CN108177978A - A kind of Construction of Civil Engineering brick handling facilities - Google Patents
A kind of Construction of Civil Engineering brick handling facilities Download PDFInfo
- Publication number
- CN108177978A CN108177978A CN201711328047.0A CN201711328047A CN108177978A CN 108177978 A CN108177978 A CN 108177978A CN 201711328047 A CN201711328047 A CN 201711328047A CN 108177978 A CN108177978 A CN 108177978A
- Authority
- CN
- China
- Prior art keywords
- electromagnet
- cylinder
- screw
- connecting rod
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G47/00—Article or material-handling devices associated with conveyors; Methods employing such devices
- B65G47/74—Feeding, transfer, or discharging devices of particular kinds or types
- B65G47/90—Devices for picking-up and depositing articles or materials
- B65G47/92—Devices for picking-up and depositing articles or materials incorporating electrostatic or magnetic grippers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F7/00—Lifting frames, e.g. for lifting vehicles; Platform lifts
- B66F7/10—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks
- B66F7/12—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by mechanical jacks
- B66F7/14—Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by mechanical jacks screw operated
Abstract
A kind of Construction of Civil Engineering brick handling facilities, including the first electromagnet, the second electromagnet, multistage retractable rod, screw, stent, the first cylinder, flake bearing, the second cylinder, first connecting rod, charging hopper, second connecting rod, third cylinder, supporting rack, motor, engine base, leading screw and fagging, motor is installed on the engine base, motor is connected by shaft coupling with leading screw, leading screw upper end is mounted on the flange bearing in fagging, shaft coupling is mounted on supporting rack, supporting rack is mounted on engine base, screw on leading screw is installed, multistage retractable rod is installed on screw;It is an advantage of the invention that:Hopper has lifting and spinfunction simultaneously.
Description
Technical field
The present invention relates to a kind of Construction of Civil Engineering brick handling facilities, belong to civil engineering plant technical field.
Background technology
It had both referred to the technical activities such as applied material, equipment and the exploration carried out, design, construction, maintenance, repair,
Also refer to the object of engineering construction.Build on the ground or in underground, land or water, be directly or indirectly human lives, production,
Military, Scientific Research Service various job facilities.Brick is loaded and unloaded with handling facilities in work progress, the handling of the prior art are set
Standby hopper all only has elevating function, without spinfunction.In order to solve above-mentioned difficulties, need to develop a hopper simultaneously
A kind of Construction of Civil Engineering brick handling facilities with lifting and spinfunction.
Invention content
The object of the present invention is to provide a kind of Construction of Civil Engineering brick handling facilities.
The problem to be solved in the present invention is that the hopper of the handling facilities of the prior art all only has elevating function, without rotation
The problem of rotating function.
Purpose to realize the present invention, the technical solution adopted by the present invention are:
A kind of Construction of Civil Engineering brick handling facilities, including the first electromagnet, the second electromagnet, multistage retractable rod, screw, branch
Frame, the first cylinder, flake bearing, the second cylinder, first connecting rod, charging hopper, second connecting rod, third cylinder, supporting rack, motor,
Engine base, leading screw and fagging install motor on the engine base, and motor is connected by shaft coupling with leading screw, and leading screw upper end is mounted on support
On flange bearing in plate, shaft coupling is mounted on supporting rack, and supporting rack is mounted on engine base, and screw, screw are installed on leading screw
The second electromagnet, magnetic after the second electromagnet and the first electromagnet are powered are installed in upper installation multistage retractable rod, multistage retractable rod upper end
Property it is attracting, the first electromagnet is mounted on fagging bottom, and the first electromagnet and the second electromagnet installation site correspond, and screw is left
Side mounting bracket, the first cylinder of stent left side installation, the piston rod of the first cylinder are mounted on flake bearing, the installation of flake bearing
On the side wall of the second cylinder, first connecting rod is installed on the piston rod of the second cylinder, first connecting rod is mounted on charging by axis pin
On bucket, four third cylinders on the left of stent are installed, second connecting rod are respectively installed on the piston rod of third cylinder, second connecting rod passes through pin
Axis is mounted on charging hopper.
Rubber pad is installed on the charging hopper madial wall.
It is an advantage of the invention that:Motor rotates leading screw, and the first electromagnet and the second electromagnet are attached together, and make screw
It moves up and down, moves up and down charging hopper, multistage retractable rod is made to do stretching motion, to coordinate the movement of screw;First electromagnet
It loses magnetism after being powered off with the second electromagnet, makes the first electromagnet and the second electromagnet not fixed with each other, screw can be with
Leading screw rotation, rotates charging hopper;First cylinder, the second cylinder and third cylinder respectively do stretching motion, with regard to that can make charging
Struggle against run-off the straight, and brick is facilitated to unload.
Description of the drawings
Fig. 1 is a kind of Construction of Civil Engineering brick handling facilities overall structure figure of the present invention;
Fig. 2 is the vertical view of second connecting rod mounting structure;
In figure:1st, the first electromagnet 2, the second electromagnet 3, multistage retractable rod 4, screw 5, stent 6,
One cylinder 7, flake bearing 8, the second cylinder 9, first connecting rod 10, charging hopper 11, second connecting rod 12,
Third cylinder 13, supporting rack 14, motor 15, engine base 16, leading screw 17, fagging.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and embodiments.
A kind of Construction of Civil Engineering brick handling facilities of the present invention, stretch including the first electromagnet 1, the second electromagnet 2, multistage
Contracting bar 3, screw 4, stent 5, the first cylinder 6, flake bearing 7, the second cylinder 8, first connecting rod 9, charging hopper 10, second connecting rod
11st, third cylinder 12, supporting rack 13, motor 14, engine base 15, leading screw 16 and fagging 17 install motor 14, electricity on the engine base 15
Machine 14 is connected by shaft coupling with leading screw 16, and 16 upper end of leading screw is mounted on the flange bearing in fagging 17, and shaft coupling is mounted on
On supporting rack 13, supporting rack 13 is mounted on engine base 15, and screw 4 is installed on leading screw 16, and multistage retractable rod 3 is installed on screw 4, more
The second electromagnet 2 is installed in 3 upper end of grade telescopic rod, and the second electromagnet 2 and the first electromagnet 1 are magnetic attracting after being powered, and motor 14 makes
Leading screw 16 rotates, and the first electromagnet 1 and the second electromagnet 2 are attached together, and move up and down screw 4, make charging hopper about 10
It is mobile, multistage retractable rod 3 is made to do stretching motion, to coordinate the movement of screw 4;After first electromagnet 1 and the power-off of the second electromagnet 2
It loses magnetism, makes the first electromagnet 1 and the second electromagnet 2 not fixed with each other, screw 4 can be rotated with leading screw 16, be made
Charging hopper 10 rotates, and the first electromagnet 1 is mounted on 17 bottom of fagging, and the first electromagnet 1 and 2 installation site of the second electromagnet are one by one
Corresponding, 4 left mounting bracket 5 of screw, 5 the first cylinder 6 of left side installation of stent, the piston rod of the first cylinder 6 is mounted on flake axis
It holding on 7, flake bearing 7 is mounted on the side wall of the second cylinder 8, installation first connecting rod 9 on the piston rod of the second cylinder 8, and first
Connecting rod 9 is mounted on by axis pin on charging hopper 10,5 four third cylinders 12 of left side installation of stent, the piston rod of third cylinder 12
Upper each installation second connecting rod 11, second connecting rod 11 are mounted on by axis pin on charging hopper 10, the first cylinder 6, the second cylinder 8 and the
Three cylinders 12 respectively do stretching motion, just can make 10 run-off the straight of charging hopper, brick is facilitated to unload, is pacified on 10 madial wall of charging hopper
Equipped with rubber pad.
Application method of the present invention:Motor 14 rotates leading screw 16, and the first electromagnet 1 and the second electromagnet 2 are attached together,
Screw 4 is moved up and down, moves up and down charging hopper 10, multistage retractable rod 3 is made to do stretching motion, to coordinate the movement of screw 4;
It loses magnetism after first electromagnet 1 and the power-off of the second electromagnet 2, the first electromagnet 1 and the second electromagnet 2 is made not to be fixed to each other
Together, screw 4 can be rotated with leading screw 16, rotate charging hopper 10;First cylinder 6, the second cylinder 8 and third cylinder 12 are respective
Stretching motion is done, with regard to 10 run-off the straight of charging hopper can be made, brick is facilitated to unload.
Claims (2)
1. a kind of Construction of Civil Engineering brick handling facilities, including the first electromagnet(1), the second electromagnet(2), multistage retractable rod
(3), screw(4), stent(5), the first cylinder(6), flake bearing(7), the second cylinder(8), first connecting rod(9), charging hopper
(10), second connecting rod(11), third cylinder(12), supporting rack(13), motor(14), engine base(15), leading screw(16)And fagging
(17), it is characterized in that:The engine base(15)Upper installation motor(14), motor(14)Pass through shaft coupling and leading screw(16)It is connected, silk
Thick stick(16)Upper end is mounted on fagging(17)On interior flange bearing, shaft coupling is mounted on supporting rack(13)On, supporting rack(13)Peace
Mounted in engine base(15)On, leading screw(16)Upper installation screw(4), screw(4)Upper installation multistage retractable rod(3), multistage retractable rod(3)
Upper end is installed by the second electromagnet(2), the second electromagnet(2)With the first electromagnet(1)Magnetic attracting, the first electromagnet after energization
(1)Mounted on fagging(17)Bottom, the first electromagnet(1)With the second electromagnet(2)Installation site corresponds, screw(4)It is left
Side mounting bracket(5), stent(5)Left side is installed by the first cylinder(6), the first cylinder(6)Piston rod be mounted on flake bearing(7)
On, flake bearing(7)Mounted on the second cylinder(8)Side wall on, the second cylinder(8)Piston rod on first connecting rod is installed(9),
First connecting rod(9)Charging hopper is mounted on by axis pin(10)On, stent(5)Left side is installed by four third cylinders(12), third gas
Cylinder(12)Piston rod on second connecting rod is respectively installed(11), second connecting rod(11)Charging hopper is mounted on by axis pin(10)On.
2. a kind of Construction of Civil Engineering brick handling facilities according to claim 1, it is characterized in that:The charging hopper(10)
Rubber pad is installed on madial wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711328047.0A CN108177978B (en) | 2017-12-13 | 2017-12-13 | Civil engineering construction fragment of brick handling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711328047.0A CN108177978B (en) | 2017-12-13 | 2017-12-13 | Civil engineering construction fragment of brick handling equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108177978A true CN108177978A (en) | 2018-06-19 |
CN108177978B CN108177978B (en) | 2020-03-17 |
Family
ID=62546262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711328047.0A Active CN108177978B (en) | 2017-12-13 | 2017-12-13 | Civil engineering construction fragment of brick handling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108177978B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07245334A (en) * | 1994-03-02 | 1995-09-19 | Yaskawa Electric Corp | Wafer cassette elevator |
CN200973345Y (en) * | 2006-11-27 | 2007-11-14 | 外商独资大树智能科技(南京)有限公司 | Cigarette thread (slice) on-line analysing used automatic reclaiming and kickoff set |
CN204886532U (en) * | 2015-08-28 | 2015-12-16 | 宁波荣城机电科技有限公司 | Single pole feeds steering spindle device |
CN205526656U (en) * | 2016-04-22 | 2016-08-31 | 嘉善固威紧固件有限公司 | Device is moved to hardware for assembly line |
CN205687476U (en) * | 2016-06-30 | 2016-11-16 | 郑州工业应用技术学院 | A kind of civil engineering elevator |
CN205740162U (en) * | 2016-05-06 | 2016-11-30 | 徐子光 | A kind of safety five metals lowering or hoisting gear |
CN206172570U (en) * | 2016-11-01 | 2017-05-17 | 浙江国际海运职业技术学院 | Sealing device of bulk cargo grab bucket |
-
2017
- 2017-12-13 CN CN201711328047.0A patent/CN108177978B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07245334A (en) * | 1994-03-02 | 1995-09-19 | Yaskawa Electric Corp | Wafer cassette elevator |
CN200973345Y (en) * | 2006-11-27 | 2007-11-14 | 外商独资大树智能科技(南京)有限公司 | Cigarette thread (slice) on-line analysing used automatic reclaiming and kickoff set |
CN204886532U (en) * | 2015-08-28 | 2015-12-16 | 宁波荣城机电科技有限公司 | Single pole feeds steering spindle device |
CN205526656U (en) * | 2016-04-22 | 2016-08-31 | 嘉善固威紧固件有限公司 | Device is moved to hardware for assembly line |
CN205740162U (en) * | 2016-05-06 | 2016-11-30 | 徐子光 | A kind of safety five metals lowering or hoisting gear |
CN205687476U (en) * | 2016-06-30 | 2016-11-16 | 郑州工业应用技术学院 | A kind of civil engineering elevator |
CN206172570U (en) * | 2016-11-01 | 2017-05-17 | 浙江国际海运职业技术学院 | Sealing device of bulk cargo grab bucket |
Also Published As
Publication number | Publication date |
---|---|
CN108177978B (en) | 2020-03-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210564561U (en) | Concrete pumping system applying tunnel lining concrete distribution cantilever crane mechanism | |
CN108031595A (en) | A kind of paint spraying apparatus of engineering machinery car body | |
CN108177978A (en) | A kind of Construction of Civil Engineering brick handling facilities | |
US20210054637A1 (en) | Support apparatus for use in civil construction | |
CN105836684B (en) | A kind of Prestressed concrete cylinder pipe turnover device | |
CN104847112A (en) | Crane with function of concrete conveying pump truck | |
CN104191220B (en) | Vibration ore dumping machine disassembling and assembling machine system and assembly and disassembly methods thereof | |
CN212768053U (en) | Tail turntable device of displacement belt conveyor | |
CN104444867A (en) | Liftable column fixation type rotation cantilever crane | |
CN214025489U (en) | Fixed-point sleeve taking and replacing device | |
CN205472329U (en) | Line hangs equipment | |
CN212292566U (en) | Double-rotation cantilever crane | |
CN204958236U (en) | Just, dismantle fixed base crane base chassis | |
CN107814315A (en) | One kind building hoisting machine | |
CN202645586U (en) | Mine car material-taking apparatus with hydraulic drive | |
CN205225274U (en) | Arm whitewashing operation platform | |
CN215927410U (en) | Concrete auxiliary guniting manipulator for mine tunnel | |
CN204198325U (en) | A kind of adjustable crane | |
CN210214052U (en) | Civil engineering pipeline loading and unloading frame | |
CN207583004U (en) | A kind of civil engineering work supporting rack | |
CN211818473U (en) | Novel middle and low pressure pole setting special-purpose vehicle | |
CN219860182U (en) | Grab bucket equipment of mechanical crane | |
CN103626050A (en) | Rescue cabin location base and rescue crane | |
CN111573523B (en) | Double-rotation cantilever crane | |
CN105565246A (en) | Crane tube device for truck loading of asphalt tank truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |