CN108166528A - Subway station construction method of underground continuous wall in a kind of confined space - Google Patents

Subway station construction method of underground continuous wall in a kind of confined space Download PDF

Info

Publication number
CN108166528A
CN108166528A CN201711460637.9A CN201711460637A CN108166528A CN 108166528 A CN108166528 A CN 108166528A CN 201711460637 A CN201711460637 A CN 201711460637A CN 108166528 A CN108166528 A CN 108166528A
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
cage
slot
decentralization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711460637.9A
Other languages
Chinese (zh)
Other versions
CN108166528B (en
Inventor
邓永斌
汤永久
程闯
昝永奇
陈明春
徐成双
娄闪
曹俊林
陈星�
毕永洪
姚永久
刘贯中
姜小琦
刘永庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Engineering Group Co Ltd
China Railway First Engineering Group Co Ltd Guanzhou Branch
China Railway First Engineering Group Guangzhou Construction Engineering Co Ltd
Original Assignee
China Railway First Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Engineering Group Co Ltd filed Critical China Railway First Engineering Group Co Ltd
Priority to CN201711460637.9A priority Critical patent/CN108166528B/en
Publication of CN108166528A publication Critical patent/CN108166528A/en
Application granted granted Critical
Publication of CN108166528B publication Critical patent/CN108166528B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Abstract

The invention discloses subway station construction method of underground continuous wall in a kind of confined space, including step:Step 1: trenching construction:It is constructed using groover to the slot of constructed diaphram wall;Step 2: reinforcing bar cage hoisting decentralization channel determines:The length of accessible slot section measures respectively in length and slot to slot, and reinforcing bar cage hoisting decentralization channel is determined according to measurement result;Step 3: steel reinforcement cage presses Division and binding;Step 4: translation installation steel reinforcement cage installation;Step 5: decentralization installation steel reinforcement cage installation;Step 6: underwater concrete construction.The predetermined reinforcing bar cage hoisting decentralization channel of the present invention, and by carrying out wall steel bar basket structure by Division and binding respectively, corresponding installation method is used to the different steel reinforcement cages for pressing Division simultaneously, the diaphram wall wall steel reinforcement cage installation process that energy is easy, is rapidly completed in the confined space, work progress are safe and reliable.

Description

Subway station construction method of underground continuous wall in a kind of confined space
Technical field
The invention belongs to underground continuous wall construction technique field, more particularly, to subway station in a kind of confined space Construction method of underground continuous wall.
Background technology
Diaphram wall is that foundation engineering uses a kind of trench machine on the ground, along all side axis of deep excavation project Line under the conditions of mud off, excavates out a long and narrow deep trouth, after clear slot, steel reinforcement cage is hung in slot, then uses tremie method Underwater concreting with tremie method builds up a unit groove section, so carries out paragraph by paragraph, and continuous reinforced concrete wall together is built up in underground Wall, as intercept water, antiseepage, load-bearing, water-retaining structure.Subway is a kind of form of railway transportation, refers to the city based on being run in underground City's Rail Transit System, i.e. " underground railway " or " subway ".
Since bustling location of the subway station usually in urban district is built, thus subway station diaphram wall is applied In working hour, not only avoiding can be by the existing building of residing construction area and/or influencing for existing buildings, wherein existing building Object is referred to as barrier with existing buildings.Under the prior art and process conditions, deposited in construction area residing for diaphram wall The barriers such as existing bridge, building, overhead high-voltage wire the confined space (specifically referring to barrier) in, because by safety away from From limitation, the lifting of diaphram wall steel reinforcement cage, installation difficulty are very big, particularly when confined space height is less than lifting When mechanical height, directly resulting in can not construct.Thus, it need to design in the case of a kind of not removal of the obstacles in a limited space Diaphragm wall steel reinforcement cage is lifted by crane, is installed, and construction of diaphragm wall process in the easy completion confined space.
Invention content
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that provide a kind of confined space Interior subway station construction method of underground continuous wall predefines reinforcing bar cage hoisting decentralization channel, and by wall steel bar cage knot Structure is carried out by Division and is bound respectively, while to pressing the different steel reinforcement cages of Division using corresponding installation method, energy Diaphram wall wall steel reinforcement cage installation process easy, being rapidly completed in the confined space, work progress are safe and reliable.
In order to solve the above technical problems, the technical solution adopted by the present invention is:Subway station underground in a kind of confined space Continuous wall construction method, which is characterized in that this method includes the following steps:
Step 1: trenching construction:It is constructed using groover to the slot of constructed diaphram wall;
It is vertically linear type to laying and its cross section that institute's construction diaphram wall, which is in, is set in institute's construction diaphram wall Steel reinforcement cage be cube shaped wall steel bar cage;The slot be divided into intermediate channel section along its length and two be connected to it is described The side slots section of intermediate channel section both sides;The intermediate channel section is has obstacle slot section below barrier;
The slot has obstacle slot or bilateral to have obstacle slot for unilateral side;The unilateral side has in obstacle slot described in one For side slots section to there is obstacle slot section described in below barrier, another described side slots section is accessible slot section;It is described It is accessible slot section that bilateral, which has two side slots sections in obstacle slot,;
The vertical height H of wall steel bar cage described in vertical spacing h < at the top of the slot between barrier bottom;
Step 2: reinforcing bar cage hoisting decentralization channel determines:Institute in length L and the slot to slot described in step 1 The length for stating accessible slot section measures respectively, and reinforcing bar cage hoisting decentralization channel is determined according to measurement result;Institute It is translation mounting groove section to state the slot section in slot in addition to the reinforcing bar cage hoisting transfers channel;
When slot has obstacle slot for unilateral side, channel is transferred using the accessible slot section as the reinforcing bar cage hoisting, The reinforcing bar cage hoisting decentralization number of channels is one at this time;
When slot has obstacle slot for bilateral, when two accessible slot Duan Jun are not less than L1 or two no barrier When hindering the length of slot section identical, channel is transferred using two accessible slot Duan Jun as the reinforcing bar cage hoisting, it is described at this time Reinforcing bar cage hoisting decentralization number of channels is two;Otherwise, the length of accessible slot section described to two compares, by two institutes It states the accessible slot section that length is big in accessible slot section and transfers channel as the reinforcing bar cage hoisting, at this time the steel Muscle cage lifting decentralization number of channels is one;Wherein, L1=0.2L~0.3L;
When reinforcing bar cage hoisting decentralization number of channels is one, the length of the reinforcing bar cage hoisting decentralization channel is denoted as L0;When reinforcing bar cage hoisting decentralization number of channels is different for the length that reinforcing bar cage hoisting decentralization channel is stated described in two and two When, the length of two reinforcing bar cage hoisting decentralization channels is denoted as L respectively1And L2, wherein L1> L2;When the reinforcing bar cage hoisting Decentralization number of channels for state described in two and two reinforcing bar cage hoisting transfer channel length it is identical when, under the reinforcing bar cage hoisting The length for putting channel is denoted as L3
Step 3: steel reinforcement cage presses Division and binding:According to cloth of the wall steel bar cage being pre-designed in slot If position, and identified reinforcing bar cage hoisting decentralization channel in step 2 is combined, the cube steel reinforcement cage is divided into positioned at institute It states the decentralization installation steel reinforcement cage in reinforcing bar cage hoisting decentralization channel and reinforcing bar is installed in the translation in the translation mounting groove section Cage;The quantity for translating installation steel reinforcement cage is one, under the quantity and the reinforcing bar cage hoisting of the decentralization installation steel reinforcement cage The quantity for putting channel is identical;
Meanwhile the vertical spacing h between at the top of the slot and barrier bottom and the wall steel bar cage is vertical Height H is compared, and the structure of the translation installation steel reinforcement cage is determined according to comparing result:It is described as h < h0 The longitudinal spliced formula steel reinforcement cage that translation installation steel reinforcement cage is spliced by multiple vertical reinforcement cages laid from front to back, Duo Gesuo The height for stating vertical reinforcement cage is H, wherein h0=0.3H~0.4H;Otherwise, it is described translation installation steel reinforcement cage be by it is multiple from Under supreme laying the vertical spliced steel reinforcement cage that is spliced of steel reinforcement cage segment, the height of each steel reinforcement cage segment is not It is identical with the length of the translation installation steel reinforcement cage more than h and its length;
When the quantity of reinforcing bar cage hoisting decentralization channel is one, each vertical steel in the longitudinal spliced formula steel reinforcement cage The length of muscle cage is no more than L0;When the quantity of reinforcing bar cage hoisting decentralization channel is hung to state steel reinforcement cage described in two and two When loading the length difference for putting channel, the length of each vertical reinforcement cage is no more than L in the longitudinal spliced formula steel reinforcement cage2;When The quantity of reinforcing bar cage hoisting decentralization channel for stated described in two and two reinforcing bar cage hoisting transfer channel length it is identical when, The length of each vertical reinforcement cage is no more than L in the longitudinal spliced formula steel reinforcement cage3
Steel reinforcement cage, the vertical reinforcement cage are installed in the decentralization and the steel reinforcement cage segment is cube shaped and three Width is of same size with the wall steel bar cage;
When being bound to the wall steel bar cage, the decentralization installation steel reinforcement cage and the translation of splicing composition are installed All vertical reinforcement cages of steel reinforcement cage or all steel reinforcement cage segments are bound respectively;
Step 4: translation installation steel reinforcement cage installation:The translation installation steel reinforcement cage is installed;
When the translation installation steel reinforcement cage is longitudinal spliced formula steel reinforcement cage, the longitudinal spliced formula reinforcing bar is formed to splicing Multiple vertical reinforcement cages of cage are installed one by one;The installation method all same of multiple vertical reinforcement cages, passes through The reinforcing bar cage hoisting decentralization channel is installed;When reinforcing bar cage hoisting decentralization number of channels is one, pass through the steel Muscle cage lifting decentralization channel installs multiple vertical reinforcement cages one by one;When the reinforcing bar cage hoisting transfers number of channels When being two, transfer Channel Synchronous by two reinforcing bar cage hoistings and multiple vertical reinforcement cages are installed respectively;
By the reinforcing bar cage hoisting transfer channel to vertical reinforcement cage is installed any one described when, process is as follows:
Step A1, lifting and decentralization:The vertical reinforcement cage is from top to bottom lifted using hanging device and is transferred to institute It states in reinforcing bar cage hoisting decentralization channel, and passes through Compact Mounts and the vertical reinforcement cage is limited, make described vertical The top segment of steel reinforcement cage is located to slot;
The Compact Mounts are laid in the limiting that can be moved forward and backward on the aperture of slot and along the aperture of slot Device, the Compact Mounts are installed in the top segment of the vertical reinforcement cage;
Step A2, it translates:Vertical reinforcement cage described in step A1 is translated using the folding arm loop wheel machine below barrier In place;
Step A3, it transfers in place:Compact Mounts described in removal step A1, and the vertical reinforcement cage is transferred to Position;
It, will be multiple after multiple vertical reinforcement cages are respectively mounted in place according to the method described in step A1 to step A3 The vertical reinforcement cage, which is fastenedly connected, to be integrated, and obtains the assembled longitudinal spliced formula steel reinforcement cage;Again by each vertical reinforcement The Compact Mounts installed on cage are removed, then are transferred to the longitudinal spliced formula steel reinforcement cage using folding arm loop wheel machine The installation process of the translation installation steel reinforcement cage is completed in position;
When the translation installation steel reinforcement cage is vertical spliced steel reinforcement cage, from the bottom to top to the vertical spliced reinforcing bar Multiple steel reinforcement cage segments of cage are installed respectively, and process is as follows:
Step B1, bottom segment lifting and decentralization:It will be hung using folding arm loop wheel machine positioned at the steel reinforcement cage segment of bottommost Fill and transfer to it is described translation mounting groove section in, while by Compact Mounts described in step A1 to the steel reinforcement cage segment into Row limiting makes the top segment of the steel reinforcement cage segment be located to slot;At this point, the Compact Mounts are installed on the steel In the top segment of muscle cage segment;
Step B2, a upper steel reinforcement cage segment lifting continues and transfers:Using folding arm loop wheel machine by upper one institute to be installed It states steel reinforcement cage segment from top to bottom to lift to the currently mounted steel reinforcement cage segment, and described in currently being lifted Steel reinforcement cage segment is fastenedly connected with the steel reinforcement cage segment being disposed below, then to described in being connect under being located on steel reinforcement cage segment Compact Mounts are removed;Later, using folding arm loop wheel machine by the steel reinforcement cage segment currently lifted and under it All steel reinforcement cage segments of side, which synchronize, is transferred, while by the Compact Mounts to currently lifting steel reinforcement cage segment It is limited, the top segment of the steel reinforcement cage segment is made to be located to slot;At this point, the Compact Mounts are installed on this In the top segment of steel reinforcement cage segment;
Steel reinforcement cage segment is connect under described to be lifted below the steel reinforcement cage segment positioned at current and being lifted institute with current State the adjacent steel reinforcement cage segment in steel reinforcement cage segment;
Step B3, it is one or many to repeat step B2, until completing to be located at top in the vertical spliced steel reinforcement cage The steel reinforcement cage segment lifting, continue and decentralization process, obtain the assembled vertical spliced steel reinforcement cage;
Step B4, it transfers in place:To the Compact Mounts on spliced steel reinforcement cage vertical described in step B3 into Row is removed, and by the vertical spliced steel reinforcement cage decentralization in place, completes the installation process of the translation installation steel reinforcement cage;
Step 5: decentralization installation steel reinforcement cage installation:Using hanging device described in step A1, reinforcing bar is installed into the decentralization Cage is lifted and is transferred to residing reinforcing bar cage hoisting decentralization channel;Treat the decentralization installation in the wall steel bar cage After steel reinforcement cage is transferred in place, steel reinforcement cage is installed into the translation that steel reinforcement cage is installed in the decentralization with installation is complete in step 4 It is fastenedly connected and is integrated, obtain the wall steel bar cage that installation is complete;
Step 6: underwater concrete construction:Underwater concrete construction is carried out to constructed diaphram wall, is obtained Obtain the diaphram wall of construction molding.
Subway station construction method of underground continuous wall in a kind of above-mentioned confined space, it is characterized in that:Each institute in step 3 The height of steel reinforcement cage segment is stated no more than h1;Wherein, h1=0.4h~0.7h.
Subway station construction method of underground continuous wall in a kind of above-mentioned confined space, it is characterized in that:It is hung described in step A1 Standby installing is crawler crane.
Subway station construction method of underground continuous wall in a kind of above-mentioned confined space, it is characterized in that:Water described in step A1 Flat limiting device includes the more cross spacing beams being laid in same level, the cross spacing beam and the perpendicular cloth of slot If;
The length of the cross spacing beam is more than the width of slot, and the every cross spacing beam is inserted into the top In segment, the every cross spacing beam is respectively positioned on above slot and its both ends is respectively supported on the soil body of slot both sides.
Subway station construction method of underground continuous wall in a kind of above-mentioned confined space, it is characterized in that:The Horizontal limiting dress The quantity for putting middle cross spacing beam is two.
Subway station construction method of underground continuous wall in a kind of above-mentioned confined space, it is characterized in that:Step A1, step B1 and The height of top segment described in step B2 is 20cm~50cm.
Subway station construction method of underground continuous wall in a kind of above-mentioned confined space, it is characterized in that:Step A1 and step B2 Described in folding arm loop wheel machine be respectively positioned on the soil body of slot side.
Subway station construction method of underground continuous wall in a kind of above-mentioned confined space, it is characterized in that:Wall described in step 1 The length of body steel reinforcement cage is not less than 20m, and the height of the wall steel bar cage is more than 5m.
Subway station construction method of underground continuous wall in a kind of above-mentioned confined space, it is characterized in that:Slot described in step 1 Vertical spacing h at the top of hole between barrier bottom is more than the height of folding arm loop wheel machine.
Compared with the prior art, the present invention has the following advantages:
1st, construction method step reasonable design, easy to operate and realization are convenient.
2nd, slot divides reasonable, according to whether below barrier, by the slot section of slot be divided into obstacle slot section and Accessible slot section two types, and mutually should determine that and hung convenient for reinforcing bar cage hoisting and decentralization and the safe and reliable steel reinforcement cage of work progress It loads and puts channel.
3rd, according to residing slot section, wall steel bar cage is carried out by Division;And combine slot top and barrier bottom Between vertical spacing h and wall steel bar cage vertical height H between comparing result, to translation installation steel reinforcement cage structure into Row realizes the construction that becomes more meticulous, steel reinforcement cage is reasonable by Division, and to being carried out respectively by each steel reinforcement cage after Division by Division Binding molding.
4th, easy construction and work progress is safe and reliable, using effect is good, for by being located at slot difference position after Division The steel reinforcement cage at place is put, takes corresponding different installation methods, construction operability is strong, and mechanical equipment can need to select according to scene It selects, combine, convenient for organizing and implementing;It is safe controlled on existing construction of structures or pipeline almost without influence;Avoid construction of structures And the dismounting of the construction of structures of the influences such as overhead line construction, construction cost is greatly saved;It is applicable in the ground under most limited heights Lower construction of diaphragm wall, there is larger promotional value.Steel reinforcement cage is installed for installation difficulty big translation, zoning is pressed using different Divide method, and coordinate corresponding shifting method (i.e. for the installation method of longitudinal spliced formula steel reinforcement cage) and segmented lift-on/lift-off system (i.e. For the installation method of vertical spliced steel reinforcement cage) the mode obstacle avoidance that is combined, it is real in the case of the not removal of the obstacles Diaphragm wall reinforcement cage hoisting, installation under the existing confined space.And it transfers installation steel reinforcement cage and passes through reinforcing bar cage hoisting with vertical reinforcement cage Decentralization channel is integrally lifted and is transferred, and work progress is easy, and construction safety is reliable.
In conclusion the predetermined reinforcing bar cage hoisting decentralization channel of the present invention, and by being carried out to wall steel bar basket structure It is bound by Division and respectively, while corresponding installation method is used to the different steel reinforcement cages for pressing Division, it can be easy, fast Speed completes the diaphram wall wall steel reinforcement cage installation process in the confined space, and work progress is safe and reliable.
Below by drawings and examples, technical scheme of the present invention is described in further detail.
Description of the drawings
Fig. 1 is the method flow block diagram of the present invention.
Fig. 2 is the lifting status diagram that steel reinforcement cage and vertical reinforcement cage are installed in present invention decentralization.
Fig. 3 is the Construction State schematic diagram after vertical reinforcement cage of the present invention translates in place.
Fig. 4 is the Construction State schematic diagram after vertical reinforcement cage of the present invention is transferred in place.
Fig. 5 is the wiring state schematic diagram of the upper section steel reinforcement cage segment of the present invention.
Fig. 6 is structure diagram of the wall steel bar cage of the present invention after installation is complete.
Reference sign:
1-slot;2-barrier;3-folding arm loop wheel machine;
4-cross spacing beam;5-crawler crane hanging apparatus;6-folding arm crane hanging apparatus;
7-monolithic reinforced cage;8-sectional type steel reinforcement cage.
Specific embodiment
Subway station construction method of underground continuous wall in a kind of confined space as shown in Figure 1, includes the following steps:
Step 1: trenching construction:It is constructed using groover to the slot 1 of constructed diaphram wall;
It is vertically linear type to laying and its cross section that institute's construction diaphram wall, which is in, is set in institute's construction diaphram wall Steel reinforcement cage be cube shaped wall steel bar cage;The slot 1 is divided into intermediate channel section along its length and two are connected to institute State the side slots section of intermediate channel section both sides;The intermediate channel section is to have obstacle slot section positioned at 2 lower section of barrier;
The slot 1 has obstacle slot or bilateral to have obstacle slot for unilateral side;There is an institute in obstacle slot in the unilateral side It is to have obstacle slot section positioned at described in 2 lower section of barrier to state side slots section, another described side slots section is accessible slot section;Institute It is accessible slot section to state bilateral to have two side slots sections in obstacle slot;
The vertical height H of wall steel bar cage described in vertical spacing h < between 1 top of slot and 2 bottom of barrier;
Step 2: reinforcing bar cage hoisting decentralization channel determines:To in the length L and the slot 1 of slot 1 described in step 1 The length of the accessible slot section measures respectively, and reinforcing bar cage hoisting decentralization channel is determined according to measurement result; Slot section in the slot 1 in addition to the reinforcing bar cage hoisting transfers channel is translation mounting groove section;
When slot 1 has obstacle slot for unilateral side, channel is transferred using the accessible slot section as the reinforcing bar cage hoisting, The reinforcing bar cage hoisting decentralization number of channels is one at this time;
When slot 1 has obstacle slot for bilateral, when two accessible slot Duan Jun are not less than L1 or two nothing When the length of obstacle slot section is identical, channel is transferred using two accessible slot Duan Jun as the reinforcing bar cage hoisting, at this time institute It is two to state reinforcing bar cage hoisting decentralization number of channels;Otherwise, the length of accessible slot section described to two compares, by two A big accessible slot section of length transfers channel as the reinforcing bar cage hoisting in the accessible slot section, described at this time Reinforcing bar cage hoisting decentralization number of channels is one;Wherein, L1=0.2L~0.3L;
When reinforcing bar cage hoisting decentralization number of channels is one, the length of the reinforcing bar cage hoisting decentralization channel is denoted as L0;When reinforcing bar cage hoisting decentralization number of channels is different for the length that reinforcing bar cage hoisting decentralization channel is stated described in two and two When, the length of two reinforcing bar cage hoisting decentralization channels is denoted as L respectively1And L2, wherein L1> L2;When the reinforcing bar cage hoisting Decentralization number of channels for state described in two and two reinforcing bar cage hoisting transfer channel length it is identical when, under the reinforcing bar cage hoisting The length for putting channel is denoted as L3
Step 3: steel reinforcement cage presses Division and binding:According to cloth of the wall steel bar cage being pre-designed in slot 1 If position, and identified reinforcing bar cage hoisting decentralization channel in step 2 is combined, the cube steel reinforcement cage is divided into positioned at institute It states the decentralization installation steel reinforcement cage in reinforcing bar cage hoisting decentralization channel and reinforcing bar is installed in the translation in the translation mounting groove section Cage;The quantity for translating installation steel reinforcement cage is one, under the quantity and the reinforcing bar cage hoisting of the decentralization installation steel reinforcement cage The quantity for putting channel is identical;
Meanwhile the vertical spacing h between 1 top of the slot and 2 bottom of barrier and the wall steel bar cage is perpendicular It is compared to height H, and the structure of the translation installation steel reinforcement cage is determined according to comparing result:As h < h0, institute The longitudinal spliced formula steel reinforcement cage that translation installation steel reinforcement cage is spliced by multiple vertical reinforcement cages laid from front to back is stated, it is multiple The height of the vertical reinforcement cage is H, wherein h0=0.3H~0.4H;Otherwise, the translation installation steel reinforcement cage is by multiple The vertical spliced steel reinforcement cage that the steel reinforcement cage segment laid from bottom to up is spliced, the height of each steel reinforcement cage segment are equal It is identical with the length of the translation installation steel reinforcement cage no more than h and its length;
When the quantity of reinforcing bar cage hoisting decentralization channel is one, each vertical steel in the longitudinal spliced formula steel reinforcement cage The length of muscle cage is no more than L0;When the quantity of reinforcing bar cage hoisting decentralization channel is hung to state steel reinforcement cage described in two and two When loading the length difference for putting channel, the length of each vertical reinforcement cage is no more than L in the longitudinal spliced formula steel reinforcement cage2;When The quantity of reinforcing bar cage hoisting decentralization channel for stated described in two and two reinforcing bar cage hoisting transfer channel length it is identical when, The length of each vertical reinforcement cage is no more than L in the longitudinal spliced formula steel reinforcement cage3
Steel reinforcement cage, the vertical reinforcement cage are installed in the decentralization and the steel reinforcement cage segment is cube shaped and three Width is of same size with the wall steel bar cage;
When being bound to the wall steel bar cage, the decentralization installation steel reinforcement cage and the translation of splicing composition are installed All vertical reinforcement cages of steel reinforcement cage or all steel reinforcement cage segments are bound respectively;
Step 4: translation installation steel reinforcement cage installation:The translation installation steel reinforcement cage is installed;
When the translation installation steel reinforcement cage is longitudinal spliced formula steel reinforcement cage, the longitudinal spliced formula reinforcing bar is formed to splicing Multiple vertical reinforcement cages of cage are installed one by one;The installation method all same of multiple vertical reinforcement cages, passes through The reinforcing bar cage hoisting decentralization channel is installed;When reinforcing bar cage hoisting decentralization number of channels is one, pass through the steel Muscle cage lifting decentralization channel installs multiple vertical reinforcement cages one by one;When the reinforcing bar cage hoisting transfers number of channels When being two, transfer Channel Synchronous by two reinforcing bar cage hoistings and multiple vertical reinforcement cages are installed respectively;
It is shown as shown in Figure 2, Figure 3 and Figure 4, by the reinforcing bar cage hoisting transfer channel to vertical reinforcement cage any one described into During row installation, process is as follows:
Step A1, lifting and decentralization:The vertical reinforcement cage is from top to bottom lifted using hanging device and is transferred to institute It states in reinforcing bar cage hoisting decentralization channel, and passes through Compact Mounts and the vertical reinforcement cage is limited, make described vertical The top segment of steel reinforcement cage is located to 1 outside of slot;
The Compact Mounts are laid in the limit that can be moved forward and backward on the aperture of slot 1 and along the aperture of slot 1 Position device, the Compact Mounts are installed in the top segment of the vertical reinforcement cage;
Step A2, it translates:Vertical reinforcement cage described in step A1 is put down using the folding arm loop wheel machine 3 positioned at 2 lower section of barrier Move on to position;
Step A3, it transfers in place:Compact Mounts described in removal step A1, and the vertical reinforcement cage is transferred to Position;
It, will be multiple after multiple vertical reinforcement cages are respectively mounted in place according to the method described in step A1 to step A3 The vertical reinforcement cage, which is fastenedly connected, to be integrated, and obtains the assembled longitudinal spliced formula steel reinforcement cage;Again by each vertical reinforcement The Compact Mounts installed on cage are removed, then are transferred the longitudinal spliced formula steel reinforcement cage using folding arm loop wheel machine 3 In place, the installation process of the translation installation steel reinforcement cage is completed;
When the translation installation steel reinforcement cage is vertical spliced steel reinforcement cage, from the bottom to top to the vertical spliced reinforcing bar Multiple steel reinforcement cage segments of cage are installed respectively, and process is as follows:
Step B1, bottom segment lifting and decentralization:It will be hung using folding arm loop wheel machine 3 positioned at the steel reinforcement cage segment of bottommost Fill and transfer to it is described translation mounting groove section in, while by Compact Mounts described in step A1 to the steel reinforcement cage segment into Row limiting makes the top segment of the steel reinforcement cage segment be located to 1 outside of slot, refers to Fig. 5;At this point, the Compact Mounts It is installed in the top segment of the steel reinforcement cage segment;
Step B2, a upper steel reinforcement cage segment lifting continues and transfers:It is to be installed by upper one using folding arm loop wheel machine 3 The steel reinforcement cage segment is from top to bottom lifted to the currently mounted steel reinforcement cage segment, and the institute that will be currently lifted Steel reinforcement cage segment is stated to be fastenedly connected with the steel reinforcement cage segment being disposed below, then to meeting the institute on steel reinforcement cage segment under being located at It states Compact Mounts to be removed, refers to Fig. 5;Later, the steel reinforcement cage segment that will currently be lifted using folding arm loop wheel machine 3 With all steel reinforcement cage segments for being disposed below synchronize transferred, while by the Compact Mounts to currently being lifted Steel reinforcement cage segment is limited, and the top segment of the steel reinforcement cage segment is made to be located to 1 outside of slot;At this point, the Horizontal limiting Device is installed in the top segment of the steel reinforcement cage segment;
Steel reinforcement cage segment is connect under described to be lifted below the steel reinforcement cage segment positioned at current and being lifted institute with current State the adjacent steel reinforcement cage segment in steel reinforcement cage segment;
Step B3, it is one or many to repeat step B2, until completing to be located at top in the vertical spliced steel reinforcement cage The steel reinforcement cage segment lifting, continue and decentralization process, obtain the assembled vertical spliced steel reinforcement cage;
Step B4, it transfers in place:To the Compact Mounts on spliced steel reinforcement cage vertical described in step B3 into Row is removed, and by the vertical spliced steel reinforcement cage decentralization in place, completes the installation process of the translation installation steel reinforcement cage;
Step 5: decentralization installation steel reinforcement cage installation:Using hanging device described in step A1, reinforcing bar is installed into the decentralization Cage is lifted and is transferred to residing reinforcing bar cage hoisting decentralization channel, refers to Fig. 2;It treats described in the wall steel bar cage After decentralization installation steel reinforcement cage is transferred in place, the translation that steel reinforcement cage is installed in the decentralization with installation is complete in step 4 is pacified Dress steel reinforcement cage, which is fastenedly connected, to be integrated, and obtains the wall steel bar cage that installation is complete;
Step 6: underwater concrete construction:Underwater concrete construction is carried out to constructed diaphram wall, is obtained Obtain the diaphram wall of construction molding.
In the present embodiment, the slot 1 has obstacle slot for unilateral side.
Wherein, the decentralization installation steel reinforcement cage and vertical reinforcement cage are once to bind molding monolithic reinforced cage 7, institute Steel reinforcement cage segment is stated as sectional type steel reinforcement cage 8.
In the present embodiment, between the two neighboring vertical reinforcement cage and steel reinforcement cage and the translation are installed in the decentralization It is attached between installation steel reinforcement cage using groove joint, between neighbouring two steel reinforcement cage segments using machinery even It connects or welding manner is attached.
In the present embodiment, the height of each steel reinforcement cage segment is no more than h1 in step 3;Wherein, h1=0.4h~ 0.7h。
Wherein, the L1 described in the step 2 and h0 described in step 3 and h1 is the judgment threshold being pre-designed, Middle L1 be 0.2L~0.3L in the range of any one numerical value, h0 be 0.3H~0.4H in the range of any one numerical value, h1 0.4h Any one numerical value in the range of~0.7h.
It during practice of construction, can specifically need, the value size of L1, h0 and h1 are adjusted accordingly.
Region residing for the barrier 2 is prohibited security zone.Thus, the wall steel bar cage is lifted and transferred and is applied During work, the prohibited security zone should all be avoided.Thus, just it is to have above slot 1 and there are the construction area of barrier 2 Limit space.
In the present embodiment, hanging device described in step A1 is crawler crane.
During practice of construction, the decentralization to be lifted installation steel reinforcement cage or the vertical reinforcement cage are hung in the crawler belt 5 lower section of crawler crane hanging apparatus hung.The crawler crane hanging apparatus 5 includes suspension hook and the lifting being lifted below the suspension hook Shoulder pole girder.
Correspondingly, the steel reinforcement cage segment hanging is below the folding arm crane hanging apparatus 6 of the folding arm loop wheel machine 3.The folding Arm hangs hanging apparatus 6 and also includes suspension hook and the lifting shoulder pole girder being lifted below the suspension hook.The folding arm loop wheel machine 3 is also referred to as rolled over Boom crane.
In the present embodiment, Compact Mounts described in step A1 include the more lateral limits being laid in same level Position beam 4, the cross spacing beam 4 and 1 perpendicular laying of slot;
The length of the cross spacing beam 4 is more than the width of slot 1, and the every cross spacing beam 4 is inserted into described In top segment, the every cross spacing beam 4 is respectively positioned on 1 top of slot and its both ends and is respectively supported at the soil of 1 both sides of slot On body.
In actual use, the Compact Mounts are formed using more cross spacing beams 4, economical and practical, simple installation, And good limit effect.
In the present embodiment, the quantity of cross spacing beam 4 is two in the Compact Mounts, can be right according to specific needs The quantity of cross spacing beam 4 adjusts accordingly in the Compact Mounts.
In the present embodiment, step A1, the height of top segment described in step B1 and step B2 is 20cm~50cm.
During practice of construction, folding arm loop wheel machine 3 is respectively positioned on the soil body of 1 side of slot described in step A1 and step B2.
Also, the vertical spacing h at the top of slot 1 described in step 1 between 2 bottom of barrier is more than folding arm loop wheel machine 3 Highly.
In the present embodiment, the length of wall steel bar cage described in step 1 is not less than 20m, the height of the wall steel bar cage More than 5m.
In the present embodiment, the translation installation steel reinforcement cage is the longitudinal spliced formula steel reinforcement cage and it is described vertical by two Steel reinforcement cage is formed by connecting.The wall steel bar cage that installation is complete refers to Fig. 6.
In Fig. 6, the right side groove section of the slot 1 is accessible slot section, and the left side groove section of the slot 1 is has obstacle slot Section, the right side groove Duan Weiwei reinforcing bar cage hoistings decentralization channel of the slot 1 and the steel reinforcement cage filled in it are decentralization installation reinforcing bar Cage.The steel reinforcement cage filled in the left side groove section of the slot 1 installs steel reinforcement cage for the translation.
The above is only presently preferred embodiments of the present invention, not the present invention is imposed any restrictions, every according to the present invention Any simple modification, change and the equivalent structure that technical spirit makees above example change, and still fall within skill of the present invention In the protection domain of art scheme.

Claims (9)

1. subway station construction method of underground continuous wall in a kind of confined space, which is characterized in that this method includes the following steps:
Step 1: trenching construction:It is constructed using groover to the slot (1) of constructed diaphram wall;
Institute's construction diaphram wall is in vertically to laying and its cross section is linear type, the steel set in institute's construction diaphram wall Muscle cage is cube shaped wall steel bar cage;The slot (1) be divided into intermediate channel section along its length and two be connected to it is described The side slots section of intermediate channel section both sides;The intermediate channel section is has obstacle slot section below barrier (2);
The slot (1) has obstacle slot or bilateral to have obstacle slot for unilateral side;The unilateral side has in obstacle slot described in one Side slots section has obstacle slot section for described below barrier (2), another described side slots section is accessible slot section;Institute It is accessible slot section to state bilateral to have two side slots sections in obstacle slot;
The vertical height H of wall steel bar cage described in vertical spacing h < at the top of the slot (1) between barrier (2) bottom;
Step 2: reinforcing bar cage hoisting decentralization channel determines:In length L and the slot (1) to slot described in step 1 (1) The length of the accessible slot section measures respectively, and reinforcing bar cage hoisting decentralization channel is determined according to measurement result; Slot section in the slot (1) in addition to the reinforcing bar cage hoisting transfers channel is translation mounting groove section;
When slot (1) has obstacle slot for unilateral side, channel is transferred using the accessible slot section as the reinforcing bar cage hoisting, this Shi Suoshu reinforcing bar cage hoistings decentralization number of channels is one;
When slot (1) has obstacle slot for bilateral, when two accessible slot Duan Jun are not less than L1 or two no barrier When hindering the length of slot section identical, channel is transferred using two accessible slot Duan Jun as the reinforcing bar cage hoisting, it is described at this time Reinforcing bar cage hoisting decentralization number of channels is two;Otherwise, the length of accessible slot section described to two compares, by two institutes It states the accessible slot section that length is big in accessible slot section and transfers channel as the reinforcing bar cage hoisting, at this time the steel Muscle cage lifting decentralization number of channels is one;Wherein, L1=0.2L~0.3L;
When reinforcing bar cage hoisting decentralization number of channels is one, the length of the reinforcing bar cage hoisting decentralization channel is denoted as L0;When When the reinforcing bar cage hoisting decentralization number of channels transfers the length difference of channel to state reinforcing bar cage hoisting described in two and two, two The length of a reinforcing bar cage hoisting decentralization channel is denoted as L respectively1And L2, wherein L1> L2;When reinforcing bar cage hoisting decentralization is logical Road quantity for state described in two and two reinforcing bar cage hoisting transfer channel length it is identical when, the reinforcing bar cage hoisting transfers channel Length be denoted as L3
Step 3: steel reinforcement cage presses Division and binding:According to laying of the wall steel bar cage being pre-designed in slot (1) Position, and identified reinforcing bar cage hoisting decentralization channel in step 2 is combined, the cube steel reinforcement cage is divided into positioned at described Steel reinforcement cage is installed in decentralization installation steel reinforcement cage in reinforcing bar cage hoisting decentralization channel and the translation in the translation mounting groove section; The quantity of the translation installation steel reinforcement cage is one, and the quantity of the decentralization installation steel reinforcement cage and reinforcing bar cage hoisting decentralization are logical The quantity in road is identical;
Meanwhile to being erected with the vertical spacing h between barrier (2) bottom and the wall steel bar cage at the top of the slot (1) It is compared to height H, and the structure of the translation installation steel reinforcement cage is determined according to comparing result:As h < h0, institute The longitudinal spliced formula steel reinforcement cage that translation installation steel reinforcement cage is spliced by multiple vertical reinforcement cages laid from front to back is stated, it is multiple The height of the vertical reinforcement cage is H, wherein h0=0.3H~0.4H;Otherwise, the translation installation steel reinforcement cage is by multiple The vertical spliced steel reinforcement cage that the steel reinforcement cage segment laid from bottom to up is spliced, the height of each steel reinforcement cage segment are equal It is identical with the length of the translation installation steel reinforcement cage no more than h and its length;
When the quantity of reinforcing bar cage hoisting decentralization channel is one, each vertical reinforcement cage in the longitudinal spliced formula steel reinforcement cage Length no more than L0;When the quantity of reinforcing bar cage hoisting decentralization channel is states under reinforcing bar cage hoisting described in two and two When putting the length difference of channel, the length of each vertical reinforcement cage is no more than L in the longitudinal spliced formula steel reinforcement cage2;When described The quantity of reinforcing bar cage hoisting decentralization channel for state described in two and two reinforcing bar cage hoisting transfer channel length it is identical when, it is described The length of each vertical reinforcement cage is no more than L in longitudinal spliced formula steel reinforcement cage3
The decentralization installation steel reinforcement cage, the vertical reinforcement cage and the steel reinforcement cage segment are cube shaped and three width It is of same size with the wall steel bar cage;
When being bound to the wall steel bar cage, to the decentralization installation steel reinforcement cage and the splicing composition translation installation reinforcing bar All vertical reinforcement cages of cage or all steel reinforcement cage segments are bound respectively;
Step 4: translation installation steel reinforcement cage installation:The translation installation steel reinforcement cage is installed;
When the translation installation steel reinforcement cage is longitudinal spliced formula steel reinforcement cage, the longitudinal spliced formula steel reinforcement cage is formed to splicing Multiple vertical reinforcement cages are installed one by one;The installation method all same of multiple vertical reinforcement cages, by described Reinforcing bar cage hoisting decentralization channel is installed;When reinforcing bar cage hoisting decentralization number of channels is one, pass through the steel reinforcement cage Lifting decentralization channel installs multiple vertical reinforcement cages one by one;When reinforcing bar cage hoisting decentralization number of channels is two When a, transfer Channel Synchronous by two reinforcing bar cage hoistings and multiple vertical reinforcement cages are installed respectively;
By the reinforcing bar cage hoisting transfer channel to vertical reinforcement cage is installed any one described when, process is as follows:
Step A1, lifting and decentralization:The vertical reinforcement cage is from top to bottom lifted using hanging device and is transferred to the steel In muscle cage lifting decentralization channel, and pass through Compact Mounts and the vertical reinforcement cage is limited, make the vertical reinforcement The top segment of cage is located to slot (1);
The Compact Mounts are laid in the limit that can be moved forward and backward on the aperture of slot (1) and along the aperture of slot (1) Position device, the Compact Mounts are installed in the top segment of the vertical reinforcement cage;
Step A2, it translates:Vertical reinforcement cage described in step A1 is put down using the folding arm loop wheel machine (3) below barrier (2) Move on to position;
Step A3, it transfers in place:Compact Mounts described in removal step A1, and by vertical reinforcement cage decentralization in place;
It, will be multiple described after multiple vertical reinforcement cages are respectively mounted in place according to the method described in step A1 to step A3 Vertical reinforcement cage, which is fastenedly connected, to be integrated, and obtains the assembled longitudinal spliced formula steel reinforcement cage;It again will be on each vertical reinforcement cage The Compact Mounts installed are removed, then are transferred to the longitudinal spliced formula steel reinforcement cage using folding arm loop wheel machine (3) The installation process of the translation installation steel reinforcement cage is completed in position;
When the translation installation steel reinforcement cage is vertical spliced steel reinforcement cage, from the bottom to top to the vertical spliced steel reinforcement cage Multiple steel reinforcement cage segments are installed respectively, and process is as follows:
Step B1, bottom segment lifting and decentralization:It will be positioned at the steel reinforcement cage segment lifting of bottommost using folding arm loop wheel machine (3) And it transfers to the translation mounting groove section, while the steel reinforcement cage segment is carried out by Compact Mounts described in step A1 Limiting makes the top segment of the steel reinforcement cage segment be located to slot (1);At this point, the Compact Mounts are installed on this In the top segment of steel reinforcement cage segment;
Step B2, a upper steel reinforcement cage segment lifting continues and transfers:Using folding arm loop wheel machine (3) by upper one institute to be installed It states steel reinforcement cage segment from top to bottom to lift to the currently mounted steel reinforcement cage segment, and described in currently being lifted Steel reinforcement cage segment is fastenedly connected with the steel reinforcement cage segment being disposed below, then to described in being connect under being located on steel reinforcement cage segment Compact Mounts are removed;Later, using folding arm loop wheel machine (3) by the steel reinforcement cage segment currently lifted and positioned at it All steel reinforcement cage segments of lower section, which synchronize, is transferred, while by the Compact Mounts to currently lifting steel reinforcement cage section Duan Jinhang is limited, and the top segment of the steel reinforcement cage segment is made to be located to slot (1);At this point, the Compact Mounts peace In top segment loaded on the steel reinforcement cage segment;
Steel reinforcement cage segment is connect under described to be lifted below the steel reinforcement cage segment positioned at current and being lifted the steel with current The adjacent steel reinforcement cage segment in muscle cage segment;
Step B3, it is one or many to repeat step B2, until completing the institute for being located at top in the vertical spliced steel reinforcement cage It states the lifting of steel reinforcement cage segment, continue and decentralization process, obtain the assembled vertical spliced steel reinforcement cage;
Step B4, it transfers in place:The Compact Mounts on spliced steel reinforcement cage vertical described in step B3 are torn open It removes, and by the vertical spliced steel reinforcement cage decentralization in place, completes the installation process of the translation installation steel reinforcement cage;
Step 5: decentralization installation steel reinforcement cage installation:Using hanging device described in step A1, steel reinforcement cage is installed into the decentralization and is hung It fills and transfers to residing reinforcing bar cage hoisting decentralization channel;Treat the decentralization installation reinforcing bar in the wall steel bar cage After cage is transferred in place, by the translation installation steel reinforcement cage fastening that steel reinforcement cage is installed in the decentralization with installation is complete in step 4 It is connected as one, obtains the wall steel bar cage that installation is complete;
Step 6: underwater concrete construction:Underwater concrete construction is carried out to constructed diaphram wall, is applied The molding diaphram wall of work.
2. subway station construction method of underground continuous wall in a kind of confined space described in accordance with the claim 1, it is characterised in that: The height of each steel reinforcement cage segment is no more than h1 in step 3;Wherein, h1=0.4h~0.7h.
3. according to subway station construction method of underground continuous wall in a kind of confined space described in claims 1 or 2, feature exists In:Hanging device described in step A1 is crawler crane.
4. according to subway station construction method of underground continuous wall in a kind of confined space described in claims 1 or 2, feature exists In:Compact Mounts described in step A1 include the more cross spacing beams (4) being laid in same level, the transverse direction Limit beam (4) and slot (1) perpendicular laying;
The length of the cross spacing beam (4) is more than the width of slot (1), and the every cross spacing beam (4) is inserted into institute It states in top segment, the every cross spacing beam (4) is respectively positioned on above slot (1) and its both ends is respectively supported at slot (1) On the soil body of both sides.
5. according to subway station construction method of underground continuous wall in a kind of confined space described in claim 4, it is characterised in that: The quantity of cross spacing beam (4) is two in the Compact Mounts.
6. according to subway station construction method of underground continuous wall in a kind of confined space described in claims 1 or 2, feature exists In:Step A1, the height of top segment described in step B1 and step B2 is 20cm~50cm.
7. according to subway station construction method of underground continuous wall in a kind of confined space described in claims 1 or 2, feature exists In:Folding arm loop wheel machine (3) described in step A1 and step B2 is respectively positioned on the soil body of slot (1) side.
8. according to subway station construction method of underground continuous wall in a kind of confined space described in claims 1 or 2, feature exists In:The length of wall steel bar cage described in step 1 is not less than 20m, and the height of the wall steel bar cage is more than 5m.
9. according to subway station construction method of underground continuous wall in a kind of confined space described in claims 1 or 2, feature exists In:Vertical spacing h at the top of slot described in step 1 (1) between barrier (2) bottom is more than the height of folding arm loop wheel machine (3) Degree.
CN201711460637.9A 2017-12-28 2017-12-28 Subway station construction method of underground continuous wall in a kind of confined space Active CN108166528B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711460637.9A CN108166528B (en) 2017-12-28 2017-12-28 Subway station construction method of underground continuous wall in a kind of confined space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711460637.9A CN108166528B (en) 2017-12-28 2017-12-28 Subway station construction method of underground continuous wall in a kind of confined space

Publications (2)

Publication Number Publication Date
CN108166528A true CN108166528A (en) 2018-06-15
CN108166528B CN108166528B (en) 2019-09-20

Family

ID=62519258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711460637.9A Active CN108166528B (en) 2017-12-28 2017-12-28 Subway station construction method of underground continuous wall in a kind of confined space

Country Status (1)

Country Link
CN (1) CN108166528B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088792A (en) * 2020-01-07 2020-05-01 中国葛洲坝集团市政工程有限公司 Double L-shaped reinforcement cage hoisting method in underground continuous wall construction
CN111764374A (en) * 2020-05-28 2020-10-13 浙江土工岩土科技有限公司 Construction method of underground continuous wall in low-clearance environment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11310918A (en) * 1998-04-30 1999-11-09 Shimizu Corp Joint structure of underground continuous wall
CN102691294A (en) * 2012-05-15 2012-09-26 安宜建设集团有限公司 Construction method of underground continuous wall
CN103469817A (en) * 2013-09-30 2013-12-25 中铁一局集团有限公司 Existing subway station main structure broadening construction method
CN105155579A (en) * 2015-08-11 2015-12-16 中铁建大桥工程局集团第五工程有限公司 Construction method for penetrating existing underground passage in open cutting of subway foundation pit
CN105672354A (en) * 2016-02-29 2016-06-15 济南轨道交通集团有限公司 Cast-in-place underground diaphragm wall and cast-in-place subway station construction integrated method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11310918A (en) * 1998-04-30 1999-11-09 Shimizu Corp Joint structure of underground continuous wall
CN102691294A (en) * 2012-05-15 2012-09-26 安宜建设集团有限公司 Construction method of underground continuous wall
CN103469817A (en) * 2013-09-30 2013-12-25 中铁一局集团有限公司 Existing subway station main structure broadening construction method
CN105155579A (en) * 2015-08-11 2015-12-16 中铁建大桥工程局集团第五工程有限公司 Construction method for penetrating existing underground passage in open cutting of subway foundation pit
CN105672354A (en) * 2016-02-29 2016-06-15 济南轨道交通集团有限公司 Cast-in-place underground diaphragm wall and cast-in-place subway station construction integrated method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088792A (en) * 2020-01-07 2020-05-01 中国葛洲坝集团市政工程有限公司 Double L-shaped reinforcement cage hoisting method in underground continuous wall construction
CN111764374A (en) * 2020-05-28 2020-10-13 浙江土工岩土科技有限公司 Construction method of underground continuous wall in low-clearance environment

Also Published As

Publication number Publication date
CN108166528B (en) 2019-09-20

Similar Documents

Publication Publication Date Title
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN204343301U (en) A kind of Metro station excavation excavation supporting structure
CN111485901B (en) Method for building side-span non-filling type long and narrow shallow bottom karst cave section tunnel
CN110630284B (en) Settlement active control structure and method for construction of closely-attached underpass existing subway station
CN105155428B (en) Across railway in operation large-scale prefabricated PC concrete continuous T beam construction method
CN105587320B (en) Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method
CN108589771A (en) One kind having runed underground station increasing layer transfer node construction method
CN113482044B (en) Power pipeline relocation method for invading subway station structure
JP7394252B1 (en) Protruding type wind duct structure perpendicular to the vertical direction and construction method at deep subway station
CN105113539B (en) Combined multi-functional diaphram wall Core Walls Structure and its construction method in a kind of contrary sequence method
CN107514262A (en) The construction method of shield piping lane
CN110080526A (en) A kind of basement reversed construction method by stages
CN108166528B (en) Subway station construction method of underground continuous wall in a kind of confined space
CN111485902B (en) Tunnel construction method for side-span non-filling type deep and large karst cave section
CN105275013B (en) Core tube inverse superimposed underground diaphragm wall and construction method thereof
CN113027495B (en) Underground excavation large-span station construction method implemented by interval tunnel organization
CN109162741B (en) Method for synchronous construction of shield penetrating piston air duct and upper structure of piston air duct
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN110994523B (en) Method and system for protecting cable
CN114109402B (en) Large-section construction method of underground excavated crossover line implemented by interval tunnel organization
CN113668399B (en) Construction method of half-through tied steel box arch bridge
CN105544560B (en) It is a kind of to be used for the beam type connecting node of special-shaped double-row pile
CN106592632A (en) Underground supporting structure for reverse construction method and construction method
CN211873014U (en) System for bailey truss protects cable
CN1046784C (en) Reverse sinking construction method for mine vertical shaft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190822

Address after: The northern section of Shaanxi city of Xi'an province 710054 Yanta Road No. 1

Applicant after: Zhongtie No.1 Bureau Group Co., Ltd.

Applicant after: China Railway Group Co., Ltd. Guangzhou branch

Address before: The northern section of Shaanxi city of Xi'an province 710054 Yanta Road No. 1

Applicant before: Zhongtie No.1 Bureau Group Co., Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210617

Address after: 510000 room 310-j007, 1 Mingzhu 1st Street, Hengli Town, Nansha District, Guangzhou City, Guangdong Province (office only)

Patentee after: China Railway First Bureau Group (Guangzhou) Construction Engineering Co.,Ltd.

Patentee after: CHINA RAILWAY FIRST GROUP Co.,Ltd.

Patentee after: CHINA RAILWAY FIRST BUREAU GROUP Co.,Ltd. GUANGZHOU BRANCH

Address before: 710054 No. 1, north section, Yanta Road, Shaanxi, Xi'an

Patentee before: CHINA RAILWAY FIRST GROUP Co.,Ltd.

Patentee before: CHINA RAILWAY FIRST BUREAU GROUP Co.,Ltd. GUANGZHOU BRANCH