CN1081240A - Continuous steam generator with flue of vertical substantially pipe formation - Google Patents

Continuous steam generator with flue of vertical substantially pipe formation Download PDF

Info

Publication number
CN1081240A
CN1081240A CN 92109521 CN92109521A CN1081240A CN 1081240 A CN1081240 A CN 1081240A CN 92109521 CN92109521 CN 92109521 CN 92109521 A CN92109521 A CN 92109521A CN 1081240 A CN1081240 A CN 1081240A
Authority
CN
China
Prior art keywords
pipe
steam generator
millimeters
continuous steam
rice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 92109521
Other languages
Chinese (zh)
Other versions
CN1057592C (en
Inventor
W·卡斯特纳
W·克勒
E·维特乔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to CN 92109521 priority Critical patent/CN1057592C/en
Publication of CN1081240A publication Critical patent/CN1081240A/en
Application granted granted Critical
Publication of CN1057592C publication Critical patent/CN1057592C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The continuous steam generator that has in fact the vertical blast tube that constitutes by vertically disposed pipe.Pipe (3) forms public chamber wall (2) and supports fuel burner in the mineral in this continuous steam generator.The standing rib that has multiple thread to form in the inboard of pipe makes the parallel connection of the cooling agent that flows through in the pipe.According to the present invention, the diameter d of inside pipe wall is the function of merchant k, and by bore d and merchant's k numerical value to the point determined in coordinate system between curve A and the straight line b.Simultaneously, merchant k be under 100% steam efficiency with the total flow M of all pipes girth divided by blast tube in the horizontal cross-section, combustion chamber, and have 4 to determine to put and be positioned on the curve A of continuous rising in the case.It also is very useful less than the continuous steam generator of 500 megawatts that this device is used for rated power.

Description

Continuous steam generator with flue of vertical substantially pipe formation
The present invention relates to have basically the continuous steam generator of the vertical blast tube that the pipe by vertical setting and air-tightness welding each other constitutes, these pipes jointly constitute chamber wall and support fossil-fuel-fired device, the bore of pipe is represented with d and has on inside tube with h to represent rib spacing and represent the rib that the high multi-head spiral of rib constitutes with H that the cooling agent that these ribs will flow through is separated concurrently.
This continuous steam generator that has the vertical piping that constitutes chamber wall is compared the low and pressure loss in addition water/steam of production cost also seldom with those continuous steam generators that are made of the thread-shaped piping.Certainly, in the process of each pipe heat supply, difference can appear inevitably, for example before blowing cigarette ash with afterwards because different slagging degree, temperature difference between each pipe of each evaporimeter exhaust outlet reaches 160 ℃ (european patent applications 0217079), thereby causes unallowed hot pressing loss.In addition, this up to now with piping be cooled to the basis steam generator be only applicable to big unit power, be entitled as " floating pressure operation type forced circulation boiler " at portion (by H with vertical combustion chamber piping, Juzie et al is at VGB power station technology 64,4 to 292 pages of Heft) in the public publication, provided the steam generator with combustion chamber of by vertical piping and bone coal tangential burner hearth constituting of power bracket below 500 megawatts.
Can also draw from this publication, except the internal diameter of pipe, the flux density of cooling agent is a definite value for the traffic engineering design of parallel pipe system in the pipe, and the parallel pipe system has been the effect of evaporimeter generating surface.For constituting combustion chamber and inboard is the spirality piping of plain tube, concrete flux density is provided with its flux density of vertical piping that the pipe of rib constitutes then between 1500 and 2000 kilograms of/square metre seconds by inside between 2000 and 3000 kilograms of/square metre seconds.In these design parameters, the friction pressure drop part is sizable in the overall presure drop of continuous steam generator.Therefore, can make this evaporimeter that typical characteristics are arranged based on described design parameter, promptly the flow in the single pipe reduces under very strong heating condition, and increases at the next flow of more weak heating condition.
These characteristics are to cause the reason that has the big temperature difference between the exhaust outlet of each pipe in having the blast tube of vertical tube.As everyone knows, can an air throttle is installed and/or on the chamber wall top of blast tube outside a mixed collection pipe is set at evaporator inlet in order to reduce this temperature difference, pipe be therein by also carrying out certain heat content compensation by mixing therein.Up to now, when unit power is lower than 500 megawatt hours, all be that chamber wall with described continuous steam generator is designed to the spirality piping, so that can in pipe, keep the required flux density of cooling plain tube and under the situation of big pipe range, realize certain thermal compensation.This mode causes higher and relatively large according to the High Pressure Difference needs that the occurred feed pump power of the production cost of continuous steam generator.
Task of the present invention is low continuous steam generator of production cost and the operating cost that reduces steam generator, meanwhile economically and in the permissible value scope, reduce the temperature difference of evaporimeter exhaust ports, make the range of application of continuous steam generator expand to its unit power in fact below 500 megawatts in addition with the vertical piping that constitutes chamber wall.
According to the present invention, above-mentioned task about continuous steam generator is achieved in that to be that bore d is the function of merchant k, and by the numerical value of bore and merchant k to the point determined in coordinate system between curve A and straight line B.Meanwhile, merchant K is in the girth acquisition of the blast tube horizontal cross-section that records on divided by the tubular axis line in adjacent pipe with the total flow M of all pipes under 100% the evaporation efficiency.With numerical value to corresponding point.
Work as K 1During=3 Kilograms Per Second rice, d 1=12.5 millimeters
Work as K 2During=7 Kilograms Per Second rice, d 2=20.4 millimeters
Work as K 3During=13 Kilograms Per Second rice, d 3=30.6 millimeters and
Work as K 4During=19 Kilograms Per Second rice, d 4=39.0 millimeters
Be positioned on the curve A of continuous rising and by when numerical value to corresponding point.
Work as K 5During=1.8 Kilograms Per Second rice, d 5=14.3 millimeters and
Work as K 6During=7.6 Kilograms Per Second rice, d 6=38.4 millimeters
Determine straight line B.
After steam generator of the present invention suitably designed, the rib spacing h(rice of the rib that is made of multiple thread on inside tube) maximum equals ips d(rice) 0.9 times of root, and the high H of rib should be 0.04 times of bore d at least.
A kind of useful being designed to of the present invention, each is about 30% with the maximum deviation of the corresponding bore d of corresponding bore d of merchant K and merchant K on the curve A.
Curve A and straight line B determine that like this under the situation that does not lose advantage of the present invention, continuous steam generator can move under the littler load that maybe can guarantee continuous operation under the minimum load of fully loaded 50%.
Continuous steam generator is very favorable designed according to this invention, because the flux density that flows through in the pipe is reduced so significantly and so definite bore by this design, promptly make partial drop of pressure (geodaetisch) part in the overall presure drop force the characteristic of once through steam generator to change, according to this variation and design parameter, flow in the pipe increases when strong when single pipe is heated, and when the flow reduction in pipe when more weak of being heated.This new characteristics make vapor (steam) temperature and the tube wall temperature of the chamber wall exhaust ports that formed by evaporator heating surface has been realized significant compensation.
The reduction of flux density has further advantage in the evaporator tube, because under the constant situation of the total flow that flows through the parallel piping of evaporimeter and keeping under the situation of the bore d that equates, the number of tubes with the parallel UNICOM of circulation style on the chamber wall of blast tube is more than what designed in the past naturally.The girth that therefore might make the combustion chamber increases with the ratio of total flow and can make the range of application of the continuous steam generator with vertical tubular chamber wall expand to its power bracket far below 500 megawatts.
Yet in order to guarantee the cooling of each pipe simultaneously, the inside of pipe must be ribbing.And the geometry of rib must be almost in all evapn zone, makes the danger that has water all the time on the inwall of pipe and eliminate thin film evaporation thus by forcing the rotation of cooling agent stream.
Below will be for a more detailed description to the structure of continuous steam generator of the present invention with reference to the accompanying drawings.Shown in each figure:
Fig. 1 is the local figure in horizontal cross-section that passes vertical blast tube,
Fig. 2 is the profilograph that passes a pipe,
Fig. 3 is the coordinate system with curve A and B.
Continuous steam generator with vertical blast tube 1 comprises chamber wall 2.Chamber wall 2 constitutes airtight each other welding (Fig. 1) between the pipe 3 by pipe 3 vertical and that be arranged side by side.The pipe of airtight welding constitutes airtight chamber wall 2 with the structure of pipe-web-pipe or the version of radiating tube (Flossenrohr) each other.
According to Fig. 2, the inboard of pipe 3 is provided with rib 4, and it is the multiple thread of h that rib 4 constitutes rib spacing, and the height of rib is H.The bore d of pipe 3 determines that by the diameter that calculates the garden this garden has the same area that equates in free cross-section of the pipe 3 that limits with rib 4.Bore d and rib spacing h are each other by function h≤0.9
Figure 92109521X_IMG2
And determine that this is in order to adjust ANALYSIS OF COOLANT FLOW with enough big rotation.Simultaneously, the measurement unit of h and d rice.
The chamber wall 2 of vertical blast tube does not support described fossil-fuel-fired device, and fossil fuel are in blast tube 1 internal combustion and produce heat.The heat that generates is absorbed by cooling agent, and cooling agent flows through and constitutes pipe 3 and the evaporation simultaneously that chamber wall 2 constitutes.Under normal circumstances serve as cooling agent with suitable purifying waste water.Rib 4 0.04 times of the about bore d of projection at least in pipe 3, so that the moisture content of flowing coolant passes through inside tube, the water that at first will also exist as liquid at that time in the zone of water evaporates because of the rotation of cooling agent be urged to the inboard of pipe 3, manage 3 like this and the heat that it absorbed can be passed to well liquid and guarantee thus and cool off.
In order to guarantee enough sizes, bore d of the present invention will select according to merchant K.And merchant K is by the total flow (Kilograms Per Second) of all pipes is determined divided by the girth (rice) of blast tube 1 under 100% evaporation efficiency.The girth of blast tube records along dotted line among Fig. 15, and this dotted line is connected with each other the tubular axis of each adjacent pipe 3.
In coordinate system shown in Figure 3, bore d can be used as the function of merchant K and describes.Four points on the curve A by numerical value to providing:
Work as K 1During=3 Kilograms Per Second rice, d 1=12.5 millimeters
Work as K 2During=7 Kilograms Per Second rice, d 2=20.4 millimeters
Work as K 3During=13 Kilograms Per Second rice, d 3=30.6 millimeters and
Work as K 4During=19 Kilograms Per Second rice, d 4=39.0 millimeters
Every bit on the zone between curve A and the straight line B represents that all a numerical value is right, friction pressure drop at that point and partial drop of pressure have suitable proportionate relationship each other, and in general, partial drop of pressure is greater than friction pressure drop, when each pipe absorbs more heats, by the flow increase of pipe.
Therefore, guarantee the pipe cooling, then under the situation of given merchant K, not allow to select arbitrarily bore d.So the numerical value that exists is limited by straight line B the zone in fact usually, this straight line is by corresponding to the right point of numerical value
Work as K 5During=1.8 Kilograms Per Second rice, d 5=14.3 millimeters and
Work as K 6During=7.6 Kilograms Per Second rice, d 6=38.4 millimeters
Determine.Therefore, according to the present invention by bore d and the numerical value that constitutes of merchant K between curve A in coordinate system shown in Figure 3 and the straight line B.
Under disadvantageous especially heating state, with the corresponding bore d of merchant K at the most than the corresponding bore d little 10% of the merchant K on curve A or big by 30%.
By determining to force acquisition to manage flow regime in 3 to the size of bore d with the mode that provides and method, under this flow regime, pressure drop part that is formed by friction in the overall presure drop and the local pressure drop that causes have partly formed a rational proportion relation, that is to say no matter be in full load or in sub-load, sub-load reaches under fully loaded 50% or the lower situation even, be not always the case, since manage in the present invention 3 and blast tube 1 mutually adjusted size, so its rational proportion can be by relatively low, the cooling agent relevant with the amount of cooling agent ensures with the flow velocity that rotatablely moves by force in the axial direction simultaneously.It is that 100% o'clock maximum can reach about 800 kilograms of/square metre seconds and 850 kilograms of/square metre seconds (curve A) that this flow velocity of representing with flux density reaches 25 millimeters and evaporation efficiency at bore d.As bore d during greater than 25 millimeters, flux density increases to some extent and maximum can reach 850 and about 950 kilograms of/square metre seconds (curve A).
The overall presure drop of pipe in 3 that is to say that pressure in the bottom inlet collector pipe and the difference between the pressure in top outlet collector pipe are by friction pressure drop part, partial drop of pressure part with quicken pressure drop and partly lump together and constitute.
When single pipe 3 is accepted more heat with respect to other pipe,, the volume of water-vapor mixing increases owing to increasing the friction pressure drop that makes in this pipe.Because the parallel pipeline that communicates of all on the heating evaporation face of continuous steam generator connects with common inlet collector pipe and conjoint outlet collector pipe and has determined identical pressure drop, so in the pipe of being forced heat, flow is reduced in order to compensate these pressure drop parts.These circulatioies through having reduced flow through from the pipe of being forced heat; The steam exit temperature of its pipe end is more much higher than the temperature of the tube end that is subjected to average heating and weak heating.
In contrast, in the more pipe that is heated, because water-steam plume is very light, so single pipe 3 has been reduced with respect to other tube voltage drop because of evaporation increases.Under the effect of these factors, the flow that flows through the more pipe that is heated increases, and reaches the pressure drop that provides up to the summation of the partial drop of pressure of friction pressure drop that increases and reduction after inlet collector pipe and the associating of outlet collector pipe.For the temperature that makes tube end place steam (vapor) outlet more still keeps very low being heated, desirable method is to increase flow.The influence of partial drop of pressure is the reason that makes the continuous steam generator characteristic changing among the present invention, this change has avoided on evaporimeter pipe end the bigger temperature difference being arranged, and can be utilized higher coolant flow farthest to be compensated by himself because force the single pipe of heat.
Advantage of the present invention is especially obvious in the solid fuel in-line arrangement steam generation device that for example coal burns, because based on the pollution in various degree of combustion chamber wall, single pipe is heated many or few problem exists in a large number.

Claims (7)

1, the continuous steam generator that has the vertical blast tube that the pipe by the welding of air-tightness each other constitutes, fossil-fuel-fired device is housed on this steam generator, wherein the pipe of blast tube is vertically arranged basically, the internal diameter of this pipe is represented with d, the inner face of pipe has rib that is formed by multiple thread and the parallel UNICOM of the cooling agent that will flow through, it is characterized in that
-bore d is the function of merchant K,
-by the numerical value of bore d and merchant K to the point determined in coordinate system between curve A and the straight line B,
-wherein discuss K and be determine by the girth of the blast tube horizontal cross-section that under 100% steam efficiency, records divided by tubular axis line from adjacent pipe with the total flow of all pipes and
-wherein with numerical value to corresponding point:
Work as K 1During=3 Kilograms Per Second rice, d 1=12.5 millimeters
Work as K 2During=7 Kilograms Per Second rice, d 2=20.4 millimeters
Work as K 3During=13 Kilograms Per Second rice, d 3=30.6 millimeters and
Work as K 4During=19 Kilograms Per Second rice, d 4=39.0 millimeters
Be positioned on the curve A of continuous rising and
-wherein with numerical value to corresponding point:
Work as K 5During=1.8 Kilograms Per Second rice, d 5=14.3 millimeters
Work as K 6During=7.6 Kilograms Per Second rice, d 6=38.4 millimeters
Be positioned on the straight line B.
2, according to the continuous steam generator of claim 1, it is characterized in that, its measurement unit of the spacing h(of pipe middle rib is with " rice " expression) maximum equals its measurement unit of ips d(with meter representing) 0.9 times of root, and the height H of the rib that is formed by screw thread equals 0.04 times of bore d at least.
3, according to the continuous steam generator of claim 1 or 2, it is characterized in that, with the corresponding ips d of merchant K with curve A on the corresponding bore d of merchant K compare approximately little at the most 10% or at the most big approximately 30%.
4, according to a described continuous steam generator of claim among the claim 1-3, it is characterized in that minimum load is equal to or less than fully loaded 50% during Continuous Drive.
According to a described continuous steam generator of claim among the claim 1-4, it is characterized in that 5, fossil fuel are coal or other solid fuel.
According to a described continuous steam generator of claim among the claim 1-4, it is characterized in that 6, the electrical power of the generating equipment under this continuous steam generator is in fact less than 500 megawatts.
7, according to a described continuous steam generator of claim among the claim 1-6, it is characterized in that, when ips reaches 25 millimeters, flux density maximum in the pipe (3) is in the scope of 800-850 kilogram/square metre second, and when ips surpassed 25 millimeters, the flux density maximum can be in the scope of about 850-950 kilogram/square metre second.
CN 92109521 1992-07-17 1992-07-17 Vapor generator with flues consist of essencially vertical tubes Expired - Lifetime CN1057592C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92109521 CN1057592C (en) 1992-07-17 1992-07-17 Vapor generator with flues consist of essencially vertical tubes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92109521 CN1057592C (en) 1992-07-17 1992-07-17 Vapor generator with flues consist of essencially vertical tubes

Publications (2)

Publication Number Publication Date
CN1081240A true CN1081240A (en) 1994-01-26
CN1057592C CN1057592C (en) 2000-10-18

Family

ID=4944191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92109521 Expired - Lifetime CN1057592C (en) 1992-07-17 1992-07-17 Vapor generator with flues consist of essencially vertical tubes

Country Status (1)

Country Link
CN (1) CN1057592C (en)

Also Published As

Publication number Publication date
CN1057592C (en) 2000-10-18

Similar Documents

Publication Publication Date Title
RU2442076C1 (en) Method for controlling the process of power production at the power station
CN1126905C (en) Continuous-flow steam generator and method for starting same
CN101311624B (en) Economizer arrangement for steam generator
GB2338991A (en) Compound power-generating plant with superheated high pressure steam
US4998408A (en) Apparatus for generating electrical and/or mechanical energy from at least a low grade fuel
CN1084458C (en) Use of single-lead and multi-lead ribbed tubing for sliding pressure once-through boilers
JP3091220B2 (en) Once-through boiler with vertical flue consisting of tubes arranged almost vertically
US6536380B1 (en) Fossil-fuel heated steam generator, comprising dentrification device for heating gas
US20020157618A1 (en) Fossil-fuel-fired once-through steam generator
JP4489306B2 (en) Fossil fuel once-through boiler
JP3571298B2 (en) Fossil fuel once-through boiler
US6446584B1 (en) Fossil-fuel-fired steam generator
CN1193191C (en) Fossil-fuel fired continuous-flow steam cenerator
CN1057592C (en) Vapor generator with flues consist of essencially vertical tubes
US5839396A (en) Method and apparatus for starting up a continuous-flow steam generator
CN1831426A (en) Supercritical downshot boiler
JP3652988B2 (en) Fossil fuel boiler
CN1234995C (en) Method for reconstructing domestic 1025t/h uniflow boileer with single firebox to control loop boiler as well as equipment
CA2241877C (en) Continuous-flow steam generator with spiral evaporation tubes
CN1232533A (en) Method for operating boiler with forced circulation and boiler for its implementation
US3280798A (en) Steam generator and regenerative air heating system therefor
JP2000205556A (en) Operating method of once-through boiler
KR100209120B1 (en) Steam generator having vertical gas pipe
Cortes et al. Improvements in PF boiler instrumentation for advanced monitoring and modeling of thermal performance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
OR01 Other related matters
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20120717

Granted publication date: 20001018