CN108119702A - A kind of auxiliary system and construction method of underground pipe gallery Pipe installing - Google Patents

A kind of auxiliary system and construction method of underground pipe gallery Pipe installing Download PDF

Info

Publication number
CN108119702A
CN108119702A CN201611070363.8A CN201611070363A CN108119702A CN 108119702 A CN108119702 A CN 108119702A CN 201611070363 A CN201611070363 A CN 201611070363A CN 108119702 A CN108119702 A CN 108119702A
Authority
CN
China
Prior art keywords
pipeline
travelling bogie
piping lane
ladder
trailer wagon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611070363.8A
Other languages
Chinese (zh)
Inventor
王士芳
苏占军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201611070363.8A priority Critical patent/CN108119702A/en
Publication of CN108119702A publication Critical patent/CN108119702A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/036Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Handcart (AREA)

Abstract

The present invention provides a kind of auxiliary system and construction method of underground pipe gallery Pipe installing, including tilting ladder, being arranged at the carrying roller, trailer wagon and the travelling bogie that tilt on ladder, inclination ladder top is fixedly mounted on piping lane and reserves on the upside of transport mouth, ladder bottom is tilted to be fixedly mounted on inside piping lane, trailer wagon and travelling bogie are arranged on inside piping lane, pipeline is dropped to by tilting ladder on trailer wagon, trailer wagon is moved as pipeline declines, until pipe safety is placed on travelling bogie, travelling bogie carries conduit running to pipeline pre-installed position.The beneficial effects of the invention are as follows can effectively reduce transport pipeline or when large equipment enters inside piping lane caused by collide with and personnel's injury accident, pipeline is convenient in piping lane inside transport, saves manpower, improves construction efficiency, reduces construction cost, increases economic efficiency.

Description

A kind of auxiliary system and construction method of underground pipe gallery Pipe installing
Technical field
The invention belongs to underground pipe gallery Pipe installing field, more particularly, to a kind of auxiliary system of underground pipe gallery Pipe installing System and construction method.
Background technology
In the prefabricated underground pipe gallery construction site of non-batch production, it is necessary to will be managed by reserved transport mouth after the completion of piping lane construction Then road and other construction instruments and equipment conveying are installed, lifting pipeline enters inside piping lane, adopts again to inside piping lane The method manually carried transports installation site, and transport is inconvenient, time-consuming and laborious, because reserved opening size is limited, transport is big Part equipment be easy to cause equipment and collides with and personnel's injury accident, and in whole process, the transport there are pipeline or equipment occupies greatly The time of amount and manpower, and it be easy to cause the problems such as colliding with personnel's injury accident.
The content of the invention
The problem to be solved in the present invention is to provide a kind of auxiliary system and construction method of underground pipe gallery Pipe installing, especially Underground pipe gallery pipeline or instrument and equipment is suitble to be used to piping lane inside transport process and pipeline in piping lane inside transport.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of auxiliary system of underground pipe gallery Pipe installing, including tilting ladder, the carrying roller being arranged on inclination ladder, leading Draw trolley and travelling bogie, inclination ladder top is fixedly mounted on piping lane and reserves on the upside of transport mouth, tilts ladder bottom and fixes and pacifies Inside piping lane, trailer wagon and travelling bogie are arranged on inside piping lane, and carrying roller is mounted on by rotation axis and tilted on ladder.Support Roller quantity is multiple, along the parallel uniform arrangement of inclination ladder.
Trailer wagon top is provided with moveable baffle plate, and trailer wagon bottom is provided with universal wheel.
Travelling bogie includes conduit support, stent, stent carrying roller, up and down adjustment device and universal wheel, up and down adjustment dress It puts mounted on the top of travelling bogie, stent is fixedly mounted on the top of up and down adjustment device, and conduit support is fixedly mounted on The medial surface of stent, stent carrying roller are fixedly mounted on the inner surface of stent, and the shape of stent is U-shaped, and universal wheel is mounted on transport The bottom of trolley.
Travelling bogie and trailer wagon quantity are multiple.
A kind of construction method of the auxiliary system of underground pipe gallery Pipe installing, includes the following steps:
Lifting pipeline to piping lane reserves transport mouth the upper surface of;
The pipeline of lifting is entered into piping lane from reserved transport mouth, is declined by tilting transporter;
When pipeline drops on trailer wagon, trailer wagon is with pipeline descending motion, until pipe safety is placed on On travelling bogie;
By travelling bogie row to pre-installing pipeline location, and pipeline is placed on preserved pipeline stent;
The second segment pipe is lifted by step before and places pre-installed position;
Moving cart position carries out two segment pipes counterpart and welds.
The invention has the advantages and positive effects that:Due to the adoption of the above technical scheme, make pipeline or instrument and equipment to Piping lane inside transport and pipeline are more convenient in piping lane inside transport, have simple in structure, high safety, when saving transport Between and manpower, improve construction efficiency, reduce construction cost, the advantages that increasing economic efficiency.
Description of the drawings
Fig. 1 is the structure diagram of the auxiliary system of the present invention
Fig. 2 is the trailer wagon structure diagram of the present invention
Fig. 3 is the travelling bogie structure diagram of the present invention
Fig. 4 is the inclination transporter structure diagram of the present invention
In figure:
1st, transporter 2, trailer wagon 3, travelling bogie are tilted
11st, ladder 21, baffle plate 22, universal wheel are tilted
31st, conduit support 32, up and down adjustment device 33, carrying roller
34th, stent
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1, a kind of auxiliary system of underground pipe gallery Pipe installing, including tilting ladder 11, being arranged at inclination ladder Carrying roller 33, trailer wagon 2 and travelling bogie 3 on frame 11,11 top of inclination ladder are fixedly mounted on piping lane and reserve on transport mouth Side tilts 11 bottom of ladder and is fixedly mounted on inside piping lane, and pipeline is lifted to piping lane by devices such as ropes and reserved on transport mouth, Slowly decline, enter piping lane through reserved transport mouth, decline along ladder is tilted, when pipeline drops on trailer wagon 2, therewith Pipeline continues to decline, drive trailer wagon 2 travel forward, when trailer wagon 2 advance 1/3 pipeline apart from when, travelling bogie 3 moves To below pipeline, until pipe safety is placed on travelling bogie 3, travelling bogie 3 carries pipeline and is moved to pre-installed position, Pipeline is placed on preserved pipeline stent, is further continued for the transport of the second length of tubing.
Wherein, as shown in figure 4, carrying roller 33 is mounted on by rotation axis on inclination ladder 11, carrying roller 33 can pass through rotation Axis is freely rotated on ladder 11 is tilted, and carrying roller 33 can ensure pipeline along inclining along the parallel uniform arrangement of ladder 11 is tilted When oblique transporter 1 moves downward, carrying roller 33 is driven to rotate, it is small to move downward resistance, and can and carrying roller 33 come into full contact with, downwards Operation is more convenient.33 quantity of carrying roller is multiple, does not provide, can voluntarily be selected according to actual demand and construction requirement.
Trailer wagon 2 and travelling bogie 3 are arranged on inside piping lane.Travelling bogie 3 and 2 quantity of trailer wagon be it is multiple, no It provides, can voluntarily be selected according to the demand of construction site, every pipeline at least two travelling bogies 3.
As shown in Fig. 2, 2 top of trailer wagon is provided with moveable baffle plate 21, baffle plate 21 can be small along drawing 2 surface of vehicle move back and forth, when pipeline along tilt transporter 1 move downward, when pipeline one end is dropped on trailer wagon 2, It is contacted with baffle plate 21,21 backstop pipeline one end of baffle plate continues to move, and prevents since pipeline down force is larger, from traction Skidded off on trolley 2, due to pipeline self gravitation effect continue along tilt transporter 1 move downward, drive trailer wagon 2 to Preceding movement, until pipe safety is placed on travelling bogie 3.The frame materials of trailer wagon 2 be channel steel, channel steel comprehensive mechanical Performance is good, and the mechanical performance of trailer wagon 2 and the demand of load-bearing when disclosure satisfy that pipeline transportation, 2 bottom of trailer wagon is provided with Universal wheel 22 can realize that trailer wagon 2 freely moves inside pipeline.When pipeline is completely placed on travelling bogie 3, by Travelling bogie 3 carries pipeline and is moved to pipeline pre-installed position, and trailer wagon 2, which leaves to return to, tilts 1 end of transporter, prepares The transport of next length of tubing.
As shown in figure 3, travelling bogie 3 includes conduit support 31, carrying roller 33, stent 34, up and down adjustment device 32 and ten thousand To wheel 22, up and down adjustment device 32 is mounted on the top of travelling bogie 3, and stent 34 is fixedly mounted on the upper of up and down adjustment device 32 Portion, conduit support 31 are fixedly mounted on the medial surface of stent 34, and carrying roller 33 is fixedly mounted on the inner surface of stent 34, universal Wheel 22 is mounted on the bottom of travelling bogie 3.Travelling bogie 3 can be moved freely by universal wheel 22 inside piping lane.Travelling bogie 3 Material for channel steel, the comprehensive mechanical performance of channel steel is good, disclosure satisfy that load-bearing need of the travelling bogie 3 when carry pipeline transportation It asks.When pipe safety is when being placed on travelling bogie 3, pipeline is placed on stent 34, and the shape of stent 34 is U-shaped, is possessed Reliablely and stablely bearing capacity adapts to the pressure distortion of pipeline and the variation of load, meanwhile, the surface of pipeline and conduit support 31 contacts prevent pipeline left and right on travelling bogie 3 from rolling, carrying roller 33 and tube contacts so that pipeline can be in travelling bogie 3 On slid back and forth along stent 34.Up and down adjustment device 32 is small-sized hydraulic device, according to hydraulic transmission principle, can be realized Stent 34 moves up and down, and presses the foot pedal of hydraulic device so that the adjusting rod of hydraulic device moves upwards, and drives stent 34 It moves up.Due to hydraulic drive stable drive, large carrying capacity, can safe self-locking, can realize overload protection so that fortune For defeated trolley 3 when carrying pipeline and being moved to pipeline pre-installed position, transportational process is steady, is not susceptible to pipeline and drops accident.Fortune When defeated trolley 3 carries pipeline and is moved to pre-installed position, pass through the lifting that hydraulic device realizes pipeline so that pipeline can be put down Steady is placed on preserved pipeline stent, will not generate phenomenon of colliding with.Entire pipeline is moved by travelling bogie 3 inside piping lane When, steady safety.
A kind of construction method of the auxiliary system of underground pipe gallery Pipe installing, includes the following steps:
Pipeline is lifted, the hanging apparatus on bottom surface is sling pipeline by rope vertically, and is moved to piping lane and is reserved transport The upper end of mouth;
The pipeline of lifting is slowly declined from piping lane reserved opening, the lower end of pipeline is contacted with tilting ladder 11, and along inclining Inclined ladder frame 11 moves downward, and is declined by tilting ladder 11;
When pipeline drops on trailer wagon 2, pipeline is contacted with the baffle plate 21 of trailer wagon 2,21 backstop of baffle plate Pipeline continues forward movement, and trailer wagon 2 is driven to travel forward with pipeline descending motion, until pipe safety is placed on On one travelling bogie 3;
After pipeline leaves completely tilts transporter 1, pipeline movement is carried by two or more travelling bogies 3, will be transported Defeated 3 row of trolley adjusts the height of pipeline by adjusting the up and down adjustment device 32 on travelling bogie 3 to pipeline location is pre-installed, Pipeline is placed on preserved pipeline stent;
The second segment pipe is lifted by step before and places pre-installed position;
Mobile 3 position of travelling bogie carries out two segment pipes counterpart and welds.
The invention has the advantages and positive effects that:Due to the adoption of the above technical scheme, make pipeline or instrument and equipment to Piping lane inside transport and pipeline are more convenient in piping lane inside transport, have simple in structure, high safety, save haulage time and Manpower improves construction efficiency, construction cost is reduced, the advantages that increasing economic efficiency.
One embodiment of the present of invention is described in detail above, but the content is only the preferable implementation of the present invention Example, it is impossible to be construed as limiting the practical range of the present invention.All all the changes and improvements made according to the present patent application scope Deng, should all still belong to the present invention patent covering scope within.

Claims (7)

1. a kind of auxiliary system of underground pipe gallery Pipe installing, it is characterised in that:It is tilted including tilting ladder, being arranged on ladder Carrying roller, trailer wagon and travelling bogie, the inclination ladder top be fixedly mounted on piping lane reserve transport mouth on the upside of, it is described Inclination ladder bottom be fixedly mounted on inside piping lane, the carrying roller by rotation axis be mounted on the inclination ladder on, The trailer wagon and the travelling bogie are arranged on inside piping lane.
2. the auxiliary system of underground pipe gallery Pipe installing according to claim 1, it is characterised in that:The carrying roller quantity To be multiple, along the parallel uniform arrangement of inclination ladder.
3. the auxiliary system of underground pipe gallery Pipe installing according to claim 1 or 2, it is characterised in that:The traction Trolley top is provided with moveable baffle plate, and the trailer wagon bottom is provided with universal wheel.
4. the auxiliary system of underground pipe gallery Pipe installing according to claim 1 or 2, it is characterised in that:The transport Trolley includes conduit support, stent, stent carrying roller, up and down adjustment device and universal wheel, up and down adjustment device installation On the top of the travelling bogie, the stent is fixedly mounted on the top of the up and down adjustment device, the pipeline Supporting item is fixedly mounted on the medial surface of the stent, and the stent carrying roller is fixedly mounted on the interior of the stent, described Universal wheel is mounted on the bottom of the travelling bogie.
5. the auxiliary system of underground pipe gallery Pipe installing according to claim 4, it is characterised in that:The shape of the stent Shape is U-shaped.
6. the auxiliary system of underground pipe gallery Pipe installing according to claim 1, it is characterised in that:The travelling bogie It is multiple with the trailer wagon quantity.
7. a kind of construction method of auxiliary system using underground pipe gallery Pipe installing described in claim 1, including walking as follows Suddenly:
Lifting pipeline to piping lane reserves transport mouth the upper surface of;
The pipeline of lifting is entered into piping lane from reserved transport mouth, is declined by the inclination ladder;
When pipeline drops on the trailer wagon, the trailer wagon is with pipeline descending motion, until pipe safety is put It puts on the travelling bogie;
By the travelling bogie row to pre-installing pipeline location, and pipeline is placed on preserved pipeline stent;
The second segment pipe is lifted by step before and is placed on pre-installed position;
The mobile travelling bogie position carries out two segment pipes counterpart and welds.
CN201611070363.8A 2016-11-29 2016-11-29 A kind of auxiliary system and construction method of underground pipe gallery Pipe installing Pending CN108119702A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611070363.8A CN108119702A (en) 2016-11-29 2016-11-29 A kind of auxiliary system and construction method of underground pipe gallery Pipe installing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611070363.8A CN108119702A (en) 2016-11-29 2016-11-29 A kind of auxiliary system and construction method of underground pipe gallery Pipe installing

Publications (1)

Publication Number Publication Date
CN108119702A true CN108119702A (en) 2018-06-05

Family

ID=62225466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611070363.8A Pending CN108119702A (en) 2016-11-29 2016-11-29 A kind of auxiliary system and construction method of underground pipe gallery Pipe installing

Country Status (1)

Country Link
CN (1) CN108119702A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112009960A (en) * 2020-06-30 2020-12-01 上海宝冶集团有限公司 Sliding transportation method of ammonia refrigeration pipeline of snow car ski-track
CN114475753A (en) * 2022-02-15 2022-05-13 中国建筑第四工程局有限公司 Process pipeline and equipment transferring method for confined space of buried sewage plant
CN114833499A (en) * 2022-05-26 2022-08-02 中国核工业第二二建设有限公司 Auxiliary device and method for mounting large-diameter pipeline in limited space of tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040190995A1 (en) * 2003-03-24 2004-09-30 Komatsu Ltd. Pipelayer
CN102101623A (en) * 2009-12-18 2011-06-22 上海市电力公司 Method for transporting and lifting underground substation large-sized equipment
CN103123016A (en) * 2013-02-28 2013-05-29 浙江国联设备工程有限公司 Construction method for laying gas pipelines along bridge
CN205034618U (en) * 2015-08-24 2016-02-17 中国建筑第八工程局有限公司 Underground pipe gallery's pipeline transport device
CN105821904A (en) * 2016-04-07 2016-08-03 上海市政工程设计研究总院(集团)有限公司 Feeding hole structure of underground comprehensive pipe gallery and construction method
CN105984730A (en) * 2015-02-16 2016-10-05 中国二十冶集团有限公司 Pipe transporting method in pipe ditch unloading port

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040190995A1 (en) * 2003-03-24 2004-09-30 Komatsu Ltd. Pipelayer
CN102101623A (en) * 2009-12-18 2011-06-22 上海市电力公司 Method for transporting and lifting underground substation large-sized equipment
CN103123016A (en) * 2013-02-28 2013-05-29 浙江国联设备工程有限公司 Construction method for laying gas pipelines along bridge
CN105984730A (en) * 2015-02-16 2016-10-05 中国二十冶集团有限公司 Pipe transporting method in pipe ditch unloading port
CN205034618U (en) * 2015-08-24 2016-02-17 中国建筑第八工程局有限公司 Underground pipe gallery's pipeline transport device
CN105821904A (en) * 2016-04-07 2016-08-03 上海市政工程设计研究总院(集团)有限公司 Feeding hole structure of underground comprehensive pipe gallery and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112009960A (en) * 2020-06-30 2020-12-01 上海宝冶集团有限公司 Sliding transportation method of ammonia refrigeration pipeline of snow car ski-track
CN114475753A (en) * 2022-02-15 2022-05-13 中国建筑第四工程局有限公司 Process pipeline and equipment transferring method for confined space of buried sewage plant
CN114475753B (en) * 2022-02-15 2024-05-03 中国建筑第四工程局有限公司 Buried sewage plant limited space process pipeline and equipment transferring method
CN114833499A (en) * 2022-05-26 2022-08-02 中国核工业第二二建设有限公司 Auxiliary device and method for mounting large-diameter pipeline in limited space of tunnel

Similar Documents

Publication Publication Date Title
CN108119702A (en) A kind of auxiliary system and construction method of underground pipe gallery Pipe installing
CN212556365U (en) Multi-functional transport trolley of utility tunnel
CN202063137U (en) Double-carrying-cable circulation-type freight cableway system
CN204057752U (en) The outer vacuum refining vehicle frame lifting mode trolley device of a kind of RH stove
CN104210958B (en) A kind of method of vehicle-mounted lifting RH steel ladle and device
CN204778465U (en) Transport frame
CN110173289A (en) A kind of coal mine roadway is multi-faceted from shifting skid shoe type hydraulic support
CN208563005U (en) Guided way, running gear, track, stream carrier vehicle and logistics transportation system
CN206986752U (en) Dilatory steel truss girder rolling dolly
CN207001640U (en) Underground coal conveying arrangement system
CN104787554B (en) A kind of horizontal equipment translating device
CN204823299U (en) Every single move mechanism of formula of lying prone trailer
CN203581022U (en) GIS (geographic information system) equipment conveying device
CN102923426B (en) Rubbish container transferring frame for vertical rubbish transfer station
CN212154200U (en) Purlin delivery wagon of spatial grid structure construction usefulness
CN205312351U (en) Waste transportation station elevating gear
CN209715959U (en) A kind of pipeline cleaner transmitting-receiving ball trolley
CN201605002U (en) Climbing trolley system for belt conveyor maintenance
CN206494541U (en) A kind of special handling facilities of bottled water
CN203319142U (en) Online weighing device of suspension conveying system
CN208746983U (en) A kind of runner device for heavy equipment conveying
CN206590494U (en) A kind of device for changing belt roller
CN206204795U (en) A kind of Hanging Basket with vertical lift limit function
CN204941559U (en) A kind of auxiliary TBM muck removal conveyor walks the bracket system of synchronization lining chassis
CN109532981A (en) A kind of subway tunnel section cable laying transport device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180605