environment safety, process in time and interferes that small, speed of application is fast, can promote the use of constructing tunnel field.

Description

A kind of circular cross section tunnel lining construction method three times
Technical field
The invention belongs to technical field of tunnel construction, and in particular to a kind of circular cross section tunnel lining construction side three times Method.
Background technology
In the construction of city underground shallow-depth-excavation tunnel, liner structure is generally using secondary liner structure, i.e. once lining (preliminary bracing structure)+secondary lining (reinforced concrete lining layer), and waterproof layer is set among once lining and secondary lining. But in tunnel excavation support, due to hydrogeologic condition limitation (level of ground water height, geology country rock difference etc.) or construction ring Border condition element influences (buried depth is shallow, above ground structure is intensive etc.), to ensure tunnel excavation safety, generally using temporary support System in CD or CRD methods, adds interim median septum or interim inverted arch.
In Tunnel Second Lining structure construction, general using bottom inverted arch of first constructing, re-segmenting removes temporary support System, segmentation installation waterproof layer, the secondary armored concrete liner structure of construction.Particularly in circular cross section tunnel, inverted arch filling Layer structure is very thin, only can not remove temporary supporting system safely after the completion of inverted arch construction.
Therefore when the circular tunnel section for being provided with temporary supporting system carries out Tunnel Second Lining structure construction, generally It is that construction period is very long, speed is slower, and process interference is big, and effect is low.
Invention content
The technical problems to be solved by the invention are to overcome above-mentioned the deficiencies in the prior art, and providing one kind can remove in time Temporary supporting system, construction environment safety, process interfere the circular cross section tunnel small, speed of application is fast lining construction side three times Method.
Above-mentioned technical problem is solved the technical solution adopted is that including the following steps:S1, tunnel advanced support;S2, tunnel Preliminary bracing;S3, Tunnel Second Lining;S4, tunnel water proofing construction;The lining cutting three times of S5, tunnel;
The tunnel advanced support of the present invention is included in the Shed-pipe Advanced Support that tunnel cross-section outer rim squeezes into a diameter of 146mm, tunnel The advanced self-feeding anchor pile of a diameter of 32mm and slip casting are squeezed on the inside of section Shed-pipe Advanced Support.
The Tunnel of the present invention includes the loopful in tunnel circular cross section and sets steel arch-shelf, the setting of steel arch-shelf both sides There is lock foot anchoring stock, be laid with bar-mat reinforcement, spray C25 early strength concrete tunneling boring supportings, micro-expanding agent is added in the concrete, The interim mid-board being connected with Tunnel and interim inverted arch are set in tunnel cross-section.
The interim mid-board and interim inverted arch of the present invention using profile steel frame, overlays bar-mat reinforcement and sprays C25 concrete Form temporary support node concrete.
The Tunnel Second Lining of the present invention is included in after the completion of Tunnel, cuts part temporary support concrete, Thickness is cut to be adapted, and retain bracing members with thickness needed for Second Lining Construction, segmentation installation secondary lining reinforcing bar, template, Stent, casting concrete.
The tunnel water proofing construction of the present invention is included in after completion secondary lining, and form removal cuts whole temporary supports Concrete, cuts off interim profile steel frame, repairing leveling secondary lining concrete surface, and installation overlays waterproof roll.
The lining cutting three times of the present invention includes the lining cutting of construction inverted arch, arch wall lining cutting, inverted arch fill concrete, inverted arch lining Block is included in section bottom and overlays waterproof roll, surface installation lining cutting reinforcing bar three times, erects template, casting concrete, in abutment wall Setting steel plate water stopper in the middle part of the construction joint of lining cutting longitudinal direction;The inverted arch fill concrete is included in inverted arch bottom, and to pour filling mixed Solidifying soil;The arch wall lining cutting is included along waterproof roll surface setting tunnel arch wall lining cutting reinforcing bar three times is overlay, using monoblock type Lining trolley construction lining concrete three times.
The present invention has the following advantages relative to the prior art:
1st, tunnel cross-section is small, constructs smaller to the disturbance on stratum.
2nd, bored tunnel is mostly using horseshoe type, oblate type, and circular cross section stress is evenly.
3rd, it is designed relative to two layers of liner structure, three layers of liner structure design can be complete in second layer reinforced concrete lining layer Cheng Houke, which shifts to an earlier date, all removes temporary support, and speed of application is relatively faster.
The 4th, waterproof layer is set between second layer lining cutting and third layer lining cutting, waterproof layer laying basal plane is more smooth, more sharp In the construction quality of control waterproof layer, ensure the construction quality of entire circular cross section.
Description of the drawings
Fig. 1 is the full face liner structure schematic diagram of the present invention.
Fig. 2 is longitudinal liner structure schematic diagram of the invention.
Fig. 3 is once lining structure diagram of the present invention.
Fig. 4 is secondary liner structure schematic diagram of the present invention.
Fig. 5,6 are present invention lining cutting and waterproof construction structure schematic diagrames three times.
In figure:1st, Shed-pipe Advanced Support;2nd, advanced self-feeding anchor pile;3rd, Tunnel;4th, secondary lining;5th, waterproof is overlay Coiled material;6th, lining cutting three times;7th, lock foot anchoring stock;8th, interim mid-board;9th, interim inverted arch;10th, temporary support node concrete;11、 Inverted arch lining cutting;12nd, arch wall lining cutting;13rd, steel plate water stopper;14th, inverted arch fill concrete.
Specific embodiment
The present invention is described in further details with reference to the accompanying drawings and examples, but the present invention is not restricted to these implement Example.
Embodiment 1
In Fig. 1,2,3,4,5,6, a kind of circular cross section tunnel of present invention lining construction method three times, including following step Suddenly:
S1, tunnel advanced support;The tunnel advanced support is included in tunnel cross-section outer rim and squeezes into a diameter of 146mm's Advanced self-feeding anchor pile 2 and the slip casting of a diameter of 32mm is squeezed into Shed-pipe Advanced Support 1,1 inside of tunnel cross-section Shed-pipe Advanced Support.
S2, Tunnel;The Tunnel 3 includes the loopful in tunnel circular cross section and sets steel arch Frame, steel arch-shelf both sides are provided with lock foot anchoring stock 7, are laid with bar-mat reinforcement, spray C25 early strength concrete tunneling boring supportings, and described is mixed Micro-expanding agent is added in solidifying soil, the interim mid-board 8 being connected with Tunnel 3 is set in tunnel cross-section and is faced upward temporarily Arch 9, interim mid-board 8 and interim inverted arch 9 using profile steel frame, overlay bar-mat reinforcement and spray C25 concrete.
S3, Tunnel Second Lining;The Tunnel Second Lining is included in after the completion of Tunnel 3, carries out part Temporary support node concrete 10 is cut, cut thickness and secondary lining 4 construct needed for thickness be adapted, thickness needs to meet " two Secondary lining design thickness+template thickness+stupefied thickness of branch sortie ", and a little surplus capacities are reserved, it is easily installed support and adjusts;In interim Partition wall is about 8 and interim 9 two side ends of inverted arch retain type steel support so that the interim type steel support in part and 4 concrete of secondary lining It pours and is integrated, cut reinforcing bar, template, the stent of segmentation installation secondary lining 4 after temporary support node concrete 10, pour mixed Solidifying soil.
S4, tunnel waterproofing layer construction;The tunnel water proofing construction is included in after completion secondary lining 4, form removal, All interim mid-board 8 and interim inverted arch 9 are cut, and cuts off the support of the profile steel frame in gib, repairing flattens secondary lining 4 concrete surfaces are built, installation overlays waterproof roll 5.
The lining cutting three times of S5, tunnel;The lining cutting three times includes construction inverted arch lining cutting 11, arch wall lining cutting 12, inverted arch filling Concrete 14, the inverted arch lining cutting 11 are included in section bottom and overlay waterproof roll 5, cross-sectional face installation inverted arch lining cutting three times Reinforcing bar erects end head formwork and arc formwork, pours inverted arch concrete lining, and steel is set in the middle part of the construction joint of side wall lining longitudinal direction Plate waterstop 13 pours inverted arch fill concrete 14 in bottom;The arch wall lining cutting 12 includes edge and overlays 5 surface of waterproof roll Tunnel arch wall lining cutting reinforcing bar three times is set, using integral type lining platform building cart construction lining concrete three times;The lining cutting three times Concrete uses the impervious armored concrete of C30, and inverted arch filling uses one using C20 normal concretes, inverted arch fill concrete 14 Secondary property pouring molding.

Claims (7)

1. a kind of circular cross section tunnel lining construction method three times, it is characterised in that include the following steps:
S1, tunnel advanced support;
S2, Tunnel;
S3, Tunnel Second Lining;
S4, tunnel water proofing construction;
The lining cutting three times of S5, tunnel.
2. a kind of circular cross section tunnel according to claim 1 lining construction method three times, it is characterised in that:The tunnel Road advance support is included in the Shed-pipe Advanced Support that tunnel cross-section outer rim squeezes into a diameter of 146mm, is beaten on the inside of tunnel cross-section Shed-pipe Advanced Support Enter the advanced self-feeding anchor pile of a diameter of 32mm and slip casting.
3. a kind of circular cross section tunnel according to claim 1 lining construction method three times, it is characterised in that:The tunnel Road preliminary bracing includes the loopful in tunnel circular cross section and sets steel arch-shelf, and steel arch-shelf both sides are provided with lock foot anchoring stock, are laid with steel Muscle net sprays C25 early strength concrete tunneling boring supportings, adds micro-expanding agent in the concrete, set in tunnel cross-section The interim mid-board and interim inverted arch being connected with Tunnel.
4. a kind of circular cross section tunnel according to claim 3 lining construction method three times, it is characterised in that:Described faces When mid-board and interim inverted arch using profile steel frame, overlay bar-mat reinforcement and spray C25 concrete and form temporary support node and mix Solidifying soil.
5. a kind of circular cross section tunnel according to claim 4 lining construction method three times, it is characterised in that:The tunnel Road secondary lining is included in after the completion of Tunnel, cuts part temporary support concrete, cuts thickness and secondary lining Thickness is adapted needed for construction, and retains bracing members, segmentation installation secondary lining reinforcing bar, template, stent, casting concrete.
6. a kind of circular cross section tunnel according to claim 1 lining construction method three times, it is characterised in that:The tunnel Road waterproof construction is included in after completion secondary lining, and form removal cuts whole temporary support concrete, cuts off interim shaped steel Steelframe, repairing leveling secondary lining concrete surface, installation overlay waterproof roll.
7. a kind of circular cross section tunnel according to claim 1 lining construction method three times, it is characterised in that:Described three Secondary lining cutting includes the lining cutting of construction inverted arch, arch wall lining cutting, inverted arch fill concrete, and it is pre- that the inverted arch lining cutting is included in section bottom Waterproof roll, surface installation lining cutting reinforcing bar three times are spread, erects template, casting concrete, in the middle part of the construction joint of side wall lining longitudinal direction Steel plate water stopper is set;The inverted arch fill concrete is included in inverted arch bottom and pours fill concrete;The arch wall lining Block includes, along waterproof roll surface setting tunnel arch wall lining cutting reinforcing bar three times is overlay, serving as a contrast three times using the construction of integral type lining platform building cart Building concrete.
CN201810093537.5A 2018-01-31 2018-01-31 A kind of circular cross section tunnel lining construction method three times Pending CN108180025A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810093537.5A CN108180025A (en) 2018-01-31 2018-01-31 A kind of circular cross section tunnel lining construction method three times

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810093537.5A CN108180025A (en) 2018-01-31 2018-01-31 A kind of circular cross section tunnel lining construction method three times

Publications (1)

Publication Number Publication Date
CN108180025A true CN108180025A (en) 2018-06-19

Family

ID=62551730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810093537.5A Pending CN108180025A (en) 2018-01-31 2018-01-31 A kind of circular cross section tunnel lining construction method three times

Country Status (1)

Country Link
CN (1) CN108180025A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843346A (en) * 2018-07-18 2018-11-20 中铁十二局集团第二工程有限公司 Lining construction method of the large section shallow-depth-excavation tunnel in water-rich sand layer
CN109505609A (en) * 2018-11-21 2019-03-22 中交第四公路工程局有限公司 Shallow buried covered excavation Urban Underground pipe gallery non-stand construction method and pipe gallery
CN111456757A (en) * 2020-04-30 2020-07-28 中铁隧道集团二处有限公司 Construction method for preventing large-section tunnel lining reinforcing steel bars from collapsing
CN111608727A (en) * 2020-06-08 2020-09-01 哈尔滨工业大学 Cold region mountain tunnel composite drainage system and construction method thereof
CN111828051A (en) * 2020-07-28 2020-10-27 中建七局安装工程有限公司 Construction method of two-lining middle partition wall injection tunnel with support
WO2020253001A1 (en) * 2019-06-19 2020-12-24 中铁十九局集团第六工程有限公司 Two-step fast closed tunnel support structure having inverted arch and construction method therefor
CN112412499A (en) * 2020-11-17 2021-02-26 魏良帅 Construction supporting system for tunnel water burst and construction method
CN112901205A (en) * 2021-03-15 2021-06-04 中铁第六勘察设计院集团有限公司 Soft rock large-span tunnel double-layer superposed lining support removing method and structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08253946A (en) * 1995-03-17 1996-10-01 Fujita Corp Reverse placing method for concrete of underground structure under road
JP2004124603A (en) * 2002-10-04 2004-04-22 Shimizu Corp Manufacturing method for lining segment, method for lining tunnel and method for repairing tunnel lining body
CN104405411A (en) * 2014-12-15 2015-03-11 中铁第四勘察设计院集团有限公司 Oversized variable cross section tunnel supporting structure
CN205063959U (en) * 2015-08-28 2016-03-02 大连海事大学 Tunnel supporting construction suitable for last soft hard ground layer down
CN106014456A (en) * 2016-07-22 2016-10-12 长安大学 Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof
CN106437760A (en) * 2016-07-20 2017-02-22 中铁二院工程集团有限责任公司 Large-section tunnel novel multi-layer lining structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08253946A (en) * 1995-03-17 1996-10-01 Fujita Corp Reverse placing method for concrete of underground structure under road
JP2004124603A (en) * 2002-10-04 2004-04-22 Shimizu Corp Manufacturing method for lining segment, method for lining tunnel and method for repairing tunnel lining body
CN104405411A (en) * 2014-12-15 2015-03-11 中铁第四勘察设计院集团有限公司 Oversized variable cross section tunnel supporting structure
CN205063959U (en) * 2015-08-28 2016-03-02 大连海事大学 Tunnel supporting construction suitable for last soft hard ground layer down
CN106437760A (en) * 2016-07-20 2017-02-22 中铁二院工程集团有限责任公司 Large-section tunnel novel multi-layer lining structure
CN106014456A (en) * 2016-07-22 2016-10-12 长安大学 Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843346A (en) * 2018-07-18 2018-11-20 中铁十二局集团第二工程有限公司 Lining construction method of the large section shallow-depth-excavation tunnel in water-rich sand layer
CN109505609A (en) * 2018-11-21 2019-03-22 中交第四公路工程局有限公司 Shallow buried covered excavation Urban Underground pipe gallery non-stand construction method and pipe gallery
CN109505609B (en) * 2018-11-21 2023-11-14 中交建筑集团有限公司 Bracket-free construction method for underground comprehensive pipe rack of shallow-buried underground excavation city and comprehensive pipe rack
WO2020253001A1 (en) * 2019-06-19 2020-12-24 中铁十九局集团第六工程有限公司 Two-step fast closed tunnel support structure having inverted arch and construction method therefor
JP2022500579A (en) * 2019-06-19 2022-01-04 中鉄十九局集団第六工程有限公司China Railway 19Th Bureau Group Sixth Engineering Co., Ltd. Support structure of two-stage high-speed closed tunnel with reverse arch and its construction method
JP7125550B2 (en) 2019-06-19 2022-08-24 中鉄十九局集団第六工程有限公司 SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH
CN111456757A (en) * 2020-04-30 2020-07-28 中铁隧道集团二处有限公司 Construction method for preventing large-section tunnel lining reinforcing steel bars from collapsing
CN111608727A (en) * 2020-06-08 2020-09-01 哈尔滨工业大学 Cold region mountain tunnel composite drainage system and construction method thereof
CN111828051A (en) * 2020-07-28 2020-10-27 中建七局安装工程有限公司 Construction method of two-lining middle partition wall injection tunnel with support
CN111828051B (en) * 2020-07-28 2022-04-15 中建七局安装工程有限公司 Construction method of two-lining middle partition wall injection tunnel with support
CN112412499A (en) * 2020-11-17 2021-02-26 魏良帅 Construction supporting system for tunnel water burst and construction method
CN112901205A (en) * 2021-03-15 2021-06-04 中铁第六勘察设计院集团有限公司 Soft rock large-span tunnel double-layer superposed lining support removing method and structure

Similar Documents

Publication Publication Date Title
CN108180025A (en) A kind of circular cross section tunnel lining construction method three times
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN111075454B (en) Double-arch tunnel five-hole excavation method
CN101725149B (en) Construction method of long open-cut tunnel
CN104763435B (en) Construction method of shallow-buried excavation type large cross section of tunnel in tail slag filling area
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN110617067B (en) Low-risk construction method for full-section boundary advanced pipe shed of extremely-soft surrounding rock tunnel
CN103670446B (en) Circular diversion tunnel 2/3 circle concrete-liner construction method
CN107939415A (en) Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span
CN109914474A (en) A kind of pipe gallery U-type groove, which is excavated, presses push construction method
CN108412506A (en) Ground fissure region tunnel lining structure based on shield tunnel and its construction method
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN110159294A (en) A kind of high steep landform tunnel immediately adjacent to bridge section spreading open cut tunnel construction method
CN107191206B (en) A kind of six step construction method of Shallow-buried Large-span Tunnel Unit two
CN207033463U (en) Mine shield handing-over tunnel folded type joint design in the middle part of marine site
CN207905825U (en) A kind of circular cross section tunnel lining construction device three times
CN108374663A (en) Mould builds construction twice for a kind of sand gravel geology tunnel
CN208040386U (en) A kind of ground fissure region tunnel lining structure based on shield tunnel
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN108729927B (en) A kind of existing tunnel reorganization and expansion is the mid-board construction method of multiple-arch tunnel
CN101153494A (en) Underground beam-pile frame construction for reinforcing side slope
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN207211188U (en) Outer wall of underground structure HCMW engineering methods overlap wall
CN113027495A (en) Underground excavation large-span station construction method implemented by interval tunnel organization
CN209523759U (en) A kind of super shallow-buried tunnel structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180619

WD01 Invention patent application deemed withdrawn after publication