CN108118699A - Can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine - Google Patents
Can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine Download PDFInfo
- Publication number
- CN108118699A CN108118699A CN201810029042.6A CN201810029042A CN108118699A CN 108118699 A CN108118699 A CN 108118699A CN 201810029042 A CN201810029042 A CN 201810029042A CN 108118699 A CN108118699 A CN 108118699A
- Authority
- CN
- China
- Prior art keywords
- auxiliary
- clamping
- plate
- steel sheet
- sheet pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The present invention relates to can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine, including bottom plate, the lower end of bottom plate is equipped with mobile fixture, the upper end of bottom plate, which is equipped with, pulls out clamping device, placing box is installed on bottom plate, placing box is located at the underface for pulling out clamping device, and the mobile fixture includes two mobile auxiliary bodies being mounted on bottom plate, and two mobile auxiliary bodies are symmetrically positioned in the left and right sides of bottom plate.The present invention can solve existing bridge construction cofferdam and apply and needs manually to pull out steel sheet pile by existing equipment lifting equipment present in steel sheet pile demolishing process, it needs that manually steel sheet pile is fixed, need artificial conveyance pull out after steel sheet pile, it is unstable manually steel sheet pile to be pulled out by existing lifting equipment, artificial fixation steel plate stake stability is poor, and there are security risk, and lifting equipment movement bothers, it needs manually to be fixed in work, influences steel sheet pile and pull out operation.
Description
Technical field
The present invention relates to water conservancy lake technical field, specifically can efficient stable pull out the water of steel structure body steel sheet pile
Sharp lake flood bank builds machine.
Background technology
Steel sheet pile is that a kind of edge carries linkage, and this linkage can be freely combined to form a kind of company
Continue the steel structure body of close earth-retaining or waterwall, steel sheet pile is a kind of shaped steel with fore shaft, and section has U-shaped and Z-shaped
Deng having full range of sizes and interlocking form.It common are Ademilson formula of drawing, clarke Wan Nashi etc..Its advantage is:Intensity is high, holds
Easily squeeze into hard soil layer;Can be in deep subaqueous work, if necessary plus bearing diagonal becomes an inclosure.Water resistance is good;It can be on demand
The cofferdam of various shapes is formed, it is widely used in during water conservancy lake flood bank builds, and steel sheet pile construction is simple, appoints for building
For business, the requirement to space can be reduced, necessary security can be provided using steel sheet pile and timeliness is stronger;Use steel plate
Stake can be from the restriction of weather condition;During steel sheet pile is used, the complexity for checking material or system performance can be simplified
Program ensures its adaptability, and interchangeability is good, and may be reused, and can recycle and reuse, and saves fund, water conservancy work
Steel sheet pile is that construction is essential link during Cheng Xiujian, and steel sheet pile is to repeat to utilize material, bridge construction
It needs manually to pull out steel sheet pile by existing equipment lifting equipment in journey, it is necessary to manually steel sheet pile be fixed, need
Want artificial conveyance pull out after steel sheet pile, unstable, artificial fixation steel plate of manually pulling out steel sheet pile by existing lifting equipment
Stake stability is poor, and there are security risks, are manually adjusted accordingly for the steel sheet pile needs of different size, complicated for operation,
And lifting equipment movement trouble, it needs manually to be fixed in work, influences steel sheet pile and pull out operation, labor intensity is big, expends
Time length is low with work efficiency.
The content of the invention
To solve the above-mentioned problems, the present invention provides can efficient stable pull out the water conservancy lake of steel structure body steel sheet pile and prevent
Big vast dike builds machine, can solve existing bridge construction cofferdam apply needed present in steel sheet pile demolishing process manually by existing equipment rise
Heavy equipment steel sheet pile is pulled out, it is necessary to manually steel sheet pile is fixed, it is necessary to artificial conveyance pull out after steel sheet pile, people
Work pulls out that steel sheet pile is unstable, and artificial fixation steel plate stake stability is poor by existing lifting equipment, there are security risk, for
The steel sheet pile needs of different size are manually adjusted accordingly, complicated for operation, and lifting equipment movement trouble, are needed in work
It is manually fixed, influences steel sheet pile and pull out operation, labor intensity is big, expends the time grows the problems such as low with work efficiency;It can be with
It realizes the function that bridge construction cofferdam construction Steel Sheet Pile high-efficiency stable is pulled out, without human intervention, there is no security risk, and has
Have it is easy to operate, save that time, stability is good, labor intensity advantages low with work efficiency etc. greatly.
To achieve these goals, the present invention is realized using following technical scheme:Can efficient stable pull out steel structure body
The water conservancy lake flood bank of steel sheet pile builds machine, and including bottom plate, the lower end of bottom plate is equipped with mobile fixture, the upper end of bottom plate
It is equipped with and pulls out clamping device, placing box is installed on bottom plate, placing box is located at the underface for pulling out clamping device, and placing box is to pulling out
The steel sheet pile removed plays the role of collection, and mobile fixture can be ensured that stabilization of the present invention in steel sheet pile operation is pulled out
Property, the steel sheet pile pulled out to needs that pulling out clamping device can stablize during the work time carries out stable clamping, so as to really
It protects steel sheet pile and pulls out the reliability of operation, mobile fixture and pull out clamping device and be used in conjunction with each other completion bridge construction cofferdam and apply
The technique that work Steel Sheet Pile high-efficiency stable is pulled out.
The mobile fixture includes two mobile auxiliary bodies being mounted on bottom plate, two mobile auxiliary bodies pair
Claim positioned at the left and right sides of bottom plate, bottom plate is equipped with moving lifting control cylinder, and the top of moving lifting control cylinder passes through method
Orchid is mounted on moving lifting control panel, and bottom plate is mounted on crawler belt locomotive, and crawler belt locomotive can drive the present invention multiple
It is moved in miscellaneous work, it is mobile simple, the working depth of the cylinder control present invention, two movements are controlled by moving lifting
Auxiliary body can ensure that the present invention can fix on the ground during steel sheet pile operation is pulled out, and will not send out at work
Raw inclination etc. influences the movement that steel sheet pile pulls out operation, without human intervention, reduces the labor intensity of staff, improves
The efficiency of work.
The clamping device of pulling out includes pulling out switching mechanism on moving lifting control panel, pulls out switching mechanism
Upper setting pulls out adjusting mechanism for two and is located at the front and rear sides for pulling out switching mechanism in opposite directions, pull out there are two adjusting mechanism is pulled out
Switching mechanism can control the course of work for pulling out adjusting mechanism during work, can automate the steel sheet pile to pulling out
Conveying operation is carried out, the steel sheet pile specification that pulling out adjusting mechanism can pull out as needed during work is automated
Adjust, so as to ensure that clamping operation can be fixed in the steel sheet pile for different size, without manually carry out to steel sheet pile into
Row is fixed, easy to operate, is reduced the labor intensity of staff, is improved the efficiency of work.
The mobile auxiliary body includes the auxiliary electric rotating machine being mounted on by motor cabinet on bottom plate, aids in electric rotating machine
Output shaft on auxiliary swivel plate is installed, aid in by bearing with one end of auxiliary drive plate being connected on the side wall of swivel plate,
The other end of auxiliary drive plate is connected to by bearing on the side wall of auxiliary linkage board, and the lower end of linkage board is aided in match somebody with somebody by sliding
Conjunction mode is mounted on auxiliary rotating seat, and auxiliary rotating seat is mounted on bottom plate, the outside of auxiliary drive plate by axis pin with it is auxiliary
The top of adjustable plate is helped to be connected, the middle part of auxiliary adjustment is connected to by axis pin on bottom plate, and auxiliary adjustment plate is of an L-shaped structure, and
Auxiliary stopper slot is provided on the side wall of auxiliary adjustment plate, auxiliary stopper branch, auxiliary adjustment plate are provided in auxiliary stopper slot
Lower end be provided with auxiliary control flume, aid in being provided with auxiliary control branch in control flume;The auxiliary stopper branch includes peace
Auxiliary stopper frame on bottom plate, auxiliary stopper frame are located in auxiliary stopper slot, and auxiliary stopper frame is in convex structure, and auxiliary
The shape for helping position-limited rack is corresponding with the direction of motion of auxiliary stopper slot, and auxiliary positioning slot is evenly arranged on auxiliary stopper frame,
Sub-barrier is provided on the side wall of auxiliary adjustment plate, auxiliary stopper cylinder, auxiliary stopper are installed on the side wall of sub-barrier
The top of cylinder is mounted on by flange on auxiliary positioning block, and auxiliary positioning block is corresponding with auxiliary positioning slot;The auxiliary control
The auxiliary that branch processed includes being mounted on by motor cabinet on auxiliary adjustment plate controls motor, and the output shaft of auxiliary control motor passes through
Shaft coupling is connected with one end of auxiliary rotating roller, and the other end of rotating roller is aided in be mounted on by bearing on accessory mounting plate, auxiliary
Installing plate is helped to be mounted on auxiliary adjustment plate, the outer wall of rotating roller is aided in be resisted against on auxiliary follower plate, is aided under follower plate
There are two auxiliary stopper bar, two auxiliary stopper bars are symmetrically positioned in the front and rear sides of auxiliary positioning slot for end installation, positioned at auxiliary from
It is arranged on each auxiliary stopper bar between movable plate and auxiliary adjustment plate there are one spring-assisted reduction, aided under follower plate
End is uniformly provided with auxiliary fixed link, and auxiliary fixed link is located in auxiliary positioning slot, by aiding in electric rotating machine band dynamic auxiliary
Driving plate is rotated, and auxiliary drive strip dynamic auxiliary adjustable plate adjusted in auxiliary stopper frame into row position, passes through auxiliary
Limiting cylinder drives auxiliary positioning block to move in auxiliary positioning slot and auxiliary adjustment plate is fixed into row position, it is ensured that auxiliary adjustment
The lower end of plate and ground keeping parallelism, by the way that control motor band dynamic auxiliary rotating roller is aided in be rotated, auxiliary rotating roller is turning
Change the contact position with auxiliary follower plate in dynamic process, auxiliary follower plate is in spring-assisted reduction with aiding in matching somebody with somebody for rotating roller
Lower band dynamic auxiliary fixed link is closed to be inserted into ground, it is fixed so as to play the role of to the present invention, it can be ensured that the present invention exists
It will not be slided during pulling out steel sheet pile operation, improve the stability of work.
The position electric rotating machine pulled out switching mechanism and be mounted on including passing through motor cabinet on moving lifting control panel, position
It puts to be equipped on the output shaft of electric rotating machine and pulls out support plate, annular groove, annular groove are installed on moving lifting control panel
Interior to be connected with rotary support frame by sliding matching mode, rotary support frame is mounted on and pulls out in support plate, pulls out support plate
Rear end, which is provided with, pulls out regulating tank, and the upper end for pulling out support plate is equipped with and pulls out riser, pulls out to be equipped on the side wall of riser and pull out
Except telescopic cylinder, the top for pulling out telescopic cylinder is mounted on by flange and pulls out on adjusting bracket, is pulled out adjusting bracket and is located at and pulls out tune
It saves in slot, the upper end for pulling out adjusting bracket is equipped with and pulls out fixed frame, and the lower end for pulling out fixed frame is provided with and pulls out control flume, pulls out
Control flume is symmetrically positioned in the front and rear sides for pulling out fixed frame, and the upper end for pulling out fixed frame is equipped with and pulls out lifting cylinder, pulls out liter
The top of sending down abnormally ascending cylinder is mounted on by flange and pulled out on lifter plate, and pulling out support plate by the drive of position electric rotating machine is rotated
It adjusts, rotary support frame, which is used in conjunction with each other to aid in pulling out support plate with annular groove, to be rotated, while is propped up pulling out
Fagging plays the role of support, pulls out adjusting bracket progress telescopic adjustment by pulling out telescopic cylinder control, pulls out lifting cylinder
Control pulls out lifter plate and carries out elevating movement so as to drive two to pull out adjusting mechanism to steel sheet pile progress clamping operation, without people
Work operates, and reduces the labor intensity of staff, improves the efficiency of work.
The adjusting mechanism of pulling out includes being connected to pull out by axis pin pulling out installing plate on lifter plate, pulls out installing plate
On be provided with and pull out sliding groove, pull out installing plate and be located at and pull out in control flume, pull out to be equipped in control flume and pull out control shaft, pull out
It is pulled out except control shaft is located in sliding groove, the lower end installation settings for pulling out installing plate has clamping limit hole, pulls out the outer of installing plate
Clamping adjusting bracket on wall is installed, clamps the U-shaped structure of adjusting bracket, clamps and limiting slot is clamped there are two being set on adjusting bracket, two
A clamping limiting slot is symmetrically positioned in the both sides up and down of clamping adjusting bracket, clamps and is equipped with folder by motor cabinet on the inner wall of adjusting bracket
Regulation motor is held, clamps and is connected on the output shaft of regulation motor by shaft coupling with clamping one end of adjusting screw, clamping is adjusted
The other end of leading screw is mounted on by bearing and pulled out on installing plate, clamps and clamping control block is provided on adjusting screw, clamping control
It is set on clamp dog there are two clamping position plate, two clamping position plates are symmetrically positioned in the both sides up and down of clamping control block, and clamping is fixed
Position plate is located in clamping limiting slot, and clamping position plate cooperates with clamping limiting slot and moves, and clamps and pacifies on the side wall of control block
Equipped with clamping sliding bar, clamping sliding bar is located in clamping limit hole, and clamping sliding bar is mounted on clamping position frame, and clamping is fixed
Position frame is of an L-shaped structure, and clamping lifting cylinder is equipped on the inner wall of clamping position frame, the top for clamping lifting cylinder passes through flange
On clamping falsework, clamp and rubber friction block is provided on the outer wall of falsework;On the outer wall of the clamping control block
It is provided with by axis pin and pulls out position-limited rack, pulled out and be connected on the side wall of position-limited rack by axis pin with pulling out the top of limiting cylinder,
The bottom for pulling out limiting cylinder is mounted on by axis pin in clamping control block, is clamped uniformly to be provided on adjusting bracket and is pulled out /V
Slot, pulls out limiting slot and pulls out position-limited rack and cooperate and move, and pulls out lifter plate and is driven during movement and pulls out installing plate
Move to it is vertical with ground holding, by clamp regulation motor drive clamping control block move linearly, clamping position plate with
Clamping limiting slot cooperates to move plays the role of /V to clamping control block, pulls out limiting cylinder control and pulls out position-limited rack
With pull out limiting slot cooperate movement to clamping control block into row position position, clamping falsework to the progress of steel sheet pile against
Clamping, rubber friction block can increase the frictional force to steel sheet pile during clamping, so as to can to steel sheet pile progress
By stable clamping operation, clamping is fixed in the steel sheet pile that can be directed to different size, without manually consolidating to steel sheet pile
It is fixed, the labor intensity of staff is reduced, improves the efficiency of work.
During work, the crawler belt locomotive first on mobile fixture drives the present invention to be moved to the operating position specified,
The working depth of the cylinder control present invention is controlled by moving lifting, mobile auxiliary body's work is driven by auxiliary stopper cylinder
Auxiliary positioning block moves in auxiliary positioning slot and auxiliary adjustment plate is fixed into row position, it is ensured that the lower end of auxiliary adjustment plate and ground
Face keeping parallelism, by the way that control motor band dynamic auxiliary rotating roller is aided in be rotated, auxiliary rotating roller changes during rotation
Become the contact position with auxiliary follower plate, auxiliary follower plate is in spring-assisted reduction and the cooperation lower band dynamic auxiliary of auxiliary rotating roller
Fixed link is inserted into ground, fixed so as to play the role of to the present invention, is pulled out clamping device start-up operation, is pulled out conversion
Mechanism pulls out support plate by the drive of position electric rotating machine and carries out rotation adjusting, and rotary support frame makes with annular groove mutual cooperation
It is rotated with that can aid in pulling out support plate, while plays the role of support to pulling out support plate, by pulling out flexible gas
Cylinder control pulls out adjusting bracket and carries out telescopic adjustment, pulls out lifting cylinder control and pulls out lifter plate progress elevating movement so as to drive two
A adjusting mechanism of pulling out carries out clamping operation to steel sheet pile, pull out on adjusting mechanism to pull out limiting slot mutual with pulling out position-limited rack
Routing motion is pulled out lifter plate and is driven during movement and pull out installing plate and move to vertical with ground holding, passes through clamping
Regulation motor drives clamping control block to move linearly, and clamping position plate controls clamping with clamping limiting slot mutual cooperation movement
Clamp dog plays the role of /V, pulls out limiting cylinder control and pulls out position-limited rack and pull out limiting slot mutual cooperation movement to clamping
Control block is into row position position, and clamping falsework is to the progress of steel sheet pile against clamping, and rubber friction block is during clamping
The frictional force to steel sheet pile can be increased, so as to carry out reliable and stable clamping operation to steel sheet pile, can realize bridge construction
The function that cofferdam construction Steel Sheet Pile high-efficiency stable is pulled out.
The beneficial effects of the invention are as follows:
1st, the present invention can solve existing bridge construction cofferdam and apply to need present in steel sheet pile demolishing process manually by existing
Equipment lifting equipment steel sheet pile is pulled out, it is necessary to manually steel sheet pile is fixed, it is necessary to artificial conveyance pull out after steel
Sheet pile, manually pulls out that steel sheet pile is unstable, and artificial fixation steel plate stake stability is poor by existing lifting equipment, and it is hidden to there is safety
Suffer from, manually adjusted accordingly for the steel sheet pile needs of different size, it is complicated for operation, and lifting equipment movement trouble, work
It needs manually to be fixed in work, influences steel sheet pile and pull out operation, labor intensity is big, it is low with work efficiency etc. difficult to expend time length
Topic;It can realize the function that bridge construction cofferdam construction Steel Sheet Pile high-efficiency stable is pulled out, it is without human intervention, hidden there is no safety
Suffer from, and have the advantages that it is easy to operate, saving the time, stability is good, labor intensity is low with work efficiency etc. greatly;
2nd, the present invention devises mobile fixture, and the work for controlling cylinder that can control the present invention by moving lifting is high
It spends, the crawler belt locomotive on mobile fixture can drive the present invention to be moved in complicated work, mobile simple, and two
A mobile auxiliary body can ensure that the present invention can fix on the ground during steel sheet pile operation is pulled out, will not be in work
Run-off the straight etc. influences the movement that steel sheet pile pulls out operation in work, without human intervention, reduces the labor intensity of staff,
Improve the efficiency of work;
3rd, the present invention, which devises, pulls out clamping device, pulls out and pulls out switching mechanism during work on clamping device
The course of work for pulling out adjusting mechanism can be controlled, can automate and conveying operation is carried out to the steel sheet pile pulled out, pull out adjusting
The steel sheet pile specification that mechanism can pull out as needed during work carries out automation adjusting, so as to ensure for difference
Clamping operation can be fixed in the steel sheet pile of specification, easy to operate without manually carrying out that steel sheet pile is fixed, and reduce
The labor intensity of staff improves the efficiency of work.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the structure diagram between bottom plate of the present invention and mobile auxiliary body;
Fig. 3 is moving lifting control panel of the present invention and pulls out the structure diagram between clamping device;
Fig. 4 is the I of Fig. 3 of the present invention to partial enlarged view.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below
Conjunction is specifically illustrating, and the present invention is further explained.
As shown in Figures 1 to 4, can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine, wrap
Bottom plate 1 is included, the lower end of bottom plate 1 is equipped with mobile fixture 2, and the upper end of bottom plate 1, which is equipped with, pulls out clamping device 4, on bottom plate 1
Placing box 5 is installed, placing box 5 is located at the underface for pulling out clamping device 4, and placing box 5 plays collection to the steel sheet pile pulled out
Effect, mobile fixture 2 can be ensured that stability of the present invention in steel sheet pile operation is pulled out, pulls out clamping device 4 and exist
The steel sheet pile pulled out to needs that can stablize in the course of work carries out stable clamping, so that it is guaranteed that steel sheet pile pulls out operation
Reliability, mobile fixture 2 are used in conjunction with each other completion bridge construction cofferdam construction Steel Sheet Pile high efficiency with pulling out clamping device 4
Stablize the technique pulled out.
The mobile fixture 2 includes two mobile auxiliary bodies 25 being mounted on bottom plate 1, two mobile auxiliary machines
Structure 25 is symmetrically positioned in the left and right sides of bottom plate 1, and bottom plate 1 is equipped with moving lifting control cylinder 21, moving lifting control cylinder 21
Top by flange be mounted on moving lifting control panel 22 on, bottom plate 1 be mounted on crawler belt locomotive 26 on, crawler belt locomotive 26
The present invention can be driven to be moved in complicated work, it is mobile simple, the cylinder control present invention is controlled by moving lifting
Working depth, two mobile auxiliary bodies 25 can ensure that the present invention can be fixed on during steel sheet pile operation is pulled out
On ground, run-off the straight etc. the movement that steel sheet pile pulls out operation will not be influenced at work, without human intervention, reduce work
The labor intensity of personnel improves the efficiency of work.
The clamping device 4 of pulling out includes pulling out switching mechanism 41 on moving lifting control panel 22, pulls out and turns
It is set on converting mechanism 41 there are two pulling out adjusting mechanism 42, pulls out adjusting mechanism 42 and be located in opposite directions for two and pull out switching mechanism 41
Front and rear sides, the course of work for pulling out adjusting mechanism 42 can be controlled during work by pulling out switching mechanism 41, can be certainly
Dynamicization carries out conveying operation to the steel sheet pile pulled out, and pulls out what adjusting mechanism 42 can be pulled out as needed during work
Steel sheet pile specification carries out automation adjusting, so as to ensure that clamping operation, nothing can be fixed in the steel sheet pile for different size
It need to manually carry out that steel sheet pile is fixed, it is easy to operate, the labor intensity of staff is reduced, improves the effect of work
Rate.
The mobile auxiliary body 25 includes the auxiliary electric rotating machine 251 being mounted on by motor cabinet on bottom plate 1, auxiliary rotation
Auxiliary swivel plate 252 on the output shaft of rotating motor 251 is installed, aids in driving by bearing and auxiliary on the side wall of swivel plate 252
One end of movable plate 253 is connected, and the other end of auxiliary drive plate 253 is connected to by bearing on the side wall of auxiliary linkage board 254, auxiliary
The lower end of linkage board 254 is helped to be mounted on by sliding matching mode on auxiliary rotating seat 255, auxiliary rotating seat 255 is mounted on bottom
On plate 1, the outside of auxiliary drive plate 253 is connected by axis pin with the top of auxiliary adjustment plate 256, is passed through in the middle part of auxiliary adjustment
Axis pin is connected on bottom plate 1, and auxiliary adjustment plate 256 is of an L-shaped structure, and auxiliary limit is provided on the side wall of auxiliary adjustment plate 256
Position slot, is provided with auxiliary stopper branch 27 in auxiliary stopper slot, the lower end of auxiliary adjustment plate 256 is provided with auxiliary control flume, auxiliary
It helps in control flume and is provided with auxiliary control branch 28;The auxiliary stopper branch 27 includes the auxiliary stopper being mounted on bottom plate 1
Frame 271, auxiliary stopper frame 271 are located in auxiliary stopper slot, and auxiliary stopper frame 271 is in convex structure, and auxiliary stopper frame 271
Shape it is corresponding with the direction of motion of auxiliary stopper slot, be evenly arranged with auxiliary positioning slot on auxiliary stopper frame 271, auxiliary is adjusted
It saves and is provided with sub-barrier 272 on the side wall of plate 256, auxiliary stopper cylinder 273 is installed on the side wall of sub-barrier 272, it is auxiliary
The top of limiting cylinder 273 is helped to be mounted on by flange on auxiliary positioning block 274, auxiliary positioning block 274 and auxiliary positioning slot phase
It is corresponding;The auxiliary that the auxiliary control branch 28 includes being mounted on by motor cabinet on auxiliary adjustment plate 256 controls motor 281,
The output shaft of auxiliary control motor 281, with one end of rotating roller 282 is aided in be connected, aids in the another of rotating roller 282 by shaft coupling
One end is mounted on by bearing on accessory mounting plate 283, and accessory mounting plate 283 is mounted on auxiliary adjustment plate 256, auxiliary rotation
The outer wall of roller 282 is resisted against on auxiliary follower plate 284, and the lower end installation of auxiliary follower plate 284 is there are two auxiliary stopper bar, two
Auxiliary stopper bar is symmetrically positioned in the front and rear sides of auxiliary positioning slot, between auxiliary follower plate 284 and auxiliary adjustment plate 256
It is arranged on each auxiliary stopper bar there are one spring-assisted reduction 286, the lower end of auxiliary follower plate 284 is uniformly provided with auxiliary
Fixed link 287 is helped, auxiliary fixed link 287 is located in auxiliary positioning slot, by the way that electric rotating machine 251 is aided in drive auxiliary drive plate
253 are rotated, and auxiliary drive plate 253 drives auxiliary adjustment plate 256 adjusted in auxiliary stopper frame 271 into row position, leads to
It crosses the drive auxiliary positioning of auxiliary stopper cylinder 273 block 274 and moves in auxiliary positioning slot and auxiliary adjustment plate 256 is consolidated into row position
It is fixed, it is ensured that the lower end of auxiliary adjustment plate 256 and ground keeping parallelism, by aiding in control motor 281 with dynamic auxiliary rotating roller 282
It is rotated, auxiliary rotating roller 282 changes the contact position with auxiliary follower plate 284 during rotation, aids in follower plate
284 are inserted into spring-assisted reduction 286 and the cooperation lower band dynamic auxiliary fixed link 287 of auxiliary rotating roller 282 in ground, so as to
Play the role of to the present invention fixed, it can be ensured that the present invention will not slide during steel sheet pile operation is pulled out, and improve
The stability of work.
The position electric rotating pulled out switching mechanism 41 and be mounted on including passing through motor cabinet on moving lifting control panel 22
Machine 411 is equipped on the output shaft of position electric rotating machine 411 and pulls out support plate 412, ring is equipped on moving lifting control panel 22
Shape sliding slot 413, annular groove 413 is interior to be connected with rotary support frame 414 by sliding matching mode, and rotary support frame 414 is installed
On support plate 412 is pulled out, the rear end for pulling out support plate 412 is provided with and pulls out regulating tank, pulls out the upper end installation of support plate 412
Riser 415 is pulled out, pulls out to be equipped on the side wall of riser 415 and pulls out telescopic cylinder 416, pull out the top of telescopic cylinder 416
It is mounted on and is pulled out on adjusting bracket 417 by flange, pulled out adjusting bracket 417 positioned at pulling out in regulating tank, pull out the upper of adjusting bracket 417
End is equipped with and pulls out fixed frame 418, and the lower end for pulling out fixed frame 418 is provided with and pulls out control flume, pulls out control flume and is symmetrically positioned in
The front and rear sides of fixed frame 418 are pulled out, the upper end for pulling out fixed frame 418 is equipped with and pulls out lifting cylinder 419, pulls out lifting cylinder
419 top is mounted on by flange and pulled out on lifter plate 4110, and support plate 412 is pulled out by the drive of position electric rotating machine 411
Carry out rotation adjusting, rotary support frame 414 is used in conjunction with each other to aid in pulling out support plate 412 with annular groove 413 and carry out
Rotation, while play the role of support to pulling out support plate 412, pull out adjusting bracket 417 by pulling out the control of telescopic cylinder 416
Telescopic adjustment is carried out, the control of lifting cylinder 419 is pulled out and pulls out the progress elevating movement of lifter plate 4110 so as to drive two to pull out tune
It saves mechanism 42 and clamping operation is carried out to steel sheet pile, without human intervention, reduce the labor intensity of staff, improve work
Efficiency.
The adjusting mechanism 42 of pulling out includes being connected to pull out by axis pin pulling out installing plate 421 on lifter plate 4110,
It pulls out to be provided on installing plate 421 and pulls out sliding groove, pull out installing plate 421 positioned at pulling out in control flume, pull out peace in control flume
Equipped with control shaft 422 is pulled out, control shaft 422 is pulled out positioned at pulling out in sliding groove, the lower end installation settings for pulling out installing plate 421 has
Limit hole is clamped, pulls out and clamping adjusting bracket 423 is installed on the outer wall of installing plate 421, clamps 423 U-shaped structure of adjusting bracket, folder
It holds and is set on adjusting bracket 423 there are two clamping limiting slot, two clamping limiting slots are symmetrically positioned in up and down the two of clamping adjusting bracket 423
Side clamps and is equipped with clamping regulation motor 424 by motor cabinet on the inner wall of adjusting bracket 423, clamps the output of regulation motor 424
It is connected on axis by shaft coupling with clamping one end of adjusting screw 425, the other end of clamping adjusting screw 425 is installed by bearing
On installing plate 421 is pulled out, clamp and clamping control block 426 is provided on adjusting screw 425, clamp and be provided in control block 426
Two clamping position plates 427, two clamping position plates 427 are symmetrically positioned in the both sides up and down of clamping control block 426, clamping position plate
427 are located in clamping limiting slot, and clamping position plate 427 cooperates with clamping limiting slot and moves, and clamps the side wall of control block 426
On clamping sliding bar 428 is installed, clamping sliding bar 428 is located in clamping limit hole, and it is fixed that clamping sliding bar 428 is mounted on clamping
On the frame 429 of position, clamping position frame 429 is of an L-shaped structure, and clamping lifting cylinder 4210 is equipped on the inner wall of clamping position frame 429,
The top for clamping lifting cylinder 4210 is mounted on by flange on clamping falsework 4211, is clamped and is set on the outer wall of falsework 4211
It is equipped with rubber friction block;It is provided on the outer wall of the clamping control block 426 by axis pin and pulls out position-limited rack 4261, pull out /V
It is connected on the side wall of frame 4261 by axis pin with pulling out the top of limiting cylinder 4262, the bottom for pulling out limiting cylinder 4262 passes through
Axis pin is mounted in clamping control block 426, is clamped and is uniformly provided on adjusting bracket 423 and pulls out limiting slot, pull out limiting slot with
It pulls out position-limited rack 4261 to cooperate movement, pulls out lifter plate 4110 and driven during movement and pull out installing plate 421 and move
To vertical with ground holding, by clamping regulation motor 424 clamping control block 426 is driven to move linearly, clamping position plate
427 cooperate to move with clamping limiting slot plays the role of /V to clamping control block 426, pulls out limiting cylinder 4262 and controls
System, which pulls out position-limited rack 4261 and pulls out limiting slot, cooperates movement to clamping control block 426 into row position position, clamps work
For frame 4211 to the progress of steel sheet pile against clamping, rubber friction block can increase the friction to steel sheet pile during clamping
Power, so as to carry out reliable and stable clamping operation to steel sheet pile, folder is fixed in the steel sheet pile that can be directed to different size
It holds, without manually steel sheet pile is fixed, reduces the labor intensity of staff, improve the efficiency of work.
During work, the crawler belt locomotive 26 first on mobile fixture 2 drives the present invention to be moved to the working position specified
It puts, the working depth of the cylinder control present invention is controlled by moving lifting, the mobile work of auxiliary body 25 passes through auxiliary stopper gas
Cylinder 273 drives auxiliary positioning block 274 to move in auxiliary positioning slot and auxiliary adjustment plate 256 is fixed into row position, it is ensured that auxiliary
The lower end of adjustable plate 256 and ground keeping parallelism, it is auxiliary by the way that control motor 281 is aided in be rotated with dynamic auxiliary rotating roller 282
Rotating roller 282 is helped to change the contact position with auxiliary follower plate 284 during rotation, auxiliary follower plate 284 is multiple in auxiliary
Position spring 286 and the cooperation lower band dynamic auxiliary fixed link 287 of auxiliary rotating roller 282 are inserted into ground, so as to be risen to the present invention
Fixed effect has been arrived, clamping device 4 has been pulled out and starts to work, switching mechanism 41 has been pulled out and is pulled out by the drive of position electric rotating machine 411
Except support plate 412 carries out rotation adjusting, rotary support frame 414 is used in conjunction with each other with annular groove 413 and can aid in pulling out branch
Fagging 412 is rotated, while plays the role of support to pulling out support plate 412, is pulled out by pulling out the control of telescopic cylinder 416
Except adjusting bracket 417 carries out telescopic adjustment, pull out the control of lifting cylinder 419 and pull out the progress elevating movement of lifter plate 4110 so as to drive
It pulls out adjusting mechanism 42 for two and clamping operation is carried out to steel sheet pile, pull out pulling out on adjusting mechanism 42 and limiting slot and pull out /V
Frame 4261 cooperates movement, pulls out lifter plate 4110 and is driven during movement and pulls out installing plate 421 and move to and ground
It keeps vertical, by clamping regulation motor 424 clamping control block 426 is driven to move linearly, clamping position plate 427 and clamping
Limiting slot cooperates to move plays the role of /V to clamping control block 426, pulls out the control of limiting cylinder 4262 and pulls out limit
Position frame 4261 cooperates movement to clamping control block 426 into row position position with pulling out limiting slot, and clamping falsework 4211 is right
Against clamping, rubber friction block can increase the frictional force to steel sheet pile during clamping for the progress of steel sheet pile, so as to
It is enough that reliable and stable clamping operation is carried out to steel sheet pile, realize the work(that bridge construction cofferdam construction Steel Sheet Pile high-efficiency stable is pulled out
Can, solving existing bridge construction cofferdam and applying needs present in steel sheet pile demolishing process manually by existing equipment lifting equipment to steel
Sheet pile pulled out, it is necessary to manually steel sheet pile is fixed, it is necessary to artificial conveyance pull out after steel sheet pile, manually by existing
Lifting equipment pull out that steel sheet pile is unstable, and artificial fixation steel plate stake stability is poor, there are security risk, for different size
Steel sheet pile needs are manually adjusted accordingly, complicated for operation, and lifting equipment movement trouble, need manually to be consolidated in work
It is fixed, it influences steel sheet pile and pulls out operation, labor intensity is big, expends the time grows the problems such as low with work efficiency, has reached purpose.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and the description in above embodiments and description simply illustrates the present invention
Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these change and change
Into all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent
It defines.
Claims (6)
1. can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine, including bottom plate (1), feature exists
In:The lower end of bottom plate (1) is equipped with mobile fixture (2), and the upper end of bottom plate (1), which is equipped with, pulls out clamping device (4), bottom plate
(1) placing box (5) is installed, placing box (5) is located at the underface for pulling out clamping device (4), and mobile fixture (2) is with pulling out on
Clamping device (4), which is used in conjunction with each other, completes the technique that bridge construction cofferdam construction Steel Sheet Pile high-efficiency stable is pulled out;
The mobile fixture (2) includes two mobile auxiliary bodies (25) being mounted on bottom plate (1), two mobile auxiliary
Mechanism (25) is symmetrically positioned in the left and right sides of bottom plate (1), and bottom plate (1) is equipped with moving lifting control cylinder (21), moving lifting
The top of cylinder (21) is controlled to be mounted on by flange on moving lifting control panel (22), bottom plate (1) is mounted on crawler belt locomotive
(26) on;
The clamping device (4) of pulling out includes pulling out switching mechanism (41) on moving lifting control panel (22), pulls out
It is set in switching mechanism (41) there are two pulling out adjusting mechanism (42), pulls out adjusting mechanism (42) and be located in opposite directions for two and pull out conversion
The front and rear sides of mechanism (41);
The mobile auxiliary body (25) includes the auxiliary electric rotating machine (251) being mounted on by motor cabinet on bottom plate (1), auxiliary
Auxiliary swivel plate (252) on the output shaft of electric rotating machine (251) is installed, passes through bearing on the side wall of auxiliary swivel plate (252)
It is connected with one end of auxiliary drive plate (253), the other end of auxiliary drive plate (253) is connected to auxiliary linkage board by bearing
(254) on side wall, the lower end of auxiliary linkage board (254) is mounted on by sliding matching mode on auxiliary rotating seat (255), auxiliary
Rotating seat (255) is helped to be mounted on bottom plate (1), the outside of auxiliary drive plate (253) passes through axis pin and auxiliary adjustment plate (256)
Top is connected, and the middle part of auxiliary adjustment is connected to by axis pin on bottom plate (1), and auxiliary adjustment plate (256) is of an L-shaped structure, and auxiliary
It helps on the side wall of adjustable plate (256) and is provided with auxiliary stopper slot, auxiliary stopper branch (27) is provided in auxiliary stopper slot, aid in
The lower end of adjustable plate (256) is provided with auxiliary control flume, aids in being provided with auxiliary control branch (28) in control flume.
2. it is according to claim 1 can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine,
It is characterized in that:The auxiliary stopper branch (27) includes the auxiliary stopper frame (271) being mounted on bottom plate (1), auxiliary stopper
Frame (271) is located in auxiliary stopper slot, auxiliary stopper frame (271) be in convex structure, and the shape of auxiliary stopper frame (271) with
The direction of motion of auxiliary stopper slot is corresponding, and auxiliary positioning slot, auxiliary adjustment plate are evenly arranged on auxiliary stopper frame (271)
(256) sub-barrier (272) is provided on side wall, auxiliary stopper cylinder is installed on the side wall of sub-barrier (272)
(273), the top of auxiliary stopper cylinder (273) is mounted on by flange on auxiliary positioning block (274), auxiliary positioning block (274)
It is corresponding with auxiliary positioning slot.
3. it is according to claim 1 can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine,
It is characterized in that:The auxiliary control branch (28) includes the auxiliary control being mounted on by motor cabinet on auxiliary adjustment plate (256)
Motor (281) processed, the output shaft of auxiliary control motor (281) is connected by shaft coupling with one end of auxiliary rotating roller (282), auxiliary
The other end of rotating roller (282) is helped to be mounted on by bearing on accessory mounting plate (283), accessory mounting plate (283) is mounted on auxiliary
It helps on adjustable plate (256), the outer wall of auxiliary rotating roller (282) is resisted against on auxiliary follower plate (284), aids in follower plate (284)
Lower end set there are two auxiliary stopper bar, two auxiliary stopper bars are symmetrically positioned in the front and rear sides of auxiliary positioning slot, positioned at auxiliary
Spring-assisted reduction there are one being arranged is helped on each auxiliary stopper bar between follower plate (284) and auxiliary adjustment plate (256)
(286), the lower end of follower plate (284) is aided in uniformly to be provided with auxiliary fixed link (287), auxiliary fixed link (287) is located at auxiliary
It helps in locating slot.
4. it is according to claim 1 can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine,
It is characterized in that:The position pulled out switching mechanism (41) and be mounted on including passing through motor cabinet on moving lifting control panel (22)
Electric rotating machine (411) is equipped on the output shaft of position electric rotating machine (411) and pulls out support plate (412), moving lifting control panel
(22) annular groove (413) is installed, annular groove (413) is interior to be connected with rotary support frame by sliding matching mode on
(414), rotary support frame (414) is mounted on and pulls out in support plate (412), and the rear end for pulling out support plate (412) is provided with and pulls out
Regulating tank, the upper end for pulling out support plate (412) are equipped with and pull out riser (415), pull out to be equipped on the side wall of riser (415) and pull out
Except telescopic cylinder (416), the top for pulling out telescopic cylinder (416) is mounted on by flange and pulls out on adjusting bracket (417), pulls out tune
Section frame (417), which is located at, to be pulled out in regulating tank, and the upper end for pulling out adjusting bracket (417) is equipped with and pulls out fixed frame (418), pulls out fixation
The lower end of frame (418), which is provided with, pulls out control flume, pulls out control flume and is symmetrically positioned in the front and rear sides for pulling out fixed frame (418), pulls out
Lifting cylinder (419) is pulled out except the upper end of fixed frame (418) is equipped with, the top for pulling out lifting cylinder (419) is pacified by flange
Mounted in pulling out on lifter plate (4110).
5. it is according to claim 1 can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine,
It is characterized in that:The adjusting mechanism (42) of pulling out includes being connected to pull out by axis pin pulling out installation on lifter plate (4110)
Plate (421) is pulled out to be provided on installing plate (421) and pulls out sliding groove, pulls out installing plate (421) positioned at pulling out in control flume, pulls out
Control shaft (422) is pulled out except being equipped in control flume, control shaft (422) is pulled out positioned at pulling out in sliding groove, pulls out installing plate
(421) lower end installation settings has clamping limit hole, pulls out and clamping adjusting bracket (423) is equipped on the outer wall of installing plate (421),
Adjusting bracket (423) U-shaped structure is clamped, clamps clamping limiting slot there are two being set on adjusting bracket (423), two clamping limiting slots
The both sides up and down of clamping adjusting bracket (423) are symmetrically positioned in, clamps and clamping is equipped with by motor cabinet on the inner wall of adjusting bracket (423)
Regulation motor (424) clamps the one end for passing through shaft coupling and clamping adjusting screw (425) on the output shaft of regulation motor (424)
It is connected, the other end of clamping adjusting screw (425) is mounted on by bearing to be pulled out on installing plate (421), clamps adjusting screw
(425) it is provided on and clamps control block (426), clamping position plate (427) there are two settings in clamping control block (426), two
Clamping position plate (427) is symmetrically positioned in the both sides up and down of clamping control block (426), and clamping position plate (427) is located at clamping /V
In slot, clamping position plate (427) cooperates with clamping limiting slot and moves, and folder is equipped on the side wall of clamping control block (426)
Sliding bar (428) is held, clamping sliding bar (428) is located in clamping limit hole, and clamping sliding bar (428) is mounted on clamping position frame
(429) on, clamping position frame (429) is of an L-shaped structure, and clamping lifting cylinder is equipped on the inner wall of clamping position frame (429)
(4210), the top for clamping lifting cylinder (4210) is mounted on by flange on clamping falsework (4211), clamps falsework
(4211) rubber friction block is provided on outer wall.
6. it is according to claim 5 can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine,
It is characterized in that:It is provided on the outer wall of the clamping control block (426) by axis pin and pulls out position-limited rack (4261), pull out /V
It is connected on the side wall of frame (4261) by axis pin with pulling out the top of limiting cylinder (4262), pulls out the bottom of limiting cylinder (4262)
End is mounted on by axis pin in clamping control block (426), is clamped uniformly to be provided on adjusting bracket (423) and is pulled out limiting slot, pulls out
Except limiting slot and pull out position-limited rack (4261) mutual cooperation movement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810029042.6A CN108118699A (en) | 2018-01-12 | 2018-01-12 | Can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810029042.6A CN108118699A (en) | 2018-01-12 | 2018-01-12 | Can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108118699A true CN108118699A (en) | 2018-06-05 |
Family
ID=62232976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810029042.6A Withdrawn CN108118699A (en) | 2018-01-12 | 2018-01-12 | Can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108118699A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101517A (en) * | 2020-03-16 | 2020-05-05 | 徐州市盖力工程机械有限公司 | Road guardrail pile extractor of convenient use |
-
2018
- 2018-01-12 CN CN201810029042.6A patent/CN108118699A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101517A (en) * | 2020-03-16 | 2020-05-05 | 徐州市盖力工程机械有限公司 | Road guardrail pile extractor of convenient use |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209815305U (en) | Waterproofing membrane production line with automatic mechanism of rectifying | |
CN108005076A (en) | Steel sheet pile can quickly dress up the municipal works water supply system construction equipment of steel structure body | |
CN108005074A (en) | It is a kind of can mechanization remove steel sheet pile steel structure bridge cofferdam construction equipment | |
CN208278948U (en) | A kind of adjustable double fastener blanking transfer device of clip position | |
CN108118699A (en) | Can efficient stable pull out the water conservancy lake flood bank of steel structure body steel sheet pile and build machine | |
CN108005073A (en) | The steel structure body machining robot of steel sheet pile can be pulled out automatically | |
CN109159526B (en) | Efficient machining system and machining method for galvanized steel plate water stop | |
CN205599703U (en) | Silicon steel post plane correcting unit | |
CN108518080B (en) | High-efficient construction equipment of viscous steel reinforced building | |
CN114164803A (en) | Gate frame convenient to disassemble and assemble for water conservancy sluice construction and disassembling and assembling method thereof | |
CN108239981A (en) | A kind of municipal works drainage system steel plate forming pile steel structure body equipment | |
CN108118700A (en) | A kind of steel structure bridge cofferdam construction special-purpose steel sheet pile intelligence pulling machine | |
CN108358087A (en) | A kind of hydraulic engineering hanging device | |
CN208121769U (en) | Steel sheet pile can quickly dress up the municipal works water supply system construction equipment of steel structure body | |
CN108677761B (en) | Bridge pier bar planting reinforcing equipment and reinforcing construction process thereof | |
CN215625957U (en) | Coal mine machine cable machinery moves device certainly | |
CN211681829U (en) | Crane part installation auxiliary device convenient to accurate butt joint | |
CN108005075A (en) | Steel sheet pile can efficiently be mounted to the municipal works drainage system construction machine of steel structure body | |
CN207812455U (en) | Municipal road construction places machine automatically with digging hole filling pile concrete-pouring template | |
CN201180049Y (en) | Automatic regulating device for folding machine picket fence guide rails and folding machine picket fence including the same | |
CN208327208U (en) | A kind of hydraulic engineering hanging device | |
CN218893046U (en) | Conveying device for machining hydraulic engineering drain board | |
CN207452746U (en) | Prefabricated culvert segment mounting tool | |
CN221400347U (en) | Construction engineering foundation pile driving device | |
CN108625255A (en) | A kind of asphalt tank for bituminous concrete stirring system automatically adjusts equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180605 |
|
WW01 | Invention patent application withdrawn after publication |