CN108180007A - Old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method - Google Patents

Old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method Download PDF

Info

Publication number
CN108180007A
CN108180007A CN201711438545.0A CN201711438545A CN108180007A CN 108180007 A CN108180007 A CN 108180007A CN 201711438545 A CN201711438545 A CN 201711438545A CN 108180007 A CN108180007 A CN 108180007A
Authority
CN
China
Prior art keywords
well
stepout
economic
oil
reserves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711438545.0A
Other languages
Chinese (zh)
Other versions
CN108180007B (en
Inventor
肖武
张孝天
张海燕
赵小军
海会荣
王�华
张以根
魏新辉
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co
Exploration and Development Research Institute of Sinopec Shengli Oilfield Co
Original Assignee
China Petroleum and Chemical Corp
Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Exploration and Development Research Institute of Sinopec Henan Oilfield Branch Co filed Critical China Petroleum and Chemical Corp
Priority to CN201711438545.0A priority Critical patent/CN108180007B/en
Publication of CN108180007A publication Critical patent/CN108180007A/en
Application granted granted Critical
Publication of CN108180007B publication Critical patent/CN108180007B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geophysics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The present invention provides a kind of old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method, and the old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method include:Step 1, stepout well Single Well Economic limited recoverable reserves are determined;Step 2, stepout well recovery ratio is determined;Step 3, stepout well single well-controlled economic limit oil in place is determined;Step 4, economic limit stepout well potentiality are calculated;Step 5, economic ultimate recovery is calculated.The old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method overcome contradiction of the conventional method in the application of ultra-high water-containing development late stage, can meet the economic limit stepout well potentiality of ultra-high water cut stage oil reservoir and the needs of economic ultimate recovery calculating.Therefore, can more objective evaluation oil reservoir development potentiality, instruct oil field development production practices.

Description

Old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method
Technical field
The present invention relates to oil-gas field development technical field, especially relate to a kind of old filed economic limit drilling well potentiality and Recovery ratio calculates new method.
Background technology
At present, oil field stepout well potentiality general on mining site are generally surveyed using " well spacing density and recovery ratio relational expression " It calculates.The development block that the relational expression is some simple structures such as Yi Shengtuo, isolated island, oil area is big, permeability is high is sample point Obtained empirical equation is returned, i.e.,
Wherein:
ER- recovery ratio, decimal;
Ke- effective permeability, μm2
μo- oil viscosity, mPas;
N-well spacing density, mouth/km2
This method has preferable directive function for the infilling adjustment of aqueous development period low in oil field, but contains into height After water development period, this method and the gap that development and production are put into practice are increasing.It is mainly reflected in three aspects:First, from formula sheet Body is seen, with the increase of well spacing density, swept volume increase, oil displacement efficiency are constant.And laboratory test and mining site practice prove, Input stepout well infilled well pattern, which reduces injector producer distance, can increase displacement pressure difference between well, and then improve oil displacement efficiency;And with The increasing of well spacing density, the influence to oil displacement efficiency is more and more apparent, this factor is not reflected in former formula.Second is that it passes The calculation formula of system method only relates to reservoir geology, development parameters, does not account for the influence of economic factor, to mining site practical operation Directiveness it is not strong.Third, conventional method results of measuring is with actual development production status, there are contradictions, e.g., part ultra-high water cut stage The well spacing density of oil reservoir has been over maximum excavation depth, but still with development benefit.It can be seen that conventional method can not Ultra-high water cut stage old filed development and production is effectively instructed to put into practice.We have invented a kind of new old filed economic limit drilling wells thus Potentiality and recovery ratio measuring and calculating new method, solve more than technical problem.
Invention content
The object of the present invention is to provide one kind to be dived with the cost-effective stepout well of accurate evaluation ultra-high water cut stage old filed The evaluation method of power and corresponding recovery ratio.
The purpose of the present invention can be achieved by the following technical measures:Old filed economic limit drilling well potentiality and recovery ratio are surveyed New method is calculated, the old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method include:Step 1, stepout well individual well is determined Economic limit recoverable reserves;Step 2, stepout well recovery ratio is determined;Step 3, stepout well single well-controlled economic limit geology is determined Reserves;Step 4, economic limit stepout well potentiality are calculated;Step 5, economic ultimate recovery is calculated.
The purpose of the present invention can be also achieved by the following technical measures:
In step 1, using dynamic cash flow method, Single Well Economic limited recoverable reserves and oil price relationship plate are established, from And determine economic limit recoverable reserves of the stepout well under the conditions of certain oil price, certain drilling well well depth.
In step 2, calculating development block in recent years or oil field stepout well increases recoverable reserves;Utilize virgin charter water-driven With reserves formula, the water drive mining-employed reserves of stepout well reality are calculated;According to the practical water drive reserves development degree meter of unit or oil field Calculate the corresponding oil in place of stepout well;According to the corresponding recoverable reserves of stepout well and oil in place, stepout well recovery ratio is asked for.
In step 2, for the virgin charter water drive mining-employed reserves formula used for Nd=7.5/B, coefficient B is A type Water-flooding characteristics Slope of a curve;The calculation formula of stepout well oil in place is:Stepout well oil in place=stepout well water drive mining-employed reserves/reality Water drive reserves development degree;The calculation formula of stepout well recovery ratio is:Stepout well recovery ratio=corresponding the recoverable reserves of stepout well/ Oil in place * 100.
In step 3, the new well that the stepout well Single Well Economic limited recoverable reserves and step 2 obtained according to step 1 obtain Stepout well single well-controlled economic limit oil in place is calculated in recovery ratio.
In step 3, the calculation formula of single well-controlled economic limit oil in place is:Single well-controlled economic limit geology is stored up Amount=Single Well Economic limited recoverable reserves/recovery ratio.
In step 4, it is obtained according to the single well-controlled remaining geologic reserves of current development block or oil field reality with step 3 Stepout well single well-controlled economic limit oil in place gap, calculate economic limit stepout well workload.
In step 4, the calculation formula of stepout well workload is:Stepout well workload=remaining geologic reserves/individual well control Economic limit oil in place-remaining geologic reserves/practical single well-controlled remaining geologic reserves processed.
In steps of 5, recoverable reserves scale, computing unit or oilfield economic ultimate recovery are increased according to stepout well.
In steps of 5, the calculation formula of economic ultimate recovery is:Economic ultimate recovery=(recoverable reserves+stepout well Increase recoverable reserves)/oil in place * 100%.
Old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method in the present invention, introduce economic factor, will Economical and effective calculates constraints as potentiality;Stepout well recovery ratio is determined according to the objective exploitation rule of mining site, is embodied note and is adopted Well spacing changes the influence to oil displacement efficiency, overcomes contradiction of the conventional method in the application of ultra-high water-containing development late stage, Ke Yiman The needs that the economic limit stepout well potentiality and economic ultimate recovery of sufficient ultra-high water cut stage oil reservoir calculate.It therefore, can be more Objective evaluation oil reservoir development potentiality, instruct oil field development production practices.
Description of the drawings
Fig. 1 is the specific embodiment that the old filed economic limit drilling well potentiality of the present invention and recovery ratio calculate new method Flow chart;
Fig. 2 is that the Single Well Economic limited recoverable reserves in the specific embodiment of the present invention are calculated with well depth, oil price relationship Plate;
Fig. 3 is the stepout well economically recoverable prediction graph in the specific embodiment of the present invention;
Fig. 4 is the stepout well A type WATER FLOODING CHARACTERISTIC CURVE figure in the specific embodiment of the present invention.
Specific embodiment
For enable the present invention above and other objects, features and advantages be clearer and more comprehensible, it is cited below particularly go out preferable implementation Example, and coordinate shown in attached drawing, it is described in detail below.
Step 1, stepout well Single Well Economic limited recoverable reserves are determined.Using dynamic cash flow method, Single Well Economic pole is established Recoverable reserves and oil price relationship plate are limited, so as to can determine economy of the stepout well under the conditions of certain oil price, certain drilling well well depth Limited recoverable reserves.
Step 2, stepout well recovery ratio is determined.Calculating development block in recent years or oil field stepout well increases recoverable reserves;Profit With virgin charter water drive mining-employed reserves formula Nd=7.5/B (coefficient B is the slope of A type WATER FLOODING CHARACTERISTIC CURVE), it is real to calculate stepout well The water drive mining-employed reserves on border;The corresponding oil in place of stepout well is calculated according to the practical water drive reserves development degree of unit or oil field, Stepout well oil in place=stepout well water drive mining-employed reserves/practical water drive reserves development degree;It is adopted according to stepout well is corresponding Reserves and oil in place ask for stepout well recovery ratio, the corresponding recoverable reserves of stepout well recovery ratio=stepout well/oil in place * 100%.
Step 3, stepout well single well-controlled economic limit oil in place is determined.It is passed through according to the stepout well individual well that step 1 obtains The new well recovery that Ji limited recoverable reserves and step 2 obtain, is calculated stepout well single well-controlled economic limit oil in place, Single well-controlled economic limit oil in place=Single Well Economic limited recoverable reserves/recovery ratio.
Step 4, economic limit stepout well potentiality are calculated.According to the single well-controlled of current development block or oil field reality residue The gap of stepout well single well-controlled economic limit oil in place that oil in place is obtained with step 3 calculates economic limit stepout well Workload.Stepout well workload=remaining geologic reserves/single well-controlled economic limit oil in place-remaining geologic reserves/reality Single well-controlled remaining geologic reserves.
Step 5, economic ultimate recovery is calculated.Recoverable reserves scale, computing unit or oil field warp are increased according to stepout well Help ultimate recovery, economic ultimate recovery=(recoverable reserves+stepout well increases recoverable reserves)/oil in place * 100%.
To the east of for the pungent pungent Unit 16 in oil field, economic limit stepout well workload and recovery ratio are calculated using this method.Such as Shown in Fig. 1, Fig. 1 is the stream of the old filed economic limit drilling well potentiality of the present invention and the specific embodiment of recovery ratio measuring and calculating new method Cheng Tu.
Unit oil area 2.5km2, mining-employed reserves 941 × 104T, recoverable reserves 441 × 104T demarcates recovery ratio 46.9%, 2220~2720m of reservoir buried depth, average well depth 2550m.62 mouthfuls of production well at present, individual well daily oil production 1.8t/d, Comprehensive water cut 93.9%, unit cumulative oil production 405.46 × 104t。
In a step 101, using dynamic cash flow method, Single Well Economic limited recoverable reserves are calculated.I.e. certain technology, Under economic condition, income of the oil well within the evaluation phase disclosure satisfy that minimum requirements of the enterprise to investment repayment, tired in the evaluation phase Product yield is Single Well Economic limited recoverable reserves (as shown in Figure 2).Cell-average well depth 2550m, 40 $ of oil price/bbl, Single Well Economic limited recoverable reserves when 50 $/bbl, 60 $/bbl, 70 $/bbl, 80 $/bbl are respectively 1.58 × 104t、1.22 ×104t、1.03×104t、0.86×104t、0.76×104t。
In step 103, according to the unit 12 fresh oil well development data gone into operation in 2014, this batch of oil well production is predicted extremely Cumulative oil production when is produced from economic limit end, i.e. stepout well economically recoverable 8.26 × 104T (as shown in Figure 3);Utilize virgin constitution Chapter water drive mining-employed reserves formula Nd=7.5/B calculate the practical water drive reserves employed of stepout well for 7.5/0.1352=55.5 × 104T (coefficient B value is as shown in Figure 4);According to the practical water-flooding performance 80% of unit, stepout well is calculated correspondingly Matter reserves are 55.5/0.8=69.3 × 104t;According to the corresponding economically recoverable of stepout well and oil in place, ask for newly boring Well recovery is 8.26/69.3=11.9%.
Wherein:
Nd- water drive mining-employed reserves, 104t;
B-coefficient, decimal.
In step 105, stepout well Single Well Economic limited recoverable reserves and step under the different oil prices obtained according to step 101 The minimum single well-controlled oil in place under the conditions of stepout well economical and effective is calculated in rapid 103 obtained stepout well recovery ratios.It should Single well-controlled economic limit oil in place of the unit in 40 $ of oil price/bbl, 50 $/bbl, 60 $/bbl, 70 $/bbl, 80 $/bbl Respectively 13.26 × 104T/ mouthfuls, 10.24 × 104T/ mouthfuls, 8.64 × 104T/ mouthfuls, 7.22 × 104T/ mouthfuls, 6.38 × 104T/ mouthfuls. Such as, single well-controlled economic limit oil in place=0.76/0.119=6.38 (ten thousand tons/mouthful) under the conditions of 80 $/bbl.
In step 107, the stepout well single well-controlled economic limit oil in place and unit obtained according to step 105 is current Practical single well-controlled remaining geologic reserves 8.64 × 104T/ mouthfuls of gap calculates stepout well potentiality.The unit is less than 60 in oil price Under the conditions of $/bbl, no stepout well potentiality;Under the conditions of oil price is 60 $/bb, 70 $/bbl, 80 $/bbl, stepout well potentiality difference It is 0 mouthful, 12 mouthfuls and 22 mouthfuls.Such as, stepout well workload=(941-405.46)/6.38- (941- under the conditions of 80 $/bbl 405.46)/8.65=84-62=22 (mouth).
In step 109, according to what is obtained in the Single Well Economic limited recoverable reserves and step 107 obtained in step 101 Economic limit stepout well workload, computing unit economic ultimate recovery.Under the conditions of 70 $/bbl, newly increased recoverable reserves 0.86* 12=10.32 × 104T, unit economic ultimate recovery are=(441+10.32)/941=48.0%;Under the conditions of 80 $/bbl, Newly increased recoverable reserves are 0.76*22=16.72 × 104T, unit economic ultimate recovery are=(441+16.72)/941= 48.6%.

Claims (10)

1. old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method, which is characterized in that the old filed economic limit bores Well potentiality and recovery ratio measuring and calculating new method include:
Step 1, stepout well Single Well Economic limited recoverable reserves are determined;
Step 2, stepout well recovery ratio is determined;
Step 3, stepout well single well-controlled economic limit oil in place is determined;
Step 4, economic limit stepout well potentiality are calculated;
Step 5, economic ultimate recovery is calculated.
2. old filed economic limit drilling well potentiality according to claim 1 and recovery ratio measuring and calculating new method, which is characterized in that In step 1, using dynamic cash flow method, Single Well Economic limited recoverable reserves and oil price relationship plate are established, so that it is determined that newly Economic limit recoverable reserves of the drilling well under the conditions of certain oil price, certain drilling well well depth.
3. old filed economic limit drilling well potentiality according to claim 1 and recovery ratio measuring and calculating new method, which is characterized in that In step 2, calculating development block in recent years or oil field stepout well increases recoverable reserves;Utilize virgin charter water drive mining-employed reserves public affairs Formula calculates the water drive mining-employed reserves of stepout well reality;Stepout well is calculated according to the practical water drive reserves development degree of unit or oil field Corresponding oil in place;According to the corresponding recoverable reserves of stepout well and oil in place, stepout well recovery ratio is asked for.
4. old filed economic limit drilling well potentiality according to claim 3 and recovery ratio measuring and calculating new method, which is characterized in that In step 2, for the virgin charter water drive mining-employed reserves formula used for Nd=7.5/B, coefficient B is oblique for A type WATER FLOODING CHARACTERISTIC CURVE Rate;The calculation formula of stepout well oil in place is:Stepout well oil in place=stepout well water drive mining-employed reserves/practical water drive reserves Development degree;The calculation formula of stepout well recovery ratio is:The corresponding recoverable reserves of stepout well recovery ratio=stepout well/geology storage Amount * 100.
5. old filed economic limit drilling well potentiality according to claim 1 and recovery ratio measuring and calculating new method, which is characterized in that In step 3, the new well recovery that the stepout well Single Well Economic limited recoverable reserves and step 2 obtained according to step 1 obtain, meter Calculation obtains stepout well single well-controlled economic limit oil in place.
6. old filed economic limit drilling well potentiality according to claim 5 and recovery ratio measuring and calculating new method, which is characterized in that In step 3, the calculation formula of single well-controlled economic limit oil in place is:Single well-controlled economic limit oil in place=individual well Economic limit recoverable reserves/recovery ratio.
7. old filed economic limit drilling well potentiality according to claim 1 and recovery ratio measuring and calculating new method, which is characterized in that In step 4, the stepout well obtained according to current development block or the single well-controlled remaining geologic reserves of oil field reality with step 3 The gap of single well-controlled economic limit oil in place calculates economic limit stepout well workload.
8. old filed economic limit drilling well potentiality according to claim 7 and recovery ratio measuring and calculating new method, which is characterized in that In step 4, the calculation formula of stepout well workload is:Stepout well workload=remaining geologic reserves/single well-controlled economy pole Limit oil in place-remaining geologic reserves/practical single well-controlled remaining geologic reserves.
9. old filed economic limit drilling well potentiality according to claim 1 and recovery ratio measuring and calculating new method, which is characterized in that In steps of 5, recoverable reserves scale, computing unit or oilfield economic ultimate recovery are increased according to stepout well.
10. old filed economic limit drilling well potentiality according to claim 1 and recovery ratio measuring and calculating new method, feature exist In in steps of 5, the calculation formula of economic ultimate recovery is:Economic ultimate recovery=(recoverable reserves+stepout well increases Recoverable reserves)/oil in place * 100%.
CN201711438545.0A 2017-12-26 2017-12-26 New method for measuring and calculating economic ultimate drilling potential and recovery ratio of old oil field Active CN108180007B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711438545.0A CN108180007B (en) 2017-12-26 2017-12-26 New method for measuring and calculating economic ultimate drilling potential and recovery ratio of old oil field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711438545.0A CN108180007B (en) 2017-12-26 2017-12-26 New method for measuring and calculating economic ultimate drilling potential and recovery ratio of old oil field

Publications (2)

Publication Number Publication Date
CN108180007A true CN108180007A (en) 2018-06-19
CN108180007B CN108180007B (en) 2021-11-16

Family

ID=62547447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711438545.0A Active CN108180007B (en) 2017-12-26 2017-12-26 New method for measuring and calculating economic ultimate drilling potential and recovery ratio of old oil field

Country Status (1)

Country Link
CN (1) CN108180007B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1464429A (en) * 2002-06-07 2003-12-31 中国石油天然气股份有限公司 Method for calculating gas deposit recovery efficiency and recoverable reserve
US20090194274A1 (en) * 2008-02-01 2009-08-06 Schlumberger Technology Corporation Statistical determination of historical oilfield data
CN104033137A (en) * 2013-03-06 2014-09-10 中国石油化工股份有限公司 Method for improving fault block oil reservoir recovery efficiency by utilizing oilfield wastewater
CN104268302A (en) * 2014-07-25 2015-01-07 中国海洋石油总公司 Petroleum recoverable reserve changing cause analysis chart creating method and application
CN104653175A (en) * 2013-11-22 2015-05-27 中国石油化工股份有限公司 Natural water-drive reservoir producing reserve calculating method
CN105649605A (en) * 2014-11-10 2016-06-08 中国石油化工股份有限公司 Novel economic policy bound determination method for layer recombination technology
CN106337679A (en) * 2015-07-10 2017-01-18 中国石油化工股份有限公司 Novel method for measuring and calculating well pattern thickening potential
CN107369100A (en) * 2016-08-22 2017-11-21 中国石油化工股份有限公司 Water-drive pool recovers recoverable reserves potentiality measuring and calculating new method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1464429A (en) * 2002-06-07 2003-12-31 中国石油天然气股份有限公司 Method for calculating gas deposit recovery efficiency and recoverable reserve
US20090194274A1 (en) * 2008-02-01 2009-08-06 Schlumberger Technology Corporation Statistical determination of historical oilfield data
CN104033137A (en) * 2013-03-06 2014-09-10 中国石油化工股份有限公司 Method for improving fault block oil reservoir recovery efficiency by utilizing oilfield wastewater
CN104653175A (en) * 2013-11-22 2015-05-27 中国石油化工股份有限公司 Natural water-drive reservoir producing reserve calculating method
CN104268302A (en) * 2014-07-25 2015-01-07 中国海洋石油总公司 Petroleum recoverable reserve changing cause analysis chart creating method and application
CN105649605A (en) * 2014-11-10 2016-06-08 中国石油化工股份有限公司 Novel economic policy bound determination method for layer recombination technology
CN106337679A (en) * 2015-07-10 2017-01-18 中国石油化工股份有限公司 Novel method for measuring and calculating well pattern thickening potential
CN107369100A (en) * 2016-08-22 2017-11-21 中国石油化工股份有限公司 Water-drive pool recovers recoverable reserves potentiality measuring and calculating new method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张金铸: "油藏特高含水期井网加密潜力评价新方法", 《油气地质与采收率》 *

Also Published As

Publication number Publication date
CN108180007B (en) 2021-11-16

Similar Documents

Publication Publication Date Title
CN106703883B (en) A kind of personalized method for determining Water Inrush From Working-faces danger classes
CN108868748A (en) A kind of calculation method of shale gas horizontal well refracturing crack cracking pressure
CN107044277A (en) Low permeable and heterogeneity reservoir horizontal well refracturing yield potential evaluation method
CN104965979A (en) Tight sandstone effective reservoir identifying method
CN108287373A (en) A kind of sandstone-type uranium mineralization with respect target area selection method based on oreforming favorability
CN105089585A (en) Medium and high permeability oil pool ultrahigh water content later low-cost equivalent water flooding method
CN106205060A (en) For outdoor pit Tailings Dam slope and land slide early alarming and forecasting method
CN105673001B (en) A kind of carbonate rock individual well drop in formation pressure processing method
CN103775057A (en) Recognizing method and device for effective reservoir of compact oil and gas deposit
CN109236273B (en) Dynamic data processing method for oil field development and production
CN108331574B (en) A kind of opposite section prediction in debt and the sand control segmentation stage division of shaking out of horizontal well horizontal segment
CN104832156A (en) Method for predicting yield of gas well
CN106285621A (en) Method based on Multifactor Decision Making offshore oilfield new well in old district production capacity
CN108843286A (en) The technical method of well is selected in a kind of Novel layered oil recovery
CN106337679A (en) Novel method for measuring and calculating well pattern thickening potential
CN109209312A (en) A kind of development of resources method that suitable polymers are driven
CN109858177A (en) A kind of horizontal well with bottom water reservoir water drive method for numerical simulation based on quasi- streamline method
CN109697538A (en) Carbonate Reservoir Caves-constant volume physical efficiency amount indicative curve interpretation model
CN108729912A (en) Production split method suitable for reservoir numerical simulation
CN105005649A (en) Potential underground water distribution mapping method
CN112949901A (en) Shale oil reservoir horizontal well quasi-natural energy development method and system
CN104948177A (en) Productivity prediction method based on meter liquid production index statistical characteristic law
CN108180007A (en) Old filed economic limit drilling well potentiality and recovery ratio measuring and calculating new method
CN110067555A (en) The determination method and apparatus of the minimum dynamic holdup of carbonate rock oil well
CN105221134B (en) A kind of Fractured Gas Wells return the method for discrimination that discharge opeing is formed with stratum water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant