CN109768500A - An Equipotential Working Path Planning Method for UHV AC Line Tension Tower Basket Method Considering Environmental Factors - Google Patents
An Equipotential Working Path Planning Method for UHV AC Line Tension Tower Basket Method Considering Environmental Factors Download PDFInfo
- Publication number
- CN109768500A CN109768500A CN201910096057.9A CN201910096057A CN109768500A CN 109768500 A CN109768500 A CN 109768500A CN 201910096057 A CN201910096057 A CN 201910096057A CN 109768500 A CN109768500 A CN 109768500A
- Authority
- CN
- China
- Prior art keywords
- point
- rope
- field strength
- equipotential
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
A kind of extra-high voltage AC circuit anchor support hanging basket method equipotential live line work paths planning method considering environmental factor, pass through the measurement of the meteorologic parameter to ultrahigh voltage alternating current transmission lines anchor support livewire work shaft tower geographic location, air humidity H, the environment temperature T when operation and air pressure P at that time are obtained, obtains the relative dielectric constant of air;It determines the position of the equipotential live line work personnel in hanging basket, electric Field Calculation then is carried out to the body surface field strength of each operation track point;And the body surface field strength of each setting is compared with the critical bloom field strength of conducting wire, ten operation track points are finally determined, meet the requirements ten operation track low spots are linked to be a camber line and obtain extra-high voltage AC circuit anchor support hanging basket method equipotential live line work planning path.This method considers operation shaft tower environmental factor, for the hanging basket method equipotential live line work path that ultrahigh voltage alternating current transmission lines anchor support is cooked up, carries out providing theoretical foundation and guidance for the safety of livewire work.
Description
Technical field
A kind of extra-high voltage AC circuit anchor support hanging basket method equipotential live line work path planning for considering environmental factor of the present invention
Method is related to extra-high work transmission line and hanging basket method equipotential live line work Path Planning Technique field.
Background technique
Equipotential live line work mode is most widely used in high voltage transmission line live work with its technical advantage, but in spy
On HVAC power transmission line when livewire work, since the working voltage of ultrahigh voltage alternating current transmission lines is high, around electrical body
Electric field strength is high, and UHV transmission line is long, geographical along the line, climatic environment complexity, and influence suffered by operating personnel's safety is bigger,
Therefore live-working safety distance, combinational gap, operating personnel need to be passed in and out equipotential best mode etc. and studied.Hanging basket method
Equipotential live line work is one kind of livewire work mode, and in UHV transmission line engineering, hanging basket method operation is realized equipotential
Process is that operating personnel wears screening clothing and is sitting in insulation hanging basket, and staff the electricity such as controls by adjusting both ends rope length on tower
The position of position operating personnel makes equipotential live line work personnel reach the mistake that conducting wire realizes equipotential live line work from a certain position of cross arm of tower
Journey.The operation mode is widely used in livewire work at present, but its mode for entering strong electrical field and path planning affect work
The safety of industry personnel.
Currently, ultrahigh voltage alternating current transmission lines anchor support, mode that is theoretical and entering field strength in practice is usually along strain insulator
Insulator chain is using " entering electric field across two short three " methods, also known as " free equipotential " method, but using must be to strain insulator-string institute before this method
There is strain insulator porcelain insulator to carry out live zero measure (determining that the intact insulator of strain insulator-string meets regulatory requirements), is using the method
Before, (glass insulator can not have to detection) need to be detected to insulator, during traveling, foot need to step on an insulator string,
Hand steered another string, trick synchronous horizontal is mobile, avoids movement to spend as far as possible big.The method is in 500kV extra high voltage network band
It has been widely adopted in electric operation.But due to UHV transmission line own characteristic, so that this method is difficult to be used.
The problem is that:
(1): the above are porcelain insulators for extra high voltage line anchor support 80%, and insulator chain length is more than 15 meters, and detection is tired
It is difficult;
(2): insulator chain spacing is excessive, and two insulator string horizontal distances are generally more than 60 centimetres, and heavy icing area is even more to reach
To 1 meter.Operating personnel will be with the posture transverse shifting of similar push-up successively across 70 multi-disc insulators, and difficulty is very big.
Summary of the invention
Against the above deficiency, the invention proposes a kind of extra-high voltage AC circuit anchor support hanging basket methods for considering environmental factor
Equipotential live line work paths planning method, this method are directed to UHV transmission line anchor support, enter strong electrical field using hanging basket method
Mode, and the change of environmental factor is considered, under the premise of equipotential live line work personnel's filed intensity on body surface meets electric field requirement, for
A kind of equipotential live line work path for entering strong electrical field using hanging basket method that ultrahigh voltage alternating current transmission lines anchor support is cooked up is band
The safety of electric operation carries out providing theoretical foundation and guidance.
The technical scheme adopted by the invention is as follows:
A kind of extra-high voltage AC circuit anchor support hanging basket method equipotential live line work paths planning method considering environmental factor, leads to
The measurement for crossing the meteorologic parameter to ultrahigh voltage alternating current transmission lines anchor support livewire work shaft tower geographic location, obtains operation
When air humidity H, environment temperature T and air pressure P at that time, obtain the relative dielectric constant of air on this basis;Pass through work
The determination of industry rope length and the judgement of combinational gap, to primarily determine the position of the equipotential live line work personnel in hanging basket, then
Electric Field Calculation is carried out to the body surface field strength of each operation track point;And by the body surface field strength of each setting with
The critical bloom field strength of conducting wire is compared, and finally determines ten operation track points, by meet the requirements ten operation tracks
Low spot is linked to be a camber line to get extra-high voltage AC circuit hanging basket method equipotential live line work planning path is arrived.
Equipotential live line work process is to realize that operating personnel jumps firmly from cross-arm position to ultrahigh voltage alternating current transmission lines anchor support
Process on line, operating personnel reach at hard wire jumper, need to climb from hard wire jumper to ultrahigh voltage alternating current transmission lines anchor support
On conducting wire.
A kind of extra-high voltage AC circuit anchor support hanging basket method equipotential live line work paths planning method considering environmental factor, packet
Include following steps:
Step 1: air humidity H, the environment temperature T and air pressure P at that time of measurement operation shaft tower geographic location;
Step 2: the relative dielectric constant ε and air humidity, temperature, the relationship of air pressure of air, the opposite dielectric of air are normal
Number ε becomes larger with the increase of air humidity, reduces as the temperature increases, increases with the increase of air pressure;
Step 3: determining operation shaft tower coordinate system, rope length is determined as coordinate origin using shaft tower central point where operation cross-arm
L1 and L2, rope length L2 length are equal to the sum of length and fitting length of suspension insulator, L2 rope length are ensured in operation process not
Become, L1 is variation in operation process, makes rope lengthThe angle θ is the angle of cross arm of tower and rope L2;Rope
Sub- L2 hanging point is located at the cross-arm of suspension insulator normal position, and rope L1 hanging point is equal to L2 apart from rope L2 hanging point distance
Rope length;Before equipotential live line work starts, equipotential live line work personnel are located at the hanging point of rope L1, and are sitting in hanging basket, then discharge
Rope length L1, taking the angle θ is 10 °, makes rope lengthIt determines at first operation track point, in the operation track
Point, the position of operating personnel in space in hanging basket need to meet formula (1)
The S1+S3 and S2+S3 for calculating spatial position are met the requirements if distance is all larger than 6.9m at this time, if apart from full
Foot requires, and calculates the electric field strength E that equipotential live line work personnel are in the point.By the way that φ can be found out to formula (2), by what is found out
φ substitutes into formula (3), can find out the filed intensity on body surface E for the equipotential live line work personnel being positioned in the space.
In formula:For laplacian;
φ is current potential scalar;
ρ is free charge density;
ε is the relative dielectric constant of air;
X, y, z are the rectangular co-ordinate where the medium positioning operation personnel in space;
E is equipotential live line work personnel body surface electric field strength.
The operation track point of selection, need to meet formula (1) and electric field strength E simultaneously need to be less than the critical bloom field strength of conducting wire
Ecr.Make to wear critical that the equipotential live line work personnel of shading ring are less than conducting wire in the filed intensity on body surface of the point in insulation hanging basket
It has stage fright strong, to guarantee that the safety of equipotential live line work personnel, the critical bloom field strength of conducting wire are calculated by formula (4)
δ is the relative density of air in formula (4);
r0For the radius of bloom conducting wire, cm;
M is the coefficient of regime of conductive line surfaces, and value is 0.8~1.0.
Step 4 determines remaining 8 working paths planning point, by the determination side of first operation track point in step 3
Method makes the angle θ successively be equal to 20 °, 30 °, 40 °, 50 °, 60 °, 70 °, 80 °, makes rope length according to the angle θ 10 ° of method incremented by successivelyTo determine second, third, the 4th, the 5th, the 6th, the 7th, the 8th working path
Point.The determination of 9th working path point, the operating personnel in hanging basket reaches the position of conducting wire level in vertical direction at this time,
Horizontal position is from conducting wire 0.5m, and the angle of rope length L2 and suspension insulator is α at this time,The then work
θ=90 °-the α of industry tracing point, makes rope lengthTo determine the 9th working path point.Each tracing point is pressed
After operation rope length determines job position, the value of the S1+S3 and S2+S3 of spatial position are calculated, whether checking computations meet formula (1)
With the requirement of electric field strength.If above ten operation track points are all satisfied the requirement of formula (1) and electric field strength by verifying,
Above ten operation track points can be connected it is into a line, be extra-high voltage AC circuit hanging basket method equipotential live line work planning work
Industry path.
A kind of extra-high voltage AC circuit anchor support hanging basket method equipotential live line work path planning for considering environmental factor of the present invention
Method, it is contemplated that operation shaft tower environmental factor, under the premise of operating personnel's filed intensity on body surface electric field meets electric field requirement, for spy
The hanging basket method equipotential live line work path that HVAC power transmission line anchor support is cooked up carries out providing reason for the safety of livewire work
By foundation and guidance.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples:
Fig. 1 is anchor support hanging basket method operation overall model figure.
Fig. 2 is the equipotential live line work personnel spatial position figure in anchor support hanging basket.
Fig. 3 is the operation of anchor support hanging basket method from hard wire jumper 0.5m job position figure.
Fig. 4 is the anchor support hanging basket method equipotential live line work location drawing.
Body surface electric field strength FEM calculation cloud atlas when Fig. 5 is anchor support hanging basket method equipotential live line work.
Fig. 6 straight corner anchor support hanging basket method operation overall model figure.
Equipotential live line work personnel spatial position figure in Fig. 7 straight corner anchor support hanging basket.
Fig. 8 straight corner anchor support hanging basket method operation is from conducting wire 0.5m job position figure.
Fig. 9 straight corner anchor support hanging basket method equipotential live line work location drawing.
Body surface field strength FEM calculation cloud atlas when Figure 10 straight corner anchor support hanging basket method operation equipotential.
Specific embodiment
A kind of extra-high voltage AC circuit anchor support hanging basket method equipotential live line work paths planning method considering environmental factor, leads to
The measurement for crossing the meteorologic parameter to ultrahigh voltage alternating current transmission lines livewire work shaft tower geographic location, obtains sky when operation
Air humidity degree H, environment temperature T and air pressure P at that time, obtain the relative dielectric constant of air on this basis;Pass through operation rope length
Determination and combinational gap judgement, to primarily determine the position of the equipotential live line work personnel in hanging basket, then to each
The body surface field strength of a operation track point carries out electric Field Calculation;And by the body surface field strength of each setting and conducting wire
Critical bloom field strength is compared, and finally determines ten operation track points, and meet the requirements ten operation track low spots are connected
Extra-high voltage AC circuit hanging basket method equipotential live line work planning path is obtained at a camber line.For certain ultra-high voltage AC transmission
Route design parameter establishes the cross arm of tower of ultrahigh voltage alternating current transmission lines, hanging basket, human body, absolutely according to specific geometric dimension
Parameter value is substituted into the calculating for carrying out rope, and carries out equipotential live line work personnel's filed intensity on body surface by edge, conducting wire, fitting model
It calculates, the planning path of the UHV transmission line hanging basket method equipotential live line work of a consideration environmental factor can be obtained.
Specifically includes the following steps:
1) air humidity H, the environment temperature T and air pressure P at that time of operation shaft tower geographic location, are measured;
2), the relative dielectric constant ε of air and air humidity, temperature, the relationship of air pressure, the relative dielectric constant ε of air
Become larger with the increase of air humidity, reduce as the temperature increases, increases with the increase of air pressure;Specific data are such as
Shown in table 1, table 2;
The relative dielectric constant ε and temperature, the relationship of air pressure of 1 air of table
The relative dielectric constant ε and humidity, the relationship of air pressure of 2 air of table
3), determine operation shaft tower coordinate system, using shaft tower central point where operation cross-arm as coordinate origin, determine rope length L1 and
L2, rope length L2 length are equal to the sum of length and fitting length of suspension insulator, ensure that L2 rope length is constant in operation process,
L1 is variation in operation process, makes rope lengthThe angle θ is the angle of cross arm of tower and rope L2;Rope
L2 hanging point is located at the cross-arm of suspension insulator normal position, and rope L1 hanging point is equal to L2 apart from rope L2 hanging point distance and restricts
It is long;Before equipotential live line work starts, equipotential live line work personnel are located at the hanging point of rope L1, and are sitting in hanging basket, then release rope
Long L1, taking the angle θ is 10 °, makes rope lengthIt determines at first operation track point, in the operation track point,
The position of operating personnel in space in hanging basket needs to meet formula (1)
The S1+S3 and S2+S3 for calculating spatial position are met the requirements if distance is all larger than 6.9m at this time, if apart from full
Foot requires, and calculates the electric field strength E that equipotential live line work personnel are in the point.By the way that φ can be found out to formula (2), by what is found out
φ substitutes into formula (3), can find out the filed intensity on body surface E for the equipotential live line work personnel being positioned in the space.
In formulaFor laplacian;
φ is current potential scalar;
ρ is free charge density;
ε is the relative dielectric constant of air;
X, y, z are the rectangular co-ordinate where the medium positioning operation personnel in space;
E is equipotential live line work personnel body surface electric field strength.
The operation track point of selection, need to meet formula (1) and electric field strength E simultaneously need to be less than the critical bloom field strength of conducting wire
Ecr.Make to wear critical that the equipotential live line work personnel of shading ring are less than conducting wire in the filed intensity on body surface of the point in insulation hanging basket
It has stage fright strong, to guarantee that the safety of equipotential live line work personnel, the critical bloom field strength of conducting wire are calculated by formula (4)
δ is the relative density of air in formula (4);
r0For the radius of bloom conducting wire, cm;
M is the coefficient of regime of conductive line surfaces, and value is 0.8~1.0.
4) remaining 8 working paths planning point, is determined, by the determination method of first operation track point in step 3),
According to the angle θ 10 ° of method incremented by successively, so that the angle θ is successively equal to 20 °, 30 °, 40 °, 50 °, 60 °, 70 °, 80 °, make rope lengthTo determine second, third, the 4th, the 5th, the 6th, the 7th, the 8th working path
Point.The determination of 9th working path point, the operating personnel in hanging basket reaches the position of conducting wire level in vertical direction at this time,
Horizontal position is from conducting wire 0.5m, and the angle of rope length L2 and suspension insulator is α at this time,The then work
θ=90 °-the α of industry tracing point, makes rope lengthTo determine the 9th working path point.Tenth working path
The determination of point, operating personnel need to reach on conducting wire, when reaching the 9th working path point, because of operating personnel and conductor flat
It together, is 0.5m from conducting wire horizontal distance, the equipotential live line work personnel in hanging basket will hold rapidly arc suppression reactor and go to connect at this time
Ultra-high Voltage Wire is touched, the angle of L1 and L2 is 90 degree when contact wire, makes rope lengthEach tracing point is pressed
After operation rope length determines job position, the value of the S1+S3 and S2+S3 of spatial position are calculated, whether checking computations meet formula (1)
With the requirement of electric field strength.If above ten operation track points are all satisfied the requirement of formula (1) and electric field strength by verifying,
Above ten operation track points can be connected it is into a line, be extra-high voltage AC circuit anchor support hanging basket method equipotential live line work rule
The working path drawn.
Specific example:
By taking Huainan-Nanjing-Shanghai -1000kV UHV transmission line engineering anchor support hanging basket method operation as an example:
According to the process that step 1) describes, operation on Huainan-Nanjing-Shanghai 1000kV Thailand Wu No. 568 shaft towers of I/II line, bar
Tower model SJV321, on November 10th, 2018 carry out operation at this, and the environment temperature T measured at that time is 19 °, the phase of air
To humidity be H (%) be 55.7, air pressure P (Torr) is 756.45.
According to the process that step 2) describes, the environmental parameter measured according to step 1) tables look-up the opposite dielectric for obtaining air
Constant ε=1.000668.
According to the process that step 3) describes, operation shaft tower coordinate system is determined, using the lower cross-arm center of operation shaft tower as coordinate
Origin;Operation cross-arm length is 12.4m, and hard wire jumper insulator chain is long and fitting total length is 11m, so the length of operation rope length L2
Degree is 11m, and L2 is remained unchanged in operation process, and the hanging point of L2 is hung at the cross-arm A of two hard wire jumper insulator middle upper parts,
The hanging point of L1 is hung on the cross-arm at the hanging point 11m from L2 at B, anchor support hanging basket method operation overall model figure is established, such as Fig. 1 institute
Show.Before operation starts, equipotential live line work personnel are and to be sitting in hanging basket at the hanging point of L1, and then staff discharges operation rope
Sub- L1, makesL1=1.92m is acquired, so staff should discharge work at this time
The length of industry rope L1 is 1.92m, obtains first operation track point, and S1 is the equipotential live line work personnel that are sitting in hanging basket from tower
The horizontal distance of body, S2 are vertical range of the equipotential live line work personnel from shaft tower being sitting in hanging basket, and S3 is to be sitting in hanging basket
Equipotential live line work personnel fall the distance of conducting wire, and the equipotential live line work personnel spatial position figure in hanging basket is such as schemed shown in (2).At this point,
S1=1.772m;S2=1.913m;S3=14.139m.Meet formula (1)
Then obtain wearing the body surface electric field strength that screening clothing is sitting in human body in hanging basket, E using FEM calculationmax=5.8kV/
M at this time and calculates the critical bloom field strength of conducting wire, according to formula
For the relative density of air, m is the coefficient of regime of conductive line surfaces, it is contemplated that eight bundle conductor configurations, m value are 0.85.r0For
The radius of bloom conducting wire, eight oidiospore wire diameter of extra-high voltage are 33.8mm, and the equivalent redius for being scaled conducting wire is 350mm, Ecr
=2690.1kV/m.It is compared discovery Emax<Ecr, illustrate that body surface field strength at this time is less than the critical bloom field strength of conducting wire, no
Electric discharge phenomena can occur, operating personnel is safe.
According to the process that step 4) describes, the determination of remaining 8 working paths planning point is carried out.Determine the second operation road
When diameter point, operation rope length is discharged, is madeL1=3.82m is acquired, obtains second
A working path point, at this point, S1=2.193m;S2=3.819m;S3=12.569m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=6.9kV/m, Emax<Ecr,
Illustrate that electric discharge phenomena will not occur for body surface field strength, operating personnel is safe less than the critical bloom field strength of conducting wire at this time.
When determining third working path point, operation rope length is discharged, is madeAcquire L1
=5.69m obtains third working path point, at this point, S1=2.897m;S2=5.496m;S3=11m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=11.8kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining the 4th working path point, operation rope length is discharged, is madeAcquire L1=
7.52m obtains the 4th working path point, at this point, S1=3.917m;S2=7.067m;S3=9.302m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=40.1kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining the 5th working path point, operation rope length is discharged, is madeAcquire L1=
9.30m obtains the 5th working path point, at this point, S1=5.210m;S2=8.428m;S3=7.522m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=50.6kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining the 6th working path point, operation rope length is discharged, is madeIt acquires
L1=11m obtains the 6th working path point, at this point, S1=6.723m;S2=9.526m;S3=5.695m.Meet formula
(1)
And the calculating of operating personnel's body surface electric field strength at this time, calculated value E are carried out using FInite Elementmax=198.2kV/
M, Emax<Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena, operation people will not occur for body surface field strength at this time
Member is safe.When determining the 7th working path point, operation rope length is discharged, is made L1=12.62m is acquired, the 7th working path point is obtained, at this point, S1=8.071m;S2=10.243m;S3=
4.081m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=250.5kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining the 8th working path point, operation rope length is discharged, is madeIt asks
L1=14.14m is obtained, the 8th working path point is obtained, at this point, S1=10.094m;S2=10.833m;S3=1.917m is full
Sufficient formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=798kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is peace
Complete.When determining the 9th working path point, the operating personnel in hanging basket reaches the position of conducting wire level in vertical direction at this time
It sets, from conducting wire 0.5m, the operation of hanging basket method is such as schemed shown in (3), calculating is restricted at this time from conducting wire 0.5m job position figure for horizontal position
The angle of long L2 and suspension insulator is α, according to formulaθ=90 °-α=87.4 are obtained,
Make rope lengthθ=87.4 °, L2=11m acquire L1=15.2m, at this point, S1=11.491m;S2=
10.989m;S3=0.5m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time is carried out using FInite Element, the operation of hanging basket method is from hard wire jumper
0.5m body surface maximum field intensity is Emax=1260kV/m, Emax<Ecr, Emax<Ecr, illustrate body surface field strength at this time
Less than the critical bloom field strength of conducting wire, electric discharge phenomena will not occur, operating personnel is safe.Tenth working path point is really
Fixed, operating personnel need to reach on conducting wire, when reaching the 9th working path point, because operating personnel is concordant with conducting wire, from
Conducting wire horizontal distance be 0.5m, at this time the equipotential live line work personnel in hanging basket to hold rapidly arc suppression reactor go to contact it is extra-high
Conducting wire is pressed, the angle of L1 and L2 is 90 degree when contact wire, makes rope lengthAcquire L1=15.2m, hanging basket method
The equipotential live line work location drawing is such as schemed shown in (4).At this point, S1=11.98m, S2=11m;S3=0m;Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time is carried out using FInite Element, people when hanging basket method operation equipotential
Body filed intensity on body surface FEM calculation cloud atlas is as shown in figure 5, Emax=1583kV/m, Emax<Ecr, illustrate that body surface field strength is small at this time
In the critical bloom field strength of conducting wire, electric discharge phenomena will not occur, operating personnel is safe.
It is with Huainan-Nanjing-Shanghai -1000kV UHV transmission line engineering straight corner anchor support hanging basket method operation
Example:
According to the process that step 1) describes, operation on Huainan-Nanjing-Shanghai 1000kV Thailand Wu No. 537 shaft towers of I/II line, bar
Tower model SZJV322, on November 10th, 2018 carry out operation at this, and the environment temperature T measured at that time is 19 °, air
Relative humidity be H (%) be 55.7, air pressure P (Torr) is 756.45.
According to the process that step 2) describes, the environmental parameter measured according to step 1) tables look-up the opposite dielectric for obtaining air
Constant ε=1.000668.
According to the process that step 2) describes, the environmental parameter measured according to step 1) tables look-up the opposite dielectric for obtaining air
Constant ε=1.000668.
According to the process that step 3) describes, operation shaft tower coordinate system is determined, using the lower cross-arm center of operation shaft tower as coordinate
Origin;Operation cross-arm length is 18.7m, and V string edge substring is long and fitting total length is 12.4m, and two constitute V insulator string
Angle is 90 degree, so the length of operation rope length L2 is 12.4 × cos45 °=8.8m, L2 is remained unchanged in operation process, L2
Hanging point hang over the place cross-arm A among V insulator string, the hanging point of L1 is hung on the cross-arm at the hanging point 8.8m from L2 at B, foundation
Straight corner anchor support hanging basket method operation overall model figure, as shown in Figure 6.Before operation starts, equipotential live line work personnel are L1's
It at hanging point, and is sitting in hanging basket, then staff discharges operation rope L1, makesθ=10 °, L2=
8.8m acquires L1=1.53m, so the length that staff should discharge operation rope L1 at this time is 1.53m, obtains first
Operation track point, S1 are horizontal distance of the equipotential live line work personnel from tower body being sitting in hanging basket, S2 be sitting in hanging basket etc.
Vertical range of the current potential operating personnel from shaft tower, S3 are that the equipotential live line work personnel being sitting in hanging basket fall the distance of conducting wire, straight line
Equipotential live line work personnel spatial position figure in corner anchor support hanging basket, as shown in Figure 7.At this point, S1=2.198m;S2=
1.524m;S3=11.268m.Meet formula (1)
Then obtain wearing the body surface electric field strength that screening clothing is sitting in human body in hanging basket, E using FEM calculationmax=
10.9kV/m at this time and calculates the critical bloom field strength of conducting wire, according to formulaFor the relative density of air, m is the state system of conductive line surfaces
Number, it is contemplated that eight bundle conductor configurations, m value are 0.85. r0For the radius of bloom conducting wire, extra-high voltage eight is divided outside sub-conductor
Diameter is 33.8mm, and the equivalent redius for being scaled conducting wire is 350mm, Ecr=2690.1kV/m.It is compared discovery Emax<Ecr, say
The bright field strength of body surface at this time is less than the critical bloom field strength of conducting wire, electric discharge phenomena will not occur, operating personnel is safe.
According to the process that step 4) describes, the determination of remaining 8 working paths planning point is carried out.Determine the second operation road
When diameter point, operation rope length is discharged, is madeL1=3.06m is acquired, obtains second
A working path point, at this point, S1=2.538m;S2=3.013m;S3=10.049m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=12.3kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining third working path point, operation rope length is discharged, is madeIt acquires
L1=4.56m obtains third working path point, at this point, S1=2.12m;S2=5.496m;S3=11m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=11.6kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining the 4th working path point, operation rope length is discharged, is madeIt acquires
L1=6.02m obtains the 4th working path point, at this point, S1=3.963m;S2=5.657m;S3=7.406m.Meet formula
(1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=48.8kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining the 5th working path point, operation rope length is discharged, is madeIt acquires
L1=7.44m obtains the 5th working path point, at this point, S1=5.007m;S2=6.743m;S3=5.992m.Meet formula
(1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=180.6kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining the 6th working path point, operation rope length is discharged, is madeIt asks
L1=8.8m is obtained, the 6th working path point is obtained, at this point, S1=6.227m;S2=7.621m;S3=4.536m.Meet public
Formula (1):
And the calculating of operating personnel's body surface electric field strength at this time, calculated value E are carried out using FInite Elementmax=230.2kV/
M, Emax<Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena, operation people will not occur for body surface field strength at this time
Member is safe.When determining the 7th working path point, operation rope length is discharged, is made L1=10.09m is acquired, the 7th working path point is obtained, at this point, S1=7.572m;S2=8.267m;S3=
3.108m.Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=388.6kV/m, Emax<
Ecr, illustrate that less than the critical bloom field strength of conducting wire electric discharge phenomena will not occur for body surface field strength at this time, operating personnel is safety
's.When determining the 8th working path point, operation rope length is discharged, is madeIt asks
L1=11.31m is obtained, the 8th working path point is obtained, at this point, S1=9.056m;S2=8.666m;S3=1.531m meets
Formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, E are carried out using FInite Elementmax=1001.1kV/m, Emax
< Ecr, illustrate that electric discharge phenomena will not occur for body surface field strength, operating personnel is less than the critical bloom field strength of conducting wire at this time
Safety.When determining the 9th working path point, the operating personnel in hanging basket reaches conducting wire level in vertical direction at this time
Position, horizontal position is from conducting wire 0.5m, and the hanging basket method operation of straight corner anchor support is from conducting wire 0.5m job position figure, such as Fig. 8 institute
Show, calculating the angle of rope length L2 and suspension insulator at this time is α, according to formulaIt obtains
θ=90 °-α=86.74, make rope lengthθ=87.4 °, L2=8.8m acquire L1=12.09m, at this point,
S1=10.085m;S2=8.786m;S3=0.5m.Meet formula (1):
And the calculating of operating personnel's body surface electric field strength at this time is carried out using FInite Element, the operation of hanging basket method is from hard wire jumper
0.5m body surface maximum field strength is Emax=1262kV/m, Emax<Ecr, illustrate that body surface field strength is less than facing for conducting wire at this time
Boundary's bloom field strength, will not occur electric discharge phenomena, and operating personnel is safe.The determination of tenth working path point, operating personnel
It need to reach on conducting wire, when reaching the 9th working path point, because operating personnel is concordant with conducting wire, from conducting wire horizontal distance
For 0.5m, the equipotential live line work personnel in hanging basket will hold rapidly arc suppression reactor and go contact Ultra-high Voltage Wire, contact at this time
The angle of L1 and L2 is 90 degree when conducting wire, makes rope lengthAcquire L1=15.2m, straight corner anchor support hanging basket
The method equipotential live line work location drawing, as shown in Figure 9.At this point, S1=11.66m, S2=11m;S3=0m;Meet formula (1)
And the calculating of operating personnel's body surface electric field strength at this time, straight corner anchor support hanging basket method are carried out using FInite Element
Body surface field strength FEM calculation cloud atlas when operation equipotential, E as shown in Figure 10max=1583kV/m, Emax<Ecr, illustrate this
When body surface field strength be less than conducting wire critical bloom field strength, electric discharge phenomena will not occur, operating personnel is safe.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910096057.9A CN109768500B (en) | 2019-01-18 | 2019-01-18 | Equipotential operation path planning method for tension tower and hanging basket method of extra-high voltage alternating current line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910096057.9A CN109768500B (en) | 2019-01-18 | 2019-01-18 | Equipotential operation path planning method for tension tower and hanging basket method of extra-high voltage alternating current line |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109768500A true CN109768500A (en) | 2019-05-17 |
CN109768500B CN109768500B (en) | 2021-02-19 |
Family
ID=66455842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910096057.9A Active CN109768500B (en) | 2019-01-18 | 2019-01-18 | Equipotential operation path planning method for tension tower and hanging basket method of extra-high voltage alternating current line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109768500B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110165600A (en) * | 2019-06-03 | 2019-08-23 | 国家电网有限公司 | A kind of double loop passes in and out the device and method of electric field with tower transmission line of electricity |
CN113049923A (en) * | 2021-01-28 | 2021-06-29 | 南方电网科学研究院有限责任公司 | DC transmission line combined gap discharge characteristic test device and adjustment method |
CN113971355A (en) * | 2021-10-21 | 2022-01-25 | 国网安徽省电力有限公司电力科学研究院 | Three-dimensional electric field calculation method for live-line operation tower of extra-high voltage direct current line |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4478312A (en) * | 1982-09-30 | 1984-10-23 | Kurtgis Michael P | System and portable cage for servicing power transmission lines |
KR20080024852A (en) * | 2006-09-15 | 2008-03-19 | 한국전기공사협회 | Spacer damper replacement method on 765 kilovolt 2-line transmission line |
KR20080044012A (en) * | 2006-11-15 | 2008-05-20 | 한국전기공사협회 | Direct ship construction method of 765 kilovolt 2-line transmission line by helicopter |
CN201850813U (en) * | 2010-09-30 | 2011-06-01 | 中国电力工程顾问集团中南电力设计院 | Gan-shaped (Chinese character) tension resistant tower of compact power transmission line |
CN104979776A (en) * | 2015-07-10 | 2015-10-14 | 中国电力科学研究院 | Method for entering equipotential level for tension support of UHV transmission line |
CN107941273A (en) * | 2017-11-15 | 2018-04-20 | 国网湖南省电力公司检修公司 | A kind of live-working safety method for early warning and device |
CN108133510A (en) * | 2017-12-18 | 2018-06-08 | 国网江苏省电力有限公司检修分公司 | Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method |
-
2019
- 2019-01-18 CN CN201910096057.9A patent/CN109768500B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4478312A (en) * | 1982-09-30 | 1984-10-23 | Kurtgis Michael P | System and portable cage for servicing power transmission lines |
KR20080024852A (en) * | 2006-09-15 | 2008-03-19 | 한국전기공사협회 | Spacer damper replacement method on 765 kilovolt 2-line transmission line |
KR20080044012A (en) * | 2006-11-15 | 2008-05-20 | 한국전기공사협회 | Direct ship construction method of 765 kilovolt 2-line transmission line by helicopter |
CN201850813U (en) * | 2010-09-30 | 2011-06-01 | 中国电力工程顾问集团中南电力设计院 | Gan-shaped (Chinese character) tension resistant tower of compact power transmission line |
CN104979776A (en) * | 2015-07-10 | 2015-10-14 | 中国电力科学研究院 | Method for entering equipotential level for tension support of UHV transmission line |
CN107941273A (en) * | 2017-11-15 | 2018-04-20 | 国网湖南省电力公司检修公司 | A kind of live-working safety method for early warning and device |
CN108133510A (en) * | 2017-12-18 | 2018-06-08 | 国网江苏省电力有限公司检修分公司 | Ultra-high-tension power transmission line Equipotential live working hanging basket method enters simulation system and method |
Non-Patent Citations (2)
Title |
---|
徐文洋: "《±800kV 输电线路典型带电作业方法研究》", 《中国优秀硕士学位论文全文数据库工程科技II辑》 * |
黎琳: "《直流输电线路合成电场与带电作业人员体表电场分析研究》", 《中国优秀硕士学位论文全文数据库工程科技II辑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110165600A (en) * | 2019-06-03 | 2019-08-23 | 国家电网有限公司 | A kind of double loop passes in and out the device and method of electric field with tower transmission line of electricity |
CN113049923A (en) * | 2021-01-28 | 2021-06-29 | 南方电网科学研究院有限责任公司 | DC transmission line combined gap discharge characteristic test device and adjustment method |
CN113049923B (en) * | 2021-01-28 | 2022-04-19 | 南方电网科学研究院有限责任公司 | DC transmission line combined gap discharge characteristic test device and adjustment method |
CN113971355A (en) * | 2021-10-21 | 2022-01-25 | 国网安徽省电力有限公司电力科学研究院 | Three-dimensional electric field calculation method for live-line operation tower of extra-high voltage direct current line |
CN113971355B (en) * | 2021-10-21 | 2024-07-05 | 国网安徽省电力有限公司电力科学研究院 | Three-dimensional electric field calculation method for pole tower of live working of extra-high voltage direct current line |
Also Published As
Publication number | Publication date |
---|---|
CN109768500B (en) | 2021-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2013284979B2 (en) | Electric cables having self-protective properties and immunity to magnetic interferences | |
CN109768500A (en) | An Equipotential Working Path Planning Method for UHV AC Line Tension Tower Basket Method Considering Environmental Factors | |
KR100968046B1 (en) | How to measure the transmission tower grounding resistance on the transmission line with overhead line | |
CN107908846B (en) | Magnetic field analysis method of magnetic resonance wireless power supply technology in high-voltage power line monitoring | |
CN109861134A (en) | An Equipotential Working Path Planning Method for UHV AC Line Basket Method Considering Environmental Factors | |
Sun et al. | Influence of pollution distribution on insulator surface on flashover characteristics | |
CN109165441A (en) | Simulation Calculation Method of Induced Voltage and Current in Parallel AC Transmission Line Based on ATP-EMTP | |
CN106096161B (en) | The emulated computation method of power transmission line power frequency induced voltage and electric current | |
CN109269973A (en) | Insulators on HVDC Transmission Line fitting DC electric field corrosion experiment system and method | |
CN112505390B (en) | Distributed rail potential and stray current real-time monitoring method | |
CN115436839A (en) | A method for testing the sheath circulation of high-voltage single-core cables | |
CN205429680U (en) | Cable cross -bonding case | |
KR102753686B1 (en) | Apparatus for measuring dc electric field for pylon | |
CN207191413U (en) | A kind of unmanned plane for high-speed railway inspection | |
CN109193955A (en) | High voltage electric field induction energy fetching device | |
CN103715630B (en) | The method entering same-tower double-circuit alternating-current transmission line tangent tower equal potential | |
CN109059818A (en) | A kind of insulator and wire icing state equivalence calculation method | |
CN109787142A (en) | An Equal Potential Working Path Planning Method for UHV AC Lines with Soft Ladder Method Considering Environmental Factors | |
Surianu | Determination of the induced voltages by 220 kV electric overhead power lines working in parallel and narrow routes. Measurements on the ground and mathematical model | |
CN108344954A (en) | Wireless power supply electromagnetic security analysis method applied to high-tension line monitoring | |
CN109638719B (en) | Equipotential operation path planning method for extra-high voltage alternating current line strain tower rope ladder method | |
Stet et al. | Case studies on electromagnetic interference between HVPL and buried pipelines | |
CN105353218A (en) | Method for calculating split wire AC resistance and self inductance with consideration of proximity effect and skin effect | |
CN104730325B (en) | The detection method of induced overvoltage and overcurrent during cable core trouble hunting | |
CN208329816U (en) | Extra high voltage network and its EHV transmission strain insulator steel tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20250522 Address after: Room 626, Land Innovation Center Office, No. 2809 Innovation Avenue, High tech Zone, Hefei City, Anhui Province, 230000 Patentee after: Anhui Wanqi Tiancheng Technology Co.,Ltd. Country or region after: China Address before: 443002 Yichang University, Xiling, Hubei Road, No. 8 Patentee before: CHINA THREE GORGES University Country or region before: China |
|
TR01 | Transfer of patent right |