CN108100817A - A kind of high-speed elevator compensation rope swelling device - Google Patents

A kind of high-speed elevator compensation rope swelling device Download PDF

Info

Publication number
CN108100817A
CN108100817A CN201810088892.3A CN201810088892A CN108100817A CN 108100817 A CN108100817 A CN 108100817A CN 201810088892 A CN201810088892 A CN 201810088892A CN 108100817 A CN108100817 A CN 108100817A
Authority
CN
China
Prior art keywords
lance
guide
plate
fixed
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810088892.3A
Other languages
Chinese (zh)
Inventor
蕭人大
洪於
周桂雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Julong Elevator Co., Ltd.
Original Assignee
Zhejiang Giant Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Giant Holding Co Ltd filed Critical Zhejiang Giant Holding Co Ltd
Priority to CN201810088892.3A priority Critical patent/CN108100817A/en
Publication of CN108100817A publication Critical patent/CN108100817A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables
    • B66B7/068Cable weight compensating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • B66B5/16Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well
    • B66B5/18Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well and applying frictional retarding forces
    • B66B5/22Braking or catch devices operating between cars, cages, or skips and fixed guide elements or surfaces in hoistway or well and applying frictional retarding forces by means of linearly-movable wedges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables
    • B66B7/10Arrangements of ropes or cables for equalising rope or cable tension

Abstract

The invention discloses a kind of high-speed elevator compensation rope swelling devices, including bottom plate, guide rail, channel steel, safety tongs, upper beam, bottom plate is connected by chemical bolt with well pit ground, tension mechanism is provided between bottom plate and upper beam, tension mechanism is slidably connected between guide rail and with the guide rail of both sides, tension mechanism includes expansion tightening wheel, fixing device, clump weight, and fixing device includes two fixed plates, dust cover, and clump weight is symmetricly set in fixed plate.Present invention compensation swelling device is connected by using chemical bolt well pit ground, save hoistway space, reduce the interference with each component of hoistway, simultaneously, by the both sides that clump weight is arranged on to fixed plate, it avoids occupying excessive pit space, realization is simple and compact for structure, easy for installation, operates steadily.

Description

A kind of high-speed elevator compensation rope swelling device
Technical field
The invention belongs to technical field of elevator manufacturing, and in particular to a kind of high-speed elevator compensation rope swelling device.
Background technology
As elevator is run, the position of car and counterweight constantly changes, and does not cause traction sheave both sides steel wire rope gravitational difference also not Disconnected variation.It is higher in hoisting depth and in the case that amount speed is larger, traction sheave both sides steel wire rope gravitational difference to traction and The influence of traction machine output torque will become larger, and need to increase compensation rope at this time to reduce traction sheave both sides steel wire rope gravitational difference.
Compensation rope can generate stronger vibration in the process of running, cause the comfort of car to reduce.In order to eliminate these It influences, in the case where hoisting depth is higher, express elevator need to increase compensation rope swelling device.
The existing compensation rope swelling device for elevator, clump weight are generally arranged above or below expansion tightening wheel, Cause to occupy larger space, and due to deficient in stability or complicated, and design requirement can not be met, this just needs to design One kind have it is simple in structure, it is compact-sized, it is easy for installation, operate steadily, safe and reliable high-speed elevator compensation rope swelling device.
The content of the invention
For problems of the prior art, it is an object of the invention to design a kind of high-speed elevator compensation rope of offer to rise Tight device mainly solves the problems, such as that existing compensating rope of elevator swelling device occupies excessive pit space.
A kind of high-speed elevator compensation rope swelling device, it is characterised in that including bottom plate, be symmetrically welded and be arranged on bottom The guide rail and channel steel of plate both sides, the safety tongs that is fixed at by gravity on guide rail are connected by bolt with rail crown Upper beam, the bottom plate are connected by chemical bolt with well pit ground, and tension mechanism is provided between bottom plate and upper beam, is risen Tight mechanism is slidably connected between guide rail and with the guide rail of both sides, and the tension mechanism includes expansion tightening wheel, is arranged on expansion tightening wheel The fixing device in outside, clump weight, the fixing device include two fixed plates, are prevented by what bolt was connected with two fixed plate tops Dust hood, the clump weight are symmetricly set in fixed plate.
A kind of high-speed elevator compensation rope swelling device, it is characterised in that the tension mechanism further includes straight beam, hits Bar, guide shoe, guide shoe plate, lance fixed block, lance stent, limited block, switch, switch bracket, lance briquetting, the guide shoe pass through Bolt is fixed on guide shoe plate, and the guide shoe plate, /V block welding are arranged on straight beam, the lance fixed block, straight beam, switch Stent welding is arranged in fixed plate, and lance stent is welded on lance and is maintained at limited block in same level, and switch is logical It crosses bolt to be fixed on switch bracket, lance briquetting is fixed on by spring, bolt, lance on lance fixed block.
A kind of high-speed elevator compensation rope swelling device, it is characterised in that the tension mechanism further include axis snap-gauge, Guide wheel assemblies, casing, ward off rope device, weight linear meter, the axis snap-gauge are fixed on by bolt, guide wheel assemblies in fixed plate, The weight linear meter is connected with fixed plate, clump weight, casing, ward off rope device.
A kind of high-speed elevator compensation rope swelling device, it is characterised in that there are two the lance briquetting is set.
A kind of high-speed elevator compensation rope swelling device, it is characterised in that the clump weight is provided with four groups, sets up separately In the both sides of straight beam.
A kind of high-speed elevator compensation rope swelling device, it is characterised in that the U-shaped structure in straight beam cross section.
A kind of high-speed elevator compensation rope swelling device, it is characterised in that the safety tongs include square caliper, Voussoir, the guide plate of cylinder, the one side of the caliper are provided with opening, and guide plate passes through bolt and the caliper for being provided with opening One side connection, the gap being used cooperatively with guide rail is formed between the side of guide plate and the side wall of opening, is open away from guide rail The inner wall of one side is arranged to inclined surface, and the voussoir touches setting with inclined surface, and guide post is provided on voussoir, the guide plate On be provided with the waist type groove being used cooperatively with guide post.
A kind of high-speed elevator compensation rope swelling device, it is characterised in that the waist type groove is parallel with inclined surface to be set It puts.
Present invention compensation swelling device is connected by using chemical bolt well pit ground, saves hoistway space, is reduced Interference with each component of hoistway, meanwhile, by the way that clump weight to be arranged on to the both sides of fixed plate, avoid occupying excessive pit empty Between, realization is simple and compact for structure, easy for installation, operates steadily.
Description of the drawings
Fig. 1 is bottom plate and the structure diagram of track combination;
Fig. 2 is the structure diagram of fixing device;
Fig. 3 is clump weight and the structure diagram of expansion tightening wheel assembling;
Fig. 4 is the structure diagram of tension mechanism;
Fig. 5 is overall structure diagram of the present invention;
Fig. 6 is the structure diagram of safety tongs;
Fig. 7 is the perspective view of Fig. 6;
In figure, 1- bottom plates, 2- guide rails, 3- channel steels, 4- safety tongs, 41- calipers, 42- voussoirs, 43- guide plates, 44- openings, 45- Inclined surface, 46- guide posts, 47- waist type grooves, 5- upper beams, 6- chemical bolts, 7- expansion tightening wheels, 8- clump weights, 9- fixed plates, 10- are dust-proof Cover, 11- straight beams, 12- lances, 13- guide shoes, 14- guide shoe plates, 15- lance fixed blocks, 16- lance stents, 17- limited blocks, 18- Switch, 19- switch brackets, 20- lance briquettings, 21- axis snap-gauges, 22- guide wheel assemblies, 23- casings, 24- ward off rope device, 25- Weight linear meter.
Specific embodiment
The present invention is described in further detail below in conjunction with Figure of description, and provides specific embodiment.
As shown in Figs. 1-5, a kind of high-speed elevator compensation rope swelling device of the present invention including bottom plate, is symmetrically welded and is arranged on The guide rail and channel steel of bottom plate both sides, the safety tongs being fixed at by gravity on guide rail are connected by bolt with rail crown Upper beam, bottom plate is connected by chemical bolt with well pit ground, and tension mechanism, tensioner are provided between bottom plate and upper beam Mechanism is slidably connected between guide rail and with the guide rail of both sides, and tension mechanism includes expansion tightening wheel, is arranged on the outside of expansion tightening wheel Fixing device, clump weight, the dust cover that fixing device includes two fixed plates, is connected by bolt with two fixed plate tops, counterweight Block is symmetricly set in fixed plate.
Tension mechanism further include the U-shaped straight beam in cross section, lance, guide shoe, guide shoe plate, lance fixed block, lance stent, Limited block, switch, switch bracket, lance briquetting, guide shoe are bolted on guide shoe plate, and guide shoe plate, /V block welding are set Put on straight beam, lance fixed block, straight beam, switch bracket welding be arranged in fixed plate, lance stent be welded on lance and Be maintained at limited block in same level, switch be bolted on switch bracket, lance briquetting by spring, bolt, Lance is fixed on lance fixed block, and there are two the settings of lance briquetting, clump weight is provided with four groups, sets up separately the two of straight beam Side, clump weight can be increased and decreased according to the variation of hoisting depth, and fixed plate, the distance of clump weight to ground can be according to promotions The variation respective change of height.
Tension mechanism further includes axis snap-gauge, guide wheel assemblies, casing, ward off rope device, weight linear meter, and the axis snap-gauge passes through spiral shell Bolt, guide wheel assemblies are fixed in fixed plate, and weight linear meter is connected with fixed plate, clump weight, casing, ward off rope device.Guide wheel group Part can select 1 directive wheel or two directive wheels, grooving according to the change in location of car and counterweight, the variation of hoisting depth It can be adjusted according to the size of compensation rope.
The concrete structure of safety tongs as shown in fig. 6-7, including square caliper 41, cylindrical voussoir 42, guide plate 43, The one side of caliper 41 is provided with opening 44, and guide plate 43 is connected with the one side for the caliper 41 for being provided with opening 44 by bolt, led The gap being used cooperatively with guide rail 2 is formed between the side of plate 43 and 44 side wall that is open, opening 44 is away from 2 one side of guide rail Inner wall is arranged to inclined surface 45, and voussoir 42 touches setting with inclined surface 45, and guide post 46 is provided on voussoir 42, on guide plate 43 The waist type groove 47 being used cooperatively with guide post 46 is provided with, and waist type groove 47 is arranged in parallel with inclined surface 45.
Lance of the present invention is the minimum component of moving component, and the component and ground keep certain distance, it is ensured that compensation rope because When the excessive or device of tension elongation is beated downwards, lance contacts to earth, and causes switch motion, and elevator major loop disconnects, and ensures operation peace Entirely;When device is made to beat excessive upwards in running process of elevator, lance stent, limited block hit safety tongs, cause safety tongs Voussoir is clamped with guide rail, and lance stent drives lance athletic performance, and elevator major loop disconnects, and prevents compensation rope bounce;Work as device During falling, guide shoe plate hits safety tongs, and safety tongs voussoir is made to unclamp guide rail.

Claims (8)

1. a kind of high-speed elevator compensation rope swelling device, it is characterised in that including bottom plate(1), be symmetrically welded and be arranged on bottom plate(1) The guide rail of both sides(2)And channel steel(3), guide rail is fixed at by gravity(2)On safety tongs(4), pass through bolt and guide rail (2)The upper beam of top connection(5), the bottom plate(1)Pass through chemical bolt(6)It is connected with well pit ground, in bottom plate(1)With Upper beam(5)Between be provided with tension mechanism, tension mechanism is located at guide rail(2)Between and with the guide rail of both sides(2)It is slidably connected, institute Stating tension mechanism includes expansion tightening wheel(7), be arranged on expansion tightening wheel(7)The fixing device in outside, clump weight(8), the fixing device Including two fixed plates(9), pass through bolt and two fixed plates(9)The dust cover of top connection(10), the clump weight(8)Symmetrically set It puts in fixed plate(9)On.
2. a kind of high-speed elevator compensation rope swelling device as described in claim 1, it is characterised in that the tension mechanism also wraps Include straight beam(11), lance(12), guide shoe(13), guide shoe plate(14), lance fixed block(15), lance stent(16), limited block (17), switch(18), switch bracket(19), lance briquetting(20), the guide shoe(13)It is bolted on guide shoe plate(14) On, the guide shoe plate(14), limited block(17)Welding is arranged on straight beam(11)On, the lance fixed block(15), straight beam(11)、 Switch bracket(19)Welding is arranged on fixed plate(9)On, lance stent(16)It is welded on lance(12)Upper and and limited block(17) It is maintained in same level, switchs(18)It is bolted on switch bracket(19)On, lance briquetting(20)Pass through spring, spiral shell Bolt, lance are fixed on lance fixed block(15)On.
3. a kind of high-speed elevator compensation rope swelling device as described in claim 1, it is characterised in that the tension mechanism also wraps Include axis snap-gauge(21), guide wheel assemblies(22), casing(23), ward off rope device(24), weight linear meter(25), the axis snap-gauge(21)It is logical Cross bolt, guide wheel assemblies(22)It is fixed on fixed plate(9)On, the weight linear meter(25)With fixed plate(9), clump weight(8), set Pipe(23), ward off rope device(24)Connection.
A kind of 4. high-speed elevator compensation rope swelling device as claimed in claim 2, it is characterised in that the lance briquetting(20) There are two settings.
A kind of 5. high-speed elevator compensation rope swelling device as claimed in claim 2, it is characterised in that the clump weight(8)It sets There are four groups, set up separately in straight beam(11)Both sides.
A kind of 6. high-speed elevator compensation rope swelling device as claimed in claim 2, it is characterised in that the straight beam(11)It is transversal The U-shaped structure in face.
A kind of 7. high-speed elevator compensation rope swelling device as described in claim 1, it is characterised in that the safety tongs(4)Including Square caliper(41), cylindrical voussoir(42), guide plate(43), the caliper(41)One side be provided with opening(44), Guide plate(43)By bolt and it is provided with opening(44)Caliper(41)One side connection, guide plate(43)Side and opening (44)Side wall between formed and guide rail(2)The gap being used cooperatively, opening(44)Away from guide rail(2)The inner wall of one side is arranged to Inclined surface(45), the voussoir(42)With inclined surface(45)Touch setting, and voussoir(42)On be provided with guide post(46), it is described to lead To plate(43)On be provided with and guide post(46)The waist type groove being used cooperatively(47).
A kind of 8. high-speed elevator compensation rope swelling device as claimed in claim 7, it is characterised in that the waist type groove(47)With Inclined surface(45)It is arranged in parallel.
CN201810088892.3A 2018-01-30 2018-01-30 A kind of high-speed elevator compensation rope swelling device Pending CN108100817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810088892.3A CN108100817A (en) 2018-01-30 2018-01-30 A kind of high-speed elevator compensation rope swelling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810088892.3A CN108100817A (en) 2018-01-30 2018-01-30 A kind of high-speed elevator compensation rope swelling device

Publications (1)

Publication Number Publication Date
CN108100817A true CN108100817A (en) 2018-06-01

Family

ID=62221495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810088892.3A Pending CN108100817A (en) 2018-01-30 2018-01-30 A kind of high-speed elevator compensation rope swelling device

Country Status (1)

Country Link
CN (1) CN108100817A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502676A (en) * 2018-06-27 2018-09-07 苏州莱茵电梯股份有限公司 High-speed elevator compensation rope tension device
CN108928707A (en) * 2018-09-11 2018-12-04 广东川田电梯有限公司 Cargo lift assembly
CN109607353A (en) * 2018-12-25 2019-04-12 宁波宏大电梯有限公司 A kind of Zhang Sheng mechanism and the rope device that rises with the Zhang Sheng mechanism
CN110436303A (en) * 2019-08-27 2019-11-12 森赫电梯股份有限公司 A kind of high-adaptability elevator speed limit tensioning device
CN110626923A (en) * 2019-10-12 2019-12-31 中际联合(北京)科技股份有限公司 Lifting equipment

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0440839A1 (en) * 1990-02-06 1991-08-14 Thyssen Aufzüge Gmbh Arrangement to prevent uncontrolled movement of elevators
CN101920882A (en) * 2010-08-23 2010-12-22 康力电梯股份有限公司 Compensating device for elevator
CN202829204U (en) * 2012-05-13 2013-03-27 安徽丰海起重设备制造有限公司 High-reliability lift cage anti-drop safety device
JP2013166606A (en) * 2012-02-14 2013-08-29 Mitsubishi Electric Building Techno Service Co Ltd Elevator compensation device and connecting device
CN204607309U (en) * 2015-01-30 2015-09-02 欧姆尼机电科技(昆山)有限公司 A kind of compensating rope of elevator anti-bouncing device
CN205472123U (en) * 2016-02-24 2016-08-17 江苏伯爵电梯股份有限公司 High -speed elevator tight pulley device that rises
CN205603019U (en) * 2016-04-06 2016-09-28 西继迅达(许昌)电梯有限公司 High -speed terraced compensating rope overspeed device tensioner
CN106865383A (en) * 2017-03-13 2017-06-20 天奥电梯(中国)有限公司 High-speed elevator compensation swelling device
CN207903702U (en) * 2018-01-30 2018-09-25 浙江巨人控股有限公司 A kind of high-speed elevator compensation rope swelling device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0440839A1 (en) * 1990-02-06 1991-08-14 Thyssen Aufzüge Gmbh Arrangement to prevent uncontrolled movement of elevators
CN101920882A (en) * 2010-08-23 2010-12-22 康力电梯股份有限公司 Compensating device for elevator
JP2013166606A (en) * 2012-02-14 2013-08-29 Mitsubishi Electric Building Techno Service Co Ltd Elevator compensation device and connecting device
CN202829204U (en) * 2012-05-13 2013-03-27 安徽丰海起重设备制造有限公司 High-reliability lift cage anti-drop safety device
CN204607309U (en) * 2015-01-30 2015-09-02 欧姆尼机电科技(昆山)有限公司 A kind of compensating rope of elevator anti-bouncing device
CN205472123U (en) * 2016-02-24 2016-08-17 江苏伯爵电梯股份有限公司 High -speed elevator tight pulley device that rises
CN205603019U (en) * 2016-04-06 2016-09-28 西继迅达(许昌)电梯有限公司 High -speed terraced compensating rope overspeed device tensioner
CN106865383A (en) * 2017-03-13 2017-06-20 天奥电梯(中国)有限公司 High-speed elevator compensation swelling device
CN207903702U (en) * 2018-01-30 2018-09-25 浙江巨人控股有限公司 A kind of high-speed elevator compensation rope swelling device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
本书编委会: "《新编建设工程质量安全管理实务全书》", 31 July 2008, 企业管理出版社, pages: 783 - 784 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502676A (en) * 2018-06-27 2018-09-07 苏州莱茵电梯股份有限公司 High-speed elevator compensation rope tension device
CN108928707A (en) * 2018-09-11 2018-12-04 广东川田电梯有限公司 Cargo lift assembly
CN108928707B (en) * 2018-09-11 2023-12-08 广东川田电梯有限公司 Cargo lift assembly
CN109607353A (en) * 2018-12-25 2019-04-12 宁波宏大电梯有限公司 A kind of Zhang Sheng mechanism and the rope device that rises with the Zhang Sheng mechanism
CN110436303A (en) * 2019-08-27 2019-11-12 森赫电梯股份有限公司 A kind of high-adaptability elevator speed limit tensioning device
CN110626923A (en) * 2019-10-12 2019-12-31 中际联合(北京)科技股份有限公司 Lifting equipment

Similar Documents

Publication Publication Date Title
CN108100817A (en) A kind of high-speed elevator compensation rope swelling device
AU2001285634B2 (en) Elevator with drive unit mounted in a superior lateral section of the elevator hoistway
EP2755907B1 (en) Suspension arrangement and guide shoe arrangement for an elevator
CN108840198B (en) Super high-speed elevator
CN108861966B (en) Knapsack formula elevator with wrap up in plastic wire rope
CN111776979A (en) High-speed large-stroke elevator
CN207903702U (en) A kind of high-speed elevator compensation rope swelling device
JP5368289B2 (en) Elevator equipment
CN208950401U (en) Suspension type garage parking
CN204607309U (en) A kind of compensating rope of elevator anti-bouncing device
CN109812093A (en) Parking systems and its control method
US6302239B1 (en) Elevator apparatus with hoisting machine beneath elevator car
CN205472123U (en) High -speed elevator tight pulley device that rises
CN208950399U (en) Parking systems
JP2009541181A (en) Elevator installation with reduced hoistway dimensions
JP6318022B2 (en) Elevator
CN105366488A (en) Compensation device of lift
CN214269848U (en) Shallow pit elevator top-hanging rope winding structure
CN209481024U (en) One kind having computer room Steel belt elevator
CN211895612U (en) High-speed ladder shock attenuation compensation chain guider
CN213202043U (en) Elevator with circulation compensation chain
CN210763791U (en) Rear-mounted counterweight double-car top wheel structure for large net depth well of elevator
CN110040601B (en) H-shaped frame for double-deck elevator
CN209568759U (en) Parking systems
CN213923644U (en) Elevator counterweight buffer device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190104

Address after: 313009 Shengli Road 698, Nanxun Town, Nanxun District, Huzhou City, Zhejiang Province

Applicant after: Julong Elevator Co., Ltd.

Address before: 313009 Shengli Road 698, Nanxun Town, Nanxun District, Huzhou City, Zhejiang Province

Applicant before: Zhejiang Giant Holding Co., Ltd.