CN108131155B - To the construction technology of tunnel double-lining reinforcing bar positioning - Google Patents

To the construction technology of tunnel double-lining reinforcing bar positioning Download PDF

Info

Publication number
CN108131155B
CN108131155B CN201711470753.9A CN201711470753A CN108131155B CN 108131155 B CN108131155 B CN 108131155B CN 201711470753 A CN201711470753 A CN 201711470753A CN 108131155 B CN108131155 B CN 108131155B
Authority
CN
China
Prior art keywords
layer
steel
circumferential reinforcement
away
positioning angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711470753.9A
Other languages
Chinese (zh)
Other versions
CN108131155A (en
Inventor
弯晓林
张松
成赫
李飞
赵忠洋
苏影
刘阔
闫首铭
马宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group No.2 Engineering Co., Ltd
East China Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201711470753.9A priority Critical patent/CN108131155B/en
Publication of CN108131155A publication Critical patent/CN108131155A/en
Application granted granted Critical
Publication of CN108131155B publication Critical patent/CN108131155B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to the construction technologies positioned to tunnel double-lining reinforcing bar.Mainly for solve at present manually to the positioning of two lined steel muscle lead to problems such as layer between inside and outside layer reinforcing bar away from and reinforcing bar between spacing accuracy it is low and invent.Layer is set between the inside and outside layer circumferential reinforcement of two lined steel muscle away from positioning angle steel, there is circumferential reinforcement limiting slot on two channel steels, inside and outside layer circumferential reinforcement limit is all located at channel steel to top of the layer away from positioning angle steel, each steel hoop limiting slot in positioning angle steel all respectively from layer away from stretching out;Two channel steels are fixed by bolt and layer away from positioning angle steel;Each circumferential reinforcement of inside and outside layer is stuck in the circumferential reinforcement limiting slot of inside and outside layer circumferential reinforcement limit channel steel, and all inside and outside layer circumferential reinforcements is made all to be tightly attached to layer away from positioning angle steel, reinforcing bar is bound, concrete is poured.Advantage is to can guarantee the layer of inside and outside layer circumferential reinforcement away from accurate with spacing.

Description

To the construction technology of tunnel double-lining reinforcing bar positioning
Technical field:
The present invention relates to the construction technologies positioned to tunnel double-lining reinforcing bar.
Background technique:
It is all that two lined steel muscle are positioned by way of manual measurement at present in constructing tunnel, this positioning side Formula cause the layer between internal layer reinforcing bar and outer reinforcement away from and each layer reinforcing bar between spacing accuracy it is low, in addition casting concrete Shi Yi causes single steel bar to shift steel bars, influences construction quality.
Summary of the invention:
Technical problem to be solved by the invention is to provide the layer between a kind of certifiable internal layer reinforcing bar and outer reinforcement away from And the spacing uniformity between each layer reinforcing bar, when being poured concrete reinforcing bar will not shift to tunnel double-lining reinforcing bar positioning Construction technology.
Above-mentioned purpose is achieved in that the position between the internal layer circumferential reinforcement and outer layer circumferential reinforcement of two lined steel muscle Place sets elongated layer away from positioning angle steel, and layer is bolted on tunnel wall away from the both ends of positioning angle steel, then sets two and lead to Long channel steel, this two channel steels are respectively internal layer circumferential reinforcement limit channel steel and outer layer circumferential reinforcement limit channel steel, and two All be provided with several circumferential reinforcement limiting slots by the spacing of design on channel steel, by the limit of internal layer circumferential reinforcement with channel steel be located at layer away from The top of angle steel is positioned, and makes steel hoop limiting slot on internal layer circumferential reinforcement limit channel steel towards internal layer steel hoop, Each steel hoop limiting slot all from layer away from positioning angle steel in stretch out;The limit of outer layer circumferential reinforcement is also provided in layer away from positioning with channel steel The top of angle steel, and make the steel hoop limiting slot on outer layer circumferential reinforcement limit channel steel towards outer layer circumferential reinforcement, each ring Shape reinforcing bar limiting slot is all stretched out from layer away from positioning angle steel;Two channel steel positions install rear both ends by bolt and layer away from orientation angle Steel is fixed together;
Each circumferential reinforcement of internal layer is stuck in the circumferential reinforcement limiting slot of internal layer circumferential reinforcement limit channel steel, and And all internal layer circumferential reinforcements is made all to be tightly attached to layer away from positioning angle steel, each steel hoop of outer layer is stuck in outer layer ring Into the circumferential reinforcement limiting slot of reinforcing bar limit channel steel, and all outer layer circumferential reinforcements is made all to be tightly attached to layer away from orientation angle On steel, the positioning to internal layer circumferential reinforcement and outer layer circumferential reinforcement is thereby realized, then reinforcing bar is bound, casting is mixed Solidifying soil, unloads two channel steels after concrete initial set, and layer is cast in concrete away from positioning angle steel.
The invention has the advantages that due to setting layer between internal layer circumferential reinforcement and outer layer circumferential reinforcement away from positioning angle steel, and And internal layer circumferential reinforcement and outer layer circumferential reinforcement are limited by two channel steels, it can guarantee internal layer circumferential reinforcement and outer in this way The layer of layer circumferential reinforcement is away from accurate with spacing, and when being poured concrete, reinforcing bar is not shifted, and ensure that construction quality.
Specific embodiment:
Elongated layer is set away from orientation angle at position between the internal layer circumferential reinforcement and outer layer circumferential reinforcement of two lined steel muscle Steel, layer is bolted on tunnel wall away from the both ends of positioning angle steel, then sets two elongated channel steels, this two channel steels point Not Wei internal layer circumferential reinforcement limit channel steel and outer layer circumferential reinforcement limit channel steel, all opened by the spacing of design on two channel steels There are several circumferential reinforcement limiting slots, the limit of internal layer circumferential reinforcement is located at top of the layer away from positioning angle steel with channel steel, and make interior Steel hoop limiting slot on layer circumferential reinforcement limit channel steel is towards internal layer steel hoop, and each steel hoop limiting slot is all from layer It is stretched out away from positioning in angle steel;The limit of outer layer circumferential reinforcement is also provided in top of the layer away from positioning angle steel with channel steel, and makes outer layer ring Steel hoop limiting slot on reinforcing bar limit channel steel is towards outer layer circumferential reinforcement, and each steel hoop limiting slot is all from layer away from fixed Parallactic angle steel stretches out;Two channel steel positions install rear both ends and are fixed together by bolt and layer away from positioning angle steel;
Each circumferential reinforcement of internal layer is stuck in the circumferential reinforcement limiting slot of internal layer circumferential reinforcement limit channel steel, and And all internal layer circumferential reinforcements is made all to be tightly attached to layer away from positioning angle steel, each steel hoop of outer layer is stuck in outer layer ring Into the circumferential reinforcement limiting slot of reinforcing bar limit channel steel, and all outer layer circumferential reinforcements is made all to be tightly attached to layer away from orientation angle On steel, the positioning to internal layer circumferential reinforcement and outer layer circumferential reinforcement is thereby realized, then reinforcing bar is bound, casting is mixed Solidifying soil, unloads two channel steels after concrete initial set, and layer is cast in concrete away from positioning angle steel.

Claims (1)

1. the construction technology of pair tunnel double-lining reinforcing bar positioning, it is characterized in that: in the internal layer circumferential reinforcement and outer layer ring of two lined steel muscle Elongated layer is set to the position between reinforcing bar away from positioning angle steel, layer is bolted on tunnel wall away from the both ends of positioning angle steel On body, then two elongated channel steels are set, this two channel steels are respectively internal layer circumferential reinforcement limit channel steel and outer layer circumferential reinforcement It limits and uses channel steel, be all provided with several circumferential reinforcement limiting slots by the spacing of design on two channel steels, internal layer circumferential reinforcement is limited Position is located at top of the layer away from positioning angle steel with channel steel, and the steel hoop on internal layer circumferential reinforcement limit channel steel is made to limit groove face Inner layer steel hoop, each steel hoop limiting slot all from layer away from positioning angle steel in stretch out;By outer layer circumferential reinforcement limit slot Steel is also provided in top of the layer away from positioning angle steel, and faces out the limit of outer layer circumferential reinforcement with the steel hoop limiting slot on channel steel Layer circumferential reinforcement, each steel hoop limiting slot are all stretched out from layer away from positioning angle steel;Two channel steel positions install rear both ends and pass through Bolt and layer are fixed together away from positioning angle steel;
Each circumferential reinforcement of internal layer is stuck in the circumferential reinforcement limiting slot of internal layer circumferential reinforcement limit channel steel, and made All internal layer circumferential reinforcements are all tightly attached to layer away from positioning angle steel, and each steel hoop of outer layer is stuck in outer layer circumferential direction steel In the circumferential reinforcement limiting slot of muscle limit channel steel, and all outer layer circumferential reinforcements is made all to be tightly attached to layer away from positioning angle steel On, the positioning to internal layer circumferential reinforcement and outer layer circumferential reinforcement is thereby realized, then reinforcing bar is bound, is poured coagulation Soil unloads two channel steels after concrete initial set, and layer is cast in concrete away from positioning angle steel.
CN201711470753.9A 2017-12-29 2017-12-29 To the construction technology of tunnel double-lining reinforcing bar positioning Active CN108131155B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711470753.9A CN108131155B (en) 2017-12-29 2017-12-29 To the construction technology of tunnel double-lining reinforcing bar positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711470753.9A CN108131155B (en) 2017-12-29 2017-12-29 To the construction technology of tunnel double-lining reinforcing bar positioning

Publications (2)

Publication Number Publication Date
CN108131155A CN108131155A (en) 2018-06-08
CN108131155B true CN108131155B (en) 2019-10-18

Family

ID=62393491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711470753.9A Active CN108131155B (en) 2017-12-29 2017-12-29 To the construction technology of tunnel double-lining reinforcing bar positioning

Country Status (1)

Country Link
CN (1) CN108131155B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109386296A (en) * 2018-12-10 2019-02-26 中交公局桥隧工程有限公司 Construction process for improving qualified rate of space between two lining reinforcing steel bars

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1163660C (en) * 2000-06-11 2004-08-25 郭兰波 Steel bar reticulated shell support and reticulated shell anchor-shotcrete support method
CN102797481B (en) * 2012-08-13 2015-03-25 中铁一局集团有限公司 Large-span tunnel arch secondary lining steel bar binding construction method based on skeleton beams
CN102996143B (en) * 2012-11-19 2015-07-08 中铁十二局集团有限公司 Construction method of fully pouring tunnel inverted arch
CN104632253B (en) * 2014-12-31 2017-01-25 中铁大桥局集团第四工程有限公司 Positioning device for tunnel lining construction and construction method
CN204941576U (en) * 2015-09-16 2016-01-06 中铁八局集团昆明铁路建设有限公司 A kind of tunnel lining reinforcing steel bar system
CN107387127A (en) * 2017-09-13 2017-11-24 中交公局桥隧工程有限公司 A kind of tunnel inverted arch reserves ring muscle positioning fixture and application method

Also Published As

Publication number Publication date
CN108131155A (en) 2018-06-08

Similar Documents

Publication Publication Date Title
WO2018052469A3 (en) Method of reinforced cementitious construction by high speed extrusion printing and apparatus for using same
CN108131155B (en) To the construction technology of tunnel double-lining reinforcing bar positioning
WO2020208006A3 (en) Formwork for producing concrete tubbing in a tunnel lining system
CN104358360B (en) A kind of building iron connects uses full grout sleeve
CN105926935A (en) Integral column formwork based on 3d printing and used for concrete pouring and column pouring method
GB2557702A (en) Tunnel
CN103924693A (en) Ultrathin reinforced concrete pond groove deformation joint water stop structure and construction method thereof
CN108793805A (en) Concrete admixture formula of steam-curing-free high-impermeability shield segment and curing process thereof
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN209114507U (en) A kind of inspection shaft reinforcing concrete placings combined steel
CN109610737A (en) One kind being molded into concrete embedded reinforcing bar connector and construction technology
CN207750651U (en) A kind of concrete pump pipe temporary blocking device
CN203188250U (en) Basement exterior wall post-cast strip construction structure
CN205348586U (en) Bar reinforcement positioning device
CN207846486U (en) A kind of inner locking type plastics waterstop
CN104806007B (en) Template allowing free movement of positions of wall penetrating holes
CN205529916U (en) Inner formword with adjustable be used for construction of hollow mound of bridge variable cross section
CN110344590A (en) A kind of Screw arbor with nut at both-ends and its construction method
CN104943043A (en) Vacuum pouring device
CN206033589U (en) Vertical concrete structure curing means
CN206205547U (en) A kind of annular concrete electric pole flange connecting apparatus
CN207904790U (en) A kind of box culvert rubber fastening band
CN204001696U (en) The mould of building cob
CN209585614U (en) A kind of PVC template for joints cement sill cylinder
CN208576111U (en) Stifled closure alignment mechanism is poured in a kind of casting of die closing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211209

Address after: Room 901, building 2, Zhongsu century building, 425 Xinjian North Road, Yuyao City, Ningbo City, Zhejiang Province, 315400

Patentee after: China Railway 19th Bureau Group East China Engineering Co.,Ltd.

Patentee after: China Railway 19th Bureau Group No.2 Engineering Co., Ltd

Address before: 111000 No. 17 Heping Road, Baita District, Liaoning, Liaoyang

Patentee before: CHINA RAILWAY 19TH BUREAU GROUP 2ND Co.,Ltd.

TR01 Transfer of patent right