CN108131107A - A kind of baffle eye-splice-type guide die and control method - Google Patents

A kind of baffle eye-splice-type guide die and control method Download PDF

Info

Publication number
CN108131107A
CN108131107A CN201810023860.5A CN201810023860A CN108131107A CN 108131107 A CN108131107 A CN 108131107A CN 201810023860 A CN201810023860 A CN 201810023860A CN 108131107 A CN108131107 A CN 108131107A
Authority
CN
China
Prior art keywords
steel plate
baffle
oriented
splice
eye
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810023860.5A
Other languages
Chinese (zh)
Inventor
赵康林
付林林
徐华
马承明
张艳文
张星
沈伟
唐川东
李璐璐
谢华雄
汪涛
韩福军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201810023860.5A priority Critical patent/CN108131107A/en
Publication of CN108131107A publication Critical patent/CN108131107A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/24Guiding or centralising devices for drilling rods or pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of baffle eye-splice-type guide die and control methods, the guide die includes guide frame, baffle arrangement, buckle structure and gripping structure, the baffle arrangement is arranged on the guide frame upper and lower ends, the buckle structure is arranged on the guide frame lower edges, and the gripping structure is arranged at left and right sides of the guide frame.Baffle eye-splice-type guide die reasonable design provided by the present invention, it is simple in structure, it is processed convenient for construction site, installation is removed conveniently, simple operation is laborsaving, and it can be recycled, reduce the difficulty of advanced tubule bore angle control, artificial workload is reduced, effectively improves construction efficiency and civilization degree, while improve the control accuracy of advanced tubule bore angle, suitable for different size grid steel frame or profile steel frame, such as eight word muscle grid steel frames, diagonal bar grid steel frame, profile steel frame etc., suitable for large-scale promotion application.

Description

A kind of baffle eye-splice-type guide die and control method
Technical field
The present invention relates to bored tunnel advance support technical fields more particularly to one kind to be used for bored tunnel advanced tubule The baffle eye-splice-type guide die and control method of setting angle control.
Background technology
At present, advanced tubule is common a kind of assisting construction method during bored tunnel excavation construction, main Suitable for from shorter unstable rock mass, Shallow Section, hole biased segment, sand section, sandy gravel section, fault belt of steady time etc. The advance support operation in location tunnel.Advanced tubule must coordinate steelframe to use, across grid steel frame or the abdomen of profile steel frame Portion, pipe tail are welded with steelframe, and conventional design parameter is:Using welded still pipe or seamless steel pipe, 30~50mm of outer diameter of steel pipes, steel pipe Long 3~5m, steel pipe are drilled with extravasating hole spacing as 100~150mm, and the circumferentially disposed spacing of steel pipe along arch is 300~500mm, steel Pipe is 5 °~15 ° along the outer limb of circumferential direction of arch, and steel pipe is typically no less than 1m along the lap of splice of tunnel longitudinal direction, and injecting paste material is general For ordinary cement single slurry, cement-waterglass dual slurry etc..
Advanced tubule construction technique principle is:Using drilling devices such as air drills according to design position, design angle requirement It is drilled, borehole cleaning, and takes measures to squeeze into advanced tubule, the then slip casting into advanced tubule with certain pressure is led to The extravasating hole of advanced tubule tube body is crossed, in a manner of infiltration filling, splitting etc., by the original loose soil particle in periphery or crack glue Form an entirety, forming one, structure is new, intensity is big, the good induration of water resistance so that country rock loose crushing and enclose Lithofraction gap infiltration situation is significantly improved, to achieve the purpose that excavate safety, deduction and exemption just branch percolating water.
The advantages that because of advanced tubule construction technology and simple, adaptable equipment, field application is very extensive.But always Since, there are various problems for advanced tubule work progress, and especially advanced tubule drilling, which sets angle, to control well, It can only be controlled with the experience of site operation personnel and grade rod is checked by hand, work efficiency is low, low precision, and advanced tubule is caused to be installed Angular deviation is larger, be unsatisfactory for design and code requirement, restrict advanced tubule pre support, pre-reinforcement effect, to tunnel Safe excavation and first branch percolating water cause a hidden trouble.
Invention content
In order to solve the above-mentioned problems in the prior art, the present invention proposes a kind of for bored tunnel advanced tubule The baffle eye-splice-type guide die and control method of setting angle control, to be suitable in different size grid steel frame or shaped steel steel The advanced tubule of certain angle is set on frame according to design requirement, applicability is wide, and installation is fixed and removes conveniently, can be convenient The drilling of control advanced tubule set angle, reduce worker's load, and can be recycled, improve construction efficiency and civilization Degree.
In order to achieve the above objectives, the present invention adopts the following technical scheme that:
A kind of baffle eye-splice-type guide die, the guide die include guide frame, baffle arrangement, buckle structure and grab Hand structure, the baffle arrangement are arranged on the guide frame upper/lower terminal, and the buckle structure is arranged on the guide frame Upper and lower edge, the gripping structure are arranged on the guide frame arranged on left and right sides.
Preferably, the guide frame includes one piece of guiding main steel plate, a guiding steel pipe and four pieces of stiffened steel plates, described It is oriented to steel pipe and passes through the guiding main steel plate, reinforced and welded using the stiffened steel plates;The baffle arrangement includes two block baffles Structural steel and iron is respectively welded at the upper/lower terminal for being oriented to main steel plate;The buckle structure includes buckle structure steel plate and inserts Buckle structure small round steel, the buckle structure steel plate with it is described guiding main steel plate be structure as a whole, from it is described guiding main steel plate to Tunnel excavation direction is bent into right angle and forms " Contraband " type structure, is bent into right angle and forms the eye-splice of " Contraband " type structure division composition Structural steel and iron;The gripping structure includes gripping structure small round steel.
Preferably, the length and width dimensions for being oriented to main steel plate are calculated according to steelframe size to be installed determines, described to be oriented to master Positive clear height of the length of steel plate for abdomen at steelframe advanced tubule to be installed, the width for being oriented to main steel plate are treated for steelframe The positive clear span of abdomen at advanced tubule is installed;
The length for being oriented to main steel plate is provided with trepanning with wide cross searching position on the lower side, and the guiding steel pipe is according to default Advanced tubule sets angle and penetrates the trepanning;The steel plate of the baffle arrangement with it is described guiding main steel plate welding after it is exposed Length is more than more than steelframe depth of transverse section 2cm to be installed, and the steel plate width of the baffle arrangement is less than or equal to the guiding The width of main steel plate;
The length of the buckle structure small round steel is equal to the width of the steel plate of the buckle structure, using welding by both sides and institute State buckle structure Interal fixation, the cross searching point of the gripping structure and the length for being oriented to main steel plate and wide cross searching one Cause, the gripping structure at length direction both ends beyond guiding each 50mm of main steel plate, in width direction by the guiding steel Pipe is included.
Preferably, the opening diameter being oriented on main steel plate is determined according to the diameter for being oriented to steel pipe, the guiding The diameter of steel pipe is bigger 10~20mm than the diameter of advanced tubule, and the guiding steel pipe sets angle according to default advanced tubule It is fixed with the guiding main steel plate full weld.
Preferably, the length of the guiding steel pipe is:Across after the guiding main steel plate, one end is greater than or equal to 10cm, The other end is greater than or equal to steelframe cross section to be installed width.
Preferably, the gripping structure small round steel is fixed with the guiding main steel plate two-sided welding, and joint is arranged on On the guiding main steel plate, both ends exceed the part for being oriented to main steel plate to the gripping structure small round steel in the longitudinal direction 15 ° are tilted relative to the guiding main steel plate.
A kind of control method of baffle eye-splice-type guide die, includes the following steps:
Step 1, according to steelframe section structure size to be installed and advanced tubule specification, set angle requirement, calculate true Determine to be oriented to the length and width dimensions of main steel plate and buckle structure steel plate in baffle eye-splice-type guide die, be oriented to main steel plate position of opening and Diameter is oriented to diameter of steel tube and length, buckle structure small round steel length and welding position, and baffle eye-splice-type guide die is added Work is molded;
Step 2, on steelframe to be installed by measurement and positioning, the circumferential position that ductule is set before excess of export is marked on steelframe It puts;
After step 3, steelframe installation are firm, guide die is lifted by gripping structure, and in marked advanced tubule It sets and guide die buckle structure is inserted into steelframe abdomen at position, until baffle arrangement supports patch, buckle structure steel with steelframe Plate utilizes the own resilient of steel plate bending, realizes the preliminary fixation to guide die, when buckle structure steel plate is inserted into until eye-splice After structure small round steel is by steel frame structure muscle, with the rebound of buckle structure steel plate, buckle structure small round steel is stuck in steelframe It constructs on the inside of muscle, fixed guide mold;
Whether the angle of step 4, the position for checking guide die and guiding steel pipe meets design specification requirement, when being unsatisfactory for Position is adjusted by gripping structure;
After step 5, guide die positioning stablity, air drill drill bit is inserted into together with drilling rod in the guiding steel pipe of guide die, And implement bore operation;
Step 6, after a hole drilling, air drill drilling rod is removed, is transferred to guide die by gripping structure, and Another bore position is moved to, repeat the above steps 3, step 4, step 5, until all drillings set and finish.
Preferably, the control method further includes:
According to on-site actual situations, more set baffle eye-splice-type guide dies and drilling construction are processed, while complete to multiple The bore angle control of advanced tubule.
Compared with prior art, the invention has the advantages that:
Baffle eye-splice-type guide die reasonable design provided by the present invention, it is simple in structure, it is processed convenient for construction site, peace Dress is removed conveniently, and simple operation is laborsaving, and can be recycled, and reduces the difficulty of advanced tubule bore angle control, is reduced Artificial workload, effectively improves construction efficiency and civilization degree, while improve the control accuracy of advanced tubule bore angle, fits For different size grid steel frame or profile steel frame, such as eight word muscle grid steel frames, diagonal bar grid steel frame, profile steel frame etc., fit In large-scale promotion application.
Description of the drawings
Fig. 1 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment one Formula guide die front schematic view;
Fig. 2 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment one Formula guide die side schematic view;
Fig. 3 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment one Formula guide die schematic top plan view;
Fig. 4 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment two The front schematic view that formula guide die controls for advanced tubule bore angle on diagonal bar grid steel frame;
Fig. 5 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment two The side schematic view that formula guide die controls for advanced tubule bore angle on diagonal bar grid steel frame;
Fig. 6 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment two The field operation schematic diagram that formula guide die controls for advanced tubule bore angle on diagonal bar grid steel frame;
Fig. 7 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment three The front schematic view that formula guide die controls for advanced tubule bore angle on eight word muscle grid steel frames;
Fig. 8 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment three The side schematic view that formula guide die controls for advanced tubule bore angle on eight word muscle grid steel frames;
Fig. 9 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment three The field operation schematic diagram that formula guide die controls for advanced tubule bore angle on eight word muscle grid steel frames;
Figure 10 is that a kind of baffle for the control of bored tunnel advanced tubule setting angle of the present invention is inserted in example IV The front schematic view that button guide die controls for advanced tubule bore angle in profile steel frame;
Figure 11 is that a kind of baffle for the control of bored tunnel advanced tubule setting angle of the present invention is inserted in example IV The side schematic view that button guide die controls for advanced tubule bore angle in profile steel frame;
Figure 12 is that a kind of baffle for the control of bored tunnel advanced tubule setting angle of the present invention is inserted in example IV The field operation schematic diagram that button guide die controls for advanced tubule bore angle in profile steel frame.
In figure:101- is oriented to main steel plate, 102- buckle structure steel plates, and 2- is oriented to steel pipe, 3- stiffened steel plates, 4- baffle arrangements Steel plate, 5- buckle structure small round steel, 6- gripping structure small round steel, the angle that α-advanced tubule is installed, X- steelframes are waited to pacify Advanced tubule circumferential direction spacing is filled, abdomen cross section clear span at L- steelframes advanced tubule to be installed, b- steelframes are to be installed advanced Abdomen front clear span at ductule, abdomen front clear height at h- steelframes ductule to be installed.
Specific embodiment
Below by drawings and examples, technical scheme of the present invention is described in further detail.
Embodiment one
As shown in Figure 1-Figure 3, the present invention provides a kind of gears for the control of bored tunnel advanced tubule setting angle Plate eye-splice-type guide die, the guide die include guide frame, baffle arrangement, buckle structure and gripping structure, wherein, gear Harden structure is arranged on guide frame upper/lower terminal, and buckle structure is arranged on the upper and lower edge of guide frame, and gripping structure is arranged on Guide frame arranged on left and right sides.
Guide frame includes one piece and is oriented to 101, guiding steel pipes 2 of main steel plate and four pieces of stiffened steel plates 3, is oriented to steel pipe 2 Across main steel plate 101 is oriented to, is reinforced and welded using stiffened steel plates 3;Baffle arrangement includes two block baffle structural steel and irons 4, welds respectively It is connected on the upper and lower ends for being oriented to main steel plate 101;Buckle structure includes buckle structure steel plate 102 and buckle structure small round steel 5, inserts Buckle structure steel plate 102 is integrated with being oriented to main steel plate 101, and square is bent into from guiding main steel plate 101 to tunnel excavation direction Into " Contraband " type structure, it is bent into right angle and forms " Contraband " type structure composition buckle structure steel plate 102;Gripping structure includes gripping structure Small round steel 6.
The present invention is not limited the shape of gripping structure, such as:Gripping structure small round steel 6 can weld to be formed " " type structure or other shapes, firm welding.
Further, the length for being oriented to main steel plate 101 is determined with wide size according to steelframe size to be installed calculating, is oriented to main steel Positive clear height of the length of plate 101 for abdomen at steelframe advanced tubule to be installed, the width for being oriented to main steel plate 101 are treated for steelframe The positive clear span of abdomen at advanced tubule is installed;
The length and wide cross searching position on the lower side for being oriented to main steel plate 101 are provided with trepanning, are oriented to steel pipe 2 according to default advanced Ductule sets angle and penetrates trepanning;Baffle arrangement steel plate 4 is with being oriented to the protruded length after main steel plate 101 welds more than to be installed More than steelframe depth of transverse section 2cm, 4 width of baffle arrangement steel plate are less than or equal to the width for being oriented to main steel plate 101;
The length of buckle structure small round steel 5 is equal to the width of buckle structure steel plate 102, using welding by both sides and buckle structure Steel plate 102 is fixed, and the cross searching point of gripping structure is consistent with the length and width cross searching for being oriented to main steel plate 101, and gripping structure exists Finger is conveniently stretched into length direction both ends beyond 101 each 50mm of main steel plate is oriented to, and will be oriented to steel pipe 2 in width direction includes It is interior.
Further, the opening diameter being oriented on main steel plate 101 is determined according to the diameter for being oriented to steel pipe 2, is oriented to steel pipe 2 Diameter is bigger 10~20mm than the diameter of advanced tubule, is oriented to steel pipe 2 and sets angle with being oriented to main steel plate according to default ductule 101 full welds are fixed.
Further, the length of guiding steel pipe 2 is:Across after being oriented to main steel plate 101, one end is greater than or equal to 10cm, separately One end is greater than or equal to steelframe cross section to be installed width.
Further, gripping structure small round steel 6 is fixed with being oriented to 101 two-sided welding of main steel plate, and joint, which is arranged on, leads On main steel plate 101, gripping structure small round steel 6 in the longitudinal direction both ends beyond be oriented to main steel plate 101 part relative to It is oriented to main steel plate 101 and tilts 15 °, lift when easy to use or extract after use.
In the present embodiment, for the selection of each structure of guide die using integral strength when can ensure mold use as Standard, specifically, for example, by using following material:It is oriented to main steel plate 101, buckle structure steel plate 102, stiffened steel plates 3, baffle arrangement Steel plate 4 is generally 5mm, and guidings steel pipe 2 is Φ 60mm~80mm, wall thickness 3mm-4.5mm, and buckle structure small round steel 5 is generally Φ 6mm round steel, gripping structure small round steel 6 are generally Φ 8mm round steel.
Embodiment two
As shown in Figures 4 to 6, surpassed with one kind of the present invention of live diagonal bar grid steel frame practice of construction for bored tunnel For the baffle eye-splice-type guide die of preceding ductule setting angle control, the present invention is further illustrated, ties substantially Structure is set and application determines as in the first embodiment, being oriented to 101 length and width size of main steel plate and need to be calculated according to steelframe size to be installed, The positive clear height h of abdomen at length=steelframe advanced tubule to be installed, abdomen at width=steelframe advanced tubule to be installed Positive clear span b, and in guiding 101 length and width cross searching of the main steel plate appropriate location trepanning on the lower side, position of opening is to be oriented to Steel pipe can install angle [alpha] to design advanced tubule and pass through steelframe abdomen as standardization, and small in advance according to design requirement Conduit installs angle [alpha] and penetrates guiding steel pipe 2;Two block baffle structural steel and irons 4 are needed with being oriented to the protruded length after main steel plate 101 welds > more than steelframe depth of transverse section h 2cm to be installed, the width of width≤guiding main steel plate 101 of baffle arrangement steel plate 4;Eye-splice The length of structure small round steel 5=102 width of buckle structure steel plate, specific location are inserted into steelframe according to buckle structure steel plate 102 Structure muscle location determination behind inside can be prevented from moving outside mold with reaching buckle structure small round steel 5 on the outside of steel frame construction muscle.
It is as shown in figure 5, small in advance for bored tunnel with one kind of the present invention of live diagonal bar grid steel frame practice of construction For the baffle eye-splice-type guide die of erecting angle of conducting tube degree control, manually by gripping structure small round steel 6 by guide die Lift, and set in marked advanced tubule and buckle structure steel plate 102 is inserted into steelframe abdomen at position, until baffle knot Structure steel plate 4 supports patch with steelframe, at this point, buckle structure steel plate 102 is realized using the own resilient of steel plate bending to the preliminary of mold It is fixed, after buckle structure steel plate 102 is inserted into up to buckle structure small round steel 5 through grid construction muscle, with buckle structure The rebound of steel plate 102, buckle structure small round steel 5 have just been stuck on the outside of grid steel frame construction muscle, at this time the small-sized circle of buckle structure Steel 5 is used as catch feature operative, plays fixing mould, the function that mold is prevented to be displaced outwardly.
It is as shown in fig. 6, small in advance for bored tunnel with one kind of the present invention of live diagonal bar grid steel frame practice of construction For the baffle eye-splice-type guide die of erecting angle of conducting tube degree control, check die location and be oriented to whether 2 angle of steel pipe meets Design requirement then goes to adjustment position, until meeting the requirements when being unsatisfactory for by gripping structure;After mold positioning stablity, by wind Drill bit is inserted into together with drilling rod in the guiding steel pipe 2 of mold, and implements bore operation, and bore angle is determined with this;When a hole After drilling, air drill drilling rod from the guiding steel pipe 2 of mold is removed, is transferred to mold by gripping structure small round steel 6, And another bore position is moved to, it repeats above-mentioned mold installation, drilling, extract step, until all drillings set and finish.
In the present embodiment, it is advanced for bored tunnel with one kind of the present invention of live diagonal bar grid steel frame practice of construction For the baffle eye-splice-type guide die of ductule setting angle control, it is preferable that cover can be processed according to on-site actual situations more Baffle eye-splice-type guide die and drilling construction, while complete to control the bore angle of multiple advanced tubules.
Embodiment three
As shown in Figure 7 to 9, bored tunnel is used for one kind of the present invention of live eight word muscle grid steel frame practice of construction For the baffle eye-splice-type guide die of advanced tubule setting angle control, the present invention is further illustrated, basic Structure setting and application determine as in the first embodiment, being oriented to main steel plate 101 length and width dimensions and need to be calculated according to steelframe size to be installed, The positive clear height h of abdomen at length=steelframe advanced tubule to be installed, abdomen at width=steelframe advanced tubule to be installed Positive clear span b, and as possible it is described guiding the appropriate location trepanning on the lower side of 101 length and width cross searching of main steel plate, position of opening with It is oriented to steel pipe and can install angle [alpha] to design advanced tubule and pass through steelframe abdomen to standardize, and surpass according to design requirement Preceding ductule installs angle [alpha] and penetrates guiding steel pipe 2;Two block baffle structural steel and irons 4 are with being oriented to the exposed length after main steel plate 101 welds Degree needs > more than steelframe depth of transverse section h 2cm to be installed, the width of width≤guiding main steel plate 101 of baffle arrangement steel plate 4; The length of buckle structure small round steel 5=102 width of buckle structure steel plate, specific location are inserted into according to buckle structure steel plate 102 Structure muscle location determination behind steelframe inside can be prevented on the outside of steel frame construction muscle outside mold with reaching buckle structure small round steel 5 It moves.
It is as shown in figure 8, advanced for bored tunnel with one kind of the present invention of live eight word muscle grid steel frame practice of construction For the baffle eye-splice-type guide die of ductule setting angle control, guide die is carried by gripping structure small round steel 6 It rises, and sets in marked advanced tubule and buckle structure steel plate 102 is inserted into steelframe abdomen at position, until baffle arrangement Steel plate 4 supports patch with steelframe, at this point, own resilient of the buckle structure steel plate 102 using steel plate bending, is realized to the preliminary solid of mold It is fixed, after buckle structure steel plate 102 is inserted into up to buckle structure small round steel 5 through grid construction muscle, with buckle structure steel The rebound of plate 102, buckle structure small round steel 5 have just been stuck on the outside of grid steel frame construction muscle, at this time buckle structure small round steel 5 As catch feature operative, fixing mould, the function that mold is prevented to be displaced outwardly are played.
It is as shown in figure 9, advanced for bored tunnel with one kind of the present invention of live eight word muscle grid steel frame practice of construction For the baffle eye-splice-type guide die of ductule setting angle control, check die location and whether to be completely oriented to 2 angle of steel pipe Sufficient design requirement then goes to adjustment position, until meeting the requirements when being unsatisfactory for by gripping structure;It, will after mold positioning stablity Air drill drill bit is inserted into together with drilling rod in the guiding steel pipe 2 of mold, and implements bore operation, is determined bore angle with this, was crept into Cheng Zhong, drilling rod contact mold less as possible, avoid die shift;After a hole drilling, by air drill drilling rod leading from mold It removes into steel pipe 2, is transferred to mold by gripping structure small round steel 6, and move to another bore position, repeat above-mentioned mold Installation, extracts step at drilling, until all drillings set and finish.
In the present embodiment, surpassed with one kind of the present invention of live eight word muscle grid steel frame practice of construction for bored tunnel For the baffle eye-splice-type guide die of preceding ductule setting angle control, it is preferable that can be processed more according to on-site actual situations Baffle eye-splice-type guide die and drilling construction are covered, while completes to control the bore angle of multiple advanced tubules.
Example IV
As shown in Figure 10 to Figure 12, it is advanced for bored tunnel with one kind of the present invention of live profile steel frame practice of construction For the baffle eye-splice-type guide die of ductule setting angle control, the present invention is further illustrated, basic structure Setting and application are the same as embodiment one.Determining, length need to be calculated according to steelframe size to be installed by being oriented to 101 length and width dimensions of main steel plate The positive clear height h of abdomen at=steelframe advanced tubule to be installed, abdomen is being just at width=steelframe advanced tubule to be installed Face clear span b, and in guiding 101 length and width cross searching of the main steel plate appropriate location trepanning on the lower side, position of opening is to be oriented to steel pipe Angle [alpha] can be installed to design advanced tubule and pass through steelframe abdomen as standardization, and according to design requirement advanced tubule It installs angle [alpha] and penetrates the guiding steel pipe 2;Two block baffle structural steel and irons 4 are needed with being oriented to the protruded length after main steel plate 101 welds > more than steelframe depth of transverse section h 2cm to be installed, the width of 4 width of baffle arrangement steel plate≤guiding main steel plate 101;Eye-splice knot The width of the length of structure small round steel 5=buckle structure steel plate 102.
As shown in figure 11, bored tunnel advanced tubule is used for one kind of the present invention of live profile steel frame practice of construction For the baffle eye-splice-type guide die of setting angle control, mold is lifted by gripping structure small round steel 6, and is marking Note advanced tubule sets buckle structure steel plate 102 is forcibly inserted into steelframe abdomen at position, until baffle arrangement steel plate 4 with Steelframe is close to, at this point, buckle structure steel plate 102 is realized the fixation to mold, played fixation using the own resilient of steel plate bending Mold, the function that mold is prevented to be displaced outwardly.
As shown in figure 12, bored tunnel advanced tubule is used for one kind of the present invention of live profile steel frame practice of construction For the baffle eye-splice-type guide die of setting angle control, check die location and be oriented to whether 2 angle of steel pipe meets design It is required that adjustment position is then gone by gripping structure when being unsatisfactory for, until meeting the requirements;After mold positioning stablity, air drill is bored Head is inserted into together with drilling rod in the guiding steel pipe 2 of mold, and implements bore operation, and bore angle is determined with this;When a hole drilling After, air drill drilling rod from the guiding steel pipe 2 of mold is removed, is transferred to mold by gripping structure small round steel 6, and move To another bore position, repeat above-mentioned mold installation, drilling, extract step, until all drillings set and finish.
In the present embodiment, it is led with one kind of the present invention of live profile steel frame practice of construction for bored tunnel to be small in advance Pipe setting angle control baffle eye-splice-type guide die for, because inside profile steel frame without structure muscle, the small-sized circle of buckle structure Steel 5 can not be installed;More set baffle eye-splice-type guide dies and drilling construction can be processed, while is completed to multiple advanced tubules Bore angle control.
The present invention can need to be used for what is applied after the completion of above-mentioned advanced tubule is installed according to construction and place The baffle eye-splice-type guide die of bored tunnel advanced tubule angle control extract and is used in turn or disassembles, used Each material still is able to recycle.
Correspondingly, the present invention also provides a kind of control method of baffle eye-splice-type guide die, the method includes with Lower step:
Step 1, according to steelframe section structure size to be installed and advanced tubule specification, set angle requirement, calculate true Determine to be oriented to the length and width dimensions of main steel plate and buckle structure steel plate in baffle eye-splice-type guide die, be oriented to main steel plate position of opening and Diameter is oriented to diameter of steel tube and length, buckle structure small round steel length and welding position, and baffle eye-splice-type guide die is added Work is molded;
Step 2, on steelframe to be installed by measurement and positioning, the circumferential position that ductule is set before excess of export is marked on steelframe It puts;
After step 3, steelframe installation are firm, guide die is lifted by gripping structure, and in marked advanced tubule It sets and guide die buckle structure is forcibly inserted into steelframe abdomen at position, until baffle arrangement is close to steelframe, eye-splice knot Structure steel plate utilize steel plate bending own resilient, realize the preliminary fixation to guide die, when buckle structure steel plate be inserted into until After buckle structure small round steel is by steel frame structure muscle, with the rebound of buckle structure steel plate, buckle structure small round steel is stuck in On the inside of steel frame structure muscle, fixed guide mold;
Whether the angle of step 4, the position for checking guide die and guiding steel pipe meets design specification requirement, when being unsatisfactory for Position is adjusted by gripping structure, until meeting design specification requirement;
After step 5, guide die positioning stablity, air drill drill bit is inserted into together with drilling rod in the guiding steel pipe of guide die, And implement bore operation;
Step 6, after a hole drilling, air drill drilling rod is removed, is transferred to guide die by gripping structure, and Another bore position is moved to, repeat the above steps 3, step 4, step 5, until all drillings set and finish.
Preferably, the control method further includes:
According to on-site actual situations, more set baffle eye-splice-type guide dies and drilling construction are processed, while complete to multiple The bore angle control of advanced tubule.
Above-described specific embodiment has carried out the purpose of the present invention, technical solution and advantageous effect further It is described in detail, it should be understood that the foregoing is merely the specific embodiment of the present invention, is not intended to limit the present invention Protection domain, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (8)

1. a kind of baffle eye-splice-type guide die, which is characterized in that the guide die includes guide frame, baffle arrangement, inserts Buckle structure and gripping structure, the baffle arrangement are arranged on the guide frame upper and lower ends, and the buckle structure is arranged on institute Guide frame lower edges are stated, the gripping structure is arranged at left and right sides of the guide frame.
2. baffle eye-splice-type guide die according to claim 1, which is characterized in that the guide frame is led including one piece Steel pipe and four pieces of stiffened steel plates are oriented to main steel plate, one, the guiding steel pipe is passed through the guiding main steel plate, added using described Strength steel plate reinforcement welds;The baffle arrangement includes two block baffle structural steel and irons, is respectively welded at the upper of the guiding main steel plate Lower both ends;The buckle structure include buckle structure steel plate and buckle structure small round steel, the buckle structure steel plate with it is described It is oriented to main steel plate to be integrated, being bent into right angle to tunnel excavation direction from the guiding main steel plate forms " Contraband " type structure, bends Part forms the buckle structure steel plate;The gripping structure includes gripping structure small round steel.
3. baffle eye-splice-type guide die according to claim 2, which is characterized in that the length and width ruler for being oriented to main steel plate Very little calculated according to steelframe size to be installed determines that the length for being oriented to main steel plate is abdomen at steelframe advanced tubule to be installed Positive clear height, positive clear span of the width for being oriented to main steel plate for abdomen at steelframe advanced tubule to be installed;
The length and width cross searching position on the lower side for being oriented to main steel plate is provided with trepanning, and the guiding steel pipe is according to default advanced small Conduit sets angle and penetrates the trepanning;The baffle arrangement steel plate is more than with the protruded length after the guiding main steel plate welding More than steelframe depth of transverse section 2cm to be installed, the baffle arrangement steel plate width are less than or equal to the width for being oriented to main steel plate Degree;
The length of the buckle structure small round steel is equal to the width of the buckle structure steel plate, using welding by both sides and the eye-splice Structural steel and iron is fixed, and the cross searching point of the gripping structure is consistent with the length and width cross searching for being oriented to main steel plate, described Gripping structure, beyond guiding each 50mm of main steel plate, includes the guiding steel pipe in width direction at length direction both ends It is interior.
4. baffle eye-splice-type guide die according to claim 3, which is characterized in that the trepanning being oriented on main steel plate Diameter according to it is described be oriented to steel pipe diameter determine, it is described be oriented to steel pipe diameter it is bigger than the diameter of advanced tubule by 10~ 20mm, the guiding steel pipe set angle according to the default advanced tubule and are fixed with the guiding main steel plate full weld.
5. baffle eye-splice-type guide die according to claim 3, which is characterized in that it is described be oriented to steel pipe length be: Across after the guiding main steel plate, one end is greater than or equal to 10cm, and the other end is greater than or equal to steelframe cross section to be installed width.
6. baffle eye-splice-type guide die according to claim 2, which is characterized in that the gripping structure small round steel with The guiding main steel plate two-sided welding is fixed, and joint is arranged on the guiding main steel plate, the gripping structure small round steel Both ends tilt 15 ° beyond the part for being oriented to main steel plate relative to the guiding main steel plate in the longitudinal direction.
7. a kind of control method of baffle eye-splice-type guide die, which is characterized in that include the following steps:
Step 1, according to steelframe section structure size to be installed and advanced tubule specification, set angle requirement, calculate and determine gear The length and width dimensions of main steel plate and buckle structure steel plate are oriented in plate eye-splice-type guide die, are oriented to main steel plate position of opening and straight Diameter is oriented to diameter of steel tube and length, buckle structure small round steel length and welding position, and baffle eye-splice-type guide die is processed Molding;
Step 2, on steelframe to be installed by measurement and positioning, the circumferential position that the advanced tubule is set is marked on steelframe It puts;
After step 3, steelframe installation are firm, guide die is lifted by gripping structure, and is set in the marked ductule Guide die buckle structure is forcibly inserted into steelframe abdomen at position, until baffle arrangement is close to steelframe, buckle structure steel Plate utilizes the own resilient of steel plate bending, realizes the preliminary fixation to guide die, when buckle structure steel plate is inserted into until eye-splice After structure small round steel is by steel frame structure muscle, with the rebound of buckle structure steel plate, buckle structure small round steel is stuck in steelframe It constructs on the inside of muscle, fixed guide mold;
Whether the angle of step 4, the position for checking guide die and guiding steel pipe meets design specification requirement, passes through when being unsatisfactory for Gripping structure adjusts position, until meeting design specification requirement;
After step 5, guide die positioning stablity, air drill drill bit is inserted into together with drilling rod in the guiding steel pipe of guide die, and real Apply bore operation;
Step 6, after a hole drilling, air drill drilling rod is removed, is transferred to guide die, and move to by gripping structure Another bore position, repeat the above steps 3, step 4, step 5, until all drillings set and finish.
8. control method according to claim 7, which is characterized in that the control method further includes:
According to on-site actual situations, more set baffle eye-splice-type guide dies and drilling construction are processed, while is completed to multiple advanced The bore angle control of ductule.
CN201810023860.5A 2018-01-10 2018-01-10 A kind of baffle eye-splice-type guide die and control method Pending CN108131107A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810023860.5A CN108131107A (en) 2018-01-10 2018-01-10 A kind of baffle eye-splice-type guide die and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810023860.5A CN108131107A (en) 2018-01-10 2018-01-10 A kind of baffle eye-splice-type guide die and control method

Publications (1)

Publication Number Publication Date
CN108131107A true CN108131107A (en) 2018-06-08

Family

ID=62399700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810023860.5A Pending CN108131107A (en) 2018-01-10 2018-01-10 A kind of baffle eye-splice-type guide die and control method

Country Status (1)

Country Link
CN (1) CN108131107A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252876A (en) * 2018-06-26 2019-01-22 中铁五局集团贵州工程有限公司 A kind of advanced tubule angle positioning device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101057680B1 (en) * 2011-01-21 2011-08-24 주식회사 거원엔지니어링 Soil retaining wall and construction method of reuse and reinforcement steel panel
CN106761494A (en) * 2017-03-14 2017-05-31 中铁十七局集团有限公司 A kind of guider and method for tunnel pre-grouting armature boring
CN207776821U (en) * 2018-01-10 2018-08-28 中铁隧道集团二处有限公司 A kind of baffle eye-splice-type guide die

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101057680B1 (en) * 2011-01-21 2011-08-24 주식회사 거원엔지니어링 Soil retaining wall and construction method of reuse and reinforcement steel panel
CN106761494A (en) * 2017-03-14 2017-05-31 中铁十七局集团有限公司 A kind of guider and method for tunnel pre-grouting armature boring
CN207776821U (en) * 2018-01-10 2018-08-28 中铁隧道集团二处有限公司 A kind of baffle eye-splice-type guide die

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252876A (en) * 2018-06-26 2019-01-22 中铁五局集团贵州工程有限公司 A kind of advanced tubule angle positioning device
CN109252876B (en) * 2018-06-26 2024-05-10 中铁五局集团贵州工程有限公司 Advance little pipe angle positioner

Similar Documents

Publication Publication Date Title
CN104405399B (en) One kind passes through drift sand stratum tunnel excavation support body engineering method
CN101864959A (en) Method for tunneling construction of main structure of underground station
CN106014446B (en) A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability
CN206495682U (en) A kind of stand quickly handled for Tunnel Landslide
CN108487256A (en) A kind of ruggedized construction and method that foundation pit deepened is backbreak
CN109973115B (en) Construction method for drainage of vault of tunnel in karst area
CN205955759U (en) Lock foot anchor pipe mechanical connection positioner
CN108131107A (en) A kind of baffle eye-splice-type guide die and control method
CN207776821U (en) A kind of baffle eye-splice-type guide die
CN104612714B (en) Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through
CN107905368B (en) A kind of assembled beam and assembled column connection structure and construction method
CN109184752A (en) A kind of coal mine supporting construction and its method for protecting support for passing through old kiln goaf
CN203394555U (en) Feet-lock small guide tube connected with steel plate
CN103410529A (en) Tunnel supporting arch foot reinforced structure for soft surrounding rocks and construction method
CN204252400U (en) A kind of reinforcing bar connector for earthquake-proof frame top story knee joint
CN205875146U (en) Broken pile's reinforced structure
CN206205012U (en) A kind of SMW engineering methods stake inclinometer pipe installation aiding device
CN210509213U (en) Rock pillar reinforcement system in small clear distance tunnel
CN204827500U (en) Pinniform wedge body stock
CN209429120U (en) A kind of mold of control Soil-cement Wall fashioned iron decentralization precision
CN208686400U (en) The support unit of branch structure at the beginning of a kind of subsurface excavation method for PBA
CN208183733U (en) The tool of the push Anchor Agent of large aperture prestress anchoraging engineering
CN209293051U (en) A kind of open caisson reserved opening plugging structure
CN107905222A (en) Pile foundation lining material and apply the lining material prefabricated band bellend prestressing pipe pile construction method
CN206830198U (en) The vertical slip casting steel floral tube in tunnel top just props up the integral reinforcing structure being combined with tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination