CN108131107A - A kind of baffle eye-splice-type guide die and control method - Google Patents
A kind of baffle eye-splice-type guide die and control method Download PDFInfo
- Publication number
- CN108131107A CN108131107A CN201810023860.5A CN201810023860A CN108131107A CN 108131107 A CN108131107 A CN 108131107A CN 201810023860 A CN201810023860 A CN 201810023860A CN 108131107 A CN108131107 A CN 108131107A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- baffle
- oriented
- splice
- eye
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 300
- 239000010959 steel Substances 0.000 claims abstract description 300
- 210000005239 tubule Anatomy 0.000 claims abstract description 85
- 238000010276 construction Methods 0.000 claims abstract description 34
- 210000003205 muscle Anatomy 0.000 claims abstract description 24
- 238000009434 installation Methods 0.000 claims abstract description 8
- 238000005553 drilling Methods 0.000 claims description 37
- 210000001015 abdomen Anatomy 0.000 claims description 25
- 238000003466 welding Methods 0.000 claims description 12
- 229910000746 Structural steel Inorganic materials 0.000 claims description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 238000005452 bending Methods 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 5
- 235000000396 iron Nutrition 0.000 claims description 5
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 2
- 238000000465 moulding Methods 0.000 claims 1
- 239000000284 extract Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/24—Guiding or centralising devices for drilling rods or pipes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of baffle eye-splice-type guide die and control methods, the guide die includes guide frame, baffle arrangement, buckle structure and gripping structure, the baffle arrangement is arranged on the guide frame upper and lower ends, the buckle structure is arranged on the guide frame lower edges, and the gripping structure is arranged at left and right sides of the guide frame.Baffle eye-splice-type guide die reasonable design provided by the present invention, it is simple in structure, it is processed convenient for construction site, installation is removed conveniently, simple operation is laborsaving, and it can be recycled, reduce the difficulty of advanced tubule bore angle control, artificial workload is reduced, effectively improves construction efficiency and civilization degree, while improve the control accuracy of advanced tubule bore angle, suitable for different size grid steel frame or profile steel frame, such as eight word muscle grid steel frames, diagonal bar grid steel frame, profile steel frame etc., suitable for large-scale promotion application.
Description
Technical field
The present invention relates to bored tunnel advance support technical fields more particularly to one kind to be used for bored tunnel advanced tubule
The baffle eye-splice-type guide die and control method of setting angle control.
Background technology
At present, advanced tubule is common a kind of assisting construction method during bored tunnel excavation construction, main
Suitable for from shorter unstable rock mass, Shallow Section, hole biased segment, sand section, sandy gravel section, fault belt of steady time etc.
The advance support operation in location tunnel.Advanced tubule must coordinate steelframe to use, across grid steel frame or the abdomen of profile steel frame
Portion, pipe tail are welded with steelframe, and conventional design parameter is:Using welded still pipe or seamless steel pipe, 30~50mm of outer diameter of steel pipes, steel pipe
Long 3~5m, steel pipe are drilled with extravasating hole spacing as 100~150mm, and the circumferentially disposed spacing of steel pipe along arch is 300~500mm, steel
Pipe is 5 °~15 ° along the outer limb of circumferential direction of arch, and steel pipe is typically no less than 1m along the lap of splice of tunnel longitudinal direction, and injecting paste material is general
For ordinary cement single slurry, cement-waterglass dual slurry etc..
Advanced tubule construction technique principle is:Using drilling devices such as air drills according to design position, design angle requirement
It is drilled, borehole cleaning, and takes measures to squeeze into advanced tubule, the then slip casting into advanced tubule with certain pressure is led to
The extravasating hole of advanced tubule tube body is crossed, in a manner of infiltration filling, splitting etc., by the original loose soil particle in periphery or crack glue
Form an entirety, forming one, structure is new, intensity is big, the good induration of water resistance so that country rock loose crushing and enclose
Lithofraction gap infiltration situation is significantly improved, to achieve the purpose that excavate safety, deduction and exemption just branch percolating water.
The advantages that because of advanced tubule construction technology and simple, adaptable equipment, field application is very extensive.But always
Since, there are various problems for advanced tubule work progress, and especially advanced tubule drilling, which sets angle, to control well,
It can only be controlled with the experience of site operation personnel and grade rod is checked by hand, work efficiency is low, low precision, and advanced tubule is caused to be installed
Angular deviation is larger, be unsatisfactory for design and code requirement, restrict advanced tubule pre support, pre-reinforcement effect, to tunnel
Safe excavation and first branch percolating water cause a hidden trouble.
Invention content
In order to solve the above-mentioned problems in the prior art, the present invention proposes a kind of for bored tunnel advanced tubule
The baffle eye-splice-type guide die and control method of setting angle control, to be suitable in different size grid steel frame or shaped steel steel
The advanced tubule of certain angle is set on frame according to design requirement, applicability is wide, and installation is fixed and removes conveniently, can be convenient
The drilling of control advanced tubule set angle, reduce worker's load, and can be recycled, improve construction efficiency and civilization
Degree.
In order to achieve the above objectives, the present invention adopts the following technical scheme that:
A kind of baffle eye-splice-type guide die, the guide die include guide frame, baffle arrangement, buckle structure and grab
Hand structure, the baffle arrangement are arranged on the guide frame upper/lower terminal, and the buckle structure is arranged on the guide frame
Upper and lower edge, the gripping structure are arranged on the guide frame arranged on left and right sides.
Preferably, the guide frame includes one piece of guiding main steel plate, a guiding steel pipe and four pieces of stiffened steel plates, described
It is oriented to steel pipe and passes through the guiding main steel plate, reinforced and welded using the stiffened steel plates;The baffle arrangement includes two block baffles
Structural steel and iron is respectively welded at the upper/lower terminal for being oriented to main steel plate;The buckle structure includes buckle structure steel plate and inserts
Buckle structure small round steel, the buckle structure steel plate with it is described guiding main steel plate be structure as a whole, from it is described guiding main steel plate to
Tunnel excavation direction is bent into right angle and forms " Contraband " type structure, is bent into right angle and forms the eye-splice of " Contraband " type structure division composition
Structural steel and iron;The gripping structure includes gripping structure small round steel.
Preferably, the length and width dimensions for being oriented to main steel plate are calculated according to steelframe size to be installed determines, described to be oriented to master
Positive clear height of the length of steel plate for abdomen at steelframe advanced tubule to be installed, the width for being oriented to main steel plate are treated for steelframe
The positive clear span of abdomen at advanced tubule is installed;
The length for being oriented to main steel plate is provided with trepanning with wide cross searching position on the lower side, and the guiding steel pipe is according to default
Advanced tubule sets angle and penetrates the trepanning;The steel plate of the baffle arrangement with it is described guiding main steel plate welding after it is exposed
Length is more than more than steelframe depth of transverse section 2cm to be installed, and the steel plate width of the baffle arrangement is less than or equal to the guiding
The width of main steel plate;
The length of the buckle structure small round steel is equal to the width of the steel plate of the buckle structure, using welding by both sides and institute
State buckle structure Interal fixation, the cross searching point of the gripping structure and the length for being oriented to main steel plate and wide cross searching one
Cause, the gripping structure at length direction both ends beyond guiding each 50mm of main steel plate, in width direction by the guiding steel
Pipe is included.
Preferably, the opening diameter being oriented on main steel plate is determined according to the diameter for being oriented to steel pipe, the guiding
The diameter of steel pipe is bigger 10~20mm than the diameter of advanced tubule, and the guiding steel pipe sets angle according to default advanced tubule
It is fixed with the guiding main steel plate full weld.
Preferably, the length of the guiding steel pipe is:Across after the guiding main steel plate, one end is greater than or equal to 10cm,
The other end is greater than or equal to steelframe cross section to be installed width.
Preferably, the gripping structure small round steel is fixed with the guiding main steel plate two-sided welding, and joint is arranged on
On the guiding main steel plate, both ends exceed the part for being oriented to main steel plate to the gripping structure small round steel in the longitudinal direction
15 ° are tilted relative to the guiding main steel plate.
A kind of control method of baffle eye-splice-type guide die, includes the following steps:
Step 1, according to steelframe section structure size to be installed and advanced tubule specification, set angle requirement, calculate true
Determine to be oriented to the length and width dimensions of main steel plate and buckle structure steel plate in baffle eye-splice-type guide die, be oriented to main steel plate position of opening and
Diameter is oriented to diameter of steel tube and length, buckle structure small round steel length and welding position, and baffle eye-splice-type guide die is added
Work is molded;
Step 2, on steelframe to be installed by measurement and positioning, the circumferential position that ductule is set before excess of export is marked on steelframe
It puts;
After step 3, steelframe installation are firm, guide die is lifted by gripping structure, and in marked advanced tubule
It sets and guide die buckle structure is inserted into steelframe abdomen at position, until baffle arrangement supports patch, buckle structure steel with steelframe
Plate utilizes the own resilient of steel plate bending, realizes the preliminary fixation to guide die, when buckle structure steel plate is inserted into until eye-splice
After structure small round steel is by steel frame structure muscle, with the rebound of buckle structure steel plate, buckle structure small round steel is stuck in steelframe
It constructs on the inside of muscle, fixed guide mold;
Whether the angle of step 4, the position for checking guide die and guiding steel pipe meets design specification requirement, when being unsatisfactory for
Position is adjusted by gripping structure;
After step 5, guide die positioning stablity, air drill drill bit is inserted into together with drilling rod in the guiding steel pipe of guide die,
And implement bore operation;
Step 6, after a hole drilling, air drill drilling rod is removed, is transferred to guide die by gripping structure, and
Another bore position is moved to, repeat the above steps 3, step 4, step 5, until all drillings set and finish.
Preferably, the control method further includes:
According to on-site actual situations, more set baffle eye-splice-type guide dies and drilling construction are processed, while complete to multiple
The bore angle control of advanced tubule.
Compared with prior art, the invention has the advantages that:
Baffle eye-splice-type guide die reasonable design provided by the present invention, it is simple in structure, it is processed convenient for construction site, peace
Dress is removed conveniently, and simple operation is laborsaving, and can be recycled, and reduces the difficulty of advanced tubule bore angle control, is reduced
Artificial workload, effectively improves construction efficiency and civilization degree, while improve the control accuracy of advanced tubule bore angle, fits
For different size grid steel frame or profile steel frame, such as eight word muscle grid steel frames, diagonal bar grid steel frame, profile steel frame etc., fit
In large-scale promotion application.
Description of the drawings
Fig. 1 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment one
Formula guide die front schematic view;
Fig. 2 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment one
Formula guide die side schematic view;
Fig. 3 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment one
Formula guide die schematic top plan view;
Fig. 4 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment two
The front schematic view that formula guide die controls for advanced tubule bore angle on diagonal bar grid steel frame;
Fig. 5 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment two
The side schematic view that formula guide die controls for advanced tubule bore angle on diagonal bar grid steel frame;
Fig. 6 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment two
The field operation schematic diagram that formula guide die controls for advanced tubule bore angle on diagonal bar grid steel frame;
Fig. 7 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment three
The front schematic view that formula guide die controls for advanced tubule bore angle on eight word muscle grid steel frames;
Fig. 8 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment three
The side schematic view that formula guide die controls for advanced tubule bore angle on eight word muscle grid steel frames;
Fig. 9 is a kind of baffle eye-splice for the control of bored tunnel advanced tubule setting angle of the present invention in embodiment three
The field operation schematic diagram that formula guide die controls for advanced tubule bore angle on eight word muscle grid steel frames;
Figure 10 is that a kind of baffle for the control of bored tunnel advanced tubule setting angle of the present invention is inserted in example IV
The front schematic view that button guide die controls for advanced tubule bore angle in profile steel frame;
Figure 11 is that a kind of baffle for the control of bored tunnel advanced tubule setting angle of the present invention is inserted in example IV
The side schematic view that button guide die controls for advanced tubule bore angle in profile steel frame;
Figure 12 is that a kind of baffle for the control of bored tunnel advanced tubule setting angle of the present invention is inserted in example IV
The field operation schematic diagram that button guide die controls for advanced tubule bore angle in profile steel frame.
In figure:101- is oriented to main steel plate, 102- buckle structure steel plates, and 2- is oriented to steel pipe, 3- stiffened steel plates, 4- baffle arrangements
Steel plate, 5- buckle structure small round steel, 6- gripping structure small round steel, the angle that α-advanced tubule is installed, X- steelframes are waited to pacify
Advanced tubule circumferential direction spacing is filled, abdomen cross section clear span at L- steelframes advanced tubule to be installed, b- steelframes are to be installed advanced
Abdomen front clear span at ductule, abdomen front clear height at h- steelframes ductule to be installed.
Specific embodiment
Below by drawings and examples, technical scheme of the present invention is described in further detail.
Embodiment one
As shown in Figure 1-Figure 3, the present invention provides a kind of gears for the control of bored tunnel advanced tubule setting angle
Plate eye-splice-type guide die, the guide die include guide frame, baffle arrangement, buckle structure and gripping structure, wherein, gear
Harden structure is arranged on guide frame upper/lower terminal, and buckle structure is arranged on the upper and lower edge of guide frame, and gripping structure is arranged on
Guide frame arranged on left and right sides.
Guide frame includes one piece and is oriented to 101, guiding steel pipes 2 of main steel plate and four pieces of stiffened steel plates 3, is oriented to steel pipe 2
Across main steel plate 101 is oriented to, is reinforced and welded using stiffened steel plates 3;Baffle arrangement includes two block baffle structural steel and irons 4, welds respectively
It is connected on the upper and lower ends for being oriented to main steel plate 101;Buckle structure includes buckle structure steel plate 102 and buckle structure small round steel 5, inserts
Buckle structure steel plate 102 is integrated with being oriented to main steel plate 101, and square is bent into from guiding main steel plate 101 to tunnel excavation direction
Into " Contraband " type structure, it is bent into right angle and forms " Contraband " type structure composition buckle structure steel plate 102;Gripping structure includes gripping structure
Small round steel 6.
The present invention is not limited the shape of gripping structure, such as:Gripping structure small round steel 6 can weld to be formed
" " type structure or other shapes, firm welding.
Further, the length for being oriented to main steel plate 101 is determined with wide size according to steelframe size to be installed calculating, is oriented to main steel
Positive clear height of the length of plate 101 for abdomen at steelframe advanced tubule to be installed, the width for being oriented to main steel plate 101 are treated for steelframe
The positive clear span of abdomen at advanced tubule is installed;
The length and wide cross searching position on the lower side for being oriented to main steel plate 101 are provided with trepanning, are oriented to steel pipe 2 according to default advanced
Ductule sets angle and penetrates trepanning;Baffle arrangement steel plate 4 is with being oriented to the protruded length after main steel plate 101 welds more than to be installed
More than steelframe depth of transverse section 2cm, 4 width of baffle arrangement steel plate are less than or equal to the width for being oriented to main steel plate 101;
The length of buckle structure small round steel 5 is equal to the width of buckle structure steel plate 102, using welding by both sides and buckle structure
Steel plate 102 is fixed, and the cross searching point of gripping structure is consistent with the length and width cross searching for being oriented to main steel plate 101, and gripping structure exists
Finger is conveniently stretched into length direction both ends beyond 101 each 50mm of main steel plate is oriented to, and will be oriented to steel pipe 2 in width direction includes
It is interior.
Further, the opening diameter being oriented on main steel plate 101 is determined according to the diameter for being oriented to steel pipe 2, is oriented to steel pipe 2
Diameter is bigger 10~20mm than the diameter of advanced tubule, is oriented to steel pipe 2 and sets angle with being oriented to main steel plate according to default ductule
101 full welds are fixed.
Further, the length of guiding steel pipe 2 is:Across after being oriented to main steel plate 101, one end is greater than or equal to 10cm, separately
One end is greater than or equal to steelframe cross section to be installed width.
Further, gripping structure small round steel 6 is fixed with being oriented to 101 two-sided welding of main steel plate, and joint, which is arranged on, leads
On main steel plate 101, gripping structure small round steel 6 in the longitudinal direction both ends beyond be oriented to main steel plate 101 part relative to
It is oriented to main steel plate 101 and tilts 15 °, lift when easy to use or extract after use.
In the present embodiment, for the selection of each structure of guide die using integral strength when can ensure mold use as
Standard, specifically, for example, by using following material:It is oriented to main steel plate 101, buckle structure steel plate 102, stiffened steel plates 3, baffle arrangement
Steel plate 4 is generally 5mm, and guidings steel pipe 2 is Φ 60mm~80mm, wall thickness 3mm-4.5mm, and buckle structure small round steel 5 is generally
Φ 6mm round steel, gripping structure small round steel 6 are generally Φ 8mm round steel.
Embodiment two
As shown in Figures 4 to 6, surpassed with one kind of the present invention of live diagonal bar grid steel frame practice of construction for bored tunnel
For the baffle eye-splice-type guide die of preceding ductule setting angle control, the present invention is further illustrated, ties substantially
Structure is set and application determines as in the first embodiment, being oriented to 101 length and width size of main steel plate and need to be calculated according to steelframe size to be installed,
The positive clear height h of abdomen at length=steelframe advanced tubule to be installed, abdomen at width=steelframe advanced tubule to be installed
Positive clear span b, and in guiding 101 length and width cross searching of the main steel plate appropriate location trepanning on the lower side, position of opening is to be oriented to
Steel pipe can install angle [alpha] to design advanced tubule and pass through steelframe abdomen as standardization, and small in advance according to design requirement
Conduit installs angle [alpha] and penetrates guiding steel pipe 2;Two block baffle structural steel and irons 4 are needed with being oriented to the protruded length after main steel plate 101 welds
> more than steelframe depth of transverse section h 2cm to be installed, the width of width≤guiding main steel plate 101 of baffle arrangement steel plate 4;Eye-splice
The length of structure small round steel 5=102 width of buckle structure steel plate, specific location are inserted into steelframe according to buckle structure steel plate 102
Structure muscle location determination behind inside can be prevented from moving outside mold with reaching buckle structure small round steel 5 on the outside of steel frame construction muscle.
It is as shown in figure 5, small in advance for bored tunnel with one kind of the present invention of live diagonal bar grid steel frame practice of construction
For the baffle eye-splice-type guide die of erecting angle of conducting tube degree control, manually by gripping structure small round steel 6 by guide die
Lift, and set in marked advanced tubule and buckle structure steel plate 102 is inserted into steelframe abdomen at position, until baffle knot
Structure steel plate 4 supports patch with steelframe, at this point, buckle structure steel plate 102 is realized using the own resilient of steel plate bending to the preliminary of mold
It is fixed, after buckle structure steel plate 102 is inserted into up to buckle structure small round steel 5 through grid construction muscle, with buckle structure
The rebound of steel plate 102, buckle structure small round steel 5 have just been stuck on the outside of grid steel frame construction muscle, at this time the small-sized circle of buckle structure
Steel 5 is used as catch feature operative, plays fixing mould, the function that mold is prevented to be displaced outwardly.
It is as shown in fig. 6, small in advance for bored tunnel with one kind of the present invention of live diagonal bar grid steel frame practice of construction
For the baffle eye-splice-type guide die of erecting angle of conducting tube degree control, check die location and be oriented to whether 2 angle of steel pipe meets
Design requirement then goes to adjustment position, until meeting the requirements when being unsatisfactory for by gripping structure;After mold positioning stablity, by wind
Drill bit is inserted into together with drilling rod in the guiding steel pipe 2 of mold, and implements bore operation, and bore angle is determined with this;When a hole
After drilling, air drill drilling rod from the guiding steel pipe 2 of mold is removed, is transferred to mold by gripping structure small round steel 6,
And another bore position is moved to, it repeats above-mentioned mold installation, drilling, extract step, until all drillings set and finish.
In the present embodiment, it is advanced for bored tunnel with one kind of the present invention of live diagonal bar grid steel frame practice of construction
For the baffle eye-splice-type guide die of ductule setting angle control, it is preferable that cover can be processed according to on-site actual situations more
Baffle eye-splice-type guide die and drilling construction, while complete to control the bore angle of multiple advanced tubules.
Embodiment three
As shown in Figure 7 to 9, bored tunnel is used for one kind of the present invention of live eight word muscle grid steel frame practice of construction
For the baffle eye-splice-type guide die of advanced tubule setting angle control, the present invention is further illustrated, basic
Structure setting and application determine as in the first embodiment, being oriented to main steel plate 101 length and width dimensions and need to be calculated according to steelframe size to be installed,
The positive clear height h of abdomen at length=steelframe advanced tubule to be installed, abdomen at width=steelframe advanced tubule to be installed
Positive clear span b, and as possible it is described guiding the appropriate location trepanning on the lower side of 101 length and width cross searching of main steel plate, position of opening with
It is oriented to steel pipe and can install angle [alpha] to design advanced tubule and pass through steelframe abdomen to standardize, and surpass according to design requirement
Preceding ductule installs angle [alpha] and penetrates guiding steel pipe 2;Two block baffle structural steel and irons 4 are with being oriented to the exposed length after main steel plate 101 welds
Degree needs > more than steelframe depth of transverse section h 2cm to be installed, the width of width≤guiding main steel plate 101 of baffle arrangement steel plate 4;
The length of buckle structure small round steel 5=102 width of buckle structure steel plate, specific location are inserted into according to buckle structure steel plate 102
Structure muscle location determination behind steelframe inside can be prevented on the outside of steel frame construction muscle outside mold with reaching buckle structure small round steel 5
It moves.
It is as shown in figure 8, advanced for bored tunnel with one kind of the present invention of live eight word muscle grid steel frame practice of construction
For the baffle eye-splice-type guide die of ductule setting angle control, guide die is carried by gripping structure small round steel 6
It rises, and sets in marked advanced tubule and buckle structure steel plate 102 is inserted into steelframe abdomen at position, until baffle arrangement
Steel plate 4 supports patch with steelframe, at this point, own resilient of the buckle structure steel plate 102 using steel plate bending, is realized to the preliminary solid of mold
It is fixed, after buckle structure steel plate 102 is inserted into up to buckle structure small round steel 5 through grid construction muscle, with buckle structure steel
The rebound of plate 102, buckle structure small round steel 5 have just been stuck on the outside of grid steel frame construction muscle, at this time buckle structure small round steel 5
As catch feature operative, fixing mould, the function that mold is prevented to be displaced outwardly are played.
It is as shown in figure 9, advanced for bored tunnel with one kind of the present invention of live eight word muscle grid steel frame practice of construction
For the baffle eye-splice-type guide die of ductule setting angle control, check die location and whether to be completely oriented to 2 angle of steel pipe
Sufficient design requirement then goes to adjustment position, until meeting the requirements when being unsatisfactory for by gripping structure;It, will after mold positioning stablity
Air drill drill bit is inserted into together with drilling rod in the guiding steel pipe 2 of mold, and implements bore operation, is determined bore angle with this, was crept into
Cheng Zhong, drilling rod contact mold less as possible, avoid die shift;After a hole drilling, by air drill drilling rod leading from mold
It removes into steel pipe 2, is transferred to mold by gripping structure small round steel 6, and move to another bore position, repeat above-mentioned mold
Installation, extracts step at drilling, until all drillings set and finish.
In the present embodiment, surpassed with one kind of the present invention of live eight word muscle grid steel frame practice of construction for bored tunnel
For the baffle eye-splice-type guide die of preceding ductule setting angle control, it is preferable that can be processed more according to on-site actual situations
Baffle eye-splice-type guide die and drilling construction are covered, while completes to control the bore angle of multiple advanced tubules.
Example IV
As shown in Figure 10 to Figure 12, it is advanced for bored tunnel with one kind of the present invention of live profile steel frame practice of construction
For the baffle eye-splice-type guide die of ductule setting angle control, the present invention is further illustrated, basic structure
Setting and application are the same as embodiment one.Determining, length need to be calculated according to steelframe size to be installed by being oriented to 101 length and width dimensions of main steel plate
The positive clear height h of abdomen at=steelframe advanced tubule to be installed, abdomen is being just at width=steelframe advanced tubule to be installed
Face clear span b, and in guiding 101 length and width cross searching of the main steel plate appropriate location trepanning on the lower side, position of opening is to be oriented to steel pipe
Angle [alpha] can be installed to design advanced tubule and pass through steelframe abdomen as standardization, and according to design requirement advanced tubule
It installs angle [alpha] and penetrates the guiding steel pipe 2;Two block baffle structural steel and irons 4 are needed with being oriented to the protruded length after main steel plate 101 welds
> more than steelframe depth of transverse section h 2cm to be installed, the width of 4 width of baffle arrangement steel plate≤guiding main steel plate 101;Eye-splice knot
The width of the length of structure small round steel 5=buckle structure steel plate 102.
As shown in figure 11, bored tunnel advanced tubule is used for one kind of the present invention of live profile steel frame practice of construction
For the baffle eye-splice-type guide die of setting angle control, mold is lifted by gripping structure small round steel 6, and is marking
Note advanced tubule sets buckle structure steel plate 102 is forcibly inserted into steelframe abdomen at position, until baffle arrangement steel plate 4 with
Steelframe is close to, at this point, buckle structure steel plate 102 is realized the fixation to mold, played fixation using the own resilient of steel plate bending
Mold, the function that mold is prevented to be displaced outwardly.
As shown in figure 12, bored tunnel advanced tubule is used for one kind of the present invention of live profile steel frame practice of construction
For the baffle eye-splice-type guide die of setting angle control, check die location and be oriented to whether 2 angle of steel pipe meets design
It is required that adjustment position is then gone by gripping structure when being unsatisfactory for, until meeting the requirements;After mold positioning stablity, air drill is bored
Head is inserted into together with drilling rod in the guiding steel pipe 2 of mold, and implements bore operation, and bore angle is determined with this;When a hole drilling
After, air drill drilling rod from the guiding steel pipe 2 of mold is removed, is transferred to mold by gripping structure small round steel 6, and move
To another bore position, repeat above-mentioned mold installation, drilling, extract step, until all drillings set and finish.
In the present embodiment, it is led with one kind of the present invention of live profile steel frame practice of construction for bored tunnel to be small in advance
Pipe setting angle control baffle eye-splice-type guide die for, because inside profile steel frame without structure muscle, the small-sized circle of buckle structure
Steel 5 can not be installed;More set baffle eye-splice-type guide dies and drilling construction can be processed, while is completed to multiple advanced tubules
Bore angle control.
The present invention can need to be used for what is applied after the completion of above-mentioned advanced tubule is installed according to construction and place
The baffle eye-splice-type guide die of bored tunnel advanced tubule angle control extract and is used in turn or disassembles, used
Each material still is able to recycle.
Correspondingly, the present invention also provides a kind of control method of baffle eye-splice-type guide die, the method includes with
Lower step:
Step 1, according to steelframe section structure size to be installed and advanced tubule specification, set angle requirement, calculate true
Determine to be oriented to the length and width dimensions of main steel plate and buckle structure steel plate in baffle eye-splice-type guide die, be oriented to main steel plate position of opening and
Diameter is oriented to diameter of steel tube and length, buckle structure small round steel length and welding position, and baffle eye-splice-type guide die is added
Work is molded;
Step 2, on steelframe to be installed by measurement and positioning, the circumferential position that ductule is set before excess of export is marked on steelframe
It puts;
After step 3, steelframe installation are firm, guide die is lifted by gripping structure, and in marked advanced tubule
It sets and guide die buckle structure is forcibly inserted into steelframe abdomen at position, until baffle arrangement is close to steelframe, eye-splice knot
Structure steel plate utilize steel plate bending own resilient, realize the preliminary fixation to guide die, when buckle structure steel plate be inserted into until
After buckle structure small round steel is by steel frame structure muscle, with the rebound of buckle structure steel plate, buckle structure small round steel is stuck in
On the inside of steel frame structure muscle, fixed guide mold;
Whether the angle of step 4, the position for checking guide die and guiding steel pipe meets design specification requirement, when being unsatisfactory for
Position is adjusted by gripping structure, until meeting design specification requirement;
After step 5, guide die positioning stablity, air drill drill bit is inserted into together with drilling rod in the guiding steel pipe of guide die,
And implement bore operation;
Step 6, after a hole drilling, air drill drilling rod is removed, is transferred to guide die by gripping structure, and
Another bore position is moved to, repeat the above steps 3, step 4, step 5, until all drillings set and finish.
Preferably, the control method further includes:
According to on-site actual situations, more set baffle eye-splice-type guide dies and drilling construction are processed, while complete to multiple
The bore angle control of advanced tubule.
Above-described specific embodiment has carried out the purpose of the present invention, technical solution and advantageous effect further
It is described in detail, it should be understood that the foregoing is merely the specific embodiment of the present invention, is not intended to limit the present invention
Protection domain, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include
Within protection scope of the present invention.
Claims (8)
1. a kind of baffle eye-splice-type guide die, which is characterized in that the guide die includes guide frame, baffle arrangement, inserts
Buckle structure and gripping structure, the baffle arrangement are arranged on the guide frame upper and lower ends, and the buckle structure is arranged on institute
Guide frame lower edges are stated, the gripping structure is arranged at left and right sides of the guide frame.
2. baffle eye-splice-type guide die according to claim 1, which is characterized in that the guide frame is led including one piece
Steel pipe and four pieces of stiffened steel plates are oriented to main steel plate, one, the guiding steel pipe is passed through the guiding main steel plate, added using described
Strength steel plate reinforcement welds;The baffle arrangement includes two block baffle structural steel and irons, is respectively welded at the upper of the guiding main steel plate
Lower both ends;The buckle structure include buckle structure steel plate and buckle structure small round steel, the buckle structure steel plate with it is described
It is oriented to main steel plate to be integrated, being bent into right angle to tunnel excavation direction from the guiding main steel plate forms " Contraband " type structure, bends
Part forms the buckle structure steel plate;The gripping structure includes gripping structure small round steel.
3. baffle eye-splice-type guide die according to claim 2, which is characterized in that the length and width ruler for being oriented to main steel plate
Very little calculated according to steelframe size to be installed determines that the length for being oriented to main steel plate is abdomen at steelframe advanced tubule to be installed
Positive clear height, positive clear span of the width for being oriented to main steel plate for abdomen at steelframe advanced tubule to be installed;
The length and width cross searching position on the lower side for being oriented to main steel plate is provided with trepanning, and the guiding steel pipe is according to default advanced small
Conduit sets angle and penetrates the trepanning;The baffle arrangement steel plate is more than with the protruded length after the guiding main steel plate welding
More than steelframe depth of transverse section 2cm to be installed, the baffle arrangement steel plate width are less than or equal to the width for being oriented to main steel plate
Degree;
The length of the buckle structure small round steel is equal to the width of the buckle structure steel plate, using welding by both sides and the eye-splice
Structural steel and iron is fixed, and the cross searching point of the gripping structure is consistent with the length and width cross searching for being oriented to main steel plate, described
Gripping structure, beyond guiding each 50mm of main steel plate, includes the guiding steel pipe in width direction at length direction both ends
It is interior.
4. baffle eye-splice-type guide die according to claim 3, which is characterized in that the trepanning being oriented on main steel plate
Diameter according to it is described be oriented to steel pipe diameter determine, it is described be oriented to steel pipe diameter it is bigger than the diameter of advanced tubule by 10~
20mm, the guiding steel pipe set angle according to the default advanced tubule and are fixed with the guiding main steel plate full weld.
5. baffle eye-splice-type guide die according to claim 3, which is characterized in that it is described be oriented to steel pipe length be:
Across after the guiding main steel plate, one end is greater than or equal to 10cm, and the other end is greater than or equal to steelframe cross section to be installed width.
6. baffle eye-splice-type guide die according to claim 2, which is characterized in that the gripping structure small round steel with
The guiding main steel plate two-sided welding is fixed, and joint is arranged on the guiding main steel plate, the gripping structure small round steel
Both ends tilt 15 ° beyond the part for being oriented to main steel plate relative to the guiding main steel plate in the longitudinal direction.
7. a kind of control method of baffle eye-splice-type guide die, which is characterized in that include the following steps:
Step 1, according to steelframe section structure size to be installed and advanced tubule specification, set angle requirement, calculate and determine gear
The length and width dimensions of main steel plate and buckle structure steel plate are oriented in plate eye-splice-type guide die, are oriented to main steel plate position of opening and straight
Diameter is oriented to diameter of steel tube and length, buckle structure small round steel length and welding position, and baffle eye-splice-type guide die is processed
Molding;
Step 2, on steelframe to be installed by measurement and positioning, the circumferential position that the advanced tubule is set is marked on steelframe
It puts;
After step 3, steelframe installation are firm, guide die is lifted by gripping structure, and is set in the marked ductule
Guide die buckle structure is forcibly inserted into steelframe abdomen at position, until baffle arrangement is close to steelframe, buckle structure steel
Plate utilizes the own resilient of steel plate bending, realizes the preliminary fixation to guide die, when buckle structure steel plate is inserted into until eye-splice
After structure small round steel is by steel frame structure muscle, with the rebound of buckle structure steel plate, buckle structure small round steel is stuck in steelframe
It constructs on the inside of muscle, fixed guide mold;
Whether the angle of step 4, the position for checking guide die and guiding steel pipe meets design specification requirement, passes through when being unsatisfactory for
Gripping structure adjusts position, until meeting design specification requirement;
After step 5, guide die positioning stablity, air drill drill bit is inserted into together with drilling rod in the guiding steel pipe of guide die, and real
Apply bore operation;
Step 6, after a hole drilling, air drill drilling rod is removed, is transferred to guide die, and move to by gripping structure
Another bore position, repeat the above steps 3, step 4, step 5, until all drillings set and finish.
8. control method according to claim 7, which is characterized in that the control method further includes:
According to on-site actual situations, more set baffle eye-splice-type guide dies and drilling construction are processed, while is completed to multiple advanced
The bore angle control of ductule.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810023860.5A CN108131107A (en) | 2018-01-10 | 2018-01-10 | A kind of baffle eye-splice-type guide die and control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810023860.5A CN108131107A (en) | 2018-01-10 | 2018-01-10 | A kind of baffle eye-splice-type guide die and control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108131107A true CN108131107A (en) | 2018-06-08 |
Family
ID=62399700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810023860.5A Pending CN108131107A (en) | 2018-01-10 | 2018-01-10 | A kind of baffle eye-splice-type guide die and control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108131107A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252876A (en) * | 2018-06-26 | 2019-01-22 | 中铁五局集团贵州工程有限公司 | A kind of advanced tubule angle positioning device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101057680B1 (en) * | 2011-01-21 | 2011-08-24 | 주식회사 거원엔지니어링 | Soil retaining wall and construction method of reuse and reinforcement steel panel |
CN106761494A (en) * | 2017-03-14 | 2017-05-31 | 中铁十七局集团有限公司 | A kind of guider and method for tunnel pre-grouting armature boring |
CN207776821U (en) * | 2018-01-10 | 2018-08-28 | 中铁隧道集团二处有限公司 | A kind of baffle eye-splice-type guide die |
-
2018
- 2018-01-10 CN CN201810023860.5A patent/CN108131107A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101057680B1 (en) * | 2011-01-21 | 2011-08-24 | 주식회사 거원엔지니어링 | Soil retaining wall and construction method of reuse and reinforcement steel panel |
CN106761494A (en) * | 2017-03-14 | 2017-05-31 | 中铁十七局集团有限公司 | A kind of guider and method for tunnel pre-grouting armature boring |
CN207776821U (en) * | 2018-01-10 | 2018-08-28 | 中铁隧道集团二处有限公司 | A kind of baffle eye-splice-type guide die |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252876A (en) * | 2018-06-26 | 2019-01-22 | 中铁五局集团贵州工程有限公司 | A kind of advanced tubule angle positioning device |
CN109252876B (en) * | 2018-06-26 | 2024-05-10 | 中铁五局集团贵州工程有限公司 | Advance little pipe angle positioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104405399B (en) | One kind passes through drift sand stratum tunnel excavation support body engineering method | |
CN101864959A (en) | Method for tunneling construction of main structure of underground station | |
CN106014446B (en) | A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability | |
CN206495682U (en) | A kind of stand quickly handled for Tunnel Landslide | |
CN108487256A (en) | A kind of ruggedized construction and method that foundation pit deepened is backbreak | |
CN109973115B (en) | Construction method for drainage of vault of tunnel in karst area | |
CN205955759U (en) | Lock foot anchor pipe mechanical connection positioner | |
CN108131107A (en) | A kind of baffle eye-splice-type guide die and control method | |
CN207776821U (en) | A kind of baffle eye-splice-type guide die | |
CN104612714B (en) | Tunneling by mining method construction method and structure under the conditions of the poor geology of country rock is passed through | |
CN107905368B (en) | A kind of assembled beam and assembled column connection structure and construction method | |
CN109184752A (en) | A kind of coal mine supporting construction and its method for protecting support for passing through old kiln goaf | |
CN203394555U (en) | Feet-lock small guide tube connected with steel plate | |
CN103410529A (en) | Tunnel supporting arch foot reinforced structure for soft surrounding rocks and construction method | |
CN204252400U (en) | A kind of reinforcing bar connector for earthquake-proof frame top story knee joint | |
CN205875146U (en) | Broken pile's reinforced structure | |
CN206205012U (en) | A kind of SMW engineering methods stake inclinometer pipe installation aiding device | |
CN210509213U (en) | Rock pillar reinforcement system in small clear distance tunnel | |
CN204827500U (en) | Pinniform wedge body stock | |
CN209429120U (en) | A kind of mold of control Soil-cement Wall fashioned iron decentralization precision | |
CN208686400U (en) | The support unit of branch structure at the beginning of a kind of subsurface excavation method for PBA | |
CN208183733U (en) | The tool of the push Anchor Agent of large aperture prestress anchoraging engineering | |
CN209293051U (en) | A kind of open caisson reserved opening plugging structure | |
CN107905222A (en) | Pile foundation lining material and apply the lining material prefabricated band bellend prestressing pipe pile construction method | |
CN206830198U (en) | The vertical slip casting steel floral tube in tunnel top just props up the integral reinforcing structure being combined with tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |