CN108179757A - The pile foundation structure and construction method of high gradient slope containing study on weak faults - Google Patents

The pile foundation structure and construction method of high gradient slope containing study on weak faults Download PDF

Info

Publication number
CN108179757A
CN108179757A CN201810099451.3A CN201810099451A CN108179757A CN 108179757 A CN108179757 A CN 108179757A CN 201810099451 A CN201810099451 A CN 201810099451A CN 108179757 A CN108179757 A CN 108179757A
Authority
CN
China
Prior art keywords
pile foundation
casing
study
soil
weak faults
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810099451.3A
Other languages
Chinese (zh)
Inventor
梁冠亭
喻晖
肖开乾
陈启荣
郑宏伟
喻帆
卢吉
何林
夏文辉
高海林
张兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Municipal Construction Group Co Ltd
Original Assignee
Wuhan Municipal Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Municipal Construction Group Co Ltd filed Critical Wuhan Municipal Construction Group Co Ltd
Priority to CN201810099451.3A priority Critical patent/CN108179757A/en
Publication of CN108179757A publication Critical patent/CN108179757A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to a kind of pile foundation structures and construction method of the high gradient slope containing study on weak faults, pile foundation structure includes pile foundation, casing and separation layer, casing is fixedly connected as an entirety on pile foundation top and with pile foundation top, casing upper end is flushed with pile foundation, lower end passes through study on weak faults, separation layer is filled between casing outer surface and Rock And Soil, casing smooth outer surface is smooth, separation layer is made of non-coherent material, rubbing action when pile foundation top is in direct contact Rock And Soil is much larger than the rubbing action between the rubbing action between casing and separation layer and separation layer and Rock And Soil.Pile foundation and Rock And Soil are locally isolated by the present invention, ensure that the side frictional resistance of pile foundation mainly concentrates performance in the stable following Rock And Soil of study on weak faults, avoid side frictional resistance that the high gradient slope unstability for playing and being likely to occur in study on weak faults more than Rock And Soil is concentrated to collapse, so as to ensure that the safety of project subject structure.

Description

The pile foundation structure and construction method of high gradient slope containing study on weak faults
Technical field
The invention belongs to engineering construction fields, and in particular to a kind of pile foundation structure of high gradient slope containing study on weak faults and Construction method.
Background technology
Pile foundation structure is widely used in the engineering constructions such as highway, railway, Fang Jian, municipal administration, mine, water power, geological disaster neck Domain.Research data show be not the side frictional resistance distribution in same stratum pile foundation plinth yet it is equally distributed along pile body, it is right In general pile foundation, frictional resistance distribution in side shows as up big and down small.But under given conditions, the side frictional resistance of pile foundation excessively collects In not to be conducive to pile foundation in the middle and upper part of pile foundation be the safety in superstructure, such as the base in China mountainous region in middle and western China In plinth process of construction, often pile foundation must be necessarily arranged on high gradient slope, and generally there are tomography, crushed zone, weak slips for side slope The study on weak faults such as face, if the side frictional resistance of pile foundation mainly concentrates performance more than study on weak faults, according to active force and reaction force Principle necessarily has a power straight down to act on study on weak faults, when the friction at the angle of inclination of study on weak faults and tomography interface When coefficient meets certain relationship, it may result in Rock And Soil more than study on weak faults and downslide unstability occur, and pile foundation is made additionally to hold The sliding force for being parallel to study on weak faults by one, may cause pile foundation by curved, sheared destruction, this is clearly in engineering construction It should avoid the problem that as far as possible.
Invention content
The object of the present invention is to provide a kind of pile foundation structure and construction method of the high gradient slope containing study on weak faults, this hairs It is bright to be locally isolated pile foundation and Rock And Soil, ensure that the side frictional resistance of pile foundation mainly concentrates performance to break in stable weakness In the following Rock And Soil of layer, side frictional resistance is avoided to concentrate the high gradient slope unstability for playing and being likely to occur in study on weak faults more than Rock And Soil It collapses, so as to ensure that the safety of project subject structure.
The technical solution adopted in the present invention is:
A kind of pile foundation structure of the high gradient slope containing study on weak faults, including pile foundation, casing and separation layer, casing is in stake Basic top and be fixedly connected as an entirety with pile foundation top, casing upper end is flushed with pile foundation, lower end pass through it is weak disconnected Layer, separation layer are filled between casing outer surface and Rock And Soil, and casing smooth outer surface is smooth, and separation layer is by non-coherent material group Rubbing action when being in direct contact Rock And Soil into, pile foundation top much larger than the rubbing action between casing and separation layer and every Rubbing action between absciss layer and Rock And Soil.
Further, the material of pile foundation be armored concrete, plain concrete, steel, timber or composite material, pile foundation Section to be round, rectangular or special-shaped.
Further, the material of casing is steel, plastics, timber or composite material.
Further, casing is the steel casing of 3~8mm of wall thickness, and steel casing surfaces externally and internally carries out processing of rust removing, steel Brushing smooth surface in casing outer surface is painted or pitch.
Further, separation layer is sand or plastic grain.
Further, separation layer is the sand that grain size is 0.25~0.5mm.
Further, pile foundation top is adhesively fixed with casing by own material, outer adding additives are adhesively fixed or weld Connect fixation.
Further, it is more than 1m that casing lower end, which passes through study on weak faults,.
A kind of pile foundation structure construction method of the high gradient slope containing study on weak faults, first according to stake diameter pore-forming is designed, then The upward reaming of depth below study on weak faults chooses the casing consistent with counterbore depth, to appearance in casing to stake top absolute altitude After face carries out smooth treatment, casing is hung into reaming and keeps placed in the middle, fills and dissipates between casing outer surface and Rock And Soil Bulk material forms separation layer, finally carries out pile foundation construction.
Further, the material of pile foundation is armored concrete, plain concrete, steel, timber or composite material, works as pile foundation The material of plinth is first transferred steel reinforcement cage, is poured casing as the template of pile foundation for armored concrete and when carrying out pile foundation construction Pile foundation concrete is built, pile foundation is bonded as an entirety with casing after concrete final set.
The beneficial effects of the invention are as follows:
Pile foundation and Rock And Soil are locally isolated by the casing and separation layer on pile foundation top, are said on stricti jurise, Rubbing action between casing and Rock And Soil, which still has, (will accurately measure the side that its rubbing action can be tested by interface shearing Formula determines its friction coefficient, and the normal force of interface shearing experiment can be calculated by earth pressure at rest to be determined), but depositing due to separation layer Non-coherent material is being used, the side frictional resistance distribution situation of pile foundation is being can actively regulate, changes previous pile foundation side frictional resistance Up big and down small situation is distributed, ensures that the side frictional resistance of pile foundation mainly concentrates performance in the stable following Rock And Soil of study on weak faults In, avoid side frictional resistance that the high gradient slope unstability for playing and being likely to occur in study on weak faults more than Rock And Soil is concentrated to collapse, so as to protect The safety of project subject structure is demonstrate,proved.
Description of the drawings
Fig. 1 is the elevational schematic view of pile foundation plinth structure of the embodiment of the present invention.
Fig. 2 is that pile foundation plinth structure of the embodiment of the present invention applies the schematic diagram in the high gradient slope containing study on weak faults.
The schematic cross-section of A-A in Fig. 3 Fig. 1.
Fig. 4 is that pile foundation structure applies the stress diagram in the high gradient slope containing study on weak faults.
In figure:1- pile foundations;2- casings;3- separation layers;4- study on weak faults;5- Rock And Soils.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
As shown in Figure 1 to Figure 3, a kind of pile foundation structure of the high gradient slope containing study on weak faults, including pile foundation 1, casing 2 With separation layer 3, casing 2 is sleeved on 1 top of pile foundation and is fixedly connected as an entirety, 2 upper end of casing and stake with 1 top of pile foundation Basis 1 flushes, lower end passes through study on weak faults 4, and separation layer 3 is filled between 2 outer surface of casing and Rock And Soil 5,2 outer surface of casing Smooth, separation layer 3 is made of non-coherent material, and rubbing action when 1 top of pile foundation is in direct contact Rock And Soil 5 is much larger than The rubbing action between rubbing action and separation layer 3 and Rock And Soil 5 between casing 2 and separation layer 3.
Wherein, the material of pile foundation 1 can be armored concrete, plain concrete, steel, timber, composite material or other Material, the section of pile foundation 1 can be round, rectangular or special-shaped, and the material of casing 2 can be steel, plastics, timber or compound Material, separation layer 3 can be sand or plastic grain.
Wherein, 1 top of pile foundation with casing 2 can be adhesively fixed by own material, outer adding additives are adhesively fixed or It is welded and fixed.
A kind of pile foundation structure construction method of the high gradient slope containing study on weak faults, first according to stake diameter pore-forming is designed, then The upward reaming of depth of the study on weak faults below 4 to stake top absolute altitude (counter bore diameter is 1.05~1.1 times of design stake diameter), choose Casing 2 after carrying out smooth treatment to 2 surfaces externally and internally of casing, is hung into reaming and kept by the casing 2 consistent with counterbore depth Between two parties, non-coherent material is filled between 2 outer surface of casing and Rock And Soil 5 and forms separation layer 3, then transferred steel reinforcement cage, will protect Cylinder 2 pours 1 concrete of pile foundation as the template of pile foundation 1, after concrete final set pile foundation 1 and casing 2 be bonded as one it is whole Body.In the present embodiment, pile foundation 1 is armored concrete, and casing 2 is the steel casing 2 of 3~8mm of wall thickness, and steel casing 2 is hung Before putting, 2 surfaces externally and internally of steel casing carries out processing of rust removing, 2 outer surface brushing smooth surface of steel casing paint or pitch, steel casing 2 lower ends pass through study on weak faults 4, and more than 1m, separation layer 3 is the sand that grain size is 0.25~0.5mm.In fact, the material of pile foundation 1 Material can also be plain concrete, steel, timber, composite material or other materials.
In the present invention, the casing 2 on 1 top of pile foundation and separation layer 3 by pile foundation 1 and Rock And Soil 5 carried out part every From being said on stricti jurise, the rubbing action between casing 2 and Rock And Soil 5 still has that (accurately to measure its rubbing action can lead to The mode for crossing interface shearing experiment determines its friction coefficient, and the normal force of interface shearing experiment can be calculated really by earth pressure at rest It is fixed), as shown in figure 4, but due to the presence of separation layer, using non-coherent material, can actively regulate the side frictional resistance of pile foundation 1 Distribution situation changes previous 1 side frictional resistance of pile foundation and is distributed up big and down small situation, ensures that the side frictional resistance of pile foundation 1 mainly collects It is middle to play in stable study on weak faults below 4 in Rock And Soil 5, side frictional resistance is avoided to concentrate and is played in more than 4 Rock And Soil 5 of study on weak faults When the high gradient slope unstability that is likely to occur collapse, so as to ensure that the safety of project subject structure.
It should be understood that for those of ordinary skills, can be improved or converted according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (10)

1. a kind of pile foundation structure of the high gradient slope containing study on weak faults, it is characterised in that:Including pile foundation, casing and isolation Layer, casing are fixedly connected as an entirety on pile foundation top and with pile foundation top, and casing upper end is flushed with pile foundation, lower end Across study on weak faults, separation layer is filled between casing outer surface and Rock And Soil, and casing smooth outer surface is smooth, and separation layer is by dissipating Bulk material forms, and rubbing action when pile foundation top is in direct contact Rock And Soil is much larger than the friction between casing and separation layer Effect and the rubbing action between separation layer and Rock And Soil.
2. the pile foundation structure of the high gradient slope containing study on weak faults as described in claim 1, it is characterised in that:The material of pile foundation Expect for armored concrete, plain concrete, steel, timber or composite material, the section of pile foundation is round, rectangular or special-shaped.
3. the pile foundation structure of the high gradient slope containing study on weak faults as described in claim 1, it is characterised in that:The material of casing For steel, plastics, timber or composite material.
4. the pile foundation structure of the high gradient slope containing study on weak faults as claimed in claim 3, it is characterised in that:Casing is wall thickness The steel casing of 3~8mm, steel casing surfaces externally and internally carry out processing of rust removing, steel casing outer surface brushing smooth surface paint or drip It is green.
5. the pile foundation structure of the high gradient slope containing study on weak faults as described in claim 1, it is characterised in that:Separation layer is sand Son or plastic grain.
6. the pile foundation structure of the high gradient slope containing study on weak faults as claimed in claim 5, it is characterised in that:Separation layer is grain Diameter is the sand of 0.25~0.5mm.
7. the pile foundation structure of the high gradient slope containing study on weak faults as described in claim 1, it is characterised in that:Pile foundation top It is adhesively fixed with casing by own material, outer adding additives are adhesively fixed or are welded and fixed.
8. the pile foundation structure of the high gradient slope containing study on weak faults as described in claim 1, it is characterised in that:It wears casing lower end Study on weak faults is crossed more than 1m.
9. a kind of pile foundation structure construction method of the high gradient slope containing study on weak faults, it is characterised in that:First according to design stake diameter The casing consistent with counterbore depth is chosen in pore-forming, the then upward reaming of the depth below study on weak faults to stake top absolute altitude, to shield After cylinder surfaces externally and internally carries out smooth treatment, casing is hung into reaming and keeps placed in the middle, casing outer surface and Rock And Soil it Between filling non-coherent material formed separation layer, finally carry out pile foundation construction.
10. the pile foundation structure construction method of the high gradient slope containing study on weak faults as claimed in claim 9, it is characterised in that: The material of pile foundation is armored concrete, plain concrete, steel, timber or composite material, when the material of pile foundation is mixed for reinforcing bar When coagulating soil and carrying out pile foundation construction, steel reinforcement cage is first transferred, pile foundation concrete is poured using casing as the template of pile foundation, mixed Pile foundation is bonded as an entirety with casing after solidifying soil final set.
CN201810099451.3A 2018-01-31 2018-01-31 The pile foundation structure and construction method of high gradient slope containing study on weak faults Pending CN108179757A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810099451.3A CN108179757A (en) 2018-01-31 2018-01-31 The pile foundation structure and construction method of high gradient slope containing study on weak faults

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810099451.3A CN108179757A (en) 2018-01-31 2018-01-31 The pile foundation structure and construction method of high gradient slope containing study on weak faults

Publications (1)

Publication Number Publication Date
CN108179757A true CN108179757A (en) 2018-06-19

Family

ID=62551913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810099451.3A Pending CN108179757A (en) 2018-01-31 2018-01-31 The pile foundation structure and construction method of high gradient slope containing study on weak faults

Country Status (1)

Country Link
CN (1) CN108179757A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853313A (en) * 2019-01-17 2019-06-07 浙江绿艺园林工程有限公司 Pile foundation side soft soil foundation road eliminates frictional resistance structure and construction method
CN109853530A (en) * 2019-01-21 2019-06-07 中建五局土木工程有限公司 Supporting bridge structure and the Bridge Pile Foundation Construction technique for increasing pile foundation flexibility
CN110747880A (en) * 2019-10-30 2020-02-04 中建五局第三建设有限公司 Construction method of high slope isolation bearing platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05346019A (en) * 1992-06-15 1993-12-27 Chiyoda Corp Execution method for cast-in-place pile applied with no negative frictional force
CN203654272U (en) * 2013-12-30 2014-06-18 中铁第四勘察设计院集团有限公司 Lateral friction boring filling pile for isolation pile
CN107268610A (en) * 2017-06-19 2017-10-20 中铁大桥局第七工程有限公司 A kind of local antifriction resistance piling strtucture and its construction method
CN107386277A (en) * 2017-07-25 2017-11-24 中建五局土木工程有限公司 Flexible foundation pile side friction isolation structure and construction method
CN208309599U (en) * 2018-01-31 2019-01-01 武汉市市政建设集团有限公司 The pile foundation structure of high gradient slope containing study on weak faults

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05346019A (en) * 1992-06-15 1993-12-27 Chiyoda Corp Execution method for cast-in-place pile applied with no negative frictional force
CN203654272U (en) * 2013-12-30 2014-06-18 中铁第四勘察设计院集团有限公司 Lateral friction boring filling pile for isolation pile
CN107268610A (en) * 2017-06-19 2017-10-20 中铁大桥局第七工程有限公司 A kind of local antifriction resistance piling strtucture and its construction method
CN107386277A (en) * 2017-07-25 2017-11-24 中建五局土木工程有限公司 Flexible foundation pile side friction isolation structure and construction method
CN208309599U (en) * 2018-01-31 2019-01-01 武汉市市政建设集团有限公司 The pile foundation structure of high gradient slope containing study on weak faults

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853313A (en) * 2019-01-17 2019-06-07 浙江绿艺园林工程有限公司 Pile foundation side soft soil foundation road eliminates frictional resistance structure and construction method
CN109853313B (en) * 2019-01-17 2024-04-30 浙江绿艺建设有限公司 Pile foundation side soft soil foundation road friction resistance eliminating structure and construction method
CN109853530A (en) * 2019-01-21 2019-06-07 中建五局土木工程有限公司 Supporting bridge structure and the Bridge Pile Foundation Construction technique for increasing pile foundation flexibility
CN109853530B (en) * 2019-01-21 2021-05-04 中建五局土木工程有限公司 Bridge supporting structure and bridge pile foundation construction process for increasing pile foundation flexibility
CN110747880A (en) * 2019-10-30 2020-02-04 中建五局第三建设有限公司 Construction method of high slope isolation bearing platform

Similar Documents

Publication Publication Date Title
CN105696427B (en) The construction method and its road structure of a kind of consolidation process newly built railway karst foundation
CN107060774B (en) A kind of anti-tunnel portal wall damage device and construction method
CN202466594U (en) Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure
CN102720196B (en) Anticorrosive anchor rod capable of preventing slurry from leaking
CN108179757A (en) The pile foundation structure and construction method of high gradient slope containing study on weak faults
CN205576940U (en) Compound retaining structure of friction pile that pile bolck is connected entirely
CN108517861B (en) Composite reinforced pile structure for resisting foundation uplift and construction method
CN103233473A (en) Polymer multi-edge pile grouting method
CN102561330A (en) Integrated construction method for artificial dug pile and steel pipe concrete column
Andromalos et al. Stabilization of soft soils by soil mixing
CN105464395B (en) A kind of building inclination rectification method for disturbing bearing course at pile end
CN208309599U (en) The pile foundation structure of high gradient slope containing study on weak faults
CN105926589A (en) Steel pipe pile applicable to coral reef geology and grouting method of steel pipe pile
CN211571692U (en) Cast-in-place damping foundation pile and foundation pile structure
JP6895842B2 (en) Ground improvement method
CN107083775B (en) Rock slope fracture surface replacement treatment method
CN106120833A (en) A kind of underground truss-like pile foundation and construction method thereof
CN110512667A (en) It is a kind of to handle because water damage leads to the new method of pile foundation settlement
CN205576638U (en) Consolidate roadbed structure who handles newly -built railway karst foundation
JP3596687B2 (en) Seismic retrofitting method for existing foundation
JP2007231629A (en) Construction method of stabilizing ground
CN208362868U (en) It is a kind of to provide the device of counter-force for the construction of urban road surfaces static sounding
CN206916750U (en) A kind of foundation pit support device
Zhang et al. Application of polymer grouting reinforcement technology in the treatment of slope collapse
CN108798589A (en) A kind of water-bearing layer method of modifying

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination