CN108131155B - To the construction technology of tunnel double-lining reinforcing bar positioning - Google Patents
To the construction technology of tunnel double-lining reinforcing bar positioning Download PDFInfo
- Publication number
- CN108131155B CN108131155B CN201711470753.9A CN201711470753A CN108131155B CN 108131155 B CN108131155 B CN 108131155B CN 201711470753 A CN201711470753 A CN 201711470753A CN 108131155 B CN108131155 B CN 108131155B
- Authority
- CN
- China
- Prior art keywords
- layer
- steel
- circumferential reinforcement
- away
- positioning angle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 23
- 238000010276 construction Methods 0.000 title claims abstract description 8
- 238000005516 engineering process Methods 0.000 title claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 107
- 239000010959 steel Substances 0.000 claims abstract description 107
- 230000002787 reinforcement Effects 0.000 claims abstract description 68
- 210000003205 muscle Anatomy 0.000 claims abstract description 7
- 239000002689 soil Substances 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims 1
- 238000005345 coagulation Methods 0.000 claims 1
- 238000005266 casting Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/15—Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
- E21D11/152—Laggings made of grids or nettings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to the construction technologies positioned to tunnel double-lining reinforcing bar.Mainly for solve at present manually to the positioning of two lined steel muscle lead to problems such as layer between inside and outside layer reinforcing bar away from and reinforcing bar between spacing accuracy it is low and invent.Layer is set between the inside and outside layer circumferential reinforcement of two lined steel muscle away from positioning angle steel, there is circumferential reinforcement limiting slot on two channel steels, inside and outside layer circumferential reinforcement limit is all located at channel steel to top of the layer away from positioning angle steel, each steel hoop limiting slot in positioning angle steel all respectively from layer away from stretching out;Two channel steels are fixed by bolt and layer away from positioning angle steel;Each circumferential reinforcement of inside and outside layer is stuck in the circumferential reinforcement limiting slot of inside and outside layer circumferential reinforcement limit channel steel, and all inside and outside layer circumferential reinforcements is made all to be tightly attached to layer away from positioning angle steel, reinforcing bar is bound, concrete is poured.Advantage is to can guarantee the layer of inside and outside layer circumferential reinforcement away from accurate with spacing.
Description
Technical field:
The present invention relates to the construction technologies positioned to tunnel double-lining reinforcing bar.
Background technique:
It is all that two lined steel muscle are positioned by way of manual measurement at present in constructing tunnel, this positioning side
Formula cause the layer between internal layer reinforcing bar and outer reinforcement away from and each layer reinforcing bar between spacing accuracy it is low, in addition casting concrete
Shi Yi causes single steel bar to shift steel bars, influences construction quality.
Summary of the invention:
Technical problem to be solved by the invention is to provide the layer between a kind of certifiable internal layer reinforcing bar and outer reinforcement away from
And the spacing uniformity between each layer reinforcing bar, when being poured concrete reinforcing bar will not shift to tunnel double-lining reinforcing bar positioning
Construction technology.
Above-mentioned purpose is achieved in that the position between the internal layer circumferential reinforcement and outer layer circumferential reinforcement of two lined steel muscle
Place sets elongated layer away from positioning angle steel, and layer is bolted on tunnel wall away from the both ends of positioning angle steel, then sets two and lead to
Long channel steel, this two channel steels are respectively internal layer circumferential reinforcement limit channel steel and outer layer circumferential reinforcement limit channel steel, and two
All be provided with several circumferential reinforcement limiting slots by the spacing of design on channel steel, by the limit of internal layer circumferential reinforcement with channel steel be located at layer away from
The top of angle steel is positioned, and makes steel hoop limiting slot on internal layer circumferential reinforcement limit channel steel towards internal layer steel hoop,
Each steel hoop limiting slot all from layer away from positioning angle steel in stretch out;The limit of outer layer circumferential reinforcement is also provided in layer away from positioning with channel steel
The top of angle steel, and make the steel hoop limiting slot on outer layer circumferential reinforcement limit channel steel towards outer layer circumferential reinforcement, each ring
Shape reinforcing bar limiting slot is all stretched out from layer away from positioning angle steel;Two channel steel positions install rear both ends by bolt and layer away from orientation angle
Steel is fixed together;
Each circumferential reinforcement of internal layer is stuck in the circumferential reinforcement limiting slot of internal layer circumferential reinforcement limit channel steel, and
And all internal layer circumferential reinforcements is made all to be tightly attached to layer away from positioning angle steel, each steel hoop of outer layer is stuck in outer layer ring
Into the circumferential reinforcement limiting slot of reinforcing bar limit channel steel, and all outer layer circumferential reinforcements is made all to be tightly attached to layer away from orientation angle
On steel, the positioning to internal layer circumferential reinforcement and outer layer circumferential reinforcement is thereby realized, then reinforcing bar is bound, casting is mixed
Solidifying soil, unloads two channel steels after concrete initial set, and layer is cast in concrete away from positioning angle steel.
The invention has the advantages that due to setting layer between internal layer circumferential reinforcement and outer layer circumferential reinforcement away from positioning angle steel, and
And internal layer circumferential reinforcement and outer layer circumferential reinforcement are limited by two channel steels, it can guarantee internal layer circumferential reinforcement and outer in this way
The layer of layer circumferential reinforcement is away from accurate with spacing, and when being poured concrete, reinforcing bar is not shifted, and ensure that construction quality.
Specific embodiment:
Elongated layer is set away from orientation angle at position between the internal layer circumferential reinforcement and outer layer circumferential reinforcement of two lined steel muscle
Steel, layer is bolted on tunnel wall away from the both ends of positioning angle steel, then sets two elongated channel steels, this two channel steels point
Not Wei internal layer circumferential reinforcement limit channel steel and outer layer circumferential reinforcement limit channel steel, all opened by the spacing of design on two channel steels
There are several circumferential reinforcement limiting slots, the limit of internal layer circumferential reinforcement is located at top of the layer away from positioning angle steel with channel steel, and make interior
Steel hoop limiting slot on layer circumferential reinforcement limit channel steel is towards internal layer steel hoop, and each steel hoop limiting slot is all from layer
It is stretched out away from positioning in angle steel;The limit of outer layer circumferential reinforcement is also provided in top of the layer away from positioning angle steel with channel steel, and makes outer layer ring
Steel hoop limiting slot on reinforcing bar limit channel steel is towards outer layer circumferential reinforcement, and each steel hoop limiting slot is all from layer away from fixed
Parallactic angle steel stretches out;Two channel steel positions install rear both ends and are fixed together by bolt and layer away from positioning angle steel;
Each circumferential reinforcement of internal layer is stuck in the circumferential reinforcement limiting slot of internal layer circumferential reinforcement limit channel steel, and
And all internal layer circumferential reinforcements is made all to be tightly attached to layer away from positioning angle steel, each steel hoop of outer layer is stuck in outer layer ring
Into the circumferential reinforcement limiting slot of reinforcing bar limit channel steel, and all outer layer circumferential reinforcements is made all to be tightly attached to layer away from orientation angle
On steel, the positioning to internal layer circumferential reinforcement and outer layer circumferential reinforcement is thereby realized, then reinforcing bar is bound, casting is mixed
Solidifying soil, unloads two channel steels after concrete initial set, and layer is cast in concrete away from positioning angle steel.
Claims (1)
1. the construction technology of pair tunnel double-lining reinforcing bar positioning, it is characterized in that: in the internal layer circumferential reinforcement and outer layer ring of two lined steel muscle
Elongated layer is set to the position between reinforcing bar away from positioning angle steel, layer is bolted on tunnel wall away from the both ends of positioning angle steel
On body, then two elongated channel steels are set, this two channel steels are respectively internal layer circumferential reinforcement limit channel steel and outer layer circumferential reinforcement
It limits and uses channel steel, be all provided with several circumferential reinforcement limiting slots by the spacing of design on two channel steels, internal layer circumferential reinforcement is limited
Position is located at top of the layer away from positioning angle steel with channel steel, and the steel hoop on internal layer circumferential reinforcement limit channel steel is made to limit groove face
Inner layer steel hoop, each steel hoop limiting slot all from layer away from positioning angle steel in stretch out;By outer layer circumferential reinforcement limit slot
Steel is also provided in top of the layer away from positioning angle steel, and faces out the limit of outer layer circumferential reinforcement with the steel hoop limiting slot on channel steel
Layer circumferential reinforcement, each steel hoop limiting slot are all stretched out from layer away from positioning angle steel;Two channel steel positions install rear both ends and pass through
Bolt and layer are fixed together away from positioning angle steel;
Each circumferential reinforcement of internal layer is stuck in the circumferential reinforcement limiting slot of internal layer circumferential reinforcement limit channel steel, and made
All internal layer circumferential reinforcements are all tightly attached to layer away from positioning angle steel, and each steel hoop of outer layer is stuck in outer layer circumferential direction steel
In the circumferential reinforcement limiting slot of muscle limit channel steel, and all outer layer circumferential reinforcements is made all to be tightly attached to layer away from positioning angle steel
On, the positioning to internal layer circumferential reinforcement and outer layer circumferential reinforcement is thereby realized, then reinforcing bar is bound, is poured coagulation
Soil unloads two channel steels after concrete initial set, and layer is cast in concrete away from positioning angle steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711470753.9A CN108131155B (en) | 2017-12-29 | 2017-12-29 | To the construction technology of tunnel double-lining reinforcing bar positioning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711470753.9A CN108131155B (en) | 2017-12-29 | 2017-12-29 | To the construction technology of tunnel double-lining reinforcing bar positioning |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108131155A CN108131155A (en) | 2018-06-08 |
CN108131155B true CN108131155B (en) | 2019-10-18 |
Family
ID=62393491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711470753.9A Active CN108131155B (en) | 2017-12-29 | 2017-12-29 | To the construction technology of tunnel double-lining reinforcing bar positioning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108131155B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109386296A (en) * | 2018-12-10 | 2019-02-26 | 中交公局桥隧工程有限公司 | Construction process for improving qualified rate of space between two lining reinforcing steel bars |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1163660C (en) * | 2000-06-11 | 2004-08-25 | 郭兰波 | Steel bar reticulated shell support and reticulated shell anchor-shotcrete support method |
CN102797481B (en) * | 2012-08-13 | 2015-03-25 | 中铁一局集团有限公司 | Large-span tunnel arch secondary lining steel bar binding construction method based on skeleton beams |
CN102996143B (en) * | 2012-11-19 | 2015-07-08 | 中铁十二局集团有限公司 | Construction method of fully pouring tunnel inverted arch |
CN104632253B (en) * | 2014-12-31 | 2017-01-25 | 中铁大桥局集团第四工程有限公司 | Positioning device for tunnel lining construction and construction method |
CN204941576U (en) * | 2015-09-16 | 2016-01-06 | 中铁八局集团昆明铁路建设有限公司 | A kind of tunnel lining reinforcing steel bar system |
CN107387127A (en) * | 2017-09-13 | 2017-11-24 | 中交公局桥隧工程有限公司 | A kind of tunnel inverted arch reserves ring muscle positioning fixture and application method |
-
2017
- 2017-12-29 CN CN201711470753.9A patent/CN108131155B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN108131155A (en) | 2018-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018052469A3 (en) | Method of reinforced cementitious construction by high speed extrusion printing and apparatus for using same | |
CN108131155B (en) | To the construction technology of tunnel double-lining reinforcing bar positioning | |
WO2020208006A3 (en) | Formwork for producing concrete tubbing in a tunnel lining system | |
CN104358360B (en) | A kind of building iron connects uses full grout sleeve | |
CN105926935A (en) | Integral column formwork based on 3d printing and used for concrete pouring and column pouring method | |
GB2557702A (en) | Tunnel | |
CN103924693A (en) | Ultrathin reinforced concrete pond groove deformation joint water stop structure and construction method thereof | |
CN108793805A (en) | Concrete admixture formula of steam-curing-free high-impermeability shield segment and curing process thereof | |
CN103741949B (en) | Treatment of juncture between vertical structure and horizontal structure | |
CN209114507U (en) | A kind of inspection shaft reinforcing concrete placings combined steel | |
CN109610737A (en) | One kind being molded into concrete embedded reinforcing bar connector and construction technology | |
CN207750651U (en) | A kind of concrete pump pipe temporary blocking device | |
CN203188250U (en) | Basement exterior wall post-cast strip construction structure | |
CN205348586U (en) | Bar reinforcement positioning device | |
CN207846486U (en) | A kind of inner locking type plastics waterstop | |
CN104806007B (en) | Template allowing free movement of positions of wall penetrating holes | |
CN205529916U (en) | Inner formword with adjustable be used for construction of hollow mound of bridge variable cross section | |
CN110344590A (en) | A kind of Screw arbor with nut at both-ends and its construction method | |
CN104943043A (en) | Vacuum pouring device | |
CN206033589U (en) | Vertical concrete structure curing means | |
CN206205547U (en) | A kind of annular concrete electric pole flange connecting apparatus | |
CN207904790U (en) | A kind of box culvert rubber fastening band | |
CN204001696U (en) | The mould of building cob | |
CN209585614U (en) | A kind of PVC template for joints cement sill cylinder | |
CN208576111U (en) | Stifled closure alignment mechanism is poured in a kind of casting of die closing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211209 Address after: Room 901, building 2, Zhongsu century building, 425 Xinjian North Road, Yuyao City, Ningbo City, Zhejiang Province, 315400 Patentee after: China Railway 19th Bureau Group East China Engineering Co.,Ltd. Patentee after: China Railway 19th Bureau Group No.2 Engineering Co., Ltd Address before: 111000 No. 17 Heping Road, Baita District, Liaoning, Liaoyang Patentee before: CHINA RAILWAY 19TH BUREAU GROUP 2ND Co.,Ltd. |
|
TR01 | Transfer of patent right |