CN108133510A - Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method - Google Patents

Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method Download PDF

Info

Publication number
CN108133510A
CN108133510A CN201711366900.8A CN201711366900A CN108133510A CN 108133510 A CN108133510 A CN 108133510A CN 201711366900 A CN201711366900 A CN 201711366900A CN 108133510 A CN108133510 A CN 108133510A
Authority
CN
China
Prior art keywords
hanging basket
transmission line
ultra
power transmission
tension power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711366900.8A
Other languages
Chinese (zh)
Inventor
张涛
秦志军
庄严
鲁永生
杨诚
张志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI V+KING COMMUNICATION TECHNOLOGY Co Ltd
Wei Kun Intelligent Technology (shanghai) Co Ltd
Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
SHANGHAI V+KING COMMUNICATION TECHNOLOGY Co Ltd
Wei Kun Intelligent Technology (shanghai) Co Ltd
Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI V+KING COMMUNICATION TECHNOLOGY Co Ltd, Wei Kun Intelligent Technology (shanghai) Co Ltd, Maintenance Branch of State Grid Jiangsu Electric Power Co Ltd filed Critical SHANGHAI V+KING COMMUNICATION TECHNOLOGY Co Ltd
Priority to CN201711366900.8A priority Critical patent/CN108133510A/en
Publication of CN108133510A publication Critical patent/CN108133510A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/20Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2210/00Indexing scheme for image generation or computer graphics
    • G06T2210/61Scene description
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2219/00Indexing scheme for manipulating 3D models or images for computer graphics
    • G06T2219/20Indexing scheme for editing of 3D models
    • G06T2219/2004Aligning objects, relative positioning of parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • Architecture (AREA)
  • Geometry (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Computer Hardware Design (AREA)
  • General Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Engineering & Computer Science (AREA)

Abstract

The invention discloses a kind of ultra-high-tension power transmission line Equipotential live working hanging basket methods to enter simulation system, mainly include simulation process module, distance calculation module, information display module, simulated operation module, it also discloses a kind of ultra-high-tension power transmission line Equipotential live working hanging basket method and enters analogy method, include the following steps:S1:By building ultra-high-tension power transmission line three-dimensional live platform, simulating hanging basket motion track and being shown in three-dimensional scenic;S2:The combinational gap during hanging basket motion track is calculated, and combinational gap numerical value is shown in three-dimensional scenic when hanging basket displacement stops;S3:Livewire work modeling scheme is generated, for instructing site layout project.Through the above way, the present invention is implemented personnel for livewire work and provides a kind of simulation system that can be entered with simulated high-pressure hot line maintenance hanging basket method, based on accurate three-dimensional live platform, the deficiency based on conventional transmission lines road livewire work mode of operation and displaying is effectively compensated for, there is practical significance.

Description

Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method
Technical field
The present invention relates to electric network operation technical fields, are hung more particularly to a kind of ultra-high-tension power transmission line Equipotential live working Basket method enters simulation system and method.
Background technology
The work such as transmission line of electricity operation, maintenance, maintenance are grasp grid operating conditions, find in time and processing equipment lacks Sunken important means is also to ensure that the element task of line security stable operation.Since high-voltage fence is transported in entire national grid In critical role in row, therefore the operating maintenance work of ultra-high-tension power transmission line is for safe and stable, the reliable fortune of guarantee power grid Row has a very important significance.
Livewire work is a kind of on high pressure electrical equipment, and do not have a power failure the operational method overhauled, tested.Its technology Comparision contents are high, as soon as a common repairing needs cost 3-4 hours, livewire work, which is possible to a hour, to be completed, and can have Effect saves man power and material, reduces emergency repair time, and the influence to resident living is preferably minimized.But the danger of livewire work It is very big, it is more demanding to the technical capability of service personnel.
High-voltage hot-line work at present, it is more to be swung using hanging basket method from shaft tower into setting.When hanging basket method operates, pass through coaster Group and location control rope swing equipotential live line work personnel into electric field, pass through the combination air between electrical body and human body and grounding body Gap is more than safe arc radius, to ensure the safety of operating personnel.
Live-working safety distance includes livewire work minimum electric clearance and limit actting distance of worker working.In IEC standard In, minimum electric clearance refers to that livewire work operating point can prevent the minimum combination distance electrically punctured.Between minimum combination When gap refers to that the operating personnel in operation gap is in 50% minimum switching impulse sparkover voltage position, human body is to grounding body With the sum of the distance that should be kept to both electrical bodies.If personnel are less than safe distance into fashionable combinational gap, just have by high pressure The danger of electrical breakdown.But operation on direct shaft tower, it is unable to control hanging basket and swings combinational gap value into process.
Therefore, still lack a kind of system that can effectively simulate the entrance of livewire work hanging basket, to determine to cause to people That section of the air gap of body electric discharge, guidance is provided for practical livewire work process.
Invention content
The technical problems to be solved by the invention be to provide a kind of ultra-high-tension power transmission line Equipotential live working hanging basket method into Enter simulation system and method, the level of security of ultra-high-tension power transmission line Equipotential live working can be effectively improved.
In order to solve the above technical problems, one aspect of the present invention is:A kind of ultra-high-tension power transmission line etc. is provided Current potential livewire work hanging basket method enters simulation system, mainly includes:-
Simulation process module, by building ultra-high-tension power transmission line three-dimensional live platform, simulating hanging basket motion track and showing In three-dimensional scenic;
Distance calculation module calculates the combinational gap during hanging basket motion track;
Information display module, when hanging basket displacement stops, combinational gap numerical value is shown in three-dimensional scenic;
Simulated operation module carries out hanging basket method modeling scheme record screen, sectional drawing, playback, preservation, loading operation.
In order to solve the above technical problems, another technical solution used in the present invention is:It provides a kind of based on the height Pressure transmission line Equipotential live working hanging basket method enters the analogy method of simulation system, includes the following steps:
Step S1:By building ultra-high-tension power transmission line three-dimensional live platform, simulating hanging basket motion track and being shown in three-dimensional Scene;
Step S2:The combinational gap during hanging basket motion track is calculated, and when hanging basket displacement stops in three-dimensional scenic Middle display combinational gap numerical value;
Step S3:Livewire work modeling scheme is generated, for instructing site layout project.
In a preferred embodiment of the present invention, step S1 the specific steps are:
S1.1:Three-dimensional modeling is carried out according to ultra-high-tension power transmission line actual conditions, ultra-high-tension power transmission line three-dimensional live is built and puts down Platform;
S1.2:Based on three-dimensional live platform, with reference to the shaft tower number of display, select to carry out simulation band on high voltage transmission line road The shaft tower of electric operation;
S1.3:In three-dimensional live, hanging basket process is placed in simulation, and hanging basket is calculated and be shown automatically to anchor point above conducting wire Arc radius R;
S1.4:After hanging basket is placed, simulate hanging basket motion track and be shown in three-dimensional scenic, while provide hanging basket in moving rail Displacement operation displaying on mark.
Further, in step S1.1, the method for ultra-high-tension power transmission line three-dimensional live platform is built to draw using three-dimensional Technology is held up, is rendered using OpenGL, language is realized as logic using java, interface framework is built using java fx, and Scene cut can be realized into several enclosure bodies by cross-platform operation using the method using BIHTree scene structures, it is and other Engine integrates processing GIS information.
Further, in step S1.2, click the method for shaft tower using ray Pick technologies, mouse click scene i.e. to Scene emits the ray of a simulation, ray and the enclosure body nearest with ray is collided, not taking into account that can not possibly occur The enclosure body of collision is calculated into without traversing scene, greatly improves Pick efficiency, obtains collision distance current view point most Near object conduct, which clicks result, to select shaft tower.
Further, in step S1.3, the method for selecting hanging basket placement location uses plane Pick technologies and ray Pick technologies create a virtual plane, on the virtual plane with the shaft tower center currently selected and the forward projection of shaft tower Ray Pick operations are carried out, emits the ray of a simulation, ray and the enclosure body nearest with ray is collided, acquirement is touched The object nearest apart from current view point is hit as the position that clicks the hanging basket that result is selection and will place.Using plane Pick The result of Pick is limited in some desired plane placed by technology, makes the result of Pick without departing from desired range, and And limitation Pick ranges can promote operational efficiency.
Further, in step S1.4, the method for simulation hanging basket motion track includes the following steps:
The placement location of hanging basket is defined as starting point first, anchor point is defined as focus, before starting point and focus away from From for arc radius R;
Then the offset for transmitting 1 radian θ is moved to hanging basket every time, one can be calculated relatively according to round parametric equation Displacement point (x, y) value, by d engine technology by the two-dimensional space coordinate transformation be three dimensional space coordinate, that is, halt;
Several displacement points calculated connection is finally obtained to the simulation motion track of hanging basket.
In a preferred embodiment of the present invention, step S2 the specific steps are:
Scene management and GIS coordinate systems are combined, local coordinate system is created for each shaft tower, livewire work is wrapped The model contained includes camber line, hanging basket, lateral line, horizontal line, display content and gathers the office being put into belonging to corresponding shaft tower as one In portion's coordinate system, the position of the model be relative to the coordinate of the local coordinate system of shaft tower, Tower Model include longitude and latitude and Elevation information obtains world locations information by spherical surface conversion;
Placed on Tower Model virtual key point obtain with the relevant key position of shaft tower, including shaft tower apical position, Shaft tower bottom position, insulator position, shaft tower left and right sides position, focus, starting point, halt, by key position and hanging basket Position input circular arc calculation formula can calculate three distance S1, S2, S3s of the hanging basket 1 apart from shaft tower, then substitute into combinational gap Calculation formula i.e. can determine whether current location dangerous, wherein, S1 be the distance between hanging basket and tower body top frame, S2 For the distance between hanging basket and tower body side, S3 is the distance between hanging basket and cross-arm.It can be saved shaft tower using the method Corresponding key value is saved in the operation of database.
Further, in step s 2, the calculation formula of combinational gap is
S=min (S1, S2)+S3,
Wherein, S1 be the distance between hanging basket and tower body top frame, S2 be the distance between hanging basket and tower body side, S3 For the distance between hanging basket and cross-arm.
The beneficial effects of the invention are as follows:
(1) the present invention is based on three-dimensional live platform simulation ultra-high-tension power transmission line actual scene, user can see three dimensional field Scape, operation hanging basket movement are conducive to visualization, imaging grasp analog position and process, are conducive to deduce exchange;
(2) analogy method of the present invention provide a convenient, the computational methods of accurate combinational gap, hung for livewire work Basket method enters simulation and provides data processing means, ensure that livewire work service personnel can be by three-dimensional live platform simulation Operation provides deduction reference for actual job, effectively increases the level of security of ultra-high-tension power transmission line Equipotential live working;
(3) system of the present invention provides modeling scheme record screen, sectional drawing, playback, preservation, load-on module, is conducive to mould Intend preservation, the backup of data, user can be needed according to simulation and scheme importance selecting module function, enriches analogue data Preservation means.
Description of the drawings
Fig. 1 is that ultra-high-tension power transmission line Equipotential live working hanging basket of the present invention enters simulation system display interface one preferably in fact Apply the partial schematic diagram of example;
Fig. 2 is the flow chart that the ultra-high-tension power transmission line Equipotential live working hanging basket enters analogy method;
Fig. 3 is the idiographic flow that the ultra-high-tension power transmission line Equipotential live working hanging basket enters analogy method step S1 Figure.
The label of each component is as follows in attached drawing:1st, hanging basket, 2, anchor point, 3, cross-arm, 4, conducting wire, 5, tower body, 6, safety rope.
Specific embodiment
The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
A kind of ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system, mainly includes:
Simulation process module, by building ultra-high-tension power transmission line three-dimensional live platform, simulating hanging basket motion track and showing In three-dimensional scenic;
Distance calculation module calculates the combinational gap during hanging basket motion track;
Information display module, when hanging basket displacement stops, combinational gap numerical value is shown in three-dimensional scenic;
Simulated operation module carries out hanging basket method modeling scheme record screen, sectional drawing, playback, preservation, loading operation.
Referring to Fig. 2, enter the simulation of simulation system based on the ultra-high-tension power transmission line Equipotential live working hanging basket method Method includes the following steps:
Step S1:By building ultra-high-tension power transmission line three-dimensional live platform, simulating 1 motion track of hanging basket and being shown in three-dimensional Scene;
With reference to Fig. 3, it is as follows:
S1.1:Three-dimensional modeling is carried out according to ultra-high-tension power transmission line actual conditions, ultra-high-tension power transmission line three-dimensional live is built and puts down Platform;
According to ultra-high-tension power transmission line actual conditions, fusion laser point cloud, outdoor scene model, oblique photograph, orthography of taking photo by plane Figure, panoramic pictures and GIS (GIS-Geographic Information System, Geographic Information System), DEM (digital elevation moulds Type, Digital Elevation Model) etc. information, to shaft tower, insulator, conducting wire etc. carry out three-dimensional modeling, according to 1:1 Ratio forms physical model, incorporates 3D platforms and forms three-dimensional visible file, ultimately forms outdoor scene model.
The method for building ultra-high-tension power transmission line three-dimensional live platform is using d engine technology, uses OpenGL (Open Graphics Library) it is rendered, language is realized as logic using java, interface framework is built using java fx, and Scene cut can be realized into several enclosure bodies by cross-platform operation using the method using BIHTree scene structures, it is and other Engine integrates processing GIS information.
S1.2:Based on three-dimensional live platform, with reference to the shaft tower number of display, select to carry out simulation band on high voltage transmission line road The shaft tower of electric operation;
Into after " livewire work " function, left mouse button clicks selection shaft tower in three-dimensional scenic, the livewire work chosen Shaft tower number is shown in " livewire work " of information list, and the bar of other shaft tower switching livewire work can be clicked in three-dimensional scenic Tower.The livewire work information simulated in scene is also shown in " livewire work " list of information list.
The method of shaft tower is clicked using ray Pick technologies, and the BIHTree scene structures carried with engine are combined, Otherwise scene, which will be traversed, leads to inefficiency, BIHTree by scene cut into several enclosure bodies, collision will with emission lines Nearest enclosure body carries out, and the enclosure body that not taking into account that can not possibly collide does not need to traversal scene and calculates, and the method will Pick efficiency can greatly be improved.
The method of ray Pick technologies is:Mouse clicks the ray that scene emits a simulation to scene, by ray and Nearest enclosure body is collided with ray, does not take into account that the enclosure body that can not possibly be collided into without traversing scene meter Calculate, greatly improve Pick efficiency, obtain the nearest object of collision distance current view point as click result can to shaft tower into Row selection.
S1.3:In three-dimensional live, 1 process of hanging basket is placed in simulation, and hanging basket 1 is calculated and be shown automatically to anchor point above conducting wire Arc radius R;
Hanging basket 1 is automatically displayed in the pole I sides (i.e. circuit side of the positive electrode) of chosen shaft tower, can drag hanging basket, be placed In the other positions of shaft tower, after being moved to destination, left mouse button, which is clicked, places hanging basket 1.If position needs to adjust after hanging basket 1 is placed It is whole, moving hanging basket 1 can be again tapped on and reapposed.The placement location of hanging basket is starting point O2, and starting point O2 is with being set in advance in Simulation shaft tower falls the arc radius R that the distance between focus O1 on arm is defined as livewire work, and focus Q2 is true according to customer demand Positioning is put.Hanging basket 1 is fixed between focus O1 and starting point O2 by safety rope 6, the arc radius R be hanging basket swing into shifting The arc radius of dynamic rail mark.
The method of 1 placement location of hanging basket is selected using plane Pick technologies and ray Pick technologies, with the bar currently selected The forward projection of tower center and shaft tower creates a virtual plane, and ray Pick operations, transmitting one are carried out on the virtual plane The ray of item simulation, ray and the enclosure body nearest with ray are collided, and obtain the nearest object of collision distance current view point Body is as the position that clicks the hanging basket that result is selection and will place.The result of Pick is limited in using plane Pick technologies Some is wanted in the plane placed, and makes the result of Pick without departing from desired range, and limit Pick ranges to be promoted Operational efficiency.
S1.4:After hanging basket 1 is placed, simulate 1 motion track of hanging basket and be shown in three-dimensional scenic, while hanging basket 1 is provided and is being moved Displacement operation displaying on dynamic rail mark.
After hanging basket 1 is placed, backstage is automatic to be calculated 1 motion track of hanging basket and is shown in three-dimensional scenic.As shown in Figure 1, combination Gap is less than the track segment of 6.8 meters of safe distance (according to ultra-high-tension power transmission line voltage class difference, safe arc radius is different) Dotted line is shown as, simulation motion track is shown in solid on dotted line.
Enter operating area into method to swing, provide there are two types of the displacement operation methods of exhibiting of hanging basket 1 in the direction of movement: First, using three-dimensional scenic it is upward ↑ or downwards ↓ arrow can control hanging basket 1 to be moved along track, after placing hanging basket, downwards, to moving up The prompting of dynamic key is directly provided in three-dimensional scenic;2nd, the START button of three-dimensional scenic is clicked, after hanging basket 1 is placed, is being hung automatically 1 top of basket shows start button, and animated show hanging basket 1 is moved to the process of conducting wire cross-arm 3 from placement location.
The method of simulation 1 motion track of hanging basket includes the following steps:
The placement location of hanging basket is defined as starting point first, anchor point is defined as focus, before starting point and focus away from From for arc radius R;
Then the offset for transmitting 1 radian θ is moved to hanging basket every time, one can be calculated relatively according to round parametric equation Displacement point (x, y) value, by d engine technology by the two-dimensional space coordinate transformation be three dimensional space coordinate, that is, halt;
Wherein, round parametric equation is
Several displacement points calculated connection is finally obtained to the simulation motion track of hanging basket.
This algorithm can real-time update render alarm camber line, it is described alarm camber line simulated using multiple small cylinders, it is small Cylinder more multi sphere line is more smooth, and alarm camber line is calculated and updated in button operation, not always in real-time update.
Step S2:The combinational gap during 1 motion track of hanging basket is calculated, and when 1 displacement of hanging basket stops in three dimensional field Combinational gap numerical value is shown in scape;
Scene management and GIS coordinate systems are combined, local coordinate system is created for each shaft tower, livewire work is wrapped The model contained includes camber line, hanging basket, lateral line, horizontal line, display content and gathers the office being put into belonging to corresponding shaft tower as one In portion's coordinate system, the position of the model be relative to the coordinate of the local coordinate system of shaft tower, Tower Model include longitude and latitude and Elevation information obtains world locations information by spherical surface conversion;
Placed on Tower Model virtual key point obtain with the relevant key position of shaft tower, including shaft tower apical position, Shaft tower bottom position, insulator position, shaft tower left and right sides position, focus, starting point, halt, by key position and hanging basket Position input circular arc calculation formula can calculate three distance S1, S2, S3s of the hanging basket 1 apart from shaft tower, then substitute into combinational gap Calculation formula can determine whether current location dangerous, wherein, the calculation formula of combinational gap for S=min (S1, S2)+ S3, S1 are the distance between hanging basket 1 and 5 top frame of tower body, and S2 is the distance between hanging basket 1 and 5 side of tower body, and S3 is hanging basket The distance between 1 and cross-arm 3.The operation that the corresponding key value of shaft tower is saved in database can be saved using the method.
Illustrated with a preferred embodiment, algorithm of the present invention can calculate starting point S1 to focus O, halt S2 to coke Angle between point O, while halt S2 can be also calculated in real time to the horizontal distance S2=of the nearest steel frame construction of shaft tower 1.26m, while hanging basket can be also calculated to the vertical range S1=3.37m of arm, hanging basket is then calculated by the algorithm again The distance S3=2.35m of nearest insulator below to arm.After obtaining these data, then bring above-mentioned minimum safe distance meter into Calculate formula, { S1, S2}min+S3>=6.8m meets safe distance requirement.
Hanging basket along track displacement of the lines stop when, the numerical value of S1, S2, S3, S, hanging basket initial position are shown in three-dimensional scenic S1, S2, S3, S numerical value are not shown.
Presentation of information employs Billboard methods, and the method shows two-dimensional signal for three-dimensional scenic, is creating one just To the rectangle of viewpoint, generation one puts up figure content to think information to be shown, is sticked in rectangle and thinks information to be shown Textures, viewpoint movement update Billboard (shaft tower sky node) position and direction when rotating, you can are placed on Billboard The position of face viewpoint.Entire interface can be avoided when view distance thinks position to be shown farther out into horizontal blanking Billboard Piling up Billboard causes interface chaotic.
Step S3:Livewire work modeling scheme is generated, for instructing site layout project.
After placing hanging basket 1, record screen, sectional drawing, playback, preservation, load button on the right side of three dimensional field scenic spot are operated, can preserve and work as Preceding livewire work simulation process supports generation livewire work modeling scheme, for instructing site layout project.
The difference of hardware configuration during in view of actual displayed, the present invention provides can the rendering of cross-platform operation, frame and It realizes language, range measurement is realized using ray Pick technologies, swing into the rendering of alarm camber line using TowerLine algorithms, Scene management and GIS coordinates combine and integrate Billboard methods and show.
The present invention can realize that livewire work hanging basket method enters process simulation, and simulation process and result can reliably be shown With storage, be loaded into, for livewire work implementation personnel provide one kind can with simulated high-pressure hot line maintenance hanging basket method into The simulation system entered based on accurate three-dimensional live platform, is effectively compensated for based on conventional transmission lines road livewire work operation side Formula and the deficiency of displaying, have good actual motion effect.
The foregoing is merely the embodiment of the present invention, are not intended to limit the scope of the invention, every to utilize this hair The equivalent structure or equivalent flow shift that bright specification and accompanying drawing content are made directly or indirectly is used in other relevant skills Art field, is included within the scope of the present invention.

Claims (9)

1. a kind of ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system, which is characterized in that mainly includes:
Simulation process module by building ultra-high-tension power transmission line three-dimensional live platform, simulates hanging basket motion track and is shown in three Tie up scene;
Distance calculation module calculates the combinational gap during hanging basket motion track;
Information display module, when hanging basket displacement stops, combinational gap numerical value is shown in three-dimensional scenic;
Simulated operation module carries out hanging basket method modeling scheme record screen, sectional drawing, playback, preservation, loading operation.
2. enter the simulation side of simulation system based on ultra-high-tension power transmission line Equipotential live working hanging basket method described in claim 1 Method includes the following steps:
Step S1:By building ultra-high-tension power transmission line three-dimensional live platform, simulating hanging basket motion track and being shown in three-dimensional scenic;
Step S2:The combinational gap during hanging basket motion track is calculated, and is shown in three-dimensional scenic when hanging basket displacement stops Show combinational gap numerical value;
Step S3:Livewire work modeling scheme is generated, for instructing site layout project.
3. ultra-high-tension power transmission line Equipotential live working hanging basket method according to claim 2 enters analogy method, feature Be, step S1 the specific steps are:
S1.1:Three-dimensional modeling is carried out according to ultra-high-tension power transmission line actual conditions, builds ultra-high-tension power transmission line three-dimensional live platform;
S1.2:Based on three-dimensional live platform, with reference to the shaft tower number of display, select simulate charging on high voltage transmission line road to make The shaft tower of industry;
S1.3:In three-dimensional live, hanging basket process is placed in simulation, and hanging basket is calculated and be shown automatically to the arc half of anchor point above conducting wire Diameter R;
S1.4:After hanging basket is placed, simulate hanging basket motion track and be shown in three-dimensional scenic, while provide hanging basket on motion track Displacement operation displaying.
4. ultra-high-tension power transmission line Equipotential live working hanging basket method according to claim 3 enters analogy method, feature It is, in step S1.1, the method for building ultra-high-tension power transmission line three-dimensional live platform is using d engine technology, is used OpenGL is rendered, and language is realized as logic using java, and interface framework is built, and using BIHTree using java fx Scene structure is by scene cut into several enclosure bodies.
5. ultra-high-tension power transmission line Equipotential live working hanging basket method according to claim 3 enters analogy method, feature It is, in step S1.2, clicks the method for shaft tower using ray Pick technologies, mouse clicks scene and emits one to scene The ray of simulation collides ray and the enclosure body nearest with ray, obtains the nearest object of collision distance current view point Shaft tower can be selected as result is clicked.
6. ultra-high-tension power transmission line Equipotential live working hanging basket method according to claim 3 enters analogy method, feature It is, in step S1.3, the method for hanging basket placement location is selected using plane Pick technologies and ray Pick technologies, with current The shaft tower center of selection and the forward projection of shaft tower create a virtual plane, and ray Pick behaviour is carried out on the virtual plane Make, emit the ray of a simulation, ray and the enclosure body nearest with ray are collided, obtain collision distance current view point Nearest object is as the position that clicks the hanging basket that result is selection and will place.
7. ultra-high-tension power transmission line Equipotential live working hanging basket method according to claim 3 enters analogy method, feature It is, in step S1.4, the method for simulation hanging basket motion track includes the following steps:
The placement location of hanging basket is defined as starting point first, anchor point is defined as focus, the distance before starting point and focus is Arc radius R;
Then the offset for transmitting 1 radian θ is moved to hanging basket every time, an opposite position can be calculated according to round parametric equation Move point (x, y) value, by d engine technology by the two-dimensional space coordinate transformation be three dimensional space coordinate, that is, halt;
Several displacement points calculated connection is finally obtained to the simulation motion track of hanging basket.
8. ultra-high-tension power transmission line Equipotential live working hanging basket method according to claim 2 enters analogy method, feature Be, step S2 the specific steps are:
Scene management and GIS coordinate systems are combined, local coordinate system is created for each shaft tower, livewire work is included Model includes camber line, hanging basket, lateral line, horizontal line, display content and is put into the part belonging to corresponding shaft tower as a set and sits In mark system, the position of the model is relative to the coordinate of the local coordinate system of shaft tower, and Tower Model includes longitude and latitude and elevation Information obtains world locations information by spherical surface conversion;
Virtual key point acquisition and the relevant key position of shaft tower are placed on Tower Model, including shaft tower apical position, shaft tower Bottom position, insulator position, shaft tower left and right sides position, focus, starting point, halt, by key position and hanging basket position Input circular arc calculation formula can calculate three distance S1, S2, S3s of the hanging basket 1 apart from shaft tower, then substitute into the meter of combinational gap It calculates formula and can determine whether current location is dangerous, wherein, S1 is the distance between hanging basket and tower body top frame, and S2 is hangs The distance between basket and tower body side, S3 are the distance between hanging basket and cross-arm.
9. the ultra-high-tension power transmission line Equipotential live working hanging basket method according to claim 2 or 8 enters analogy method, special Sign is that in step s 2, the calculation formula of combinational gap is
S=min (S1, S2)+S3,
Wherein, S1 is the distance between hanging basket and tower body top frame, and S2 is the distance between hanging basket and tower body side, and S3 is hangs The distance between basket and cross-arm.
CN201711366900.8A 2017-12-18 2017-12-18 Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method Pending CN108133510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711366900.8A CN108133510A (en) 2017-12-18 2017-12-18 Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711366900.8A CN108133510A (en) 2017-12-18 2017-12-18 Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method

Publications (1)

Publication Number Publication Date
CN108133510A true CN108133510A (en) 2018-06-08

Family

ID=62390399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711366900.8A Pending CN108133510A (en) 2017-12-18 2017-12-18 Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method

Country Status (1)

Country Link
CN (1) CN108133510A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109638719A (en) * 2019-01-18 2019-04-16 三峡大学 A kind of extra-high voltage AC circuit anchor support rope ladder method equipotential live line work paths planning method considering environmental factor
CN109742680A (en) * 2019-01-15 2019-05-10 北京拓维思科技有限公司 The processing method and processing device of track of marching into the arena based on rope ladder method
CN109768500A (en) * 2019-01-18 2019-05-17 三峡大学 A kind of extra-high voltage AC circuit anchor support hanging basket method equipotential live line work paths planning method considering environmental factor
CN109787142A (en) * 2019-01-18 2019-05-21 三峡大学 A kind of extra-high voltage AC circuit rope ladder method equipotential live line work paths planning method considering environmental factor
CN109861134A (en) * 2019-01-18 2019-06-07 三峡大学 A kind of extra-high voltage AC circuit hanging basket method equipotential live line work paths planning method considering environmental factor
CN110707601A (en) * 2019-12-09 2020-01-17 云南电网有限责任公司昆明供电局 Method for entering multi-loop vertical arrangement wire equipotential operation
CN111934236A (en) * 2020-07-03 2020-11-13 中国电力科学研究院有限公司 Method for entering and exiting equipotential during live working of ultra-high voltage transmission line
CN113049923A (en) * 2021-01-28 2021-06-29 南方电网科学研究院有限责任公司 DC transmission line combined gap discharge characteristic test device and adjustment method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8300379B2 (en) * 2008-03-27 2012-10-30 Otkrytoe Aktsionernoe Obschestvo “NPO Streamer” High-voltage insulator and a high-voltage electric power line using said insulator
CN102930106A (en) * 2012-11-09 2013-02-13 武汉科技大学 Simulation method for live working path optimization of transmission lines
CN103744516A (en) * 2014-01-21 2014-04-23 国家电网公司 Safety evaluation system and method of live-line work equipotential entry paths
CN104638565A (en) * 2015-01-30 2015-05-20 国家电网公司 Method for performing equipotential live line work by putting +/-800kV tangent tower electric transmission line into electric field
CN105591314A (en) * 2015-09-09 2016-05-18 国家电网公司 UHV DC transmission line strain tower electrified processing hardware fitting fall-off field operation process
CN105977863A (en) * 2016-06-08 2016-09-28 国网甘肃省电力公司检修公司 Power transmission power off maintenance method and live-line maintenance method through rope throwing by unmanned plane
CN106786146A (en) * 2016-12-19 2017-05-31 国网福建省电力有限公司 The identical tower window list back transmission line compact linear towers of 500kV tri- enter equipotential operational method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8300379B2 (en) * 2008-03-27 2012-10-30 Otkrytoe Aktsionernoe Obschestvo “NPO Streamer” High-voltage insulator and a high-voltage electric power line using said insulator
CN102930106A (en) * 2012-11-09 2013-02-13 武汉科技大学 Simulation method for live working path optimization of transmission lines
CN103744516A (en) * 2014-01-21 2014-04-23 国家电网公司 Safety evaluation system and method of live-line work equipotential entry paths
CN104638565A (en) * 2015-01-30 2015-05-20 国家电网公司 Method for performing equipotential live line work by putting +/-800kV tangent tower electric transmission line into electric field
CN105591314A (en) * 2015-09-09 2016-05-18 国家电网公司 UHV DC transmission line strain tower electrified processing hardware fitting fall-off field operation process
CN105977863A (en) * 2016-06-08 2016-09-28 国网甘肃省电力公司检修公司 Power transmission power off maintenance method and live-line maintenance method through rope throwing by unmanned plane
CN106786146A (en) * 2016-12-19 2017-05-31 国网福建省电力有限公司 The identical tower window list back transmission line compact linear towers of 500kV tri- enter equipotential operational method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
徐文洋: "±800kV输电线路典型带电作业方法研究", 《中国优秀硕士学位论文全文数据库 信息科技II辑》 *
朱红亮: "虚拟现实技术在电力培训中的应用", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
石生智: "交流特高压输电线路带电作业工器具及作业方法研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109742680A (en) * 2019-01-15 2019-05-10 北京拓维思科技有限公司 The processing method and processing device of track of marching into the arena based on rope ladder method
CN109638719A (en) * 2019-01-18 2019-04-16 三峡大学 A kind of extra-high voltage AC circuit anchor support rope ladder method equipotential live line work paths planning method considering environmental factor
CN109768500A (en) * 2019-01-18 2019-05-17 三峡大学 A kind of extra-high voltage AC circuit anchor support hanging basket method equipotential live line work paths planning method considering environmental factor
CN109787142A (en) * 2019-01-18 2019-05-21 三峡大学 A kind of extra-high voltage AC circuit rope ladder method equipotential live line work paths planning method considering environmental factor
CN109861134A (en) * 2019-01-18 2019-06-07 三峡大学 A kind of extra-high voltage AC circuit hanging basket method equipotential live line work paths planning method considering environmental factor
CN110707601A (en) * 2019-12-09 2020-01-17 云南电网有限责任公司昆明供电局 Method for entering multi-loop vertical arrangement wire equipotential operation
CN111934236A (en) * 2020-07-03 2020-11-13 中国电力科学研究院有限公司 Method for entering and exiting equipotential during live working of ultra-high voltage transmission line
CN113049923A (en) * 2021-01-28 2021-06-29 南方电网科学研究院有限责任公司 DC transmission line combined gap discharge characteristic test device and adjustment method
CN113049923B (en) * 2021-01-28 2022-04-19 南方电网科学研究院有限责任公司 DC transmission line combined gap discharge characteristic test device and adjustment method

Similar Documents

Publication Publication Date Title
CN108133510A (en) Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method
CN108074280A (en) The method that ultra-high-tension power transmission line Equipotential live working simulates hanging basket motion track
CN102509330B (en) Application of virtual three-dimensional system of transformer substation on the basis of electric power geographic information system (GIS)
CN102323996B (en) Three-dimensional GIS (Geographic Information System) technology based visual state monitoring system for power transmission lines
CN103093663B (en) Hydropower station three-dimensional precise modeling and visualization simulation training system and implementation method thereof
CN103021024A (en) Method displaying electromagnetic field of converting station in three-dimensional and visual mode
CN104978693A (en) Simulation deduction system and method of electric power emergency disposal situation on the basis of State Grid GIS (Geographic Information System)
CN104317855A (en) Metering producing real-time monitoring method based on real-time database
CN101621191A (en) Three-dimensional visual processing method and system for extra high voltage transmission line
CN105929770B (en) A kind of substation operation operating condition method for visualizing based on CIM model
CN108038910A (en) The implementation method of substation's main equipment Virtual Reality Demonstration
CN113989452B (en) GIS-based digital twin city coordinate positioning method and monitoring system
CN106412526A (en) Police oblique-photography real 3D platform system and interface system thereof
CN102842103B (en) High speed comprehensive detection train two-dimension holographic visualization system and method
CN107507275A (en) The method and device that transmission line of electricity tripping operation coverage based on big data determines
CN104766365A (en) Three-dimensional visualization method for engineering structure disease information
CN110580564A (en) Method for assisting in acceptance of line engineering completion by three-dimensional design result of power transmission line
CN117351521B (en) Digital twinning-based power transmission line bird detection method, system, medium and equipment
CN116012557B (en) Weather natural scene data docking system and docking method based on three-dimensional system
CN115496398A (en) Electric power operation safety control method and system
CN105678839A (en) Security device distribution design method based on computer three dimensional scene simulation technology
CN111914332A (en) Underground pipeline identification and warning method based on BIM + AR technology
CN112435337A (en) Landscape visual field analysis method and system
CN206249417U (en) A kind of ultra-high voltage transformer station three-dimensional live supervising device
CN105825272B (en) Management system and management method of transformer substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180608

RJ01 Rejection of invention patent application after publication