CN108104394A - A kind of slim transparent marble cladding construction method and its structure - Google Patents
A kind of slim transparent marble cladding construction method and its structure Download PDFInfo
- Publication number
- CN108104394A CN108104394A CN201711437036.6A CN201711437036A CN108104394A CN 108104394 A CN108104394 A CN 108104394A CN 201711437036 A CN201711437036 A CN 201711437036A CN 108104394 A CN108104394 A CN 108104394A
- Authority
- CN
- China
- Prior art keywords
- composite plates
- dry hanging
- hanging article
- composite
- slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/081—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
- E04F13/0821—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements
- E04F13/0823—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements piercing the side faces of the covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
- E04F13/144—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass with an outer layer of marble or other natural stone
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
- E04F13/15—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass characterised by the use of glass elements, i.e. wherein an outer layer is not of glass
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The present invention provides a kind of slim transparent marble cladding construction method, comprises the following steps:Step 1, preparation of construction;Substrate surface should be cleaned out before construction, and by design drawing unwrapping wire, Structural Engineering and other cooperation work post projects are checked;Step 2, live line setting;According to the first typesetting on the wall of the size of design typesetting figure and composite plates;Line carries out unwrapping wire on the basis of the main control axis transferred by civil engineering unit, carries out snap the line positioning according to the typesetting after adjustment, marks the installation position line of steelframe keel;Step 3, live core ruler place an order, plant produced processing;Step 4, the fabrication and installation of steelframe keel;Step 5, base's concealment acceptance;Step 6 installs dry hanging article and composite plates;Step 7 fastens leveling;Step 8, scene cleaning;The present invention, which has, to be improved construction efficiency, shortens the construction period, improves light transmittance, the characteristics of enhancing decorative effect, cost-effective, safety and environmental protection.
Description
Technical field
The present invention relates to building decoration area, more particularly, to a kind of cladding construction method of slim transparent marble and its knot
Structure.
Background technology
In building decoration engineering, transparent marble is often used to enhance the decorative effect of building.In the prior art, it is right
All it is using traditional handicraft in the application of transparent marble, there are following defects:Marble decoration panel is thicker, and cost is higher, light transmittance
It is not high, and because easy clashing and breaking during material property execute-in-place, so as to cause the waste of material and influence construction speed.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of slim transparent marble cladding construction method and its structure, tools
Construction efficiency is improved, shortens the construction period, improve light transmittance, the characteristics of enhancing decorative effect, cost-effective, safety and environmental protection.
In order to solve the above technical problem, the present invention provides a kind of cladding construction method of slim transparent marble, including with
Lower step:
Step 1, preparation of construction;Substrate surface should be cleaned out before construction, and by design drawing unwrapping wire, to Structural Engineering
And other cooperation work post projects are checked;
Step 2, live line setting;According to the first typesetting on the wall of the size of design typesetting figure and composite plates;With civil engineering
Line carries out unwrapping wire on the basis of the main control axis that unit is transferred, and snap the line positioning is carried out according to the typesetting after adjustment, marks steelframe dragon
The installation position line of bone;
Step 3, live core ruler place an order, plant produced processing;(1) measured, checked according to scene positioning snap the line, it is accurate
It is really errorless that the specification of translucidus slabstone and transparency glass plate places an order to processing factory with reference to construction drawing afterwards;(2) processing factory
Specific processing dimension according to receiving is processed production, and transparency glass plate is bonded in the back side of translucidus slabstone, is formed multiple
Plywood block opens up slot respectively in the upper and lower side of composite plates;
Step 4, the fabrication and installation of steelframe keel;(1) need are chosen according to location dimension in advance in substrate concrete structure
The position to be punched is punched, and connector is fixed in substrate concrete structure with expansion bolt;(2) selected according to design
Specifications and models steel member is selected to be processed, make steelframe skeleton, steelframe skeleton is included by longitudinal main joist of wall and outer
The horizontal secondary joist of side is cross-linked, and main joist and connector are attached fixation;
Step 5, base's concealment acceptance
After the completion of steelframe keel fabrication and installation, carry out an acceptance inspection to steelframe keel and the hidden project of hydropower installation, qualified rear
It can carry out the next step.
Step 6 installs dry hanging article and composite plates
(1) upper position dry hanging article is installed
Dry hanging article is mounted on the secondary joist of upper position, the longitudinal section of dry hanging article is " ┫ " type, and dry hanging article includes end
Portion offers the horizontal fixing end of bolt hole, the bell end vertical with fixing end;Make bolt hole in the fixing end of dry hanging article with
Bolt hole alignment on secondary joist transverse direction face, penetrates bolt;First not fastening bolt is twisted again after plate fixation inspection to be composite is smooth
Tight bolt;
(2) composite plate is installed
First in the deployed epoxy dried hanging hang structure glue of operation instruction ratio before installation, then in the slot of composite plates end
Fill epoxy dried hanging hang structure glue, composite plates shifted downwards, make its lower end slot be placed on dry hanging article bell end it is upper
The composite plates of upper position, i.e., be installed on steelframe keel by end;Rubber cushion layer is formed after the hardening of epoxy dried hanging hang structure glue, is avoided
Contacting firmly between transparency glass plate and dry hanging article, prevents stress concentration from glass self-explosion occurs.
(3) according to the installation method in (1) and (2), dry hanging article and composite plates are installed successively from bottom to top, make to be located at dry
The slot of the composite plates upper end of pendant lower end is nested with the lower end outside in dry hanging article bell end, positioned at the compound of dry hanging article upper end
The slot of plate lower end is nested in the upper end of the bell end of dry hanging article;
Step 7 fastens leveling
To between composite plates vertical seam, horizontal joint, flatness, after verticality passed examination, tighten bolt, composite plate
The position of block is just fixed one by one.
Step 8, scene cleaning
After composite plates install fixation one by one, the epoxy dried hanging hang structure glue for first being overflowed translucidus slabstone plate face with scuppit shovels
It removes, is then scrubbed plate face with clear water, soft cloth.Finally field tool is collected and is concluded, sweeps scene, it is ensured that facing and existing
Field neatly and orderly.
It is preferred that in the step 2, if building actual size is with drawing, there is any discrepancy and not whole plate occurs and shows
As incomplete composite plates are adjusted to metope corner, and accomplish that both sides are symmetrical.
It is preferred that in the step 3, translucidus slabstone is be bonded by structural type shadowless glue with transparency glass plate.
It is preferred that in the step 4, connector is corner brace.
It is preferred that in the step 3, the slot of each end of composite plates is two of spacing arrangement;It is described
In step 6, there are two the dry hanging articles of spacing arrangement for connection on every secondary joist.
The present invention, which provides one kind, slim transparent marble dried hanging hang structure made of above-mentioned construction method, including several vertical head
The composite plates of tail connection, composite plates include translucidus slabstone and the transparency glass plate for being attached to its back side, the composite plate
One end of block be plugged with longitudinal section be " ┫ " type dry hanging article, dry hanging article include end offer bolt hole horizontal fixing end,
The bell end vertical with fixing end, the bell end include the parallel built-in end being plugged on inside the composite plates and expose to
The external end of the composite plates, the other end of the composite plates open up the slot being adapted corresponding with the external end;
Slot positioned at composite plates lower face every piece described is adaptedly set in the composite plates positioned at its lower end
On the dry hanging article of upper surface;The fixing end of dry hanging article in every piece of composite plates is bolted on time of steelframe keel
On keel, the inside main joist of the steelframe keel is fixed on by connector in original concrete structure.
It is excellent compared with existing design the present invention relates to a kind of slim transparent marble cladding construction method and its structure
Point is:(1) present invention uses slim transparent marble factory pre-slotting batch machining, improves processing efficiency and finished product protection
Rate has subtracted the process of live stone material fluting operation, has reduced labor intensity, improve construction efficiency, shorten the construction period.(2) originally
Invention replaces the former translucidus slabstone in part using transparency glass plate, and is combined into one with translucidus slabstone, forms composite plates;And
Using factory's pre-slotting technique, avoid scene fluting clashing and breaking stone material and cause to be lost, save material cost, reduce unit plane
Manufacture valency.(3) present invention uses transparency glass plate and translucidus slabstone synthesis technology, has not only reduced the thickness of transparent marble, but also
The translucency of transparency glass plate has been efficiently used, has improved light transmittance, has enhanced decorative effect.(4) present invention uses factory
Processing fluting avoids injury of the dust of scene fluting to human body, reduces pollution of the dust to environment.(5) present invention is multiple
Plywood block is process by batch production, is cohered two kinds of materials using makeup of the imports type shadowless glue, due to the adhesive of use
With extremely strong adhesive force, fragment will not fall off after the breakage that is hit, and avoids to come off after careless clashing and breaking and injures the situation of people by a crashing object, and
Slot indwelling takes batch production to process, ensure that the stability of cladding position, drastically increase safety in composite plates end
Property.
Description of the drawings
Fig. 1 is the wall diagrammatic cross-section that the present invention carries slim transparent marble dried hanging hang structure.
Fig. 2 is the slim transparent marble dried hanging hang structure stereoscopic schematic diagram of the present invention.
Fig. 3 is the slim transparent marble dried hanging hang structure schematic side view of the present invention.
Fig. 4 is the slim transparent marble dried hanging hang structure elevational schematic view of the present invention.
Fig. 5 is the slim transparent marble dried hanging hang structure schematic top plan view of the present invention.
Fig. 6 is dry hanging article longitudinal profile schematic diagram of the present invention.
Reference numeral is as follows:
The built-in end of 1- transluciduses slabstone, 2- transparency glass plates, 3- composite plates, 4- dry hanging articles, 41- bell ends, 411-,
The external ends of 412-, 42- fixing ends, 43- bolts hole, 5- slots, 6- steelframes keel, 61- secondary joists, 62- main joists, 7- connections
Part, 8- original concrete structures.
Specific embodiment
The present invention provides a kind of slim transparent marble suitable for indoor decorating engineering cladding construction method, hereafter
Present invention is described in conjunction with specific embodiments, comprises the following steps:
Step 1, preparation of construction
(1) it is familiar with construction drawing design document, the skilled connecting node drawing and design requirement for grasping design drawing is looked into
Test material product certificate, sampling check report;
(2) according to mutual restriction condition between live each process, work post, different troops, sequence of construction is determined;
(3) the institutional framework acceptance of work and process handing-over check that the concealed works such as work, hydropower installation should be completed;
(4) substrate surface should be cleaned out before constructing, and by design drawing unwrapping wire, to Structural Engineering and other cooperation works
Kind project is checked;
(5) construction model, on inspection acceptance(check) are made by design requirement.
Step 2, live line setting
According to the first typesetting on the wall of the size of design typesetting figure and composite plates, if building actual size has with drawing
Enter and not whole plate phenomenon occur, incomplete composite plates are adjusted to metope corner, and accomplish that both sides are symmetrical.With civil engineering
Line carries out unwrapping wire on the basis of the main control axis that unit is transferred, and snap the line positioning is carried out according to the typesetting after adjustment, marks keel peace
Set bit line.
Step 3, live core ruler place an order, plant produced processing
(1) live core ruler places an order
It measures, check according to scene positioning snap the line, construction drawing is combined after accurate by translucidus slabstone 1 and thoroughly
The specification of bright glass plate 2 places an order to processing factory;
(2) plant produced is processed
Translucidus slabstone 1 uses transparent marble thin plate, and transparency glass plate 2 uses transparent doubling glass, it is preferable that translucidus
Slabstone 1 and the thickness ratio of transparency glass plate 2 are about 1:3, transparency glass plate 2 is bonded in translucidus slabstone using structural type shadowless glue
1 back side forms composite plates 3.Processing factory is processed production according to the specific processing dimension list received, transparent glass with
It should be firmly bonded between translucidus slabstone.The upper and lower side of composite plates 3 open up respectively there are two spacing arrangement slot 5.
Step 4, the fabrication and installation of steelframe keel 6
First, choose the position for needing to punch on wall in advance according to location dimension, punched on wall, it will with expansion bolt
Connector 7 is attached with substrate concrete structure 8, it is preferable that connector 7 is corner brace.The specifications and models selected according to design
Steel member is selected to be processed, the size needed according to in-site installation is cut, drilling operation, makes steelframe keel 6, steelframe
Keel 6 are cross-linked including longitudinal main joist 62 by wall and horizontal secondary joist 61 in the outer part, secondary joist 61 and main joist 62
It is welded or is bolted.Main joist 62 and connector 7 are attached fixation.
Step 5, base's concealment acceptance
It after the completion of 6 fabrication and installation of steelframe keel, carries out an acceptance inspection to steelframe keel 6 and the hidden project of hydropower installation, after qualified
It can carry out the next step.
Step 6 installs dry hanging article and composite plates
(1) upper position dry hanging article is installed
By dry hanging article 4 be mounted on upper position secondary joist 61 on, dry hanging article be integrally formed made of longitudinal section be
The component of " ┫ " type, dry hanging article 4 offer the horizontal fixing end 42 of bolt hole 43, the socket joint vertical with fixing end 42 including end
End 41;The bolt hole 44 in the fixing end 43 of dry hanging article is made to align with the bolt hole on the horizontal face of secondary joist 61, penetrates bolt.First
Not fastening bolt tightens bolt again after the fixation of plate 3 inspection to be composite is smooth;
(2) composite plate is installed
First in the deployed epoxy dried hanging hang structure glue of operation instruction ratio before installation, then in the slot 5 of 3 end of composite plates
Epoxy dried hanging hang structure glue is inside filled, composite plates 3 are shifted downwards, the slot 5 of its lower end is made to be placed on the bell end of dry hanging article 4
The composite plates of upper position are installed on steelframe keel by 41 upper end;Rubber cushion is formed after the hardening of epoxy dried hanging hang structure glue
Layer avoids contacting firmly between transparency glass plate 2 and dry hanging article 4, prevents stress concentration from glass self-explosion occurs;
(3) according to the installation method in (1) and (2), dry hanging article and composite plates are installed successively from bottom to top, make to be located at dry
The slot of the composite plates upper end of pendant lower end is nested with the lower end outside in dry hanging article bell end, positioned at the compound of dry hanging article upper end
The slot of plate lower end is nested in the upper end of the bell end of dry hanging article.
Step 7 fastens leveling
To between composite plates 3 vertical seam, horizontal joint, flatness, after verticality passed examination, tighten bolt, it is compound
The position of plate 3 is just fixed one by one.
Step 8, scene cleaning
After composite plates install fixation one by one, first the AB glue that translucidus slabstone plate face is overflowed is rooted out with scuppit, Ran Houyong
Clear water, soft cloth scrub plate face.Finally field tool is collected and is concluded, sweeps scene, it is ensured that facing and scene are clean whole
Together.
The present invention also provides the structure obtained by a kind of construction method cladding as slim transparent marble, as shown in figures 1 to 6,
Include the composite plates 3 of several vertical head and the tail connections, composite plates 3 are by translucidus slabstone 1 and the transparent glass for being attached to its back side
Glass plate 2 is put together, it is preferable that transparency glass plate 2 sticks at the back side of translucidus slabstone 1, transparent glass using structural type shadowless glue
Glass plate 2 and the thickness ratio of translucidus slabstone 1 are 3:1, transparency glass plate 2 is double-deck doubling glass.Using transparent marble thin plate with
The compound mode of transparency glass plate gluing increases its light transmittance by the thickness for reducing transparent marble, by with transparency glass plate
Composite strengthening monolithic composite panel block stability.
The upper and lower ends of composite plates 3 open up slot 5 respectively, and being plugged with longitudinal section in the slot 5 of its one end is
The dry hanging article 4 of " ┫ " type, dry hanging article 4, which is integrally formed, to be made, and dry hanging article 4 includes end and offers the horizontal fixed of bolt hole 43
End 42, the bell end 41 vertical with fixing end 42;Parallel be plugged in 3 one end slot of composite plates of bell end 41 is built-in end
411, one end of composite plates 3 is exposed to as external end 412, in the slot 5 of the other end of composite plates 3 and dry hanging article 4
External end 412 corresponds to and is adapted.Further, one end of composite plates 3 is provided with two dry hanging articles 4 of spacing arrangement, another
One end is provided with and 4 corresponding two slots 5 of dry hanging article.
Slot 5 positioned at every piece of 3 lower face of composite plates is adaptedly set in the external end of the dry hanging article 4 positioned at its lower end
On 412, i.e., the composite plates 3 of upper position are connected to the upper end of the composite plate 3 of upper position, it is real with identical connection mode
Existing polylith composite plates 3 are vertically connected with, and installation is accurate, quick.Bolt passes through 4 fixing end of dry hanging article in every piece of composite plates 3
Composite plates are fixed on the secondary joist 61 of 6 lateral surface of steelframe keel by 42 bolt hole 43, and steelframe keel 6 lean on the main dragon of wall
Bone 62 is with secondary joist 61 by welding or being bolted, and main joist 62 has been bolted connector 7, and connector 7 is by swollen
Swollen bolt is fixed in original concrete structure 8.
Claims (6)
1. the cladding construction method of a kind of slim transparent marble, which is characterized in that comprise the following steps:
Step 1, preparation of construction;Should clean out substrate surface before construction, and by design drawing unwrapping wire, to Structural Engineering and
Other cooperation work post projects are checked;
Step 2, live line setting;According to the first typesetting on the wall of the size of design typesetting figure and composite plates;With civil engineering unit
Line carries out unwrapping wire on the basis of the main control axis of transfer, carries out snap the line positioning according to the typesetting after adjustment, marks steelframe keel
Position line is installed;
Step 3, live core ruler place an order, plant produced processing;(1) measured, checked, accurate nothing according to scene positioning snap the line
The specification of translucidus slabstone and transparency glass plate is placed an order to processing factory with reference to construction drawing after by mistake;(2) processing factory according to
The specific processing dimension received is processed production, and transparency glass plate is bonded in the back side of translucidus slabstone, forms composite plate
Block opens up slot respectively in the upper and lower side of composite plates;
Step 4, the fabrication and installation of steelframe keel;(1) needs are chosen in advance in substrate concrete structure according to location dimension to beat
The position in hole is punched, and connector is fixed in substrate concrete structure with expansion bolt;(2) rule selected according to design
Lattice number selects steel member to be processed, and makes steelframe skeleton, and steelframe skeleton includes the longitudinal main joist and in the outer part by wall
Horizontal secondary joist is cross-linked, and main joist and connector are attached fixation;
Step 5, base's concealment acceptance
After the completion of steelframe keel fabrication and installation, carry out an acceptance inspection to steelframe keel and the hidden project of hydropower installation, it can be into after qualified
Row the next step.
Step 6 installs dry hanging article and composite plates
(1) upper position dry hanging article is installed
Dry hanging article is mounted on the secondary joist of upper position, the longitudinal section of dry hanging article is " ┫ " type, and dry hanging article is opened including end
Horizontal fixing end equipped with bolt hole, the bell end vertical with fixing end;Make the bolt hole in the fixing end of dry hanging article and time dragon
Bolt hole alignment on bone transverse direction face, penetrates bolt;First not fastening bolt tightens spiral shell again after plate fixation inspection to be composite is smooth
Bolt;
(2) composite plate is installed
First in the deployed epoxy dried hanging hang structure glue of operation instruction ratio before installation, then filled in the slot of composite plates end
Epoxy dried hanging hang structure glue shifts downwards composite plates, make its lower end slot be placed on dry hanging article bell end upper end, i.e.,
The composite plates of upper position are installed on steelframe keel;Rubber cushion layer is formed after the hardening of epoxy dried hanging hang structure glue, is avoided transparent
Contacting firmly between glass plate and dry hanging article, prevents stress concentration from glass self-explosion occurs.
(3) according to the installation method in (1) and (2), dry hanging article and composite plates are installed successively from bottom to top, make to be located at dry hanging article
The slot of the composite plates upper end of lower end is nested with the lower end outside in dry hanging article bell end, the composite plates positioned at dry hanging article upper end
The slot of lower end is nested in the upper end of the bell end of dry hanging article;
Step 7 fastens leveling
To between composite plates vertical seam, horizontal joint, flatness, after verticality passed examination, tighten bolt, composite plates
Position is just fixed one by one.
Step 8, scene cleaning
After composite plates install fixation one by one, first the epoxy dried hanging hang structure glue that translucidus slabstone plate face is overflowed is rooted out with scuppit,
Then plate face is scrubbed with clear water, soft cloth.Finally field tool is collected and is concluded, sweeps scene, it is ensured that facing and scene
Neatly and orderly.
2. according to a kind of cladding construction method of slim transparent marble described in claim 1, which is characterized in that the step
In two, if building actual size is with drawing, there is any discrepancy and not whole plate phenomenon occurs, and incomplete composite plates are adjusted to
Metope corner, and accomplish that both sides are symmetrical.
A kind of 3. cladding construction method of slim transparent marble according to claim 2, which is characterized in that the step 3
In, translucidus slabstone is be bonded by structural type shadowless glue with transparency glass plate.
A kind of 4. cladding construction method of slim transparent marble according to claim 1, which is characterized in that the step 4
In, connector is corner brace.
A kind of 5. cladding construction method of slim transparent marble according to claim 1, which is characterized in that the step 3
In, the slot of each end of composite plates is two of spacing arrangement;In the step 6, on every secondary joist there are two connections
The dry hanging article of spacing arrangement.
6. a kind of slim transparent marble dried hanging hang structure in construction method as described in claim any one of 1-5, which is characterized in that
Include the composite plates of several vertical head and the tail connections, composite plates include translucidus slabstone and the transparent glass for being attached to its back side
Plate, one end of the composite plates are plugged with the dry hanging article that longitudinal section is " ┫ " type, and dry hanging article offers bolt hole including end
Horizontal fixing end, the bell end vertical with fixing end, the bell end includes parallel being plugged on inside the composite plates
Built-in end and the external end for exposing to the composite plates, the other ends of the composite plates open up phase corresponding with the external end
The slot of adaptation;
Slot positioned at composite plates lower face every piece described is adaptedly set in positioned at the composite plates upper end of its lower end
On the dry hanging article in face;The fixing end of dry hanging article in every piece of composite plates is bolted on the secondary joist of steelframe keel
On, the inside main joist of the steelframe keel is fixed on by connector in original concrete structure.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711437036.6A CN108104394A (en) | 2017-12-26 | 2017-12-26 | A kind of slim transparent marble cladding construction method and its structure |
PCT/CN2018/094034 WO2019128176A1 (en) | 2017-12-26 | 2018-07-02 | Thin light-transmissive marble dry hanging construction method and structure thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711437036.6A CN108104394A (en) | 2017-12-26 | 2017-12-26 | A kind of slim transparent marble cladding construction method and its structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108104394A true CN108104394A (en) | 2018-06-01 |
Family
ID=62213420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711437036.6A Pending CN108104394A (en) | 2017-12-26 | 2017-12-26 | A kind of slim transparent marble cladding construction method and its structure |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN108104394A (en) |
WO (1) | WO2019128176A1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019128176A1 (en) * | 2017-12-26 | 2019-07-04 | 深圳市宝鹰建设集团股份有限公司 | Thin light-transmissive marble dry hanging construction method and structure thereof |
CN111499258A (en) * | 2020-04-07 | 2020-08-07 | 上海同济检测技术有限公司 | Photosensitive controllable fast-hardening concrete pouring material and construction method |
CN111927024A (en) * | 2020-08-14 | 2020-11-13 | 浙江深美装饰工程有限公司 | Installation method and installation structure of wood veneer |
CN112065048A (en) * | 2020-09-21 | 2020-12-11 | 深圳市建艺装饰集团股份有限公司 | Dry-hanging stone wall surface and construction method thereof |
CN112523449A (en) * | 2020-11-23 | 2021-03-19 | 华鼎建筑装饰工程有限公司 | Construction process for splicing, installing and constructing irregular metal whole plate |
CN113737990A (en) * | 2021-09-15 | 2021-12-03 | 南京华典建设(集团)有限公司 | Construction method for dry hanging of double faces of partition wall of light-transmitting concrete slab |
CN113863590A (en) * | 2021-10-11 | 2021-12-31 | 中国建筑第八工程局有限公司 | Construction method for modularized reverse installation of overhanging metal cornice |
CN114670315A (en) * | 2022-03-31 | 2022-06-28 | 深圳市宝鹰建设集团股份有限公司 | Prefabricated simulation modeling component structure and prefabricated simulation modeling component manufacturing method |
CN115749179A (en) * | 2022-11-24 | 2023-03-07 | 徐州力泰钢结构有限公司 | Take thermal-insulated easy installation external wall insulation decorative board in vacuum |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075135A (en) * | 2019-12-12 | 2020-04-28 | 上海市建筑装饰工程集团有限公司 | Large-area wall aluminum plate rapid installation process |
CN114876144A (en) * | 2021-06-08 | 2022-08-09 | 上海牛元工贸有限公司 | Dry-hanging installation process for rock plate |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100376754C (en) * | 2005-06-30 | 2008-03-26 | 淄博德惠来装饰瓷板有限公司 | Dry hanging wall surface decoration structure of electromagnetic shield firous ceramic back lining and its construction mthod |
CN201056815Y (en) * | 2007-06-14 | 2008-05-07 | 上海市建筑装饰工程有限公司 | Translucent marble and decorating unit composed by the same |
CN101532325A (en) * | 2008-03-13 | 2009-09-16 | 郁建荣 | Pre-embedded type ultra-thin stone composite board and manufacturing method thereof |
CN102312537A (en) * | 2011-06-29 | 2012-01-11 | 苏州金螳螂建筑装饰股份有限公司 | Large-specification shadow-free transparent marble hanging back-bolt ceiling |
CN108104394A (en) * | 2017-12-26 | 2018-06-01 | 深圳市宝鹰建设集团股份有限公司 | A kind of slim transparent marble cladding construction method and its structure |
-
2017
- 2017-12-26 CN CN201711437036.6A patent/CN108104394A/en active Pending
-
2018
- 2018-07-02 WO PCT/CN2018/094034 patent/WO2019128176A1/en active Application Filing
Non-Patent Citations (2)
Title |
---|
刘巧: "《天然玻璃复合透光云石的加工及施工工艺探讨》", 《现代装饰(理论)》 * |
聚宝盆NO1: "《干挂石材专项施工方案》", 《百度文库》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019128176A1 (en) * | 2017-12-26 | 2019-07-04 | 深圳市宝鹰建设集团股份有限公司 | Thin light-transmissive marble dry hanging construction method and structure thereof |
CN111499258A (en) * | 2020-04-07 | 2020-08-07 | 上海同济检测技术有限公司 | Photosensitive controllable fast-hardening concrete pouring material and construction method |
CN111927024A (en) * | 2020-08-14 | 2020-11-13 | 浙江深美装饰工程有限公司 | Installation method and installation structure of wood veneer |
CN112065048A (en) * | 2020-09-21 | 2020-12-11 | 深圳市建艺装饰集团股份有限公司 | Dry-hanging stone wall surface and construction method thereof |
CN112065048B (en) * | 2020-09-21 | 2022-02-18 | 深圳市建艺装饰集团股份有限公司 | Dry-hanging stone wall surface and construction method thereof |
CN112523449A (en) * | 2020-11-23 | 2021-03-19 | 华鼎建筑装饰工程有限公司 | Construction process for splicing, installing and constructing irregular metal whole plate |
CN113737990A (en) * | 2021-09-15 | 2021-12-03 | 南京华典建设(集团)有限公司 | Construction method for dry hanging of double faces of partition wall of light-transmitting concrete slab |
CN113863590A (en) * | 2021-10-11 | 2021-12-31 | 中国建筑第八工程局有限公司 | Construction method for modularized reverse installation of overhanging metal cornice |
CN114670315A (en) * | 2022-03-31 | 2022-06-28 | 深圳市宝鹰建设集团股份有限公司 | Prefabricated simulation modeling component structure and prefabricated simulation modeling component manufacturing method |
CN115749179A (en) * | 2022-11-24 | 2023-03-07 | 徐州力泰钢结构有限公司 | Take thermal-insulated easy installation external wall insulation decorative board in vacuum |
CN115749179B (en) * | 2022-11-24 | 2024-02-20 | 徐州力泰钢结构有限公司 | Easy-to-install external wall heat-insulation decorative plate with vacuum heat insulation function |
Also Published As
Publication number | Publication date |
---|---|
WO2019128176A1 (en) | 2019-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108104394A (en) | A kind of slim transparent marble cladding construction method and its structure | |
CN105484461B (en) | Geometry art with inlaying wall decorative panel and preparation method thereof | |
Araújo et al. | Seismic assessment of st. james church by means of pushover analysis: before and after the new zealand earthquake | |
CN102425262B (en) | Ceiling structure | |
CN102174859B (en) | Wooden structure house and building process thereof | |
CN105970995A (en) | Bearing platform mold | |
CN115059217A (en) | Aluminum honeycomb plate integrated decoration construction method | |
CN110259144A (en) | A kind of novel energy-saving environment-friendly ash concrete lightweight wall plate construction method | |
CN111894223B (en) | Method for separating, externally processing and installing large-area multi-curved-surface artistic ribbon | |
CN101476374B (en) | Reinforcement apparatus for stair step plate, step plate with the same and its production method | |
CN109083420A (en) | Building body and indoor and outdoor decoration integral construction method | |
CN207749774U (en) | A kind of slim transparent marble dried hanging hang structure and its wall | |
CN205116520U (en) | Prevent plasterboard suspended ceiling of fracture | |
CN211341560U (en) | Arc aluminum plate structure based on BIM technique | |
CN109162478B (en) | Method for reinforcing and repairing midspan part of irregular lap type rafter of ancient building | |
CN114475077B (en) | Assembly type processing method of arc-shaped decorative plate and arc-shaped decorative plate structure | |
CN206681304U (en) | Floor panel assembly | |
CN105201118A (en) | Crack resistant gypsum board suspended ceiling and back-to-back type mounting and splicing method | |
Fatta et al. | The muqarnas ceiling of the Palatina Chapel in Palermo | |
CN205348469U (en) | Novel building partition plate | |
CN218091409U (en) | Real stone finish's outer wall structure | |
ITPD20120230A1 (en) | ANCHORAGE SYSTEM FOR WOODEN STRUCTURAL PANEL | |
CN215212066U (en) | GRG decorates construction board | |
CN214272799U (en) | Embedded through type guide groove type heat preservation and decoration integrated plate internal corner | |
CN210515910U (en) | Gypsum board fishplate bar crack filling process method demonstrates model and mold box and model room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180601 |