CN108149686A - A kind of Novel water conservancy facility - Google Patents

A kind of Novel water conservancy facility Download PDF

Info

Publication number
CN108149686A
CN108149686A CN201710899001.8A CN201710899001A CN108149686A CN 108149686 A CN108149686 A CN 108149686A CN 201710899001 A CN201710899001 A CN 201710899001A CN 108149686 A CN108149686 A CN 108149686A
Authority
CN
China
Prior art keywords
hammer portion
stretches
access slot
host
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710899001.8A
Other languages
Chinese (zh)
Inventor
施恬辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanan Ping Feng Agricultural Science And Technology Co Ltd
Original Assignee
Nanan Ping Feng Agricultural Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanan Ping Feng Agricultural Science And Technology Co Ltd filed Critical Nanan Ping Feng Agricultural Science And Technology Co Ltd
Priority to CN201710899001.8A priority Critical patent/CN108149686A/en
Publication of CN108149686A publication Critical patent/CN108149686A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of Novel water conservancy facilities, including moving trolley and the host being fixedly mounted in moving trolley, the first hammer portion and the second hammer portion of left and right equity setting are equipped in host, the heavy access slot being equipped in first hammer portion and the second hammer portion in sliding chamber and the host bottom surface being arranged below sliding chamber, sliding intracavitary, which is slipped, trolley shoe, being slipped in heavy access slot has hammering plate, sliding intracavitary switching above trolley shoe is combined with eccentric wheel, recessed access slot is equipped in sliding intracavitary bottom wall, being slipped in host between recessed access slot and heavy access slot has the bar axis for the setting that stretches up and down, the section that stretches at the top of bar axis is visited through recessed access slot into sliding intracavitary and end pin to be fixedly connected with trolley shoe bottom surface;The present invention greatly saves the time, pile body effectively is sunk to designed elevation, machinery drive is pollution-free, convenient for promoting the use of on a large scale.

Description

A kind of Novel water conservancy facility
Technical field
The present invention relates to Novel water conservancy facility technology field, specifically a kind of Novel water conservancy facility.
Background technology
It in water construction work progress, needs pile body sinking to designed elevation, just needs to utilize various pile monkeys at this time Beat repeatedly impact force and pile body dead weight, the side friction power of pile body and the resistance hammering of pile-end soil layer is overcome to realize.Mesh It is preceding using tubular diesel hammer as the most widely used one kind, it be using light diesel as fuel, to environment have pollution, Er Qiezhen It is dynamic big, noise is high, it is serious to disturb residents, and artificial be difficult to control Mechanical Moving and move.
Invention content
The technical problems to be solved by the invention are to provide a kind of Novel water conservancy facility, can solve above-mentioned present technology The problems in.
The present invention is achieved through the following technical solutions:A kind of Novel water conservancy facility of the present invention, including moving trolley And the host in the moving trolley is fixedly mounted on, the first hammer portion and second of left and right equity setting is equipped in the host Hammer portion is equipped with sliding chamber in first hammer portion and the second hammer portion and is arranged on described below the sliding chamber Heavy access slot in host bottom surface, the sliding intracavitary, which is slipped, trolley shoe, and being slipped in the heavy access slot has hammering plate, described sliding The sliding intracavitary switching above block is combined with eccentric wheel, and recessed access slot, the recessed access slot are equipped in the sliding intracavitary bottom wall Being slipped in the host between the heavy access slot has the bar axis for the setting that stretches up and down, stretches described in Duan Jing at the top of the bar axis Recessed access slot is visited to be fixedly connected into the sliding intracavitary and end pin with the trolley shoe bottom surface, the bar axis bottom stretch end pin visit into In the heavy access slot and bottom end pin is fixedly connected with the hammering plate top surface, the bar axis appearance face ring in the recessed access slot Spring element is arranged with, is connected at the top of the spring element with trolley shoe bottom surface top pressure, on rear side of first hammer portion It is equipped with cavity portion in the host, is equipped with transmission cavity in the host on rear side of second hammer portion, is equipped in the transmission cavity Transmitting device, be equipped in the cavity portion to be connected respectively with the eccentric wheel in first hammer portion and with institute The driving device of transmitting device mating connection is stated, the transmitting device front end is matched with the eccentric wheel in second hammer portion Connection is closed, top surface is fixedly installed wear-resistant pad on the trolley shoe, and the trolley shoe inner bottom surface is fixedly installed cushion pad, described Fixing device is provided at the top of hammering plate.
Preferably technical solution, the transmitting device includes switching and front and rear stretch is arranged on front side of the transmission cavity The first Coupling Shaft and switching on rear side of the sliding chamber in inner wall and second hammer portion between inner wall are equipped with First bevel gear on the transmission cavity front inner wall, the end pin that stretches on front side of first Coupling Shaft are visited into second hammer portion It the interior sliding intracavitary and is connect with the sliding intracavitary eccentric wheel rear end secure fit in second hammer portion, it is described The end pin that stretches on rear side of first Coupling Shaft is fixedly connected with the first bevel gear front end, is transferred and is matched in the transmission cavity inner left wall Close the second bevel gear for having and coincideing and connecting with the first bevel gear.
Preferably technical solution, the driving device include switching and stretch be arranged on the cavity portion front inner wall with The second Coupling Shaft on rear side of the sliding chamber in first hammer portion between inner wall, stretch on rear side of second Coupling Shaft section It visits into the cavity portion and end pin is connected with motor, the motor outer surface is arranged in inner wall and solid on rear side of the cavity portion Fixed connection, the end pin that stretches on front side of second Coupling Shaft are visited into the sliding intracavitary in first hammer portion and with described the The eccentric wheel rear end secure fit of the sliding intracavitary in one hammer portion connects, and is second switching in the cavity portion Circumferentially it is fixedly installed worm screw on axis outer surface, coincideing in the cavity portion on the right side of the worm screw is connected with worm gear, the worm gear Upper and lower both sides coordinate respectively with inner wall switching in both sides above and below the cavity portion, and the worm gear upper side is fixedly installed triconodont Wheel, the third hand tap gear right hand top, which coincide, is connected with third hand tap gear, described between the cavity portion and the transmission cavity Switching is combined with the third Coupling Shaft for controlling the setting that stretches in host, and the end pin that stretches on the left of the third Coupling Shaft is visited into the chamber It is fixedly connected in portion and with the third hand tap gear right side, the end pin that stretches on the right side of the third Coupling Shaft is visited into the transmission cavity It is interior and be fixedly connected with the second bevel gear left side.
Preferably technical solution, the fixing device include it is symmetrical be fixed at it is described hammering plate with it is described Support plate between bar axis, the support plate are fixedly installed strut close on the bar axis one side.
The beneficial effects of the invention are as follows:The present invention in the host on rear side of first hammer portion by setting cavity portion, institute State and transmission cavity set in the host on rear side of the second hammer portion, transmitting device is set in the transmission cavity, set in the cavity portion to The drive for being connected with the eccentric wheel in first hammer portion and being connected with the transmitting device respectively fills It puts, the transmitting device front end is connected with the eccentric wheel in second hammer portion, so as to fulfill automatic control simultaneously The hammering work operations of the first hammer portion and the second hammer portion are made, are greatly saved the time, pile body is effectively sunk into design Absolute altitude, machinery drive is pollution-free, convenient for promoting the use of on a large scale.
Description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and attached drawing.
Fig. 1 is a kind of Novel water conservancy facility exterior overall structure diagram of the present invention;
Fig. 2 is overall structure diagram inside a kind of Novel water conservancy facility of the present invention;
Fig. 3 is the sectional view of " A-A " in Fig. 2 of the present invention;
Fig. 4 is the structure diagram of trolley shoe in the present invention.
Specific embodiment
As Figure 1-Figure 4, a kind of Novel water conservancy facility of the invention including moving trolley 8 and is fixedly mounted on described Host 9 in moving trolley 8, interior the first hammer portion 91 and the second hammer portion 92 for being equipped with left and right equity setting of the host 9 are described Sliding chamber 93 is equipped in first hammer portion 91 and the second hammer portion 92 and is arranged on the master of 93 lower section of sliding chamber Heavy access slot 934 in 9 bottom surface of machine, slipping in the sliding chamber 93 has trolley shoe 932, and being slipped in the heavy access slot 934 has hammering Plate 937, the interior switching of the sliding chamber 93 of 932 top of trolley shoe are combined with eccentric wheel 931, sliding 93 inner bottom wall of chamber Interior to be equipped with recessed access slot 933, being slipped in the host 9 between the recessed access slot 933 and the heavy access slot 934 has upper and lower stretch to set The bar axis 936 put, 936 top of the bar axis recessed access slot 933 described in Duan Jing that stretches are visited into the sliding chamber 93 and end pin and institute It states 932 bottom surface of trolley shoe to be fixedly connected, 936 bottom of the bar axis end pin that stretches is visited into the heavy access slot 934 and the end pin of bottom It is fixedly connected with 937 top surface of the hammering plate, 936 outer surface of bar axis in the recessed access slot 933 is around equipped with spring element 935,935 top of spring element is connected with the 932 bottom surface top pressure of trolley shoe, the institute of 91 rear side of the first hammer portion It states and cavity portion 94 is equipped in host 9, transmission cavity 95, the transmission cavity are equipped in the host 9 of 92 rear side of the second hammer portion Transmitting device is equipped in 95, be equipped in the cavity portion 94 to respectively with the eccentric wheel 931 in first hammer portion 91 The driving device for being connected and being connected with the transmitting device, the transmitting device front end and second hammer portion The eccentric wheel 931 in 92 is connected, and top surface is fixedly installed wear-resistant pad 9321 on the trolley shoe 932, described sliding 932 inner bottom surface of block is fixedly installed cushion pad 9322, and 937 top of hammering plate is provided with fixing device.
Valuably, the transmitting device include switching and it is front and rear stretch be arranged on 95 front inner wall of transmission cavity with it is described The first Coupling Shaft 952 between the sliding 93 rear side inner wall of chamber and switching in second hammer portion 92 are equipped with described First bevel gear 951 on 95 front inner wall of transmission cavity, first Coupling Shaft, the 952 front side end pin that stretches are visited into the described second hammer It hits in the sliding chamber 93 in portion 92 and consolidates with 931 rear end of eccentric wheel in the sliding chamber 93 in second hammer portion 92 Fixed to be connected, the end pin that stretches on rear side of first Coupling Shaft 952 is fixedly connected with 951 front end of first bevel gear, described Switching is combined with the second bevel gear 953 for the connection that coincide with the first bevel gear 951 in 95 inner left wall of transmission cavity, so as to real The hammering work of the second hammer portion 92 is now automatically controlled, improves the working efficiency of hammering.
Valuably, the driving device includes switching and stretches to be arranged on 94 front inner wall of cavity portion and the described first hammer The second Coupling Shaft 941 between the sliding 93 rear side inner wall of chamber in portion 91 is hit, stretch section on rear side of second Coupling Shaft 941 It visits into the cavity portion 94 and end pin is connected with motor 943,943 outer surface of motor is arranged on rear side of the cavity portion 94 It in inner wall and is fixedly connected, the end pin that stretches on front side of second Coupling Shaft 941 is visited into the cunning in first hammer portion 91 It connects in chamber 93 and connects with the 931 rear end secure fit of the eccentric wheel in the sliding chamber 93 in first hammer portion 91 It connects, is that worm screw 942 is circumferentially fixedly installed on 941 outer surface of the second Coupling Shaft in the cavity portion 94, the worm screw 942 is right It coincide in the cavity portion 94 of side and is connected with worm gear 944, about 94 both sides with the cavity portion respectively for both sides about 944 for the worm gear Inner wall switching cooperation, 944 upper side of worm gear are fixedly installed third hand tap gear 945, and 945 right side of third hand tap gear is pushed up Portion, which coincide, is connected with third hand tap gear 946, and transferring in the host 9 between the cavity portion 94 and the transmission cavity 95 is combined with Left and right stretches the third Coupling Shaft 947 of setting, 947 left side of third Coupling Shaft stretch end pin visit into the cavity portion 94 and with 946 right side of third hand tap gear is fixedly connected, and the end pin that stretches on the right side of the third Coupling Shaft 947 is visited into the transmission cavity 95 It is interior and be fixedly connected with 953 left side of second bevel gear, so as to fulfill the first hammer portion 91 and transmission dress is automatically controlled The work put reduces equipment investment, improves working efficiency.
Valuably, the fixing device include it is symmetrical be fixed at hammering plate 937 and the bar axis 936 it Between support plate 9301, the support plate 9301 is fixedly installed strut 9302 close on 936 one side of bar axis.
During original state, the protruding parts on eccentric wheel 931 in the first hammer portion 91 is in position directly above, at this point, Trolley shoe 932 in one hammer portion 91 is made by 935 pressure on top surface of spring element in the first hammer portion 91 in the first hammer portion 91 Outer surface of the eccentric wheel 931 far from protrusion side is slipped with the 932 top surface top pressure of trolley shoe in the first hammer portion 91, meanwhile, 936 top section of bar axis in the first hammer portion 91 is driven utmostly to visit into first by the trolley shoe 932 in the first hammer portion 91 In sliding chamber 93 in hammer portion 91, at this point, driving the first hammer portion 91 by the 936 bottom end pin of bar axis in the first hammer portion 91 Interior hammering plate 937 is fully located in the heavy access slot 934 in the first hammer portion 91, meanwhile, the eccentric wheel in the second hammer portion 92 Protruding parts on 931 is in position directly below, at this point, the trolley shoe 932 in the second hammer portion 92 is by the second hammer portion 92 Eccentric wheel 931 pressure on top surface, the trolley shoe 932 in the second hammer portion 92 is made utmostly to overcome the bullet in the second hammer portion 92 935 pressure on top surface of power part, the sliding chamber that the trolley shoe 932 in the second hammer portion 92 is made utmostly to slide into the second hammer portion 92 93 lowest positions, meanwhile, 936 top of bar axis in the second hammer portion 92 is driven by the trolley shoe 932 in the second hammer portion 92 Section is utmostly stretched out in the sliding chamber 93 in the second hammer portion 92, at this point, by the 936 bottom tail of bar axis in the second hammer portion 92 The tip drives the hammering plate 937 in the second hammer portion 92 utmostly to stretch out outside 934 bottom of heavy access slot in the second hammer portion 92.
When needing to hammer work, moving trolley 8 is moved at the position for needing to hammer first, then, passes through motor 943 The second Coupling Shaft 941 is driven to rotate, at this point, by the second Coupling Shaft 941 drive in the first hammer portion 91 eccentric wheel 931 rotate and Worm gear 944 is driven to rotate, and then by the third hand tap gear 945 of 944 upper end of worm gear by the worm screw 942 in the second Coupling Shaft 941 Third hand tap gear 946 is driven to rotate, at this point, driving third Coupling Shaft 947 and third Coupling Shaft 947 by third hand tap gear 946 The second bevel gear 953 of right side end pin rotates, and first bevel gear 951 is driven to rotate by second bevel gear 953, and then by first Bevel gear 951 drives the eccentric wheel 931 in 952 the second hammer portion 92 of front side of the first Coupling Shaft 952 and the first Coupling Shaft to rotate Rotation, so as to fulfill the hammering work operations of the first hammer portion 91 and the second hammer portion 92 are automatically controlled simultaneously.
The beneficial effects of the invention are as follows:The present invention in the host on rear side of first hammer portion by setting cavity portion, institute State and transmission cavity set in the host on rear side of the second hammer portion, transmitting device is set in the transmission cavity, set in the cavity portion to The drive for being connected with the eccentric wheel in first hammer portion and being connected with the transmitting device respectively fills It puts, the transmitting device front end is connected with the eccentric wheel in second hammer portion, so as to fulfill automatic control simultaneously The hammering work operations of the first hammer portion and the second hammer portion are made, are greatly saved the time, pile body is effectively sunk into design Absolute altitude, machinery drive is pollution-free, convenient for promoting the use of on a large scale.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, it is of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of Novel water conservancy facility, including moving trolley and the host being fixedly mounted in moving trolley, it is characterised in that:Host It is interior to be equipped with reciprocity the first hammer portion and the second hammer portion set in left and right, it is equipped in the first hammer portion and the second hammer portion sliding Heavy access slot in chamber and the host bottom surface being arranged below sliding chamber, sliding intracavitary, which is slipped, trolley shoe, is slipped in heavy access slot There is a hammering plate, the sliding intracavitary switching above trolley shoe is combined with eccentric wheel, slips and recessed access slot, recessed access slot are equipped in intracavitary bottom wall Being slipped in host between heavy access slot has the bar axis for the setting that stretches up and down, and the section that stretches at the top of bar axis is visited through recessed access slot into sliding chamber Interior and end pin is fixedly connected with trolley shoe bottom surface, and the bar axis bottom end pin that stretches is visited into heavy access slot and bottom end pin and hammering plate top Face is fixedly connected, and the bar axis outer surface in recessed access slot is equipped with spring element, is connect at the top of spring element with trolley shoe bottom surface, first It is equipped with cavity portion in host on rear side of hammer portion, is equipped with transmission cavity in the host on rear side of the second hammer portion, transmission is equipped in transmission cavity Device is equipped in cavity portion to be connected with the eccentric wheel in the first hammer portion and be connected with transmitting device respectively Driving device, transmitting device front end are connected with the eccentric wheel in the second hammer portion, and top surface is fixedly installed resistance on trolley shoe Mill pad, trolley shoe inner bottom surface are fixedly installed cushion pad, fixing device are provided at the top of hammering plate.
2. a kind of Novel water conservancy facility according to claim 1, it is characterised in that:The transmitting device include switching and it is preceding Stretch afterwards on rear side of the sliding chamber being arranged in the transmission cavity front inner wall and second hammer portion between inner wall the One Coupling Shaft and switching are equipped with the first bevel gear on the transmission cavity front inner wall, the first Coupling Shaft front side The end pin that stretches visit into the sliding intracavitary in second hammer portion and with the sliding intracavitary in second hammer portion Eccentric wheel rear end secure fit connects, and the end pin that stretches on rear side of first Coupling Shaft is fixed with the first bevel gear front end to be connected It connects, the second bevel gear for being combined with and coincideing and connecting with the first bevel gear of transferring in the transmission cavity inner left wall.
3. a kind of Novel water conservancy facility according to claim 2, it is characterised in that:The driving device includes switching and stretches Prolong the second switching between inner wall on rear side of the sliding chamber being arranged in the cavity portion front inner wall and first hammer portion Axis, the section that stretches on rear side of second Coupling Shaft are visited into the cavity portion and end pin is connected with motor, the motor outer surface It is arranged on rear side of the cavity portion in inner wall and is fixedly connected, the end pin that stretches on front side of second Coupling Shaft is visited into the described first hammering The sliding intracavitary in portion and with the eccentric wheel rear end secure fit of the sliding intracavitary in first hammer portion It connects, is that worm screw is fixedly installed on the second Coupling Shaft outer surface in the cavity portion, the cavity portion on the right side of the worm screw Interior coincide is connected with worm gear, and both sides coordinate the worm gear with inner wall switching in both sides above and below the cavity portion respectively up and down, the worm gear Upper side is fixedly installed third hand tap gear, and the third hand tap gear right hand top, which coincide, is connected with third hand tap gear, the chamber Switching is combined with the third Coupling Shaft for controlling the setting that stretches, the third switching in the host between portion and the transmission cavity The end pin that stretches on the left of axis is visited to be fixedly connected into the cavity portion and with the third hand tap gear right side, and the third Coupling Shaft is right The side end pin that stretches is visited and is fixedly connected into the transmission cavity and with the second bevel gear left side.
4. a kind of Novel water conservancy facility according to claim 1, it is characterised in that:The fixing device includes symmetrical The support plate being fixed between the hammering plate and the bar axis, the support plate are fixedly installed close on the bar axis one side There is strut.
CN201710899001.8A 2017-09-28 2017-09-28 A kind of Novel water conservancy facility Pending CN108149686A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710899001.8A CN108149686A (en) 2017-09-28 2017-09-28 A kind of Novel water conservancy facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710899001.8A CN108149686A (en) 2017-09-28 2017-09-28 A kind of Novel water conservancy facility

Publications (1)

Publication Number Publication Date
CN108149686A true CN108149686A (en) 2018-06-12

Family

ID=62468169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710899001.8A Pending CN108149686A (en) 2017-09-28 2017-09-28 A kind of Novel water conservancy facility

Country Status (1)

Country Link
CN (1) CN108149686A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202603531U (en) * 2012-04-13 2012-12-19 浙江工商职业技术学院 Household rice cake striking machine
CN106666375A (en) * 2017-02-06 2017-05-17 浙江优嘿嘿食品有限公司 Cam-type household automatic rice cake making machine

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202603531U (en) * 2012-04-13 2012-12-19 浙江工商职业技术学院 Household rice cake striking machine
CN106666375A (en) * 2017-02-06 2017-05-17 浙江优嘿嘿食品有限公司 Cam-type household automatic rice cake making machine

Similar Documents

Publication Publication Date Title
CN104533435B (en) A kind of swing cutter head type rectangular cross section push-bench
CN110786103B (en) Efficient transplanting machine with pit digging device
CN108561078A (en) A kind of drilling equipment of soil layer or rock
CN110080682A (en) A kind of rotary steerable tool and transmission device
CN104285529A (en) Steering adjustment mechanism for ridge building component of paddy field ridge building machine
CN107604895B (en) A kind of compacting prosthetic device of water conservancy side slope
CN204312078U (en) A kind of swing cutter head type rectangular cross section push-bench
CN205343472U (en) Automatic change plane formula fluting ware
CN107489148B (en) A kind of water conservancy construction facility
CN110924861A (en) Walking type omnibearing rotary hydraulic pile foundation drilling machine
CN208966198U (en) A kind of excavator formula shot-hole rig
CN108149686A (en) A kind of Novel water conservancy facility
CN107700491B (en) A kind of water conservancy projects
CN107740330B (en) A kind of portable tamping unit of urban road
CN203701166U (en) Large-scale flat-cleaning machine with laser measurement and control
CN107700316B (en) A kind of pavement of road tamping unit
CN107399786A (en) A kind of wastewater reuse approach device
CN104677115B (en) Duplicate rows formula calcium carbide furnace discharging machine
CN108103896A (en) A kind of convenient pavement of road tamping unit
CN205577005U (en) A transmission system for hydraulic engineering groover
CN102287142A (en) Drill arm device capable of rotating 360 degrees
CN204626505U (en) A kind of loader is with handling assembly
CN204090459U (en) Paddy field banking machine is built ridge parts and is turned to governor motion
CN107604914B (en) A kind of water conservancy projects of environmental protection
CN107031749A (en) A kind of solar-energy machine people for town road

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180612