CN108119702A - A kind of auxiliary system and construction method of underground pipe gallery Pipe installing - Google Patents
A kind of auxiliary system and construction method of underground pipe gallery Pipe installing Download PDFInfo
- Publication number
- CN108119702A CN108119702A CN201611070363.8A CN201611070363A CN108119702A CN 108119702 A CN108119702 A CN 108119702A CN 201611070363 A CN201611070363 A CN 201611070363A CN 108119702 A CN108119702 A CN 108119702A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- travelling bogie
- piping lane
- ladder
- trailer wagon
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/036—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Handcart (AREA)
Abstract
The present invention provides a kind of auxiliary system and construction method of underground pipe gallery Pipe installing, including tilting ladder, being arranged at the carrying roller, trailer wagon and the travelling bogie that tilt on ladder, inclination ladder top is fixedly mounted on piping lane and reserves on the upside of transport mouth, ladder bottom is tilted to be fixedly mounted on inside piping lane, trailer wagon and travelling bogie are arranged on inside piping lane, pipeline is dropped to by tilting ladder on trailer wagon, trailer wagon is moved as pipeline declines, until pipe safety is placed on travelling bogie, travelling bogie carries conduit running to pipeline pre-installed position.The beneficial effects of the invention are as follows can effectively reduce transport pipeline or when large equipment enters inside piping lane caused by collide with and personnel's injury accident, pipeline is convenient in piping lane inside transport, saves manpower, improves construction efficiency, reduces construction cost, increases economic efficiency.
Description
Technical field
The invention belongs to underground pipe gallery Pipe installing field, more particularly, to a kind of auxiliary system of underground pipe gallery Pipe installing
System and construction method.
Background technology
In the prefabricated underground pipe gallery construction site of non-batch production, it is necessary to will be managed by reserved transport mouth after the completion of piping lane construction
Then road and other construction instruments and equipment conveying are installed, lifting pipeline enters inside piping lane, adopts again to inside piping lane
The method manually carried transports installation site, and transport is inconvenient, time-consuming and laborious, because reserved opening size is limited, transport is big
Part equipment be easy to cause equipment and collides with and personnel's injury accident, and in whole process, the transport there are pipeline or equipment occupies greatly
The time of amount and manpower, and it be easy to cause the problems such as colliding with personnel's injury accident.
The content of the invention
The problem to be solved in the present invention is to provide a kind of auxiliary system and construction method of underground pipe gallery Pipe installing, especially
Underground pipe gallery pipeline or instrument and equipment is suitble to be used to piping lane inside transport process and pipeline in piping lane inside transport.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of auxiliary system of underground pipe gallery Pipe installing, including tilting ladder, the carrying roller being arranged on inclination ladder, leading
Draw trolley and travelling bogie, inclination ladder top is fixedly mounted on piping lane and reserves on the upside of transport mouth, tilts ladder bottom and fixes and pacifies
Inside piping lane, trailer wagon and travelling bogie are arranged on inside piping lane, and carrying roller is mounted on by rotation axis and tilted on ladder.Support
Roller quantity is multiple, along the parallel uniform arrangement of inclination ladder.
Trailer wagon top is provided with moveable baffle plate, and trailer wagon bottom is provided with universal wheel.
Travelling bogie includes conduit support, stent, stent carrying roller, up and down adjustment device and universal wheel, up and down adjustment dress
It puts mounted on the top of travelling bogie, stent is fixedly mounted on the top of up and down adjustment device, and conduit support is fixedly mounted on
The medial surface of stent, stent carrying roller are fixedly mounted on the inner surface of stent, and the shape of stent is U-shaped, and universal wheel is mounted on transport
The bottom of trolley.
Travelling bogie and trailer wagon quantity are multiple.
A kind of construction method of the auxiliary system of underground pipe gallery Pipe installing, includes the following steps:
Lifting pipeline to piping lane reserves transport mouth the upper surface of;
The pipeline of lifting is entered into piping lane from reserved transport mouth, is declined by tilting transporter;
When pipeline drops on trailer wagon, trailer wagon is with pipeline descending motion, until pipe safety is placed on
On travelling bogie;
By travelling bogie row to pre-installing pipeline location, and pipeline is placed on preserved pipeline stent;
The second segment pipe is lifted by step before and places pre-installed position;
Moving cart position carries out two segment pipes counterpart and welds.
The invention has the advantages and positive effects that:Due to the adoption of the above technical scheme, make pipeline or instrument and equipment to
Piping lane inside transport and pipeline are more convenient in piping lane inside transport, have simple in structure, high safety, when saving transport
Between and manpower, improve construction efficiency, reduce construction cost, the advantages that increasing economic efficiency.
Description of the drawings
Fig. 1 is the structure diagram of the auxiliary system of the present invention
Fig. 2 is the trailer wagon structure diagram of the present invention
Fig. 3 is the travelling bogie structure diagram of the present invention
Fig. 4 is the inclination transporter structure diagram of the present invention
In figure:
1st, transporter 2, trailer wagon 3, travelling bogie are tilted
11st, ladder 21, baffle plate 22, universal wheel are tilted
31st, conduit support 32, up and down adjustment device 33, carrying roller
34th, stent
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1, a kind of auxiliary system of underground pipe gallery Pipe installing, including tilting ladder 11, being arranged at inclination ladder
Carrying roller 33, trailer wagon 2 and travelling bogie 3 on frame 11,11 top of inclination ladder are fixedly mounted on piping lane and reserve on transport mouth
Side tilts 11 bottom of ladder and is fixedly mounted on inside piping lane, and pipeline is lifted to piping lane by devices such as ropes and reserved on transport mouth,
Slowly decline, enter piping lane through reserved transport mouth, decline along ladder is tilted, when pipeline drops on trailer wagon 2, therewith
Pipeline continues to decline, drive trailer wagon 2 travel forward, when trailer wagon 2 advance 1/3 pipeline apart from when, travelling bogie 3 moves
To below pipeline, until pipe safety is placed on travelling bogie 3, travelling bogie 3 carries pipeline and is moved to pre-installed position,
Pipeline is placed on preserved pipeline stent, is further continued for the transport of the second length of tubing.
Wherein, as shown in figure 4, carrying roller 33 is mounted on by rotation axis on inclination ladder 11, carrying roller 33 can pass through rotation
Axis is freely rotated on ladder 11 is tilted, and carrying roller 33 can ensure pipeline along inclining along the parallel uniform arrangement of ladder 11 is tilted
When oblique transporter 1 moves downward, carrying roller 33 is driven to rotate, it is small to move downward resistance, and can and carrying roller 33 come into full contact with, downwards
Operation is more convenient.33 quantity of carrying roller is multiple, does not provide, can voluntarily be selected according to actual demand and construction requirement.
Trailer wagon 2 and travelling bogie 3 are arranged on inside piping lane.Travelling bogie 3 and 2 quantity of trailer wagon be it is multiple, no
It provides, can voluntarily be selected according to the demand of construction site, every pipeline at least two travelling bogies 3.
As shown in Fig. 2, 2 top of trailer wagon is provided with moveable baffle plate 21, baffle plate 21 can be small along drawing
2 surface of vehicle move back and forth, when pipeline along tilt transporter 1 move downward, when pipeline one end is dropped on trailer wagon 2,
It is contacted with baffle plate 21,21 backstop pipeline one end of baffle plate continues to move, and prevents since pipeline down force is larger, from traction
Skidded off on trolley 2, due to pipeline self gravitation effect continue along tilt transporter 1 move downward, drive trailer wagon 2 to
Preceding movement, until pipe safety is placed on travelling bogie 3.The frame materials of trailer wagon 2 be channel steel, channel steel comprehensive mechanical
Performance is good, and the mechanical performance of trailer wagon 2 and the demand of load-bearing when disclosure satisfy that pipeline transportation, 2 bottom of trailer wagon is provided with
Universal wheel 22 can realize that trailer wagon 2 freely moves inside pipeline.When pipeline is completely placed on travelling bogie 3, by
Travelling bogie 3 carries pipeline and is moved to pipeline pre-installed position, and trailer wagon 2, which leaves to return to, tilts 1 end of transporter, prepares
The transport of next length of tubing.
As shown in figure 3, travelling bogie 3 includes conduit support 31, carrying roller 33, stent 34, up and down adjustment device 32 and ten thousand
To wheel 22, up and down adjustment device 32 is mounted on the top of travelling bogie 3, and stent 34 is fixedly mounted on the upper of up and down adjustment device 32
Portion, conduit support 31 are fixedly mounted on the medial surface of stent 34, and carrying roller 33 is fixedly mounted on the inner surface of stent 34, universal
Wheel 22 is mounted on the bottom of travelling bogie 3.Travelling bogie 3 can be moved freely by universal wheel 22 inside piping lane.Travelling bogie 3
Material for channel steel, the comprehensive mechanical performance of channel steel is good, disclosure satisfy that load-bearing need of the travelling bogie 3 when carry pipeline transportation
It asks.When pipe safety is when being placed on travelling bogie 3, pipeline is placed on stent 34, and the shape of stent 34 is U-shaped, is possessed
Reliablely and stablely bearing capacity adapts to the pressure distortion of pipeline and the variation of load, meanwhile, the surface of pipeline and conduit support
31 contacts prevent pipeline left and right on travelling bogie 3 from rolling, carrying roller 33 and tube contacts so that pipeline can be in travelling bogie 3
On slid back and forth along stent 34.Up and down adjustment device 32 is small-sized hydraulic device, according to hydraulic transmission principle, can be realized
Stent 34 moves up and down, and presses the foot pedal of hydraulic device so that the adjusting rod of hydraulic device moves upwards, and drives stent 34
It moves up.Due to hydraulic drive stable drive, large carrying capacity, can safe self-locking, can realize overload protection so that fortune
For defeated trolley 3 when carrying pipeline and being moved to pipeline pre-installed position, transportational process is steady, is not susceptible to pipeline and drops accident.Fortune
When defeated trolley 3 carries pipeline and is moved to pre-installed position, pass through the lifting that hydraulic device realizes pipeline so that pipeline can be put down
Steady is placed on preserved pipeline stent, will not generate phenomenon of colliding with.Entire pipeline is moved by travelling bogie 3 inside piping lane
When, steady safety.
A kind of construction method of the auxiliary system of underground pipe gallery Pipe installing, includes the following steps:
Pipeline is lifted, the hanging apparatus on bottom surface is sling pipeline by rope vertically, and is moved to piping lane and is reserved transport
The upper end of mouth;
The pipeline of lifting is slowly declined from piping lane reserved opening, the lower end of pipeline is contacted with tilting ladder 11, and along inclining
Inclined ladder frame 11 moves downward, and is declined by tilting ladder 11;
When pipeline drops on trailer wagon 2, pipeline is contacted with the baffle plate 21 of trailer wagon 2,21 backstop of baffle plate
Pipeline continues forward movement, and trailer wagon 2 is driven to travel forward with pipeline descending motion, until pipe safety is placed on
On one travelling bogie 3;
After pipeline leaves completely tilts transporter 1, pipeline movement is carried by two or more travelling bogies 3, will be transported
Defeated 3 row of trolley adjusts the height of pipeline by adjusting the up and down adjustment device 32 on travelling bogie 3 to pipeline location is pre-installed,
Pipeline is placed on preserved pipeline stent;
The second segment pipe is lifted by step before and places pre-installed position;
Mobile 3 position of travelling bogie carries out two segment pipes counterpart and welds.
The invention has the advantages and positive effects that:Due to the adoption of the above technical scheme, make pipeline or instrument and equipment to
Piping lane inside transport and pipeline are more convenient in piping lane inside transport, have simple in structure, high safety, save haulage time and
Manpower improves construction efficiency, construction cost is reduced, the advantages that increasing economic efficiency.
One embodiment of the present of invention is described in detail above, but the content is only the preferable implementation of the present invention
Example, it is impossible to be construed as limiting the practical range of the present invention.All all the changes and improvements made according to the present patent application scope
Deng, should all still belong to the present invention patent covering scope within.
Claims (7)
1. a kind of auxiliary system of underground pipe gallery Pipe installing, it is characterised in that:It is tilted including tilting ladder, being arranged on ladder
Carrying roller, trailer wagon and travelling bogie, the inclination ladder top be fixedly mounted on piping lane reserve transport mouth on the upside of, it is described
Inclination ladder bottom be fixedly mounted on inside piping lane, the carrying roller by rotation axis be mounted on the inclination ladder on,
The trailer wagon and the travelling bogie are arranged on inside piping lane.
2. the auxiliary system of underground pipe gallery Pipe installing according to claim 1, it is characterised in that:The carrying roller quantity
To be multiple, along the parallel uniform arrangement of inclination ladder.
3. the auxiliary system of underground pipe gallery Pipe installing according to claim 1 or 2, it is characterised in that:The traction
Trolley top is provided with moveable baffle plate, and the trailer wagon bottom is provided with universal wheel.
4. the auxiliary system of underground pipe gallery Pipe installing according to claim 1 or 2, it is characterised in that:The transport
Trolley includes conduit support, stent, stent carrying roller, up and down adjustment device and universal wheel, up and down adjustment device installation
On the top of the travelling bogie, the stent is fixedly mounted on the top of the up and down adjustment device, the pipeline
Supporting item is fixedly mounted on the medial surface of the stent, and the stent carrying roller is fixedly mounted on the interior of the stent, described
Universal wheel is mounted on the bottom of the travelling bogie.
5. the auxiliary system of underground pipe gallery Pipe installing according to claim 4, it is characterised in that:The shape of the stent
Shape is U-shaped.
6. the auxiliary system of underground pipe gallery Pipe installing according to claim 1, it is characterised in that:The travelling bogie
It is multiple with the trailer wagon quantity.
7. a kind of construction method of auxiliary system using underground pipe gallery Pipe installing described in claim 1, including walking as follows
Suddenly:
Lifting pipeline to piping lane reserves transport mouth the upper surface of;
The pipeline of lifting is entered into piping lane from reserved transport mouth, is declined by the inclination ladder;
When pipeline drops on the trailer wagon, the trailer wagon is with pipeline descending motion, until pipe safety is put
It puts on the travelling bogie;
By the travelling bogie row to pre-installing pipeline location, and pipeline is placed on preserved pipeline stent;
The second segment pipe is lifted by step before and is placed on pre-installed position;
The mobile travelling bogie position carries out two segment pipes counterpart and welds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611070363.8A CN108119702A (en) | 2016-11-29 | 2016-11-29 | A kind of auxiliary system and construction method of underground pipe gallery Pipe installing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611070363.8A CN108119702A (en) | 2016-11-29 | 2016-11-29 | A kind of auxiliary system and construction method of underground pipe gallery Pipe installing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108119702A true CN108119702A (en) | 2018-06-05 |
Family
ID=62225466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611070363.8A Pending CN108119702A (en) | 2016-11-29 | 2016-11-29 | A kind of auxiliary system and construction method of underground pipe gallery Pipe installing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108119702A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112009960A (en) * | 2020-06-30 | 2020-12-01 | 上海宝冶集团有限公司 | Sliding transportation method of ammonia refrigeration pipeline of snow car ski-track |
CN114475753A (en) * | 2022-02-15 | 2022-05-13 | 中国建筑第四工程局有限公司 | Process pipeline and equipment transferring method for confined space of buried sewage plant |
CN114833499A (en) * | 2022-05-26 | 2022-08-02 | 中国核工业第二二建设有限公司 | Auxiliary device and method for mounting large-diameter pipeline in limited space of tunnel |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040190995A1 (en) * | 2003-03-24 | 2004-09-30 | Komatsu Ltd. | Pipelayer |
CN102101623A (en) * | 2009-12-18 | 2011-06-22 | 上海市电力公司 | Method for transporting and lifting underground substation large-sized equipment |
CN103123016A (en) * | 2013-02-28 | 2013-05-29 | 浙江国联设备工程有限公司 | Construction method for laying gas pipelines along bridge |
CN205034618U (en) * | 2015-08-24 | 2016-02-17 | 中国建筑第八工程局有限公司 | Underground pipe gallery's pipeline transport device |
CN105821904A (en) * | 2016-04-07 | 2016-08-03 | 上海市政工程设计研究总院(集团)有限公司 | Feeding hole structure of underground comprehensive pipe gallery and construction method |
CN105984730A (en) * | 2015-02-16 | 2016-10-05 | 中国二十冶集团有限公司 | Pipe transporting method in pipe ditch unloading port |
-
2016
- 2016-11-29 CN CN201611070363.8A patent/CN108119702A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040190995A1 (en) * | 2003-03-24 | 2004-09-30 | Komatsu Ltd. | Pipelayer |
CN102101623A (en) * | 2009-12-18 | 2011-06-22 | 上海市电力公司 | Method for transporting and lifting underground substation large-sized equipment |
CN103123016A (en) * | 2013-02-28 | 2013-05-29 | 浙江国联设备工程有限公司 | Construction method for laying gas pipelines along bridge |
CN105984730A (en) * | 2015-02-16 | 2016-10-05 | 中国二十冶集团有限公司 | Pipe transporting method in pipe ditch unloading port |
CN205034618U (en) * | 2015-08-24 | 2016-02-17 | 中国建筑第八工程局有限公司 | Underground pipe gallery's pipeline transport device |
CN105821904A (en) * | 2016-04-07 | 2016-08-03 | 上海市政工程设计研究总院(集团)有限公司 | Feeding hole structure of underground comprehensive pipe gallery and construction method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112009960A (en) * | 2020-06-30 | 2020-12-01 | 上海宝冶集团有限公司 | Sliding transportation method of ammonia refrigeration pipeline of snow car ski-track |
CN114475753A (en) * | 2022-02-15 | 2022-05-13 | 中国建筑第四工程局有限公司 | Process pipeline and equipment transferring method for confined space of buried sewage plant |
CN114475753B (en) * | 2022-02-15 | 2024-05-03 | 中国建筑第四工程局有限公司 | Buried sewage plant limited space process pipeline and equipment transferring method |
CN114833499A (en) * | 2022-05-26 | 2022-08-02 | 中国核工业第二二建设有限公司 | Auxiliary device and method for mounting large-diameter pipeline in limited space of tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108119702A (en) | A kind of auxiliary system and construction method of underground pipe gallery Pipe installing | |
CN212556365U (en) | Multi-functional transport trolley of utility tunnel | |
CN202063137U (en) | Double-carrying-cable circulation-type freight cableway system | |
CN204057752U (en) | The outer vacuum refining vehicle frame lifting mode trolley device of a kind of RH stove | |
CN104210958B (en) | A kind of method of vehicle-mounted lifting RH steel ladle and device | |
CN204778465U (en) | Transport frame | |
CN110173289A (en) | A kind of coal mine roadway is multi-faceted from shifting skid shoe type hydraulic support | |
CN208563005U (en) | Guided way, running gear, track, stream carrier vehicle and logistics transportation system | |
CN206986752U (en) | Dilatory steel truss girder rolling dolly | |
CN207001640U (en) | Underground coal conveying arrangement system | |
CN104787554B (en) | A kind of horizontal equipment translating device | |
CN204823299U (en) | Every single move mechanism of formula of lying prone trailer | |
CN203581022U (en) | GIS (geographic information system) equipment conveying device | |
CN102923426B (en) | Rubbish container transferring frame for vertical rubbish transfer station | |
CN212154200U (en) | Purlin delivery wagon of spatial grid structure construction usefulness | |
CN205312351U (en) | Waste transportation station elevating gear | |
CN209715959U (en) | A kind of pipeline cleaner transmitting-receiving ball trolley | |
CN201605002U (en) | Climbing trolley system for belt conveyor maintenance | |
CN206494541U (en) | A kind of special handling facilities of bottled water | |
CN203319142U (en) | Online weighing device of suspension conveying system | |
CN208746983U (en) | A kind of runner device for heavy equipment conveying | |
CN206590494U (en) | A kind of device for changing belt roller | |
CN206204795U (en) | A kind of Hanging Basket with vertical lift limit function | |
CN204941559U (en) | A kind of auxiliary TBM muck removal conveyor walks the bracket system of synchronization lining chassis | |
CN109532981A (en) | A kind of subway tunnel section cable laying transport device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180605 |