CN108132005A - A kind of method of short-delay blasting in medium-length hole upward hole - Google Patents

A kind of method of short-delay blasting in medium-length hole upward hole Download PDF

Info

Publication number
CN108132005A
CN108132005A CN201711312207.2A CN201711312207A CN108132005A CN 108132005 A CN108132005 A CN 108132005A CN 201711312207 A CN201711312207 A CN 201711312207A CN 108132005 A CN108132005 A CN 108132005A
Authority
CN
China
Prior art keywords
hole
medium
length
detonator
blasthole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711312207.2A
Other languages
Chinese (zh)
Other versions
CN108132005B (en
Inventor
姜永恒
宋士生
闵忠鹏
唐学义
任玉东
李成洪
汪志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Gold Research Institute
Original Assignee
Changchun Gold Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Gold Research Institute filed Critical Changchun Gold Research Institute
Priority to CN201711312207.2A priority Critical patent/CN108132005B/en
Publication of CN108132005A publication Critical patent/CN108132005A/en
Application granted granted Critical
Publication of CN108132005B publication Critical patent/CN108132005B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/22Methods for holding or positioning for blasting cartridges or tamping cartridges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention belongs to metal mine technical fields, and in particular to a kind of method of short-delay blasting in medium-length hole upward hole;By arranging multistage priming bomb and bulk explosive into blasthole, and pass through the method that the control of blasthole escapement 4 carries out multistage explosion, solve the technical barrier that mine down-hole realized in medium-length hole blasting operation up-hole In-hole short delay explosion, it can be realized on medium-length hole to powder charge In-hole short delay explosion by the method, in medium-length hole blasting simultaneous shaft sin king, both loading rate is improved, in turn ensures demolition effect, it is ensured that the success of explosion Cheng Jing.

Description

A kind of method of short-delay blasting in medium-length hole upward hole
Technical field
The invention belongs to metal mine technical fields, and in particular to a kind of method of short-delay blasting in medium-length hole upward hole.
Background technology
At present, in metal mine field of mining, Deep Hole Blasting is mainly used in stope and returns using more and more extensive In adopting, but more and more mines use medium-length hole blasting simultaneous shaft sin king technology in the driving of cutting well, for upward hole Explosion in be difficult to realize In-hole short delay explosion, generally carry out continuous charging into blasthole using explosive loader or fix powder stick Sent on to bamboo pole in blasthole to realize spaced loading in hole.But effect is unsatisfactory in practical explosion, and continuous charging can make Explosive payload is excessive, not only causes blasting cost excessively high but also can influence demolition effect, destroys periphery blasthole, backbreaks and owes to dig phenomenon Seriously;The enterprising between-line spacing powder charge of bamboo pole is fixed on using powder stick, blocking is can not achieve between two sections of medicines, seriously affects explosion effect Fruit, and powder charge process is complicated for operation, and labor intensity is big, low production efficiency.
Invention content
In order to overcome the above problem, the method that the present invention provides short-delay blasting in a kind of medium-length hole upward hole, to solve ore deposit Mountain underground realized in medium-length hole blasting operation the technical barrier of up-hole In-hole short delay explosion, can be real by the method To powder charge In-hole short delay explosion on existing medium-length hole, in medium-length hole blasting simultaneous shaft sin king, loading rate is both improved, is in turn ensured Demolition effect, it is ensured that the success of explosion Cheng Jing.
In order to achieve the above object, technical scheme is as follows:
Step 1:Drilling up-hole, i.e. medium-length hole 1 will ensure that blasthole is vertical in boring procedure;
Step 2:Priming bomb 2 is made, and is sent priming bomb 2 to 1 bottom hole of medium-length hole, and observe powder charge using powder charge pipe 7 The depth of the length mark C record medium-length holes 1 of pipe 7, wherein priming bomb 2 include detonation shell case 21, detonator 22 and emulsion 23, Emulsion 23 uses web-like emulsion, and priming bomb 2 is filled up, and detonator 22 is reversely inserted into emulsion 23, detonator 22 Upper included detonator wire 6;
Step 3:Using powder charge pipe 7 to 1 built-in bulk explosive 3 of medium-length hole, and according to blast hole depth and In-hole short delay hop count It determines loaded length, until stopping powder charge during loaded length, and extracts powder charge pipe 7, that is, complete the arrangement of epimere explosive;
Step 4:Blasthole escapement 4 is sent to 3 lower section of bulk explosive in medium-length hole 1 and is contacted with bulk explosive 3, Middle blasthole escapement 4 is made by thick bamboo tube, and the diameter of thick bamboo tube is less than blasthole internal diameter, and lower end breaks into bamboo clappers strip and formed admittedly Fixed end 42 along thick bamboo tube axial direction Drilling detonator wire perforation 41, and its edge is polished smooth, and fixing end 42 is stuck in medium-length hole 1 Inside prevent blasthole escapement 4 from coming off, the detonator wire 6 at bottom hole on priming bomb 2 passes through blasthole by detonator wire perforation 41 Escapement 4;
Step 5:Next section of priming bomb 2 is made, structure is identical with the priming bomb 2 in step 2, uses powder charge pipe 7 The priming bomb 2 is sent to the lower section of blasthole escapement 4, the remainder into medium-length hole 1 of powder charge pipe 7 is reused and dispenses bulk explosive 3, stop powder charge when bulk explosive 3 is filled to away from 1 0.3~0.5m of aperture of medium-length hole, the detonator wire 6 on the priming bomb 2 extends To the hole of medium-length hole 1, i.e., two sections of bulk explosives 3 are spaced apart by blasthole escapement 4;
Step 6:Blasthole is blocked using stemming 5, stemming 5 is filled in 1 aperture of medium-length hole, and is smash with tamper Real, stemming length, to ensure multiple-row blasting quality, keeps detonator wire 6 to throw away outside the hole of indwelling medium-length hole 1 not less than 0.3m;
Step 7:In same big gun downhole explosion, the detonator 22 of the detonator 22 of epimere and hypomere detonates when different, hypomere Detonator 22 first detonates, and the detonator 22 of re-detonating epimere after 50ms is spaced, if the depth of medium-length hole 1 cannot meet two sections of bulk explosives When 3 interval detonations require, determine to need to set three sections or four sections of bulk explosives 3 according to blast hole depth and In-hole short delay hop count, And it detonates successively from bottom to up, and a blasthole escapement 4 is respectively provided between every two sections of bulk explosives 3.
The powder charge pipe 7 is made of the hose of a diameter of 32mm, makes long scale every 1m using reflecting strips thereon Know C, and mark its corresponding length.
The detonator 22 uses msdelayed light emission Nonel detonator.
Compared with prior art, advantages of the present invention is as follows:
Construction safety of the present invention is reliable, and method is simple and practicable, and adjustment flexibility is strong, overcomes on traditional medium-length hole to continuous The problems such as powder charge and spaced loading formal operations are complicated, working efficiency is low, demolition effect is poor, realize on medium-length hole to powder charge hole Interior short-delay blasting, ensure that demolition effect, solve the problems, such as that medium-length hole blasting simultaneous shaft sin king is highly restricted, and be medium-length hole The popularization and application of explosion simultaneous shaft sin king technology provide technical guarantee.
Description of the drawings
Fig. 1 is implementation process schematic diagram of the present invention.
Fig. 2 is the structure diagram of blasthole escapement of the present invention.
Fig. 3 is priming bomb structure diagram of the present invention.
Fig. 4 is powder charge pipe structure diagram of the present invention.
Wherein:1 medium-length hole;2 priming bombs;21 detonation shell cases;22 detonators;23 emulsions;3 bulk explosives;4 blasthole intervals Device;41 detonator wires are perforated;42 fixing ends;5 stemmings;6 detonator wires;7 powder charge pipes.
Specific embodiment
The present invention is further described below in conjunction with the accompanying drawings.
The method of short-delay blasting, is as follows in a kind of medium-length hole upward hole:
Step 1:As shown in Figure 1, Drilling up-hole, i.e. medium-length hole 1, to ensure that blasthole is vertical in boring procedure;
Step 2:As shown in figures 1 and 3, priming bomb 2 is made, and is sent priming bomb 2 to 1 hole of medium-length hole using powder charge pipe 7 Bottom, and the depth of the length mark C record medium-length holes 1 of powder charge pipe 7 is observed, wherein priming bomb 2 includes detonation shell case 21, detonator 22 and emulsion 23, emulsion 23 uses web-like emulsion, and priming bomb 2 is filled up, and detonator 22 is reversely inserted into emulsification In explosive 23, detonator wire 6 is carried on detonator 22;
Step 3:Using powder charge pipe 7 to 1 built-in bulk explosive 3 of medium-length hole, and according to blast hole depth and In-hole short delay hop count It determines loaded length, until stopping powder charge during loaded length, and extracts powder charge pipe 7, that is, complete the arrangement of epimere explosive;
Step 4:Blasthole escapement 4 is sent to 3 lower section of bulk explosive in medium-length hole 1 and is contacted with bulk explosive 3, such as Shown in Fig. 2, wherein blasthole escapement 4 is made by thick bamboo tube, and the diameter of thick bamboo tube is less than blasthole 5~10mm of internal diameter, bamboo Tube length degree is 0.5m, and lower end breaks into bamboo clappers strip and forms fixing end 42, along the detonator of a diameter of 10mm of thick bamboo tube axial direction Drilling Payment to a porter perforation 41, and its edge is polished smooth, fixing end 42, which is stuck in medium-length hole 1, prevents blasthole escapement 4 from coming off, bottom hole The detonator wire 6 located on priming bomb 2 passes through blasthole escapement 4 by detonator wire perforation 41;
Step 5:As shown in figures 1 and 3, next section of priming bomb 2, structure and 2 phase of priming bomb in step 2 are made Together, the priming bomb 2 is sent to the lower section of blasthole escapement 4 using powder charge pipe 7, it is remaining into medium-length hole 1 reuses powder charge pipe 7 Part dress bulk explosive 3, stops powder charge, on the priming bomb 2 when bulk explosive 3 is filled to away from 1 0.3~0.5m of aperture of medium-length hole Detonator wire 6 is extended to outside the hole of medium-length hole 1, i.e., two sections of bulk explosives 3 are spaced apart by blasthole escapement 4;
Step 6:As shown in Figure 1, blocking blasthole using stemming 5, stemming 5 is filled in 1 aperture of medium-length hole, And consolidated with tamper, stemming length, to ensure multiple-row blasting quality, keeps detonator wire 6 to throw away indwelling medium-length hole 1 not less than 0.3m Hole outside.
As shown in figure 4, the powder charge pipe 7 is made of the hose of a diameter of 32mm, thereon using reflecting strips every 1m Length mark C to be made, and marks its corresponding length, when powder charge 7 powder charge of pipe, needs to fill in powder charge pipe 7 to medium-length hole 1, and with Powder charge pipe 7 is at the uniform velocity extracted in the progress of powder charge out.
The detonator 22 uses msdelayed light emission Nonel detonator.
In same big gun downhole explosion, the detonator 22 of the detonator 22 of epimere and hypomere detonates when different, the detonator 22 of hypomere It first detonates, the detonator 22 of re-detonating epimere after 50ms is spaced, if the depth of medium-length hole 1 cannot meet two sections of bulk explosives 3 and be spaced When detonation requires, determine to need to set three sections or four sections of bulk explosives 3, and under according to blast hole depth and In-hole short delay hop count It is supreme to detonate successively, and it is respectively provided with a blasthole escapement 4 between every two sections of bulk explosives 3.

Claims (3)

1. a kind of method of short-delay blasting in medium-length hole upward hole, it is characterised in that include the following steps:
Step 1:Drilling up-hole, i.e. medium-length hole (1) will ensure that blasthole is vertical in boring procedure;
Step 2:Priming bomb (2) is made, and is sent priming bomb (2) to medium-length hole (1) bottom hole, and observe using powder charge pipe (7) The depth of length mark (C) the record medium-length hole (1) of powder charge pipe (7), wherein priming bomb (2) include detonation shell case (21), detonator (22) it is filled up with emulsion (23), emulsion (23) using web-like emulsion, and by priming bomb (2), detonator (22) is anti- To being inserted into emulsion (23), detonator wire (6) is carried on detonator (22);
Step 3:Using powder charge pipe (7) to medium-length hole (1) built-in bulk explosive (3), and according to blast hole depth and In-hole short delay section The determining loaded length of number, until stopping powder charge during loaded length, and extracts powder charge pipe (7), that is, completes the arrangement of epimere explosive;
Step 4:Blasthole escapement (4) is sent to medium-length hole (1) interior bulk explosive (3) lower section and is connect with bulk explosive (3) It touches, wherein blasthole escapement (4) is made by thick bamboo tube, and the diameter of thick bamboo tube is less than blasthole internal diameter, and lower end breaks into bamboo lath Shape forms fixing end (42), perforates (41) along thick bamboo tube axial direction Drilling detonator wire, and its edge is polished smooth, fixing end (42) being stuck in medium-length hole (1) prevents blasthole escapement (4) from coming off, and the detonator wire (6) at bottom hole on priming bomb (2) passes through Detonator wire perforates (41) across blasthole escapement (4);
Step 5:Next section of priming bomb (2) is made, structure is identical with the priming bomb (2) in step 2, uses powder charge pipe (7) priming bomb (2) is sent to the lower section of blasthole escapement (4), reuses powder charge pipe (7) to medium-length hole (1) interior remainder Bulk explosive (3) is dispensed, stops powder charge when bulk explosive (3) is filled to away from medium-length hole (1) 0.3~0.5m of aperture, the priming bomb (2) detonator wire (6) on is extended to outside the hole of medium-length hole (1), i.e. blasthole escapement (4) is by two sections of bulk explosives (3) It is spaced apart;
Step 6:Blasthole is blocked using stemming (5), at stemming (5) plug to medium-length hole (1) aperture, and uses tamper Tamping, stemming length, to ensure multiple-row blasting quality, keep detonator wire (6) to throw away the hole of indwelling medium-length hole (1) not less than 0.3m It is external;
Step 7:In same big gun downhole explosion, the detonator (22) of the detonator (22) of epimere and hypomere detonates when different, hypomere Detonator (22) first detonates, and is spaced the detonator (22) of re-detonating epimere after 50ms, is dissipated if the depth of medium-length hole (1) cannot meet two sections When the detonation of blasting charge (3) interval requires, determined that three sections or four sections of setting is needed to dissipate according to blast hole depth and In-hole short delay hop count Blasting charge (3), and detonate successively from bottom to up, and a blasthole escapement is respectively provided between every two sections of bulk explosives (3) (4)。
2. the method for short-delay blasting in a kind of medium-length hole upward hole as described in claim 1, it is characterised in that the powder charge It manages (7) to be made of the hose of a diameter of 32mm, makes length mark C every 1m using reflecting strips thereon, and it is corresponding to mark it Length.
3. the method for short-delay blasting in a kind of medium-length hole upward hole as described in claim 1, it is characterised in that the detonator (22) using msdelayed light emission Nonel detonator.
CN201711312207.2A 2017-12-07 2017-12-07 A kind of method of short-delay blasting in medium-length hole upward hole Active CN108132005B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711312207.2A CN108132005B (en) 2017-12-07 2017-12-07 A kind of method of short-delay blasting in medium-length hole upward hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711312207.2A CN108132005B (en) 2017-12-07 2017-12-07 A kind of method of short-delay blasting in medium-length hole upward hole

Publications (2)

Publication Number Publication Date
CN108132005A true CN108132005A (en) 2018-06-08
CN108132005B CN108132005B (en) 2019-09-17

Family

ID=62390098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711312207.2A Active CN108132005B (en) 2017-12-07 2017-12-07 A kind of method of short-delay blasting in medium-length hole upward hole

Country Status (1)

Country Link
CN (1) CN108132005B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109238060A (en) * 2018-10-31 2019-01-18 唐山冀东启新水泥有限责任公司 Airspace structure and method for mine blasting
CN111412798A (en) * 2020-03-19 2020-07-14 安徽金日晟矿业有限责任公司 Mining construction process for realizing one-step blasting forming of reversing table body of chute
CN114033373A (en) * 2021-10-22 2022-02-11 武汉工程大学 Raise boring machine-medium-length hole differential blasting cooperative one-time grooving method
CN114199091A (en) * 2021-12-13 2022-03-18 攀钢集团工程技术有限公司 Detonation cartridge device for upward medium-length hole and charge construction method
CN114526649A (en) * 2021-12-16 2022-05-24 江睿 Preparation method of simple ammonium nitrate fuel oil explosive for drilling
CN114526652A (en) * 2022-03-11 2022-05-24 长沙矿山研究院有限责任公司 Upward medium-length hole non-coupling charging structure and application method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103389015A (en) * 2013-08-09 2013-11-13 贵州新联爆破工程集团有限公司 Subsection millisecond differential blasting method in blasthole
CN103954182A (en) * 2014-05-20 2014-07-30 武汉工程大学 Upward blast hole stemming device for mine, and blast hole charging method
RU2563893C1 (en) * 2014-09-10 2015-09-27 Федеральное государственное автономное образовательное учреждение высшего профессионального образования "Национальный исследовательский технологический университет "МИСиС" Method of detonation in open-cast minings of rock masses with different strength values
CN106767213A (en) * 2017-01-18 2017-05-31 长沙有色冶金设计研究院有限公司 A kind of Roof Control blasting method of soft broken top board ore body back production

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103389015A (en) * 2013-08-09 2013-11-13 贵州新联爆破工程集团有限公司 Subsection millisecond differential blasting method in blasthole
CN103954182A (en) * 2014-05-20 2014-07-30 武汉工程大学 Upward blast hole stemming device for mine, and blast hole charging method
RU2563893C1 (en) * 2014-09-10 2015-09-27 Федеральное государственное автономное образовательное учреждение высшего профессионального образования "Национальный исследовательский технологический университет "МИСиС" Method of detonation in open-cast minings of rock masses with different strength values
CN106767213A (en) * 2017-01-18 2017-05-31 长沙有色冶金设计研究院有限公司 A kind of Roof Control blasting method of soft broken top board ore body back production

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109238060A (en) * 2018-10-31 2019-01-18 唐山冀东启新水泥有限责任公司 Airspace structure and method for mine blasting
CN111412798A (en) * 2020-03-19 2020-07-14 安徽金日晟矿业有限责任公司 Mining construction process for realizing one-step blasting forming of reversing table body of chute
CN114033373A (en) * 2021-10-22 2022-02-11 武汉工程大学 Raise boring machine-medium-length hole differential blasting cooperative one-time grooving method
CN114033373B (en) * 2021-10-22 2024-02-06 武汉工程大学 Reverse well drilling machine-medium deep hole differential blasting collaborative primary grooving method
CN114199091A (en) * 2021-12-13 2022-03-18 攀钢集团工程技术有限公司 Detonation cartridge device for upward medium-length hole and charge construction method
CN114526649A (en) * 2021-12-16 2022-05-24 江睿 Preparation method of simple ammonium nitrate fuel oil explosive for drilling
CN114526652A (en) * 2022-03-11 2022-05-24 长沙矿山研究院有限责任公司 Upward medium-length hole non-coupling charging structure and application method
CN114526652B (en) * 2022-03-11 2023-03-14 长沙矿山研究院有限责任公司 Upward medium-length hole non-coupling charging structure and application method

Also Published As

Publication number Publication date
CN108132005B (en) 2019-09-17

Similar Documents

Publication Publication Date Title
CN108132005B (en) A kind of method of short-delay blasting in medium-length hole upward hole
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN103306679B (en) " ︱ type " scope of freedom slotting simultaneous shaft sin king technique
CN109029168B (en) Blasting treatment method for underground suspended roof
CN103940309A (en) Underground-blasting shaft forming method
CN108132006A (en) Anti-clogging quick well formation undercut blast hole arrangement and its blasting method
CN102967191A (en) Blasting method for treatment of gob
CN109870084A (en) A kind of VCR mining codes exempt from cleaning bottom of hole blast charging structure and its construction method
CN110307762A (en) A kind of courtyard quick well formation method based on deep hole hole by hole initiation technique
CN112696999A (en) Charging device and charging method for deep hole blasting
CN107525443A (en) The explosion method of ignition of fan shaped medium length hole
RU2647547C1 (en) Method of opening productive well formation by shaped charges and device for its implementation
CN109974545A (en) A kind of medium-length hole blasting outstanding top processing method in sublevel caving method
CN108362181B (en) A kind of driving recovery method of extra narrow vein ore body
Mishra et al. Blast-induced caving from surface over continuous miner panel at a 110m cover in an Indian mine
CN108398067B (en) On a kind of medium-length hole under punching to the In-hole short delay blasting method of powder charge
CN108590651B (en) A kind of method of more drilling chamber recycling ore pillars
AU784685B2 (en) A method of blasting
AU2016235369B2 (en) System and method for underground blasting
CN102927863A (en) New method for blasting construction of all-rock tunnel
CN105240044A (en) Method for preventing and treating coal and gas outburst by explosion
CN110145981A (en) A kind of explosion well completion method for shallow vertical shaft
CN108661638B (en) A kind of method of ring holes recycling ore pillar
CN219328376U (en) Deep hole directional blasting charging structure
US20230399926A1 (en) Single Energy Source Projectile Perforating System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 130012 nanhu road, Jilin, Changchun, No. 6760

Patentee after: CHANGCHUN GOLD RESEARCH INSTITUTE Co.,Ltd.

Address before: 130012 nanhu road, Jilin, Changchun, No. 6760

Patentee before: CHANGCHUN GOLD Research Institute