CN108104110A - The construction method of high pressure spray jetting soil cut-pff wall - Google Patents

The construction method of high pressure spray jetting soil cut-pff wall Download PDF

Info

Publication number
CN108104110A
CN108104110A CN201711303489.XA CN201711303489A CN108104110A CN 108104110 A CN108104110 A CN 108104110A CN 201711303489 A CN201711303489 A CN 201711303489A CN 108104110 A CN108104110 A CN 108104110A
Authority
CN
China
Prior art keywords
wall
spray
cut
power head
angle speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711303489.XA
Other languages
Chinese (zh)
Other versions
CN108104110B (en
Inventor
周冲
王兆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201711303489.XA priority Critical patent/CN108104110B/en
Publication of CN108104110A publication Critical patent/CN108104110A/en
Application granted granted Critical
Publication of CN108104110B publication Critical patent/CN108104110B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The construction method of high pressure spray jetting soil cut-pff wall, A, determined according to cut-pff wall construction access road positioning, unwrapping wire, make spray-hole away from;B, using drilling machine prebored hole;C, high spray booth vehicle is in place, starts high-pressure hydraulic pump, air compressor and cement slurrypump, starts angle speed rotary swing power head and hoisting mechanism;D, angle speed rotary swing power head variable angular velocity churning or variable angular velocity pendulum spray in the range of 180 ° in the range of 360 °, can reach in above-mentioned angular range has grade or stepless variable angular velocity;E, playpipe is promoted to design curtain height under the driving of hoisting mechanism constant speed;By the sequence construction in two sequence holes, the construction of whole cut-pff walls or curtain is completed.Advantage is thoroughly to solve the disadvantage that board wall is too thin at pendulum, the calmly close spray-hole of spray, non-deformability is weak, can relatively accurately be adjusted to the thickness and shape of wall within the specific limits, the cement consolidation shape formed has the shape feature of 4 ~ attached drawing of attached drawing 6.

Description

The construction method of high pressure spray jetting soil cut-pff wall
Technical field
The present invention relates to architecture construction field, especially a kind of construction method of high pressure spray jetting soil cut-pff wall.
Background technology
Jet grouting is a very ripe technology, and reinforcement mechanism is clear and definite, and application field is extensive.Because of reinforcing side The difference of formula, jet grouting are divided into churning and fixed, pendulum spray;Because of the needs of spraying operation radius, it is divided into as single pipe method, double Tube method and three tube method.When jet grouting uses churning mode, the rotary churning pile formed can be used for foundation stabilization;Work as rotation Stake is sprayed when by the way of set overlaps, it is this anti-available for the cut-pff wall of hydraulic engineering and the seepage proof curtain of foundation pit supporting project Ooze wall into wall thickness is big, non-deformability is strong.Shortcoming be arrangement pilespacing (pitch of holes) it is smaller, cement consumption is big, cost compared with It is high.Compared with rotary churning pile, pendulum sprays and spray operating radius is big surely, pitch of holes is remote, and cement consumption is relatively low, cost saves.But pendulum spray With determine spray there are one fatal defects, form that the thickness of board wall is too thin, and non-deformability is weak, reliability at spray-hole Difference.Particularly to deforming more sensitive pattern foundation pit supporting structure seepage proof curtain engineering, it some times happens that the leakage accident of wall body rupture, because This is applied fewer and fewer, is gradually suffered exit.Through calculating churning about one times is differed with pendulum spray, the cost sprayed surely.Traditional height Jet groutinl equipment its jet pressure, flow, lance lift, swing speed parameter are pressed into being fixed, institute's shape during wall Into cement consolidation shape see attached drawing 2 and 3.It is used as general cut-pff wall, from reduction project cost, it is undesirable to wall body Thickness is excessive.But it puts the shape for spraying and being sprayed into surely wall and thickness You Full foots not to require.Traditional high pressure jet grouting technique Defect can be solved by the present invention, make into wall shape and thickness reaches desirable.
Retain and put the advantages of spraying and spraying seepage proof curtain surely, thickness of wall body is too thin, non-deformability is weak, can at solution spray-hole By property it is poor the problem of, be the main purpose that patent formula of the present invention needs solve.
The content of the invention
In order to solve above-mentioned problems of the prior art, the present invention provides a kind of high pressure spray jetting soil cut-pff wall Construction method.
The technical solution adopted by the present invention to solve the technical problems is:The construction party of high pressure spray jetting soil cut-pff wall Method, construction method are implemented based on wall-forming device, and wall-forming device includes the angle speed swing that can do angle speed swing campaign Power head, the top of angle speed rotary swing power head are equipped with hoisting mechanism, are equipped with back below angle speed rotary swing power head or above Adapter, the side of swivel joint are equipped with the delivery pipe of single channel, binary channels or triple channel, swivel joint connection playpipe, spray The end for penetrating pipe is equipped with spray-hole;Delivery pipe is to spray-hole conveying high-pressure water, gas and cement mortar;Angle speed rotary motive power head can be Variable angular velocity churning or the variable angular velocity pendulum spray in the range of 180 ° in the range of 360 °.
The construction method of high pressure spray jetting soil cut-pff wall, construction method include the following steps:
A, according to cut-pff wall or seepage proof curtain determine construction access road positioned, unwrapping wire, and according to spray technology, radius, make Spray-hole away from;
B, using drilling machine prebored hole, hole diameter, drilling depth and borehole perpendicularity should all meet design requirement;
C, high spray booth vehicle is in place, will be in the hole of playpipe tripping in drilling machine preboring;Start high-pressure hydraulic pump, air compressor and cement mortar Pump, inspect medium injection it is normal after, then start angle speed rotary swing power head and hoisting mechanism successively;
D, angle speed rotary swing power head variable angular velocity churning or variable angular velocity pendulum spray in the range of 180 ° in the range of 360 °, makes biography Angle speed swing campaign is changed into the constant speed swing campaign of system;And it can reach in above-mentioned angular range and have grade or stepless angle Speed;
E, playpipe is promoted to design curtain height, that is, completes the construction of one section of wall under the driving of hoisting mechanism constant speed;It presses The sequence construction in two sequence holes completes the construction of whole cut-pff walls or curtain.
Compared to the prior art the present invention, the advantage is that:
(1)It thoroughly solves the disadvantage that board wall is too thin at pendulum, the calmly close spray-hole of spray, non-deformability is weak, extends traditional work The application of skill.It is fast by the angle of angle speed rotary swing power head, the thickness of wall can be relatively accurately adjusted within the specific limits And shape, the cement consolidation shape formed have the shape feature of attached drawing 4- attached drawings 6.
(2)Using original high-pressure rotary-spray equipment, the art of this patent can be realized in repacking angle speed rotary swing power head, saves Investment, popularization basis are good.Available for pattern foundation pit supporting structure seepage proof curtain engineering and the cut-pff wall engineering of water conservancy.Country's deep pit support at present Shield seepage proof curtain engineering has a large capacity and a wide range, while the cut-pff wall engineering of water conservancy is quite a few, has larger popularizing application prospect.With biography The socket rotary churning pile cut-pff wall of system is compared, and unit volume project cost can reduce by 40% or so.Economic benefit and social benefit are huge Greatly, national energy-saving emission reduction policy is met.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description It obtains substantially or is recognized by the practice of the present invention.
Description of the drawings
It in order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention, for those of ordinary skill in the art, without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 illustrates attached drawing for wall-forming device overall structure of the present invention;
Fig. 2 is the plan structure signal attached drawing of existing cut-pff wall or seepage proof curtain;
Fig. 3 is the plan structure signal attached drawing of existing cut-pff wall or seepage proof curtain;
Fig. 4 is the plan structure signal attached drawing of cut-pff wall of the present invention or seepage proof curtain;
Fig. 5 is the plan structure signal attached drawing of cut-pff wall of the present invention or seepage proof curtain;
Fig. 6 is the plan structure signal attached drawing of cut-pff wall of the present invention or seepage proof curtain;
Reference sign:Playpipe 1, spray-hole 2, swivel joint 3, delivery pipe 4, angle speed rotary swing power head 5.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.
In the description of the present invention, it is to be understood that term " longitudinal direction ", " transverse direction ", " on ", " under ", "front", "rear", The orientation or position relationship of the instructions such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " is based on attached drawing institutes The orientation or position relationship shown is for only for ease of the description present invention rather than instruction or implies that signified device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
The construction method of high pressure spray jetting soil cut-pff wall, construction method are implemented based on wall-forming device, wall-forming device The angle speed rotary swing power head 5 of angle speed swing campaign can be done by including, and the top of angle speed rotary swing power head 5 is equipped with elevator Structure 6 is equipped with swivel joint 3 below angle speed rotary swing power head 5 or above, and the side of swivel joint 3 is equipped with single channel, bilateral The delivery pipe 4 in road or triple channel, swivel joint 3 connect playpipe 1, and the end of playpipe 1 is equipped with spray-hole 2;Delivery pipe 4 is to spray 2 conveying high-pressure water of perforation, gas and cement mortar;Angle speed rotary motive power first 5 can in the range of 360 ° variable angular velocity churning or Variable angular velocity pendulum spray in the range of 180 °.
The angle speed rotary swing power head 5 is made of gear-box 51, power set 52 and controller 53;Gear-box 51 is to subtract Fast gear-box, power set 52 are phase asynchronous ac variable-frequency electric motor, and controller 53 is frequency converter;Phase asynchronous AC frequency conversion The output terminal of motor is connected to reduction gear box, and the output terminal of reduction gear box is connected to playpipe 1;Frequency Converter Control three-phase Asynchronous Communication adjustable frequency motor rotating speed and then the rotating speed for controlling playpipe 1.
The construction method of high pressure spray jetting soil cut-pff wall includes the following steps:
A, according to cut-pff wall or seepage proof curtain determine construction access road positioned, unwrapping wire, and according to spray technology, radius, make Spray-hole away from;
B, using drilling machine prebored hole, hole diameter, drilling depth and borehole perpendicularity should all meet design requirement;
C, high spray booth vehicle is in place, will be in the hole of 1 tripping in drilling machine preboring of playpipe;Start high-pressure hydraulic pump, air compressor and cement Stock pump, inspect medium injection it is normal after, then start angle speed rotary swing power head 5 and hoisting mechanism 6 successively;
D, angle speed rotary swing power head 5 variable angular velocity churning or variable angular velocity pendulum spray in the range of 180 ° in the range of 360 °, makes Angle speed swing campaign is changed into traditional constant speed swing campaign;And it can reach in above-mentioned angular range and have grade or stepless change Angular speed;
E, playpipe 1 is promoted to design curtain height, that is, completes the construction of one section of wall under the driving of 6 constant speed of hoisting mechanism; By the sequence construction in two sequence holes, the construction of whole cut-pff walls or curtain is completed.
Optimization, in step A, spray-hole away from determine determined according to the soil layer lithological characteristic of construction ground, spray-hole away from It the increase of soil layer lithology and is gradually reduced.
Optimization, in step B, using drilling machine prebored hole, drilling internal diameter is more than the outer diameter of playpipe 1;Hole depth is cut-pff wall Or the depth of seepage proof curtain;Pore-forming perpendicularity deviation is in 1%.
Optimization, in step C, start high-pressure hydraulic pump, air compressor and cement slurrypump;In high-pressure hydraulic pump, water pressure 25MPa-30MPa, flow 100L/min-150L/min;In air compressor, air pressure 0.7MPa-1.0MPa, flow 2m3/ min-3m3/min;In cement slurrypump, cement paste pressure 2MPa-2.5MPa, flow 120L/min-150L/min;
Optimization, in step C, start angle speed rotary swing power head 5 and hoisting mechanism 6;The average rotation of angle speed rotary swing power head 5 Rotary speed 10r.p.m-12r.p.m, and the angle gear ratio between maximum and minimum is 1:10-1:6;The promotion speed of hoisting mechanism 6 Spend 12cm/min-16cm/min.
Optimization, the thickness of cut-pff wall or seepage proof curtain is 200mm-600mm.
Its principle of the construction method of high pressure spray jetting soil cut-pff wall is as follows:High-pressure jet is in pressure, flow certain condition Under, there are much relations in the action time of operating radius and jet stream.With regard to big, action time is short, sprays for long action time, radius of spray Radius is penetrated with regard to small.If jet pressure, flow, lance lift speed are constant, the swing of original constant speed is transported in the range of 360 ° It is dynamic to be changed to speed change swing, though the swing speed perpendicular to cut-pff wall axis direction accelerate and parallel to cut-pff wall axis direction Swing speed slow down, this method can make its cut-pff wall induration flat shape as shown in attached drawing 4- attached drawings 6.In other words, originally Invention is intended to control and change the injecting time of high-pressure jet different angle in the range of 360 °, make cut-pff wall consolidation shape with Size reaches into the requirement of wall, that is, it is controllable and transformable to accomplish shape and size.
The construction method of this high pressure spray jetting soil cut-pff wall realizes its technical solution in following processing steps:Playpipe 1 In the hole that tripping in is drilled in advance, spray-hole 2 is high-pressure jet spray-hole, starts pump-up system, by swivel joint 3 and single, double Or triple channel delivery pipe 4, to 2 conveying high-pressure water of spray-hole, gas and cement mortar.The hoisting mechanism 6 of startup playpipe 1 does constant speed and carries Elevator is moved, while starts speed change rotary motive power first 5 and the churning of angle speed is done in the range of 360 ° or angle speed is done in the range of 180 ° Pendulum spray, makes to form required cut-pff wall section in foundation soil.Speed change rotary motive power first 5 is by 51 phase asynchronous AC frequency conversion of gear-box Motor 52 and frequency converter 53 form.
It transform rotary swing power head as angle speed rotary swing power head, the driving principle and construction of angle speed rotary swing power head are chatted It states as follows:Angle speed rotary swing power head is made of gear-box, phase asynchronous ac variable-frequency electric motor and frequency converter.Gear-box can be adopted With traditional The gear deceleration structure, the driving source of angle speed rotary swing power head selects phase asynchronous ac variable-frequency electric motor, with it The frequency converter of matching uses velocity checking circuits, with the letter for the speed detector (tg, pla etc.) being mounted on asynchronous motor machine Number for speed signal, operational loop is sent into, motor can be made to be operated by command speed according to instruction and computing.
Angle speed rotary swing power head 5 can in the range of 360 ° variable angular velocity churning or in the range of 180 ° variable angular velocity put Spray.No matter churning in the range of 360 ° or the spray of the pendulum in the range of 180 °, traditional constant speed swing campaign can changed For angle speed swing campaign.Make the cut-pff wall to be formed section that there is attached drawing 4- attached drawings 6 but be not limited to the spy shown in attached drawing 4- attached drawings 6 Sign.
Embodiment 1
Certain project is deep foundation pit support dewatering project, and excavation of foundation pit depth is 8m, and design water-stop curtain is 14m.In water-stop curtain In depth bounds, it is divided into 5 layers by lithological characteristic:It respectively ploughs and plants soil, silty clay, silt, silty clay, clay.Soil layer one As be soft ~ plastic state, groundwater level depth 2m.
Main construction parameter design is as follows:Using three tube method construction technologies, water pressure 25MPa, flow 100L/min;Air Pressure 0.7MPa, flow 2m3/min;Cement paste pressure 2MPa, flow 120L/min;Playpipe 1 promotes speed 16cm/min; Angle gear ratio between the average rotary speed 12r.p.m of variable-speed dynamic head, maximum and minimum is 1:10, speed change should meet throwing Object linear rule.
Under conditions of above-mentioned construction parameter, the single width wall plane shape that is formed in foundation soil be length be 2.0m, Thickness is 0.2m, with specific reference to attached drawing 4.
Embodiment 2
Certain water conservancy cut-pff wall engineering, the high 12m of dam body, soil property of building a dam are general clay;Dam foundation soil property is respectively silty clay, sand Class soil, small particle gravel soil, silty clay, clay.Soil layer generally hard ~ plastic state, design cut-pff wall depth are 20m.
Main construction parameter design is as follows:Using three tube method construction technologies, water pressure 30MPa, flow 120L/min;Air Pressure 0.7MPa, flow 2m3/min;Cement paste pressure 2.5MPa, flow 150L/min;Playpipe 1 promotes speed 12cm/ min;Angle gear ratio between the average rotary speed 10r.p.m of variable-speed dynamic head, maximum and minimum is 1:6, speed change should accord with Close parabolic rate law.
Under conditions of above-mentioned construction parameter, the single width wall plane shape that is formed in foundation soil be length be 1.6m, Thickness is 0.35m, with specific reference to attached drawing 4.
Traditional high pressure jet grouting technique, the size of jet stream operating radius except having outside the Pass with jet pressure, flow, Promotion and swing speed with jet pipe jet hole also have much relations.In the case where foundation soil is processing condition, jet stream is to certain point Injecting time is longer, its operating radius is bigger;Phase contrajet is shorter to the injecting time of certain point, its operating radius more It is small.According to the characteristics of high pressure jet grouting equipment widely used in current engineering, promotion speed and swing speed in work Degree is preset parameter.Therefore the flat shape of churning is the planar shaped that circular, pendulum spray flat shape is symmetrical sector, sprays surely Shape is similar to plate-shaped.This patent scheme is intended to, by controlling, changing swing speed, by the swing of original constant speed, be changed to speed change Swing.Swing speed i.e. perpendicular to cut-pff wall direction is fast, parallel to cut-pff wall direction swing speed it is slow.It is each by controlling The injecting time of section swing angle, reaches the target that this patent scheme is pursued.The cut-pff wall that this patent scheme is ultimately formed Thickness and flat shape can be set according to actual needs.The flat shapes such as rectangle, square, ellipse, dolioform can be formed, See attached drawing 4- attached drawings 6.
Although the various embodiments described above are described, those skilled in the art once know basic wound The property made concept can then make these embodiments other change and modification, so the foregoing is merely the embodiment of the present invention, Not thereby the scope of patent protection of the present invention, every equivalent structure made using description of the invention and accompanying drawing content are limited Or equivalent process transformation, other related technical areas are directly or indirectly used in, are similarly included in the patent of the present invention Within protection domain.

Claims (7)

1. the construction method of high pressure spray jetting soil cut-pff wall, it is characterised in that:Construction method is implemented based on wall-forming device, Wall-forming device includes the angle speed rotary swing power head that can do angle speed swing campaign(5), angle speed rotary swing power head(5)Top Portion is equipped with hoisting mechanism(6), angle speed rotary swing power head(5)Below or above be equipped with swivel joint(3), swivel joint(3) Side be equipped with single channel, binary channels or triple channel delivery pipe(4), swivel joint(3)Connect playpipe(1), playpipe(1) End be equipped with spray-hole(2);Delivery pipe(4)To spray-hole(2)Conveying high-pressure water, gas and cement mortar;Angle speed rotary motive power Head(5)It can variable angular velocity churning or the variable angular velocity pendulum spray in the range of 180 ° in the range of 360 °;
Construction method includes the following steps:
A, according to cut-pff wall or seepage proof curtain determine construction access road positioned, unwrapping wire, and according to spray technology, radius, make Spray-hole away from;
B, using drilling machine prebored hole, hole diameter, drilling depth and borehole perpendicularity should all meet design requirement;
C, high spray booth vehicle is in place, by playpipe(1)In the hole of tripping in drilling machine preboring;Start high-pressure hydraulic pump, air compressor and water Slush pump, inspect medium injection it is normal after, then successively start angle speed rotary swing power head(5)And hoisting mechanism(6);
D, angle speed rotary swing power head(5)Variable angular velocity churning or the variable angular velocity pendulum spray in the range of 180 ° in the range of 360 °, Traditional constant speed swing campaign is made to change into angle speed swing campaign;And it can reach in above-mentioned angular range and have grade or stepless Variable angular velocity;
E, playpipe(1)In hoisting mechanism(6)Under the driving of constant speed, design curtain height is promoted to, that is, completes one section of wall Construction;By the sequence construction in two sequence holes, the construction of whole cut-pff walls or curtain is completed.
2. the wall-forming device according to claim 1 based on high-pressure injection process water soil cut-pff wall, it is characterised in that:Institute State angle speed rotary swing power head(5)By gear-box(51), power set(52)And controller(53)Composition;Gear-box(51)To subtract Fast gear-box, power set(52)For phase asynchronous ac variable-frequency electric motor, controller(53)For frequency converter;Phase asynchronous exchange The output terminal of adjustable frequency motor is connected to reduction gear box, and the output terminal of reduction gear box is connected to playpipe(1);Frequency converter control It makes phase asynchronous ac variable-frequency electric motor rotating speed and then controls playpipe(1)Rotating speed.
3. the wall-forming device according to claim 1 based on high-pressure injection process water soil cut-pff wall, it is characterised in that:Step In rapid A, spray-hole away from determine determined according to the soil layer lithological characteristic and nozzle parameter of construction ground.
4. the wall-forming device according to claim 1 based on high-pressure injection process water soil cut-pff wall, it is characterised in that:Step In rapid B, using drilling machine prebored hole, drilling internal diameter is more than playpipe(1)Outer diameter;Hole depth is the depth of cut-pff wall or seepage proof curtain Degree;Pore-forming perpendicularity deviation is in 1%.
5. the wall-forming device according to claim 1 based on high-pressure injection process water soil cut-pff wall, it is characterised in that:Step In rapid C, start high-pressure hydraulic pump, air compressor and cement slurrypump;In high-pressure hydraulic pump, water pressure 25MPa-30MPa, flow 100L/min-150L/min;In air compressor, air pressure 0.7MPa-1.0MPa, flow 2m3/min-3m3/min;Cement In stock pump, cement paste pressure 2MPa-2.5MPa, flow 120L/min-150L/min.
6. the wall-forming device according to claim 1 based on high-pressure injection process water soil cut-pff wall, it is characterised in that:Step In rapid C, start angle speed rotary swing power head(5)And hoisting mechanism(6);Angle speed rotary swing power head(5)Average rotary speed 10r.p.m-12r.p.m, and the angle gear ratio between maximum and minimum is 1:10-1:6;Hoisting mechanism(6)Promotion speed 12cm/min-16cm/min。
7. the wall-forming device according to claim 1 based on high-pressure injection process water soil cut-pff wall, it is characterised in that:Institute The cut-pff wall of formation or the thickness of seepage proof curtain are 200mm-600mm.
CN201711303489.XA 2017-12-11 2017-12-11 The construction method of high pressure spray jetting soil cut-pff wall Active CN108104110B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711303489.XA CN108104110B (en) 2017-12-11 2017-12-11 The construction method of high pressure spray jetting soil cut-pff wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711303489.XA CN108104110B (en) 2017-12-11 2017-12-11 The construction method of high pressure spray jetting soil cut-pff wall

Publications (2)

Publication Number Publication Date
CN108104110A true CN108104110A (en) 2018-06-01
CN108104110B CN108104110B (en) 2019-05-07

Family

ID=62209443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711303489.XA Active CN108104110B (en) 2017-12-11 2017-12-11 The construction method of high pressure spray jetting soil cut-pff wall

Country Status (1)

Country Link
CN (1) CN108104110B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024643A (en) * 2018-08-09 2018-12-18 中国地质大学(北京) A kind of water-stop curtain constructing device, equipment and waterproof curtain construction method
CN110042854A (en) * 2019-04-25 2019-07-23 内蒙古大雁矿业集团有限责任公司 Super-pressure angular domain speed change jet stream grouting method and curtain wall
CN110144920A (en) * 2019-06-06 2019-08-20 山东省机械施工有限公司 Bivariate double pump whirl spraying seepage proof curtain wall-forming device and its construction method
CN114345176A (en) * 2021-12-31 2022-04-15 徐州徐工基础工程机械有限公司 Combined stirring device and stirring method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1172193A (en) * 1996-07-29 1998-02-04 四平东北岩土工程公司 High-pressure spray process for swing-vibrated hole
CN106223313A (en) * 2016-07-22 2016-12-14 江苏科兴项目管理有限公司 A kind of impervious wall construction method using five minor diameter mixing piles
CN106284330A (en) * 2015-06-05 2017-01-04 温州长城基础工程有限公司 A kind of intensity adjustable strength core composite pile and making apparatus thereof and construction method
CN107190755A (en) * 2017-07-19 2017-09-22 上海宝冶集团有限公司 Disposable high-pressure rotary-spray reinforced cement-soil pile anchor support construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1172193A (en) * 1996-07-29 1998-02-04 四平东北岩土工程公司 High-pressure spray process for swing-vibrated hole
CN106284330A (en) * 2015-06-05 2017-01-04 温州长城基础工程有限公司 A kind of intensity adjustable strength core composite pile and making apparatus thereof and construction method
CN106223313A (en) * 2016-07-22 2016-12-14 江苏科兴项目管理有限公司 A kind of impervious wall construction method using five minor diameter mixing piles
CN107190755A (en) * 2017-07-19 2017-09-22 上海宝冶集团有限公司 Disposable high-pressure rotary-spray reinforced cement-soil pile anchor support construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘和柱: ""高压旋喷防渗墙在舒城县东方红水库除险加固工程中的应用"", 《中国水运》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024643A (en) * 2018-08-09 2018-12-18 中国地质大学(北京) A kind of water-stop curtain constructing device, equipment and waterproof curtain construction method
CN110042854A (en) * 2019-04-25 2019-07-23 内蒙古大雁矿业集团有限责任公司 Super-pressure angular domain speed change jet stream grouting method and curtain wall
CN110144920A (en) * 2019-06-06 2019-08-20 山东省机械施工有限公司 Bivariate double pump whirl spraying seepage proof curtain wall-forming device and its construction method
CN110144920B (en) * 2019-06-06 2023-09-15 山东省机械施工有限公司 Double-variable double-pump rotary spraying anti-seepage curtain wall forming device and construction method thereof
CN114345176A (en) * 2021-12-31 2022-04-15 徐州徐工基础工程机械有限公司 Combined stirring device and stirring method

Also Published As

Publication number Publication date
CN108104110B (en) 2019-05-07

Similar Documents

Publication Publication Date Title
CN108104110B (en) The construction method of high pressure spray jetting soil cut-pff wall
CN104343455B (en) Long-distance curved jacking pipe and pipe roof construction technique
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN206016824U (en) A kind of stopping means for preventing shield sky from pushing away Segment displacement
CN105256788A (en) Saturated dredger soft soil foundation reinforcing treatment system and grid-type vacuum preloading and electroosmosis-method combined treatment method
CN106593470A (en) High-permeability water-rich sand shield terminal reinforcing system and construction method thereof
CN108086296A (en) Sound joint injected foundation reinforces engineering method
CN111501771B (en) Application method of multi-elliptical-ring combined support in deep large-sludge foundation pit engineering
CN110700842A (en) Advanced grouting reinforcement method suitable for water-rich sand layer section of shield end
CN110700853A (en) Shallow soil covering shield tunnel reinforcing method based on weak stratum
CN104314106A (en) Underground diaphragm wall with joint water stop and filling vacancy structure and construction method thereof
CN210507500U (en) Drilling, spraying and stirring integrated seepage-proof curtain wall forming device
CN101962950B (en) Long-spiral spray stirring vibration pipe sinking CFG (Cement Flyash Gravel) pile construction method and CFG composite file therefrom
CN107152042A (en) Churning clump of piles occlusion reinforcing engineering method is tilted for wearing the micro-disturbance in house under shield
CN215718763U (en) Shield constructs end reinforced structure
Yuan Discussion on anti-seepage technologies in the construction of small-scale rural water conservancy projects
CN207143934U (en) A kind of road and bridge construction rotary jet grouting rig
CN210140840U (en) Double-variable double-pump rotary-spraying anti-seepage curtain wall forming device
CN211285577U (en) MJS pile machine for accelerating cement hardening speed
CN106988330A (en) Soft soil foundation is layered dewatering construction structure and construction method
CN113464150A (en) Shield end reinforcing structure and reinforcing construction method
CN110144920B (en) Double-variable double-pump rotary spraying anti-seepage curtain wall forming device and construction method thereof
WO2021135156A1 (en) Construction apparatus for deep stirring by using curing material and construction method therefor
CN106761823B (en) Exempt from wall for grouting segmentation cleaning bottom of hole retrusive controlling grouting method
CN114352315B (en) Grouting method suitable for restraining shield segment from floating upwards in water-rich area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhou Chong

Inventor after: Wang Zhaojun

Inventor after: Yao Zhanyong

Inventor after: Zhou Guangquan

Inventor before: Zhou Chong

Inventor before: Wang Zhaojun