CN108170057A - A kind of energy consumption monitoring system based on intelligent doorplate - Google Patents

A kind of energy consumption monitoring system based on intelligent doorplate Download PDF

Info

Publication number
CN108170057A
CN108170057A CN201711487507.4A CN201711487507A CN108170057A CN 108170057 A CN108170057 A CN 108170057A CN 201711487507 A CN201711487507 A CN 201711487507A CN 108170057 A CN108170057 A CN 108170057A
Authority
CN
China
Prior art keywords
energy consumption
data
module
electrical equipment
central processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711487507.4A
Other languages
Chinese (zh)
Inventor
方贤才
谢金辉
侯德龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan City Qin Billion Information Technology Ltd By Share Ltd
Original Assignee
Wuhan City Qin Billion Information Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan City Qin Billion Information Technology Ltd By Share Ltd filed Critical Wuhan City Qin Billion Information Technology Ltd By Share Ltd
Priority to CN201711487507.4A priority Critical patent/CN108170057A/en
Publication of CN108170057A publication Critical patent/CN108170057A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24024Safety, surveillance

Abstract

The present invention relates to a kind of energy consumption monitoring systems based on intelligent doorplate, including liquid crystal display, central processing unit, data gateway, electric equipment control device, energy consumption harvester, the liquid crystal display is electrically connected with the central processing unit, and the electric equipment control device, energy consumption harvester are electrically connected by the data gateway with the central processing unit.By the present invention, user can intuitively obtain the energy consumption of electrical equipment in building by intelligent doorplate, and directly electrical equipment in building can be controlled by intelligent doorplate, convenient intuitive, easy to operation.

Description

A kind of energy consumption monitoring system based on intelligent doorplate
Technical field
The present invention relates to field of intelligent control technology, and in particular to a kind of energy consumption monitoring system based on intelligent doorplate.
Background technology
In recent years, with the development of economy, the construction industry development in China is rapid, and building energy consumption already takes up social total energy consumption Greatly, and there is rising.Meanwhile China is in the period of energy relative shortage, builds high energy consumption situation China's Pressure on Energy is increased, restricts the sustainable development of China's economy, building energy conservation has been very urgent.Therefore, energy consumption Supervision detection becomes an important content of current building energy conservation.
Existing intelligence doorplate is that aim at hotel guest room well-designed, and collection room number show and service room availability, and (room number is asked Do not bother, please clear up, someone nobody, touch bell button) the All-in-One hotel guest room intelligence doorplate that is integrated, and do not apply to In intelligent building, and it shows that content is single, can not inside exhibition building energy consumption element real-time electricity consumption data, can not to Electric equipment is monitored in real time.
Invention content
The present invention for the technical problems in the prior art, provides a kind of energy consumption monitoring system based on intelligent doorplate System, using intelligent control technology, the front end based on intelligent doorplate realization energy consumption data is shown and the monitoring to electrical equipment.
The technical solution that the present invention solves above-mentioned technical problem is as follows:A kind of energy consumption monitoring system based on intelligent doorplate, Including liquid crystal display, central processing unit, data gateway, electric equipment control device, energy consumption harvester, the liquid crystal display Device is electrically connected with the central processing unit, the electric equipment control device, energy consumption harvester by the data gateway with The central processing unit electrical connection..
Further, the liquid crystal display is touch type electronic display screen, is adopted including data disaply moudle and control information Collect module, the data disaply moudle and the control information acquisition module are electrically connected with the central processing unit, the number It is used to receive the electrical equipment visible energy consumption data of the central processing unit transmission and show, the control letter according to display module Breath acquisition module is used to acquire the electrical equipment control information that user is inputted by touch type electronic display screen and be sent to described Central processing unit.
Further, the central processing unit includes directive generation module, data processing module, visual edit module sum number According to memory module;
Described instruction generation module is electrically connected respectively with the data gateway and the control information acquisition module, for root Information is controlled according to electrical equipment input by user, is compiled by parsing, generates the identifiable control of the electric equipment control device System instruction, and the control instruction is sent to the electric equipment control device by the data gateway;
The data processing module is electrically connected with the data memory module, for being deposited according in the data memory module The electrical equipment real time energy consumption and history energy consumption data of storage analyze and process electrical equipment operation conditions;When passing through history energy When consumption comparison finds electrical equipment real time energy consumption exception, warning message is sent to the liquid crystal display;
The visual edit module is electrically connected respectively with the data disaply moudle and the data memory module, is used for The electrical equipment real time energy consumption data stored in the data memory module are subjected to visual edit, generation visualization icon letter Breath, and the Visual Chart information is sent to data disaply moudle and carries out data displaying;
The data memory module is electrically connected with the data gateway, for receive the energy consumption harvester pass through it is described The electrical equipment consumption information that data gateway uploads.
Further, the data gateway includes data transmit-receive module and performs control module;
The data transmit-receive module respectively with the central processing unit, energy consumption harvester and the execution control module Electrical connection, for receiving the energy consumption data of electrical equipment that the energy consumption harvester acquires in real time;For receiving central processing The electrical equipment control instruction that device issues, and forward it to the execution control module;
The execution control module is electrically connected with the electric equipment control device, for the electrical equipment to be forwarded to control Instruction.
Further, the electric equipment control device includes at least one device controller, and the device controller includes Command analysis module, for parsing the control instruction that the central processing unit is issued by the data gateway, and according to described The control instruction control electrical equipment performs corresponding operating.
Further, the energy consumption harvester includes at least one current or voltage sensor, for acquiring electricity consumption in real time The power information of equipment.
The beneficial effects of the invention are as follows:By the present invention, user can intuitively be obtained in building by intelligent doorplate and be used The energy consumption of electric equipment, and directly electrical equipment in building can be controlled by intelligent doorplate, it is convenient intuitive, convenient for behaviour Make.
Description of the drawings
Fig. 1 is a kind of energy consumption monitoring system structure diagram based on intelligent doorplate provided in an embodiment of the present invention;
Fig. 2 is liquid crystal display device structure schematic diagram provided in an embodiment of the present invention;
Fig. 3 is central processing unit structure diagram provided in an embodiment of the present invention;
Fig. 4 is data gateway structure diagram provided in an embodiment of the present invention.
Specific embodiment
The principle of the present invention and feature are described below in conjunction with example, the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
A kind of energy consumption monitoring system based on intelligent doorplate, including liquid crystal display, central processing unit, data gateway, use Electric equipment control device, energy consumption harvester, the liquid crystal display are electrically connected with the central processing unit, the electrical equipment Control device, energy consumption harvester are electrically connected by the data gateway with the central processing unit..
Further, the liquid crystal display is touch type electronic display screen, is adopted including data disaply moudle and control information Collect module, the data disaply moudle and the control information acquisition module are electrically connected with the central processing unit, the number It is used to receive the electrical equipment visible energy consumption data of the central processing unit transmission and show, the control letter according to display module Breath acquisition module is used to acquire the electrical equipment control information that user is inputted by touch type electronic display screen and be sent to described Central processing unit.
Further, the central processing unit includes directive generation module, data processing module, visual edit module sum number According to memory module;
Described instruction generation module is electrically connected respectively with the data gateway and the control information acquisition module, for root Information is controlled according to electrical equipment input by user, is compiled by parsing, generates the identifiable control of the electric equipment control device System instruction, and the control instruction is sent to the electric equipment control device by the data gateway;
The data processing module is electrically connected with the data memory module, for being deposited according in the data memory module The electrical equipment real time energy consumption and history energy consumption data of storage analyze and process electrical equipment operation conditions;When passing through history energy When consumption comparison finds electrical equipment real time energy consumption exception, warning message is sent to the liquid crystal display.
The visual edit module is electrically connected respectively with the data disaply moudle and the data memory module, is used for The electrical equipment real time energy consumption data stored in the data memory module are subjected to visual edit, generation visualization icon letter Breath, and the Visual Chart information is sent to data disaply moudle and carries out data displaying;
The data memory module is electrically connected with the data gateway, for receive the energy consumption harvester pass through it is described The electrical equipment consumption information that data gateway uploads.
Further, the data gateway includes data transmit-receive module and performs control module;
The data transmit-receive module respectively with the central processing unit, energy consumption harvester and the execution control module Electrical connection, for receiving the energy consumption data of electrical equipment that the energy consumption harvester acquires in real time;For receiving central processing The electrical equipment control instruction that device issues, and forward it to the execution control module;
The execution control module is electrically connected with the electric equipment control device, for the electrical equipment to be forwarded to control Instruction.
Further, the electric equipment control device includes at least one device controller, and the device controller includes Command analysis module, for parsing the control instruction that the central processing unit is issued by the data gateway, and according to described The control instruction control electrical equipment performs corresponding operating.
Further, the energy consumption harvester includes at least one current or voltage sensor, for acquiring electricity consumption in real time The power information of equipment.
By the present invention, user can intuitively obtain the energy consumption of electrical equipment in building by intelligent doorplate, and Directly electrical equipment in building can be controlled by intelligent doorplate, it is convenient intuitive, it is easy to operation.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (6)

1. a kind of energy consumption monitoring system based on intelligent doorplate, which is characterized in that including liquid crystal display, central processing unit, number According to gateway, electric equipment control device, energy consumption harvester, the liquid crystal display is electrically connected with the central processing unit, institute State electric equipment control device, energy consumption harvester is electrically connected by the data gateway with the central processing unit.
A kind of 2. energy consumption monitoring system based on intelligent doorplate according to claim 1, which is characterized in that the liquid crystal Show device for touch type electronic display screen, including data disaply moudle and control information acquisition module, the data disaply moudle and The control information acquisition module is electrically connected with the central processing unit, and the data disaply moudle is used to receive the center The electrical equipment visible energy consumption data of processor transmission simultaneously show that the control information acquisition module passes through for acquiring user The electrical equipment control information of touch type electronic display screen input is simultaneously sent to the central processing unit.
A kind of 3. energy consumption monitoring system based on intelligent doorplate according to claim 2, which is characterized in that the centre It manages device and includes directive generation module, data processing module, visual edit module and data memory module;
Described instruction generation module respectively with the data gateway and it is described control information acquisition module be electrically connected, for according to The electrical equipment control information of family input, is compiled by parsing, and is generated the identifiable control of the electric equipment control device and is referred to It enables, and the control instruction is sent to the electric equipment control device by the data gateway;
The data processing module is electrically connected with the data memory module, for according to storing in the data memory module Electrical equipment real time energy consumption and history energy consumption data analyze and process electrical equipment operation conditions;When passing through history energy consumption pair During than finding electrical equipment real time energy consumption exception, warning message is sent to the liquid crystal display;
The visual edit module is electrically connected respectively with the data disaply moudle and the data memory module, for by institute It states the electrical equipment real time energy consumption data stored in data memory module and carries out visual edit, generation visualizes icon information, And the Visual Chart information is sent to data disaply moudle and carries out data displaying;
The data memory module is electrically connected with the data gateway, passes through the data for receiving the energy consumption harvester The electrical equipment consumption information that gateway uploads.
A kind of 4. energy consumption monitoring system based on intelligent doorplate according to claim 1, which is characterized in that the data network Pass includes data transmit-receive module and performs control module;
The data transmit-receive module is electrically connected respectively with the central processing unit, energy consumption harvester and the execution control module It connects, for receiving the energy consumption data of electrical equipment that the energy consumption harvester acquires in real time;For receiving under central processing unit The electrical equipment control instruction of hair, and forward it to the execution control module;
The execution control module is electrically connected with the electric equipment control device, for the electrical equipment control to be forwarded to refer to It enables.
5. a kind of energy consumption monitoring system based on intelligent doorplate according to claim 1, which is characterized in that the electricity consumption is set Standby control device includes at least one device controller, and the device controller includes command analysis module, described for parsing The control instruction that central processing unit is issued by the data gateway, and electrical equipment is controlled to hold according to the control instruction Row corresponding operating.
6. a kind of energy consumption monitoring system based on intelligent doorplate according to claim 1, which is characterized in that the energy consumption is adopted Acquisition means include at least one current or voltage sensor, for acquiring the power information of electrical equipment in real time.
CN201711487507.4A 2017-12-29 2017-12-29 A kind of energy consumption monitoring system based on intelligent doorplate Withdrawn CN108170057A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711487507.4A CN108170057A (en) 2017-12-29 2017-12-29 A kind of energy consumption monitoring system based on intelligent doorplate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711487507.4A CN108170057A (en) 2017-12-29 2017-12-29 A kind of energy consumption monitoring system based on intelligent doorplate

Publications (1)

Publication Number Publication Date
CN108170057A true CN108170057A (en) 2018-06-15

Family

ID=62516470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711487507.4A Withdrawn CN108170057A (en) 2017-12-29 2017-12-29 A kind of energy consumption monitoring system based on intelligent doorplate

Country Status (1)

Country Link
CN (1) CN108170057A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102420784A (en) * 2011-10-13 2012-04-18 中国电力科学研究院 Home gateway, intelligent system and energy control method thereof
CN202551081U (en) * 2012-05-07 2012-11-21 山西省电力公司太原供电分公司 Home energy consumption management system
CN103680045A (en) * 2013-10-15 2014-03-26 西安物语科技有限公司 Intelligent electronic doorplate and intelligent electronic doorplate system
CN105182923A (en) * 2015-08-06 2015-12-23 国网山东省电力公司 Integrated intelligent electricity usage system for building and electricity usage method thereof
US9679310B1 (en) * 2014-06-10 2017-06-13 Cocoanut Manor, LLC Electronic display with combined human and machine readable elements
CN107368013A (en) * 2017-08-24 2017-11-21 西安邮电大学 Building energy consumption management system and method based on Internet of things

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102420784A (en) * 2011-10-13 2012-04-18 中国电力科学研究院 Home gateway, intelligent system and energy control method thereof
CN202551081U (en) * 2012-05-07 2012-11-21 山西省电力公司太原供电分公司 Home energy consumption management system
CN103680045A (en) * 2013-10-15 2014-03-26 西安物语科技有限公司 Intelligent electronic doorplate and intelligent electronic doorplate system
US9679310B1 (en) * 2014-06-10 2017-06-13 Cocoanut Manor, LLC Electronic display with combined human and machine readable elements
CN105182923A (en) * 2015-08-06 2015-12-23 国网山东省电力公司 Integrated intelligent electricity usage system for building and electricity usage method thereof
CN107368013A (en) * 2017-08-24 2017-11-21 西安邮电大学 Building energy consumption management system and method based on Internet of things

Similar Documents

Publication Publication Date Title
CN108964276A (en) Support the electricity consumption control terminal and system and load discrimination method of automatic demand response
CN103280888A (en) Household intelligent integrated electric energy control device
CN105486959A (en) Power transformer fault diagnosis system based on Internet-of-things and cloud computing
Rokonuzzaman et al. IoT-based distribution and control system for smart home applications
CN208654780U (en) A kind of opening/closing control device and detection system
CN109244762A (en) A kind of socket and electric quantity managing method with electricity statistical function
CN206210071U (en) One kind exchanges dead electricity alarm signal output circuit for distribution automation remote terminal unit
CN108170057A (en) A kind of energy consumption monitoring system based on intelligent doorplate
CN203734201U (en) Hardware platform of intelligent operation, display and control device of switch cabinet
CN207248991U (en) It is a kind of to detect the electric meter system for forgetting to close household electrical appliance and power supply
CN204480087U (en) Low-tension switch cabinet intelligent monitoring and controlling device and system
CN103473875A (en) Household electrical appliance antitheft system
CN107017703A (en) A kind of Auto-Test System Alternating Current Power Supply management and environmental monitoring installation
CN208188199U (en) Smart grid non-intrusion type resident load monitoring device
CN207651749U (en) A kind of IP PDU network intelligence insert rows
CN104111644B (en) The monitoring system of household appliances
CN112886707A (en) Dry node output method and output device of converter device
CN106612012A (en) Power distribution network information processing system
CN203119613U (en) Medical dual-power IT (information technology) isolation system
CN204719916U (en) Machine room monitoring system
CN204028660U (en) The monitoring system of household appliances
CN205753022U (en) Medical power cabinet
CN204697079U (en) The digital received and sent device that a kind of Internet of Things automatic fault detects
CN207069697U (en) A kind of status of electric power device for displaying information
CN205911833U (en) A communication management device for transformer substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180615

WW01 Invention patent application withdrawn after publication