A kind of vertical type numerically controlled machine flood fighting water-tight device
Technical field
The present invention relates to a kind of numerically-controlled machine tool flood fighting water-tight devices more particularly to a kind of vertical type numerically controlled machine flood fighting to prevent
Water installations.
Background technology
Numerically-controlled machine tool is the abbreviation of numerically-controlled machine tool, is a kind of automated machine tool equipped with program control system, the control
System processed can be handled logically with control coding or other symbolic instruction regulated procedures, and is decoded, with code
Digital representation, numerical control device is inputted by information carrier.Various control signals are sent out by numerical control device through calculation process, are controlled
The action of lathe, shape and size by drawing, automatically processes part.Numerically-controlled machine tool preferably solves multiple
Miscellaneous, accurate, small lot, the part processing problems of multi items are a kind of flexible, dynamical automated machine tools, represent existing
It is a kind of typical electromechanical integrated product for the developing direction of Machine-Tool Control technology.Urban waterlogging refer to due to precipitation or
Continuous precipitation is more than the phenomenon that municipal drainage ability causes to generate ponding disaster in city.The odjective cause for causing waterlogging is drop
Raininess degree is big, in range set.The especially anxious place of rainfall is likely to form ponding, and rainfall intensity is bigger, the time long also has
It is likely to form ponding.
Existing vertical type numerically controlled machine does not have flood fighting water-tight device, is easily flooded when flood occurs, causes to count
Lathe is controlled by serious damage, is not only difficult to repair or even therefore scrap, seriously affects the production and development of enterprise, give
Enterprise causes huge loss, therefore there is an urgent need for research and develop a kind of vertical type numerically controlled machine flood fighting water-tight device.
Invention content
(1) technical problems to be solved
The present invention holds in order to which existing vertical type numerically controlled machine is overcome not have flood fighting water-tight device when flood occurs
It is easily flooded, leads to numerically-controlled machine tool by serious damage, be not only difficult to repair or even therefore and the shortcomings that scrap, the present invention will
The technical issues of solution, is to provide a kind of vertical type numerically controlled machine flood fighting water-tight device.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a vertical type numerically controlled machine flood fighting water-tight device,
Include big fixed plate, lifting baffle device for water, drainage arrangement, first support, pedestal, support column, guide rod and second support;Greatly
Fixed plate is set as being flexibly connected with lifting baffle device for water, and big fixed plate is connected with drainage arrangement, and first support is located at lifting
The left side of baffle device for water, the top of first support are connect with the left part of big fixed plate bottom by way of being welded to connect, and first
The bottom of stent and the left part of base top are connected by way of being welded to connect, and pedestal is located at the lower section of lifting baffle device for water,
The bottom of support column and the middle part of base top are connected by way of being welded to connect, the top of support column and big fixed plate bottom
Middle part connected by way of being welded to connect, guide rod is located at the right side of support column, and the middle and lower part of guide rod right side wall is provided with
Card slot, the upper end of guide rod are connect with the right part of big fixed plate bottom by way of being welded to connect, and second support is located at lifting
The right side of baffle device for water, the top of second support are connect with the right part of big fixed plate bottom by way of being welded to connect, and second
The bottom of stent and the right part of base top are connected by way of being welded to connect, and are provided in the middle part of big fixed plate perforative up and down
First U-shaped groove, symmetrical expression is provided with perforative first groove and the second groove up and down, the first groove before and after the left part of big fixed plate
Be respectively positioned on the left side of big the first U-shaped of fixed plate groove with the second groove, the first groove and the second groove with the first U-shaped groove phase
Connection.
Preferably, lifting baffle device for water includes the first U-shaped water fender, the first cover board, the second cover board, the first cylinder, leads
To plate, small link block, L-shaped snap-gauge, tension spring and drawstring;First U-shaped water fender is located in the first U-shaped groove of big fixed plate, the
One U-shaped water fender and the first U-shaped fit depressions of big fixed plate, the first U-shaped water fender are set as activity even with big fixed plate
It connects, the first cover board is located in the first groove of big fixed plate, the first cover board and the first fit depressions of big fixed plate, the first lid
Plate is set as being flexibly connected with big fixed plate, and the second cover board is located in the second groove of big fixed plate, and the second cover board is fixed with big
Second fit depressions of plate, the second cover board are set as being flexibly connected with big fixed plate, and the first cylinder is located at first support and branch
Between dagger, the bottom of the first cylinder and the top of pedestal connect by bolted connection, the first Telescopic-cylinder bar it is upper
End is connect with the bottom of the first U-shaped water fender left side wall by way of being welded to connect, and guide plate is located at the first U-shaped water fender
Lower section, guide plate are the setting of front and rear extension, and the right end of the top of guide plate and the first U-shaped water fender bottom is by being welded to connect
Mode connect, perforative hole up and down is provided in the middle part of guide plate, guide rod is located in the hole in the middle part of guide plate, and guide rod is with leading
It is set as being flexibly connected to plate, the left side wall of small link block connects with the top of guide plate right side wall by way of being welded to connect
It connects, the right side wall of small link block and the upper end of L-shaped snap-gauge are set as being articulated and connected, and tension spring is located at the right side of guide rod, tension spring
Upper end is set as being fixedly connected with the lower end of guide plate right side wall, and the lower end and the lower part of L-shaped snap-gauge left side wall of tension spring are set as
It is fixedly connected, L-shaped snap-gauge is used in the card slot for snapping onto guide rod, and L-shaped snap-gauge is set as being flexibly connected with guide rod, big fixed
The right part of plate is provided with perforative hole, drawstring up and down and is located in the hole of big fixed plate right part, lower end and the L-shaped snap-gauge right side wall of drawstring
Middle part be set as being fixedly connected, drawstring is located at the right side of the first U-shaped water fender.
Preferably, drainage arrangement includes the first U-tube, the second U-tube, third U-tube, outlet pipe, check valve and height
Press pump;First U-tube is located at the front of support column, and the left upper end of the first U-tube is located in the first groove of big fixed plate, big solid
The right part of fixed board is provided with perforative hole, the upper right side of the first U-tube up and down and is located in the hole of big fixed plate right part, the first U-tube
Bottom be set as being fixedly connected with pedestal, the second U-tube is located at the rear of support column, and the left upper end of the second U-tube is located at big
In second groove of fixed plate, the right part of big fixed plate is provided with perforative hole up and down, and the upper right side of the second U-tube is located at big fix
In the hole of plate right part, bottom and the pedestal of the second U-tube are set as being fixedly connected, preceding lower end and the first U-tube of third U-tube
Upper right side connected by way of being welded to connect, the upper right side of the posterior end of third U-tube and the second U-tube passes through the company of welding
The mode connect connects, and third U-tube is located at the top of big fixed plate, the left end of outlet pipe and the middle part of third U-tube right side wall
It is connected by way of being welded to connect, outlet pipe is connected with third U-tube, is sequentially installed with from left to right on outlet pipe unidirectional
Valve and high-pressure pump, the bottom of high-pressure pump are connect by bolted connection with the right end at the top of big fixed plate, the first cover board and
Second cover board is located above the first U-tube and the second U-tube respectively.
Preferably, further included water blocking scuta, top plate, third stent, inverted concave stent, the second cylinder, L-shaped connecting plate,
Second U-shaped water fender and riser;The second U-shaped groove is provided at the top of first U-shaped water fender, water blocking scuta is located at the first U-shaped gear
The left side of water plate, the bottom of water blocking scuta are connect with the left part at the top of big fixed plate by way of being welded to connect, top plate bottom
Left part connect by way of being welded to connect with the top of water blocking scuta, the top of the right part and third stent of top plate bottom leads to
It crosses the mode being welded to connect to connect, the bottom of third stent connects with the middle part of inverted concave cradle top by way of being welded to connect
It connects, two lower ends of inverted concave stent are connect with the right part at the top of big fixed plate by way of being welded to connect, and outlet pipe is located at
In inverted concave stent, the top of the second cylinder is connect by bolted connection with the middle part of top plate bottom, and the second cylinder is stretched
The lower end of contracting bar is connect with the top of L-shaped connecting plate by way of being welded to connect, and the second U-shaped water fender and riser are respectively positioned on L
Below shape connecting plate, L-shaped connecting plate and riser are connect with the second U-shaped water fender by way of being welded to connect, and riser is located at
The right side of second U-shaped water fender, the second U-shaped water fender are connected with riser, and riser is located at the right side of the first U-shaped water fender, erect
Plate is set as being flexibly connected with the first U-shaped water fender, and the second U-shaped water fender is located at the top of the first U-shaped water fender, the second U-shaped
Second U-shaped fit depressions of water fender and the first U-shaped water fender, the second U-shaped water fender are set as living with the first U-shaped water fender
Dynamic connection, L-shaped connecting plate are located above the first U-shaped water fender, and L-shaped connecting plate is set as being flexibly connected with the first U-shaped water fender.
Preferably, the first rectangle aqueduct, the second rectangle aqueduct, L-shaped fixed plate and rotation oar have been further included;Water blocking shield
Symmetrical expression is provided with the perforative rectangular opening in left and right before and after the bottom of plate, symmetrical before and after the first rectangle aqueduct and the second rectangle aqueduct
Formula in the rectangular opening of water blocking scuta, the first rectangle aqueduct and the second rectangle aqueduct pass through welding with water blocking scuta
The mode of connection connects, and the first rectangle aqueduct and the second rectangle aqueduct are respectively positioned at the first groove and second of big fixed plate
The left side of groove, L-shaped fixed plate are located at the top of the first rectangle aqueduct and the second rectangle aqueduct, the right side of L-shaped fixed plate
Wall is connect with the lower part of water blocking scuta left side wall by way of being welded to connect, and rotation oar is located at the left side of L-shaped fixed plate, rotation
Paddle is set as rotary type with L-shaped fixed plate and connect.
Operation principle:Because the present invention includes big fixed plate, lifting baffle device for water, drainage arrangement, first support, bottom
Seat, support column, guide rod and second support, so being provided with groove in cement platform, the present invention is mounted in the groove of cement platform,
The middle part that numerically-controlled machine tool can be placed at the top of big fixed plate works, can when needing to protect numerically-controlled machine tool
To be lifted by lifting baffle device for water, so as to which numerically-controlled machine tool be fenced up, waterproof is carried out, while drainage arrangement can be passed through
Water guiding is discharged to other places, avoids impact of the flood to numerically-controlled machine tool, support column provides support for numerically-controlled machine tool.
Because lifting baffle device for water includes the first U-shaped water fender, the first cover board, the second cover board, the first cylinder, is oriented to
Plate, small link block, L-shaped snap-gauge, tension spring and drawstring, so when needing using lifting baffle device for water, by pulling up drawstring,
Then drawstring starts the first cylinder moving so that L-shaped snap-gauge be pulled open to the right, the first cylinder drive the first U-shaped water fender to
Upper movement, so as to which the first cover board and the second cover board be driven to move upwards simultaneously, when the first cylinder moves upward to setting position,
Unclamp drawstring, acted on by tension spring snap into L-shaped snap-gauge in the card slot of guide rod at this time, guide rod for the first U-shaped water fender and
Guide plate provides guide support, is drainage arrangement by the way that the first U-shaped water fender and the first cover board are moved upward to setting position
Use provide convenient, while the first U-shaped water fender can protect numerically-controlled machine tool, prevent flood from being caused to numerically-controlled machine tool
Impact damages numerically-controlled machine tool.
Because drainage arrangement includes the first U-tube, the second U-tube, third U-tube, outlet pipe, check valve and high pressure
Pump, so when drainage arrangement to be used, is first protected numerically-controlled machine tool by lifting baffle device for water, then flood passes through
The first groove and the second groove of big fixed plate are flowed into the first U-tube and the second U-tube, start high-pressure pump running, high pressure
Flood is delivered to other places by pump by the first U-tube, the second U-tube, third U-tube and outlet pipe, is avoided to numerical control machine
Bed causes to impact, and check valve can prevent flood from flowing backwards.
Because water blocking scuta, top plate, third stent, inverted concave stent, the second cylinder, L-shaped connecting plate, second are further included
U-shaped water fender and riser so when the excessive water surface of flood is excessively high, can start the second cylinder and be moved at this time, the second gas
Cylinder drives the second U-shaped water fender and riser to be moved downwards by L-shaped connecting plate, and the second U-shaped water fender is inserted into the
It, at this time can be by number by the second U-shaped water fender, the first U-shaped water fender and riser in second U-shaped groove of one U-shaped water fender
Control lathe is gone along with sb. to guard him, and protecting effect is more preferable, and water blocking scuta is capable of the impact of flood fighting water, shunts flood, and L-shaped connecting plate can
Second U-shaped water fender, the first U-shaped water fender and riser are firmly fixed together, shock proof effect is more preferable.
Because having further included the first rectangle aqueduct, the second rectangle aqueduct, L-shaped fixed plate and rotation oar, when flood
When water impacts water blocking scuta, rotation oar can be driven to be rotated, rotation oar can offset the impact of part by rotation
Power, the first rectangle aqueduct and the second rectangle aqueduct can guide flood, it is possible to reduce the impact of a part of flood
Power, can mitigate the burden of water blocking scuta, and protection effect is good.
(3) advantageous effect
A kind of vertical type numerically controlled machine flood fighting water-tight device provided by the present invention has lifting baffle device for water and draining dress
It puts, safe and reliable protection can be provided for numerically-controlled machine tool by using lifting baffle device for water, it can by using drainage arrangement
Shunting is carried out to flood to dredge, and reduces the impact force of flood, simple in structure to be flexibly easily installed dismounting, repair easy to maintain is tieed up
It is low to protect maintenance cost, easily manufactures, manufacturing cost is low.
Description of the drawings
Fig. 1 is the main view schematic diagram of the present invention.
Fig. 2 is the main view schematic diagram of the first cylinder of the present invention.
Fig. 3 is the main view schematic diagram of the support column of the present invention.
Fig. 4 is the three-dimensional figure structure schematic representation of the third U-tube of the present invention.
Fig. 5 is the three-dimensional figure structure schematic representation of the first U-shaped water fender of the present invention.
Fig. 6 is the three-dimensional figure structure schematic representation of the big fixed plate of the present invention.
Fig. 7 is the three-dimensional figure structure schematic representation of the inverted concave stent of the present invention.
Fig. 8 is the three-dimensional figure structure schematic representation of the water blocking scuta of the present invention.
Label in attached drawing for:The big fixed plates of 1-, 2- lifting baffle device for water, 3- drainage arrangements, 4- first supports, 5- bottoms
Seat, 6- support columns, 7- guide rods, 8- second supports, 9- numerically-controlled machine tools, 10- the first U-shaped grooves, the first grooves of 11-, 12- second
Groove, 13- cement platforms, 21- the first U-shaped water fenders, the first cover boards of 22-, the second cover boards of 23-, the first cylinders of 24-, 25- are oriented to
Plate, the small link blocks of 26-, 27-L shape snap-gauges, 28- tension springs, 29- drawstrings, the first U-tubes of 31-, the second U-tubes of 32-, the 3rd U of 33-
Shape pipe, 34- outlet pipes, 35- check valves, 36- high-pressure pumps, 41- water blocking scutas, 42- top plates, 43- third stents, 44- inverted concaves
Stent, the second cylinders of 45-, 46-L shape connecting plates, 47- the second U-shaped water fenders, 48- risers, 51- the first rectangle aqueducts, 52-
Second rectangle aqueduct, 53-L shape fixed plates, 54- rotation oars, 70- card slots, 210- the second U-shaped grooves.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of vertical type numerically controlled machine flood fighting water-tight device as shown in figures 1-8, includes big fixed plate 1, lifting water blocking dress
Put 2, drainage arrangement 3, first support 4, pedestal 5, support column 6, guide rod 7 and second support 8;Big fixed plate 1 and lifting water blocking
Device 2 is set as being flexibly connected, and big fixed plate 1 is connected with drainage arrangement 3, and first support 4 is located at a left side for lifting baffle device for water 2
Side, the top of first support 4 are connect with the left part of big 1 bottom of fixed plate by way of being welded to connect, the bottom of first support 4
It is connect by way of being welded to connect with the left part at 5 top of pedestal, pedestal 5 is located at the lower section of lifting baffle device for water 2, support column 6
The middle part at 5 top of bottom and pedestal connect by way of being welded to connect, the top of support column 6 and big 1 bottom of fixed plate
Middle part is connected by way of being welded to connect, and guide rod 7 is located at the right side of support column 6, and the middle and lower part of 7 right side wall of guide rod is provided with
Card slot 70, the upper end of guide rod 7 are connect with the right part of big 1 bottom of fixed plate by way of being welded to connect, and second support 8 is located at
The right side of baffle device for water 2 is lifted, the top of second support 8 and the right part of big 1 bottom of fixed plate connect by way of being welded to connect
It connects, the bottom of second support 8 is connect with the right part at 5 top of pedestal by way of being welded to connect, and the middle part of big fixed plate 1 is provided with
Upper and lower perforative first U-shaped groove 10, symmetrical expression is provided with perforative first groove 11 up and down and the before and after the left part of big fixed plate 1
Two grooves 12, the first groove 11 and the second groove 12 are respectively positioned on the left side of big 1 first U-shaped groove 10 of fixed plate, the first groove 11
It is connected with the second groove 12 with the first U-shaped groove 10.
Embodiment 2
A kind of vertical type numerically controlled machine flood fighting water-tight device as shown in figures 1-8, includes big fixed plate 1, lifting water blocking dress
Put 2, drainage arrangement 3, first support 4, pedestal 5, support column 6, guide rod 7 and second support 8;Big fixed plate 1 and lifting water blocking
Device 2 is set as being flexibly connected, and big fixed plate 1 is connected with drainage arrangement 3, and first support 4 is located at a left side for lifting baffle device for water 2
Side, the top of first support 4 are connect with the left part of big 1 bottom of fixed plate by way of being welded to connect, the bottom of first support 4
It is connect by way of being welded to connect with the left part at 5 top of pedestal, pedestal 5 is located at the lower section of lifting baffle device for water 2, support column 6
The middle part at 5 top of bottom and pedestal connect by way of being welded to connect, the top of support column 6 and big 1 bottom of fixed plate
Middle part is connected by way of being welded to connect, and guide rod 7 is located at the right side of support column 6, and the middle and lower part of 7 right side wall of guide rod is provided with
Card slot 70, the upper end of guide rod 7 are connect with the right part of big 1 bottom of fixed plate by way of being welded to connect, and second support 8 is located at
The right side of baffle device for water 2 is lifted, the top of second support 8 and the right part of big 1 bottom of fixed plate connect by way of being welded to connect
It connects, the bottom of second support 8 is connect with the right part at 5 top of pedestal by way of being welded to connect, and the middle part of big fixed plate 1 is provided with
Upper and lower perforative first U-shaped groove 10, symmetrical expression is provided with perforative first groove 11 up and down and the before and after the left part of big fixed plate 1
Two grooves 12, the first groove 11 and the second groove 12 are respectively positioned on the left side of big 1 first U-shaped groove 10 of fixed plate, the first groove 11
It is connected with the second groove 12 with the first U-shaped groove 10.
Lifting baffle device for water 2 include the first U-shaped water fender 21, the first cover board 22, the second cover board 23, the first cylinder 24,
Guide plate 25, small link block 26, L-shaped snap-gauge 27, tension spring 28 and drawstring 29;First U-shaped water fender 21 is located at the of big fixed plate 1
In one U-shaped groove 10, the first U-shaped water fender 21 is matched with the first U-shaped groove 10 of big fixed plate 1, the first U-shaped water fender 21
Be set as being flexibly connected with big fixed plate 1, the first cover board 22 is located in the first groove 11 of big fixed plate 1, the first cover board 22 with
First groove 11 of big fixed plate 1 matches, and the first cover board 22 is set as being flexibly connected with big fixed plate 1, the second cover board 23
In in the second groove 12 of big fixed plate 1, the second cover board 23 is matched with the second groove 12 of big fixed plate 1, the second cover board 23
It is set as being flexibly connected with big fixed plate 1, the first cylinder 24 is between first support 4 and support column 6, the bottom of the first cylinder 24
Portion is connect by bolted connection with the top of pedestal 5, the upper end of 24 telescopic rod of the first cylinder and the first U-shaped water fender 21
The bottom of left side wall is connected by way of being welded to connect, and guide plate 25 is located at the lower section of the first U-shaped water fender 21, guide plate 25
It is set for front and rear extension, the right end of the top of guide plate 25 and 21 bottom of the first U-shaped water fender is by way of being welded to connect
Connection, the middle part of guide plate 25 are provided with perforative hole up and down, and guide rod 7 is located in the hole at 25 middle part of guide plate, and guide rod 7 is with leading
It is set as being flexibly connected to plate 25, the left side wall of small link block 26 and the top of 25 right side wall of guide plate pass through the side that is welded to connect
Formula connects, and the right side wall of small link block 26 and the upper end of L-shaped snap-gauge 27 are set as being articulated and connected, and tension spring 28 is located at guide rod 7
Right side, the upper end of tension spring 28 are set as being fixedly connected with the lower end of 25 right side wall of guide plate, lower end and the L-shaped snap-gauge 27 of tension spring 28
The lower part of left side wall is set as being fixedly connected, and L-shaped snap-gauge 27 is used in the card slot 70 for snapping onto guide rod 7, and L-shaped snap-gauge 27 is with leading
It is set as being flexibly connected to bar 7, the right part of big fixed plate 1 is provided with perforative hole, drawstring 29 up and down and is located at big 1 right part of fixed plate
It in hole, is set as being fixedly connected in the middle part of the lower end of drawstring 29 and 27 right side wall of L-shaped snap-gauge, drawstring 29 is located at the first U-shaped water blocking
The right side of plate 21.
Embodiment 3
A kind of vertical type numerically controlled machine flood fighting water-tight device as shown in figures 1-8, includes big fixed plate 1, lifting water blocking dress
Put 2, drainage arrangement 3, first support 4, pedestal 5, support column 6, guide rod 7 and second support 8;Big fixed plate 1 and lifting water blocking
Device 2 is set as being flexibly connected, and big fixed plate 1 is connected with drainage arrangement 3, and first support 4 is located at a left side for lifting baffle device for water 2
Side, the top of first support 4 are connect with the left part of big 1 bottom of fixed plate by way of being welded to connect, the bottom of first support 4
It is connect by way of being welded to connect with the left part at 5 top of pedestal, pedestal 5 is located at the lower section of lifting baffle device for water 2, support column 6
The middle part at 5 top of bottom and pedestal connect by way of being welded to connect, the top of support column 6 and big 1 bottom of fixed plate
Middle part is connected by way of being welded to connect, and guide rod 7 is located at the right side of support column 6, and the middle and lower part of 7 right side wall of guide rod is provided with
Card slot 70, the upper end of guide rod 7 are connect with the right part of big 1 bottom of fixed plate by way of being welded to connect, and second support 8 is located at
The right side of baffle device for water 2 is lifted, the top of second support 8 and the right part of big 1 bottom of fixed plate connect by way of being welded to connect
It connects, the bottom of second support 8 is connect with the right part at 5 top of pedestal by way of being welded to connect, and the middle part of big fixed plate 1 is provided with
Upper and lower perforative first U-shaped groove 10, symmetrical expression is provided with perforative first groove 11 up and down and the before and after the left part of big fixed plate 1
Two grooves 12, the first groove 11 and the second groove 12 are respectively positioned on the left side of big 1 first U-shaped groove 10 of fixed plate, the first groove 11
It is connected with the second groove 12 with the first U-shaped groove 10.
Lifting baffle device for water 2 include the first U-shaped water fender 21, the first cover board 22, the second cover board 23, the first cylinder 24,
Guide plate 25, small link block 26, L-shaped snap-gauge 27, tension spring 28 and drawstring 29;First U-shaped water fender 21 is located at the of big fixed plate 1
In one U-shaped groove 10, the first U-shaped water fender 21 is matched with the first U-shaped groove 10 of big fixed plate 1, the first U-shaped water fender 21
Be set as being flexibly connected with big fixed plate 1, the first cover board 22 is located in the first groove 11 of big fixed plate 1, the first cover board 22 with
First groove 11 of big fixed plate 1 matches, and the first cover board 22 is set as being flexibly connected with big fixed plate 1, the second cover board 23
In in the second groove 12 of big fixed plate 1, the second cover board 23 is matched with the second groove 12 of big fixed plate 1, the second cover board 23
It is set as being flexibly connected with big fixed plate 1, the first cylinder 24 is between first support 4 and support column 6, the bottom of the first cylinder 24
Portion is connect by bolted connection with the top of pedestal 5, the upper end of 24 telescopic rod of the first cylinder and the first U-shaped water fender 21
The bottom of left side wall is connected by way of being welded to connect, and guide plate 25 is located at the lower section of the first U-shaped water fender 21, guide plate 25
It is set for front and rear extension, the right end of the top of guide plate 25 and 21 bottom of the first U-shaped water fender is by way of being welded to connect
Connection, the middle part of guide plate 25 are provided with perforative hole up and down, and guide rod 7 is located in the hole at 25 middle part of guide plate, and guide rod 7 is with leading
It is set as being flexibly connected to plate 25, the left side wall of small link block 26 and the top of 25 right side wall of guide plate pass through the side that is welded to connect
Formula connects, and the right side wall of small link block 26 and the upper end of L-shaped snap-gauge 27 are set as being articulated and connected, and tension spring 28 is located at guide rod 7
Right side, the upper end of tension spring 28 are set as being fixedly connected with the lower end of 25 right side wall of guide plate, lower end and the L-shaped snap-gauge 27 of tension spring 28
The lower part of left side wall is set as being fixedly connected, and L-shaped snap-gauge 27 is used in the card slot 70 for snapping onto guide rod 7, and L-shaped snap-gauge 27 is with leading
It is set as being flexibly connected to bar 7, the right part of big fixed plate 1 is provided with perforative hole, drawstring 29 up and down and is located at big 1 right part of fixed plate
It in hole, is set as being fixedly connected in the middle part of the lower end of drawstring 29 and 27 right side wall of L-shaped snap-gauge, drawstring 29 is located at the first U-shaped water blocking
The right side of plate 21.
Drainage arrangement 3 includes the first U-tube 31, the second U-tube 32, third U-tube 33, outlet pipe 34, check valve 35
With high-pressure pump 36;First U-tube 31 is located at the front of support column 6, and the left upper end of the first U-tube 31 is located at the of big fixed plate 1
In one groove 11, the right part of big fixed plate 1 is provided with perforative hole up and down, and the upper right side of the first U-tube 31 is located at big 1 right side of fixed plate
In the hole in portion, the bottom of the first U-tube 31 is set as being fixedly connected with pedestal 5, and the second U-tube 32 is located at the rear of support column 6,
The left upper end of second U-tube 32 is located in the second groove 12 of big fixed plate 1, and the right part of big fixed plate 1 is provided with perforative up and down
Hole, the upper right side of the second U-tube 32 are located in the hole of big 1 right part of fixed plate, and bottom and the pedestal 5 of the second U-tube 32 are set as
It is fixedly connected, the preceding lower end of third U-tube 33 is connect with the upper right side of the first U-tube 31 by way of being welded to connect, the 3rd U
The posterior end of shape pipe 33 is connect with the upper right side of the second U-tube 32 by way of being welded to connect, and third U-tube 33 is located at big solid
The top of fixed board 1, the left end of outlet pipe 34 are connect by way of being welded to connect with the middle part of 33 right side wall of third U-tube, gone out
Water pipe 34 is connected with third U-tube 33, is sequentially installed with check valve 35 and high-pressure pump 36, high pressure on outlet pipe 34 from left to right
The bottom of pump 36 is connect by bolted connection with the right end at big 1 top of fixed plate, the first cover board 22 and the second cover board 23
It is located at 32 top of the first U-tube 31 and the second U-tube respectively.
Embodiment 4
A kind of vertical type numerically controlled machine flood fighting water-tight device as shown in figures 1-8, includes big fixed plate 1, lifting water blocking dress
Put 2, drainage arrangement 3, first support 4, pedestal 5, support column 6, guide rod 7 and second support 8;Big fixed plate 1 and lifting water blocking
Device 2 is set as being flexibly connected, and big fixed plate 1 is connected with drainage arrangement 3, and first support 4 is located at a left side for lifting baffle device for water 2
Side, the top of first support 4 are connect with the left part of big 1 bottom of fixed plate by way of being welded to connect, the bottom of first support 4
It is connect by way of being welded to connect with the left part at 5 top of pedestal, pedestal 5 is located at the lower section of lifting baffle device for water 2, support column 6
The middle part at 5 top of bottom and pedestal connect by way of being welded to connect, the top of support column 6 and big 1 bottom of fixed plate
Middle part is connected by way of being welded to connect, and guide rod 7 is located at the right side of support column 6, and the middle and lower part of 7 right side wall of guide rod is provided with
Card slot 70, the upper end of guide rod 7 are connect with the right part of big 1 bottom of fixed plate by way of being welded to connect, and second support 8 is located at
The right side of baffle device for water 2 is lifted, the top of second support 8 and the right part of big 1 bottom of fixed plate connect by way of being welded to connect
It connects, the bottom of second support 8 is connect with the right part at 5 top of pedestal by way of being welded to connect, and the middle part of big fixed plate 1 is provided with
Upper and lower perforative first U-shaped groove 10, symmetrical expression is provided with perforative first groove 11 up and down and the before and after the left part of big fixed plate 1
Two grooves 12, the first groove 11 and the second groove 12 are respectively positioned on the left side of big 1 first U-shaped groove 10 of fixed plate, the first groove 11
It is connected with the second groove 12 with the first U-shaped groove 10.
Lifting baffle device for water 2 include the first U-shaped water fender 21, the first cover board 22, the second cover board 23, the first cylinder 24,
Guide plate 25, small link block 26, L-shaped snap-gauge 27, tension spring 28 and drawstring 29;First U-shaped water fender 21 is located at the of big fixed plate 1
In one U-shaped groove 10, the first U-shaped water fender 21 is matched with the first U-shaped groove 10 of big fixed plate 1, the first U-shaped water fender 21
Be set as being flexibly connected with big fixed plate 1, the first cover board 22 is located in the first groove 11 of big fixed plate 1, the first cover board 22 with
First groove 11 of big fixed plate 1 matches, and the first cover board 22 is set as being flexibly connected with big fixed plate 1, the second cover board 23
In in the second groove 12 of big fixed plate 1, the second cover board 23 is matched with the second groove 12 of big fixed plate 1, the second cover board 23
It is set as being flexibly connected with big fixed plate 1, the first cylinder 24 is between first support 4 and support column 6, the bottom of the first cylinder 24
Portion is connect by bolted connection with the top of pedestal 5, the upper end of 24 telescopic rod of the first cylinder and the first U-shaped water fender 21
The bottom of left side wall is connected by way of being welded to connect, and guide plate 25 is located at the lower section of the first U-shaped water fender 21, guide plate 25
It is set for front and rear extension, the right end of the top of guide plate 25 and 21 bottom of the first U-shaped water fender is by way of being welded to connect
Connection, the middle part of guide plate 25 are provided with perforative hole up and down, and guide rod 7 is located in the hole at 25 middle part of guide plate, and guide rod 7 is with leading
It is set as being flexibly connected to plate 25, the left side wall of small link block 26 and the top of 25 right side wall of guide plate pass through the side that is welded to connect
Formula connects, and the right side wall of small link block 26 and the upper end of L-shaped snap-gauge 27 are set as being articulated and connected, and tension spring 28 is located at guide rod 7
Right side, the upper end of tension spring 28 are set as being fixedly connected with the lower end of 25 right side wall of guide plate, lower end and the L-shaped snap-gauge 27 of tension spring 28
The lower part of left side wall is set as being fixedly connected, and L-shaped snap-gauge 27 is used in the card slot 70 for snapping onto guide rod 7, and L-shaped snap-gauge 27 is with leading
It is set as being flexibly connected to bar 7, the right part of big fixed plate 1 is provided with perforative hole, drawstring 29 up and down and is located at big 1 right part of fixed plate
It in hole, is set as being fixedly connected in the middle part of the lower end of drawstring 29 and 27 right side wall of L-shaped snap-gauge, drawstring 29 is located at the first U-shaped water blocking
The right side of plate 21.
Drainage arrangement 3 includes the first U-tube 31, the second U-tube 32, third U-tube 33, outlet pipe 34, check valve 35
With high-pressure pump 36;First U-tube 31 is located at the front of support column 6, and the left upper end of the first U-tube 31 is located at the of big fixed plate 1
In one groove 11, the right part of big fixed plate 1 is provided with perforative hole up and down, and the upper right side of the first U-tube 31 is located at big 1 right side of fixed plate
In the hole in portion, the bottom of the first U-tube 31 is set as being fixedly connected with pedestal 5, and the second U-tube 32 is located at the rear of support column 6,
The left upper end of second U-tube 32 is located in the second groove 12 of big fixed plate 1, and the right part of big fixed plate 1 is provided with perforative up and down
Hole, the upper right side of the second U-tube 32 are located in the hole of big 1 right part of fixed plate, and bottom and the pedestal 5 of the second U-tube 32 are set as
It is fixedly connected, the preceding lower end of third U-tube 33 is connect with the upper right side of the first U-tube 31 by way of being welded to connect, the 3rd U
The posterior end of shape pipe 33 is connect with the upper right side of the second U-tube 32 by way of being welded to connect, and third U-tube 33 is located at big solid
The top of fixed board 1, the left end of outlet pipe 34 are connect by way of being welded to connect with the middle part of 33 right side wall of third U-tube, gone out
Water pipe 34 is connected with third U-tube 33, is sequentially installed with check valve 35 and high-pressure pump 36, high pressure on outlet pipe 34 from left to right
The bottom of pump 36 is connect by bolted connection with the right end at big 1 top of fixed plate, the first cover board 22 and the second cover board 23
It is located at 32 top of the first U-tube 31 and the second U-tube respectively.
Water blocking scuta 41, top plate 42, third stent 43, inverted concave stent 44, the second cylinder 45, L-shaped connection are further included
Plate 46, the second U-shaped water fender 47 and riser 48;The top of first U-shaped water fender 21 is provided with the second U-shaped groove 210, water blocking scuta
41 are located at the left side of the first U-shaped water fender 21, and the bottom of water blocking scuta 41 is with the left part at the top of big fixed plate 1 by being welded to connect
Mode connect, the left part of 42 bottom of top plate is connect with the top of water blocking scuta 41 by way of being welded to connect, 42 bottom of top plate
The right part in portion is connect with the top of third stent 43 by way of being welded to connect, bottom and the inverted concave stent of third stent 43
The middle part at 44 tops is connected by way of being welded to connect, the right side of two lower ends of inverted concave stent 44 and big 1 top of fixed plate
Portion is connected by way of being welded to connect, and outlet pipe 34 is located in inverted concave stent 44, top and the top plate 42 of the second cylinder 45
The middle part of bottom connects by bolted connection, and the lower end and the top of L-shaped connecting plate 46 of 45 telescopic rod of the second cylinder lead to
It crosses the mode being welded to connect to connect, the second U-shaped water fender 47 and riser 48 are respectively positioned on 46 lower section of L-shaped connecting plate, L-shaped connecting plate 46
It is connect by way of being welded to connect with the second U-shaped water fender 47 with riser 48, riser 48 is located at the second U-shaped water fender 47
Right side, the second U-shaped water fender 47 are connected with riser 48, and riser 48 is located at the right side of the first U-shaped water fender 21, riser 48 and
One U-shaped water fender 21 is set as being flexibly connected, and the second U-shaped water fender 47 is located at the top of the first U-shaped water fender 21, the second U-shaped
Water fender 47 is matched with the second U-shaped groove 210 of the first U-shaped water fender 21, the second U-shaped water fender 47 and the first U-shaped water blocking
Plate 21 is set as being flexibly connected, and L-shaped connecting plate 46 is located at 21 top of the first U-shaped water fender, 46 and first U-shaped of L-shaped connecting plate gear
Water plate 21 is set as being flexibly connected.
The first rectangle aqueduct 51, the second rectangle aqueduct 52, L-shaped fixed plate 53 and rotation oar 54 are further included;Water blocking
Symmetrical expression is provided with the perforative rectangular opening in left and right, the first rectangle aqueduct 51 and the second rectangle aqueduct 52 before and after the bottom of scuta 41
It is front and rear symmetrical in the rectangular opening of water blocking scuta 41, the first rectangle aqueduct 51 and the second rectangle aqueduct 52 with gear
Water quality plate 41 is connected by way of being welded to connect, and the first rectangle aqueduct 51 and the second rectangle aqueduct 52 are located at greatly admittedly respectively
First groove 11 of fixed board 1 and the left side of the second groove 12, L-shaped fixed plate 53 are located at the first rectangle aqueduct 51 and the second rectangle
The top of aqueduct 52, the right side wall of L-shaped fixed plate 53 is with the lower part of 41 left side wall of water blocking scuta by way of being welded to connect
Connection, rotation oar 54 are located at the left side of L-shaped fixed plate 53, and rotation oar 54 is set as rotary type with L-shaped fixed plate 53 and connect.
Operation principle:Because the present invention include big fixed plate 1, lifting baffle device for water 2, drainage arrangement 3, first support 4,
Pedestal 5, support column 6, guide rod 7 and second support 8, so being provided with groove in cement platform 13, the present invention is mounted on cement platform
In 13 groove, the middle part that numerically-controlled machine tool 9 can be placed into 1 top of big fixed plate works, when needing to numerically-controlled machine tool 9
It when being protected, can be lifted by lifting baffle device for water 2, so as to which numerically-controlled machine tool 9 be fenced up, carry out waterproof, simultaneously
Can water guiding be discharged to by other places by drainage arrangement 3, avoid impact of the flood to numerically-controlled machine tool 9, support column 6 is number
It controls lathe 9 and support is provided.
Because lifting baffle device for water 2 includes the first U-shaped water fender 21, the first cover board 22, the second cover board 23, the first cylinder
24th, guide plate 25, small link block 26, L-shaped snap-gauge 27, tension spring 28 and drawstring 29, so when needing using lifting baffle device for water 2
When, by pulling up drawstring 29, then drawstring 29 starts the first cylinder 24 and moves so as to which L-shaped snap-gauge 27 be pulled open to the right,
First cylinder 24 drives the first U-shaped water fender 21 to move upwards, so as to drive the first cover board 22 and the second cover board 23 upward simultaneously
Movement when the first cylinder 24 moves upward to setting position, is unclamped drawstring 29, is acted at this time by tension spring 28 by L-shaped snap-gauge
27 snap into the card slot 70 of guide rod 7, and guide rod 7 provides guide support for the first U-shaped water fender 21 and guide plate 25, pass through by
First U-shaped water fender 21 and the first cover board 22 move upward to setting position, and the use for drainage arrangement 3 provides conveniently, simultaneously
First U-shaped water fender 21 can protect numerically-controlled machine tool 9, prevent flood from causing to impact to numerically-controlled machine tool 9, damage numerical control machine
Bed 9.
Because drainage arrangement 3 includes the first U-tube 31, the second U-tube 32, third U-tube 33, outlet pipe 34, unidirectional
Valve 35 and high-pressure pump 36 so when drainage arrangement 3 to be used, have first been protected numerically-controlled machine tool 9 by lifting baffle device for water 2
Come, then flood is flowed into the first U-tube 31 and the second U-tube by the first groove 11 and the second groove 12 of big fixed plate 1
In 32, start high-pressure pump 36 and operate, high-pressure pump 36 passes through the first U-tube 31, the second U-tube 32, third U-tube 33 and outlet pipe
Flood is delivered to other places by 34, avoids that numerically-controlled machine tool 9 is caused to impact, check valve 35 can prevent flood from flowing backwards.
Because water blocking scuta 41, top plate 42, third stent 43, inverted concave stent 44, the second cylinder 45, L-shaped are further included
Connecting plate 46, the second U-shaped water fender 47 and riser 48 so when the excessive water surface of flood is excessively high, can start the second gas at this time
Cylinder 45 is moved, and the second cylinder 45 drives the second U-shaped water fender 47 and riser 48 to be transported downwards by L-shaped connecting plate 46
It is dynamic, and the second U-shaped water fender 47 is inserted into the second U-shaped groove 210 of the first U-shaped water fender 21, pass through the second U-shaped at this time
Water fender 47, the first U-shaped water fender 21 and riser 48 can go along with sb. to guard him numerically-controlled machine tool 9, and protecting effect is more preferable, water blocking scuta
41 are capable of the impact of flood fighting water, shunt flood, and L-shaped connecting plate 46 can be by the second U-shaped water fender 47, the first U-shaped water fender
21 and riser 48 be firmly fixed together, shock proof effect is more preferable.
Because having further included the first rectangle aqueduct 51, the second rectangle aqueduct 52, L-shaped fixed plate 53 and rotation oar 54,
So when flood impacts water blocking scuta 41, rotation oar 54 can be driven to be rotated, rotation oar 54 can by rotation
The impact force of part is offset, the first rectangle aqueduct 51 and the second rectangle aqueduct 52 can guide flood, can subtract
The impact force of few a part of flood, can mitigate the burden of water blocking scuta 41, and protection effect is good.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.