CN109974545A CN201910272685.8A CN201910272685A CN109974545A CN 109974545 A CN109974545 A CN 109974545A CN 201910272685 A CN201910272685 A CN 201910272685A CN 109974545 A CN109974545 A CN 109974545A
Authority
CN
China
Prior art keywords
blasthole
encryption
normal
row
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910272685.8A
Other languages
Chinese (zh)
Other versions
CN109974545B (en
Inventor
史秀志
苟永刚
邱贤阳
霍晓锋
周科礼
赵雄文
熊国雄
徐喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daye Nonferrous Metals Co Ltd
Central South University
Original Assignee
Daye Nonferrous Metals Co Ltd
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daye Nonferrous Metals Co Ltd, Central South University filed Critical Daye Nonferrous Metals Co Ltd
Priority to CN201910272685.8A priority Critical patent/CN109974545B/en
Publication of CN109974545A publication Critical patent/CN109974545A/en
Application granted granted Critical
Publication of CN109974545B publication Critical patent/CN109974545B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses the outstanding top processing methods of medium-length hole blasting in a kind of sublevel caving method, complement first encrypts blasthole between the normal blasthole row of two rows close to the region Xuan Ding, and blasthole, the first encryption blasthole and the second encryption blasthole are encrypted with the blasthole explosion together of the normal blasthole row of back segment in each complement second in outside of the normal blasthole row of the two rows.The present invention is a kind of outstanding top processing method of simple, safe and efficient, the reliable medium-length hole blasting of operating process, in the case where not influencing normal side and collapsing explosive broken, only need a small amount of vertical hole of complement that outstanding top problem can be solved as encryption blasthole, reduce the series of processes of new pick engineering and highly difficult construction hole location, effectively shortening outstanding top leads to claim for eot phenomenon, operating procedure is simple, and low to encryption blasthole hole location precision prescribed, easy to spread and application.

Description

A kind of medium-length hole blasting outstanding top processing method in sublevel caving method
Technical field
The invention belongs to mining technical fields, and in particular to a kind of outstanding top processing method of medium-length hole blasting.
Background technique
Sublevel caving method without sill pillar is most common mining technology in sublevel caving method, and this method is also amplified out novel To all multi-methods such as mechanization medium-length hole stratified filling method, layering rock drilling afterwards filling methods on panel.But the essence of these methods Feature is all the driving rock drilling route in ore body, then falls mine to fan shaped round blasting in rock drilling route and carries out back production Method.
However, during stoping operation, sometimes because of the structural planes such as geology horizontal fault, drawing inaccuracy, or construction position Inaccuracy is set, causing hole depth to design, not in place, position is not got in hole or powder charge is not in place, causes explosion that expected height is not achieved There is top ore not by avalanche, forms outstanding top phenomenon in degree.
After outstanding top problem occurs, if not handling continuation back production, it will lead to stope and partition or stope mining height occur not It is up to standard, it results in waste of resources and is caving risk at any time.If dealt with improperly, and it will lead to the increasing of subsequent processing difficulty, safety The problems such as hidden trouble scope expansion, or even stop the actual mining of the stope.Therefore, how the outstanding top of processing of highly effective and safe is asked It inscribes most important.
In outstanding top processing scheme, the most common processing mode is in the rock drilling route near the position Xuan Ding, to outstanding top A row or multi-row slope fan medium-length hole is mended in region, one as disclosed in the Chinese patent application application No. is 201510248024.3 The method on the outstanding top of kind medium-length hole blasting processing, to hang the top/bottom part scope of freedom, using common continuous charging blasting technique tissue explosion. Personnel safety when in actual operation, to guarantee perforations adding operation, slope fan medium-length hole position of opening can only be arranged in open wiring and lean on The position of 3-4 row afterwards, this easily causes 3-4 row's medium-length hole in front to destroy, causes to perforate, and influences the arrangement of explosion section;And it is outstanding A possibility that top hole region Nei Can is likely to also remain unexploded explosive, and slope fan medium-length hole penetrates residual hole, there are one Fixed security risk.In addition, the perforations adding is the inclination blasthole of opposite low-angle, it is fixed to drilling machine to require height, and drilling machine is rushed It is big to hit device damage.
On the basis of inclined hole treatment effect is poor, some new methods are also suggested, such as by digging in the area Xuan Ding two sides Into the method for new route, then Drilling wide-angle inclined hole to the region Xuan Ding;But time-consuming for this method, increases a large amount of new works Journey, processing cost are high.Also by double priming bombs in scallop hole, elementary errors, subsequent a few artillery salvo holes of successively detonating in row behind outstanding top Mode, achieve the effect that gradually to caunch and complete to disappear to outstanding heights of roofs, such as application No. is 201810949704.1 China is special A kind of disclosed blast processing method on the outstanding top in underground of benefit application.This mode by geological conditions and is hanged without newly-increased project amount Heights of roofs etc. limitation, caunch height it is uncontrollable with required number of rows, and every separate explosion can only explosion tier hole, construct it is cumbersome, Time-consuming, and ore losses amount is big.
Summary of the invention
Technical problem solved by the present invention is providing one kind for many drawbacks existing for the above outstanding top processing method The outstanding top processing method of medium-length hole blasting in sublevel caving method.
The present invention adopts the following technical scheme that realization:
The outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method, it is characterised in that: close to the region Xuan Ding Complement first encrypts blasthole between two rows of normal blasthole rows, and encrypts big gun in each complement second in outside of the normal blasthole row of the two rows Hole, the first encryption blasthole and the second region for being distributed of encryption blasthole form encrypted area, the first encryption blasthole and the Two encryption blastholes are with the normal artillery salvo hole of a wherein row in encrypted area with section explosion.
Step 1: position and the height in the actual measurement region Xuan Ding, determine that heel row blasthole destroys situation, open wiring destroys situation;
Step 2: choosing two rows of normal blasthole rows in the region Xuan Ding according to step 1, arranged in two rows of normal blastholes Between setting-out first encrypt blasthole, and two rows normally the exclusive side of blasthole respectively add the second encryption blasthole;
Step 3: according to all encryption blastholes of layout point position Drilling;
Step 4: after encryption blasthole Drilling, to normal artillery salvo hole and encryption blast hole projectile filling;
Step 5: carrying out on line, detonation work after all blast hole projectile fillings.
Further, setting 1-3 is retained in the step 2, between the region Xuan Ding and immediate encryption blasthole to arrange Normal blasthole row.
Further, the first encryption blasthole is arranged between normal blasthole row along the direction for being parallel to normal blasthole row 2-3 row, single hole count are 4-6.
Further, single, hole count 3-5 is arranged along the direction for being parallel to normal blasthole row in the second encryption blasthole It is a, it is uniformly distributed between all encryption blastholes.
Further, in the step 3, the aperture of the encryption blasthole is greater than the aperture in normal artillery salvo hole.
Further, for the encryption blasthole to vertical parallel hole on, drilling depth pushes up area top certainly to outstanding Retain the vertical range of 0.5m-1m by face.
Further, in the step 4, normal artillery salvo hole powder charge by the way of sublevel caving method setting is described It encrypts blasthole and uses continuous charging structure, powder charge encrypts the internal charge section of blasthole to the lower part Xuan Ding scope of freedom horizontal line position Overall length is laid with primacord.
Further, in the step 5, the 1-3 retained between the region Xuan Ding and encrypted area arranges normal blasthole row first Detonation, the interior 2-3 section of the normal blasthole row of the 1-3 row row of being all made of, which is formed, arranges interior short-delay blasting, and the time of delaying after row is elongated to 75ms or more.
Further, all encryption blastholes use the blasting cap initiation of identical section, encrypt section selected by blasthole not The heel row section for the normal blasthole row of two rows for determining that encryption blasthole ranking is set can be later than.
The beneficial effects of the invention are that:
(1) after outstanding top problem occurs in mining area, in the case where not influencing normal side and collapsing explosive broken, only need complement vertical on a small quantity Outstanding top problem can be solved as encryption blasthole in hole.The identical section explosion of blasthole is encrypted, forms multiple column charings loosely Porous spherical pack form;This blasting from by livingston explosive funnel it is theoretical based on, using multiple intensive parallel Deep hole detonates simultaneously, so that the explosion energy of explosive in each blasthole is generated stress wave overlapping and intersects, synthesizes a common stress field, Stress wave peak action increases in the time of rock, momentum increases, effective range becomes wide, and such porous spherical pack is equivalent In the blast action of a larger diameter blasthole, but explosion energy distribution is more uniform, and demolition effect is more preferable.It encrypts in hole and detonates Pack is inserted on a strip powder stick with 1 primacord by single-shot Nonel detonator and is made, and this priming is packed To encryption hole bottom hole, then continuous charging to the lower part Xuan Ding scope of freedom horizontal line position.This technique reduce new pick engineering with The series of processes of highly difficult construction hole location, effectively shortening outstanding top leads to claim for eot phenomenon.
(2) encryption blasthole all uses continuous charging and loaded length corresponds to the height in the region Xuan Ding, and explosive payload is few.It is all to add Close blasthole uses same section, and charge process is simple, easy to spread and application, and low to encryption blasthole hole location precision prescribed, only It need to be uniformly distributed in encrypted area, thus, it is easy to drilling construction.
(3) encryption blasthole section arranges heel row section no more than normal blasthole is encrypted, in this way can be to avoid close blasthole section The too big caused phenomenon of miss-firing of difference.
(4) it stays 1-3 to arrange normal blasthole row between the encrypted area and the region Xuan Ding of encryption blasthole formation, on the one hand guarantees to add The safety of Mi Qu drilling and powder charge construction;In addition, these normal blasthole rows add interval mode of delaying greatly between arranging, it can be to outstanding top Nearby play the role of finishing, caunch.
(5) inclined hole is beaten to the region Xuan Ding compared to traditional, The method avoids perforated tapes during drilling to come by the present invention A system risk, avoid and play precise positioning requirement of the low-angle inclined hole to blasthole, reduce the damage to drilling machine, and will bore Hole cost is substantially reduced with the period.
In conclusion the present invention is that a kind of simple, safe and efficient, the reliable medium-length hole blasting of operating process hangs top processing The case where method has the scope of freedom in top particularly suitable for outstanding top, and outstanding heights of roofs is less than 6m.
Below in conjunction with the drawings and specific embodiments, the present invention will be further described.
Detailed description of the invention
Fig. 1 is the steel for shot top view in the outstanding top processing method of medium-length hole blasting of embodiment.
Fig. 2 is the steel for shot sectional view in the outstanding top processing method of medium-length hole blasting of embodiment.
Fig. 3 is the explosion section layout viewing of embodiment.
Figure label:
Figure label: the region 1- Xuan Ding, the outstanding top open wiring of 11-, the lower part 12- Xuan Ding, the outstanding top lower horizontal extended line of 13-;
The normal blasthole row of 2-, the normal artillery salvo hole 20-, the first blasthole is arranged after 21- hangs top, the second blasthole row behind the outstanding top 22-, Third blasthole is arranged behind the outstanding top 23-, and the 4th blasthole is arranged behind the outstanding top 24-;
31- first encrypts blasthole, and 32- second encrypts blasthole, and 33- encrypts blasthole explosive section;
41- upper segment rock drilling route, 42- rock drilling route.
Specific embodiment
Embodiment 1
Referring to Fig. 1 and Fig. 2, the steel for shot figure in diagram is that the present invention falls the raw outstanding top phenomenon of mineral products to sublevel caving method Explosion treatment mode.In the sublevel caving method, use upward drilling trolley to top ore body in ore body rock drilling route 42 To vertical parallel hole on drilling through, by the arrangement blasthole Drilling of all explosion sections after, to wherein certain block region mine Body explosion produces the region Xuan Ding 1 when falling mine.
The method that the present embodiment solves the region Xuan Ding 1 is mended between the normal blasthole row 2 of two rows close to the region Xuan Ding 1 The first encryption blasthole 31 is made a call to, and encrypts blasthole 32 in each complement second in outside of the normal blasthole row 2 of the two rows, in encryption blasthole drilling After chisel, according between the bottom plate of upper segment rock drilling route 41 and the outstanding top lower horizontal extended line 13 of the lower part Xuan Ding 12 Difference in height, this section of interregional installation explosive in encryption blasthole, by the first encryption blasthole 31 and the second encryption big gun after powder charge The blasthole explosion together that hole 32 is arranged with the normal blasthole on the segmentation ore body.The explosion together herein referred to refers to quick-fried in same segmentation It is broken, be not explosion simultaneously, below can the blasting sequence of normal artillery salvo hole intracorporal to same section mine and encryption blasthole carry out in detail Explanation.
Specific construction procedure is as follows.
Step 1: the position height of the lower part Xuan Ding 12 in the measurement region Xuan Ding 1, investigates position and the Xuan Ding of outstanding top open wiring 11 The destruction situation of rock drilling Roof of access road above and below the back segment of region.
Step 2: the case where according to step 1, determine the center of the first encryption blasthole 31 close to the region Xuan Ding 1 The normal blasthole of second row is arranged and third is arranged between normal blasthole row, i.e., the second blasthole is arranged 22 and hanged behind outstanding top in fig. 1 and 2 Carry out the first encryption blasthole 31 behind top between third blasthole row 23 adds setting-out, the first encryption blasthole 31 setting two between arranging Row, the direction along normal blasthole row are arranged in parallel, and every round number is 4-6;Then the second blasthole arranges 22 and Xuan Ding behind outstanding top Setting-out one is respectively added between the 4th blasthole row 24 behind third blasthole row 23 and outstanding top behind between the first blasthole row 21 and outstanding top afterwards It ranked second encryption blasthole 32, hole count is 3-5.Blasthole is encrypted according to the hole location in neighbouring normal artillery salvo hole 20, can have and slightly adjust It is whole, but it should being uniformly distributed adjacent encryption blasthole equidistantly in the encrypted area of formation.
Step 3: according to layout point position, using mode identical with normal artillery salvo hole, from the top plate of rock drilling route 42 to Upper all encryption blastholes of Drilling.The aperture of all encryption blastholes is all larger than the aperture in normal artillery salvo hole 20, and encryption blasthole is upper To vertical parallel hole, encrypts blasthole and do not punch ore body in drilling process, the drilling depth of control encryption blasthole to top The bottom plate of sublevel drilling route 41 retains the distance of 0.5m-1m, that is, is equivalent to the bottom hole (top) of encryption blasthole positioned at outstanding Push up 0.5m-1m below the top scope of freedom in region 1.
Step 4: adding respectively to normal artillery salvo hole 20 and the first encryption blasthole 31 and second after encryption blasthole Drilling Close 32 powder charge of blasthole.Wherein, primacord is laid with by grug transportation tube in normal artillery salvo hole 20, then using continuous charging mode extremely from The aperture position 3.0-4.0m, is then sent into igniting primer by grug transportation tube, further fills explosive to from aperture 1.0-2.5m's Position;Finally blocked in aperture using stemming or simple material.For the first encryption blasthole 31 and the second encryption blasthole 32, will lead Quick-fried rope length is machined to rise that angle value is identical with outstanding, and the primacord of a hair Nonel detonator and certain length is then inserted into item In shaped explosive charge (or priming bomb), it is made as igniting primer, igniting primer is sent by grug transportation tube to encryption blasthole bottom hole, is then filled Explosive is filled out to the position of outstanding top lower horizontal extended line 13, guarantee the height in the corresponding region Xuan Ding 1 of encryption blasthole explosive section 33 away from From.
Step 5: carrying out on line, detonation work after all blast hole projectile fillings.The section that detonates is as shown in Figure 3, hangs top The first blasthole row 21 is detonated first afterwards, section using plain detonator most to start 2-3 section other, when specially 1-3#, 1# extension Between be 0ms, the time of delaying between section is 25ms.Second blasthole row, 22 starting sections behind outstanding top are set as 6# or more, with behind outstanding top the The extension time is elongated to 75ms or more between one blasthole arranges 21 rows, and the first blasthole row 21 repairs to top area peripheral edge is hanged after guaranteeing outstanding top Whole effect.
The second blasthole row 22 equally selects 2-3 section other behind outstanding top, successively arranges from center to two sides.Third big gun behind outstanding top 22 sections of the second blasthole row behind outstanding top of hole row 23 is other on continuing, and is not arranged using 2-3 section equally.
The section of encryption blasthole Cai Yong not hang the last one section of the second blasthole row 22 behind top not or it is outstanding push up after third blasthole row 23 section of foremost one is other.Section not determine after, all encryption blastholes use same section do not detonate.
Due to equally having the second encryption shot hole blasting between the 4th blasthole row 24 behind third blasthole row 23 behind outstanding top and outstanding top, It is on the basis of 23 sections of third blasthole row is other behind outstanding top, 2-3 section after the arbitrarily selection of the 4th blasthole row 24 behind outstanding top is other Carry out powder charge, on the basis of eliminating outstanding top, guarantee the smooth of the last dead zone boundary of explosion and open wiring, be conducive to subsequent ore removal with it is quick-fried Broken operation.
After all blast hole projectile fillings, after all detonator payment to a porter in aperture are linked together, carry out work of clearing out a gathering place, And the payment to a porter of all blasthole Nonel detonators is connected to initiation net, it detonates after confirmation line is errorless.Particularly with regard to The initiation control of detonator is explosion common technology, and this will not be repeated here for the present embodiment.
All normal artillery salvo holes 20 in the present embodiment are all made of the up-hole of DL331 type drill jumbo Drilling rock, institute Having the normal artillery salvo hole 20 accomplished fluently in advance is to punch always from the top plate of rock drilling route 42 to upper segment rock drilling route 41 Bottom plate, blasthole diameter 64mm, hole depth determine 10m according to stope design height, and blasthole array pitch is 1.7-2.1m according to lithology.First 76mm is selected as in the aperture of encryption blasthole 31 and the second encryption blasthole 32, encryption blasthole be equally all on to vertical parallel big gun Hole, parallel with normal artillery salvo hole 20, Drilling mode is identical as normal artillery salvo hole 20, but does not punch ore body, encrypts blasthole Drilling Blasthole bottom keep away from the 1 top scope of freedom of the region Xuan Ding (i.e. the bottom plate of upper segment rock drilling route 41) 0.5-1m.Blaster Material uses powdery titania-mica, common Nonel detonator and primacord, and explosive is sent with delivery pipe to blasthole by explosive loader to be referred to Positioning is set, and aperture is blocked using stemming or easy material.
Blast working, effect are equally carried out in the stope of certain underground mine sublevel drilling afterwards filling method using the above method Show that explosion has reached outstanding the expected of top processing and required, has been reduced to 3 days, has been avoided by 15 days of conventional method construction period Construction period is delayed, and enormously simplifies process flow and operation level, avoids additional big cost input, and substantially reduce Security risk caused by traditional treatment method.
It should be clear that described above is only the embodiment of the present invention, it is not intended to limit the invention, it is all Within technical solution of the present invention and principle, changes, equivalent replacement, improvement etc., belong to protection of the present invention Within the scope of.

Claims (10)

1. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method, it is characterised in that: close to the two of the region Xuan Ding It arranges complement first between normal blasthole row and encrypts blasthole, and encrypt big gun in each complement second in outside of the normal blasthole row of the two rows Hole, the first encryption blasthole and the second region for being distributed of encryption blasthole form encrypted area, the first encryption blasthole and the Two encryption blastholes are with the normal artillery salvo hole of a wherein row in encrypted area with section explosion.
2. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 1, specifically include as Lower step:
Step 1: position and the height in the actual measurement region Xuan Ding, determine that heel row blasthole destroys situation, open wiring destroys situation;
Step 2: two rows of normal blasthole rows are being chosen in the region Xuan Ding according to step 1, between two rows of normal blasthole rows Setting-out first encrypts blasthole, and respectively adds the second encryption blasthole in the normal exclusive side of blasthole of the two rows,;
Step 3: according to all encryption blastholes of layout point position Drilling;
Step 4: after encryption blasthole Drilling, to normal artillery salvo hole and encryption blast hole projectile filling;
Step 5: carrying out on line, detonation work after all blast hole projectile fillings.
3. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 2, the step 2 In, setting 1-3 is retained between the region Xuan Ding and immediate encryption blasthole and arranges normal blasthole row.
4. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 3, described first adds For close blasthole along the direction arrangement 2-3 row for being parallel to normal blasthole row between normal blasthole row, single hole count is 4-6.
5. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 4, described second adds Close blasthole is single along the direction setting for being parallel to normal blasthole row, and hole count is 3-5, is uniformly distributed between all encryption blastholes.
6. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 2, the step 3 In, the aperture of the encryption blasthole is greater than the aperture in normal artillery salvo hole.
7. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 6, the encryption big gun To vertical parallel hole on, drilling depth retains the vertical range of 0.5m-1m to the outstanding top area top scope of freedom in hole.
8. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 2, the step 4 In, normal artillery salvo hole powder charge by the way of sublevel caving method setting, the encryption blasthole uses continuous charging structure, dress For medicine to the lower part Xuan Ding scope of freedom horizontal line position, the internal charge section overall length for encrypting blasthole is laid with primacord.
9. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 3, the step 5 In, the 1-3 retained between the region Xuan Ding and encrypted area arranges normal blasthole row and first detonates, which arranges normal blasthole and be all made of 2-3 section, which is formed, in row arranges interior short-delay blasting, and the time of delaying after row is elongated to 75ms or more.
10. the outstanding top processing method of medium-length hole blasting in a kind of sublevel caving method according to claim 9, all encryptions Blasthole uses the blasting cap initiation of identical section, and determining encryption blasthole ranking is set two cannot be later than by encrypting section selected by blasthole Arrange the heel row section of normal blasthole row.
CN201910272685.8A 2019-04-04 2019-04-04 Medium-length hole blasting suspended roof processing method in sublevel caving method Expired - Fee Related CN109974545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910272685.8A CN109974545B (en) 2019-04-04 2019-04-04 Medium-length hole blasting suspended roof processing method in sublevel caving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910272685.8A CN109974545B (en) 2019-04-04 2019-04-04 Medium-length hole blasting suspended roof processing method in sublevel caving method

Publications (2)

Publication Number Publication Date
CN109974545A true CN109974545A (en) 2019-07-05
CN109974545B CN109974545B (en) 2020-05-19

Family

ID=67083105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910272685.8A Expired - Fee Related CN109974545B (en) 2019-04-04 2019-04-04 Medium-length hole blasting suspended roof processing method in sublevel caving method

Country Status (1)

Country Link
CN (1) CN109974545B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111749693A (en) * 2020-06-28 2020-10-09 玉溪大红山矿业有限公司 Deep hole construction and blockage treatment method in large fault section by non-bottom-pillar sublevel caving method
CN113605895A (en) * 2021-09-15 2021-11-05 长沙矿山研究院有限责任公司 Safe and efficient mining method for sectional medium-length hole stope

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2650215A1 (en) * 1989-07-28 1991-02-01 Titanite Explosifs Method of producing resin-based anchoring charges and the devices implementing this method
CN102337893A (en) * 2011-09-20 2012-02-01 鞍钢集团矿业公司 Method for processing suspension top by medium-deep hole blasting on upper and lower shoes
CN104847350A (en) * 2015-05-15 2015-08-19 西北矿冶研究院 Method for treating suspended roof by medium-length hole blasting
CN207063903U (en) * 2017-08-04 2018-03-02 四川省华蓥山煤业股份有限公司绿水洞煤矿 Cloth pore structure is administered on the outstanding top of high-dipping fully-mechanized mining working upper corner
CN109029168A (en) * 2018-08-20 2018-12-18 河北钢铁集团矿业有限公司 A kind of blast processing method on the outstanding top in underground

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2650215A1 (en) * 1989-07-28 1991-02-01 Titanite Explosifs Method of producing resin-based anchoring charges and the devices implementing this method
CN102337893A (en) * 2011-09-20 2012-02-01 鞍钢集团矿业公司 Method for processing suspension top by medium-deep hole blasting on upper and lower shoes
CN104847350A (en) * 2015-05-15 2015-08-19 西北矿冶研究院 Method for treating suspended roof by medium-length hole blasting
CN207063903U (en) * 2017-08-04 2018-03-02 四川省华蓥山煤业股份有限公司绿水洞煤矿 Cloth pore structure is administered on the outstanding top of high-dipping fully-mechanized mining working upper corner
CN109029168A (en) * 2018-08-20 2018-12-18 河北钢铁集团矿业有限公司 A kind of blast processing method on the outstanding top in underground

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
唐红兵: "悬顶处理技术探索", 《甘肃冶金》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111749693A (en) * 2020-06-28 2020-10-09 玉溪大红山矿业有限公司 Deep hole construction and blockage treatment method in large fault section by non-bottom-pillar sublevel caving method
CN111749693B (en) * 2020-06-28 2022-05-20 玉溪大红山矿业有限公司 Method for constructing and blocking deep hole in large fault section by sill pillar-free sublevel caving method
CN113605895A (en) * 2021-09-15 2021-11-05 长沙矿山研究院有限责任公司 Safe and efficient mining method for sectional medium-length hole stope
CN113605895B (en) * 2021-09-15 2022-11-04 长沙矿山研究院有限责任公司 Safe and efficient mining method for sectional medium-length hole stope

Also Published As

Publication number Publication date
CN109974545B (en) 2020-05-19

Similar Documents

Publication Publication Date Title
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN205561688U (en) Go up big gun hole arrangement structure to medium -length hole undercutting blasting
CN103306679B (en) " ︱ type " scope of freedom slotting simultaneous shaft sin king technique
CN106091848B (en) It is a kind of to realize overlength, the method for high inclination-angle tunnel anchorage top bar explosion
CN103123247A (en) Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN104154830A (en) Medium-length hole blasting method for underground mining
CN109506529A (en) A kind of compound Cut Blasting method
CN102607341A (en) Stable-control blasting method for open-pit mine slopes
CN109029168A (en) A kind of blast processing method on the outstanding top in underground
CN102733808B (en) Closed pit open-pit mine ore recovery method
CN112161534B (en) One-step mining control blasting method for mine underground upward access
CN108132005A (en) A kind of method of short-delay blasting in medium-length hole upward hole
CN108489350A (en) III level surrounding rock tunnel top bar speedy drivage Smooth Blasting Construction method
CN109870084A (en) A kind of VCR mining codes exempt from cleaning bottom of hole blast charging structure and its construction method
CN107525443A (en) The explosion method of ignition of fan shaped medium length hole
CN109974545A (en) A kind of medium-length hole blasting outstanding top processing method in sublevel caving method
CN106545344B (en) A kind of Karst area tunnel wall-hanging country rock face blast excavation method
CN209230424U (en) A kind of compound burn cut
CN108362181B (en) A kind of driving recovery method of extra narrow vein ore body
CN108413822A (en) To fan shaped medium length hole Shock reducing blasting method in one kind
CN110030889B (en) Method for forming well by deep hole partition triangular net cut through one-time blasting
CN104790950B (en) Optimized mining middle-deep blasthole millisecond blasting slot cutting method
CN110823034A (en) Soft rock foundation blasting method capable of controlling mass percentage after blasting
CN213392157U (en) Construction structure for blasting high-order section drop shaft into well
CN108592716A (en) A kind of method of underground stope fining blasting excavation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200519