CN108053155A - Segmented caravan vehicle Parts List method for building up - Google Patents
Segmented caravan vehicle Parts List method for building up Download PDFInfo
- Publication number
- CN108053155A CN108053155A CN201711260426.0A CN201711260426A CN108053155A CN 108053155 A CN108053155 A CN 108053155A CN 201711260426 A CN201711260426 A CN 201711260426A CN 108053155 A CN108053155 A CN 108053155A
- Authority
- CN
- China
- Prior art keywords
- parts list
- platform truck
- piece installing
- vehicle
- caravan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q10/0875—Itemisation or classification of parts, supplies or services, e.g. bill of materials
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/22—Indexing; Data structures therefor; Storage structures
- G06F16/2228—Indexing structures
Abstract
The present invention relates to vehicle production Row control field more particularly to a kind of caravan Parts List method for building up.A kind of segmented caravan vehicle Parts List method for building up, establishes mutually independent platform truck and room piece installing Parts List database;Unique bicycle material number is set up for platform truck configuration;Platform truck index corresponding with bicycle material number is set up in room piece installing Parts List database, platform truck is configured as a part and is added in room piece installing Parts List database;The room piece installing BOM of a certain vehicle is calculated by Boolean calculation method and the merging of bicycle material number obtains the Parts List of caravan vehicle.The present invention is directed to the characteristics of caravan vehicle, platform truck Parts List and room piece installing Parts List are split, and it is added to platform truck Parts List as a part in room piece installing Parts List, meet the development and production demand of caravan vehicle, simplify BOM maintenances, reduce BOM synchronously change control difficulty, and add the flexibility of caravan BOM data.
Description
Technical field
The present invention relates to vehicle production Row control field more particularly to a kind of caravan Parts List method for building up.
Background technology
The more ripe vehicle Parts List generation method that Automobile Enterprises use at present mainly divides 2 kinds:1) bicycle is independently matched somebody with somebody
Vehicle Parts List BOM is put, independent BOM data is carried out to each different configuration of vehicle, different automobile types are safeguarded multiple respectively
Bicycle BOM;2) method for uniformly establishing vehicle Parts List uses all parts in platform by configuration feature constraint
Conditional definition, by the selection to vehicle configuration feature, derivation calculates the part being used to and corresponding bicycle BOM.This
Two methods cut both ways, and are also respectively suitable for different enterprises, and it is big that the former common elements need to repeat maintenance workload, but maintenance difficulties
Relatively low, small suitable for vehicle scope, automobile type configuration is simple, the relatively low enterprise of change frequency;The latter's common elements need to only safeguard once,
But each part needs to define use condition, and maintenance difficulties are higher, wide suitable for vehicle scope, and automobile type configuration is complicated, change frequency
The higher enterprise of rate.
The establishment model of above-mentioned 2 kinds of vehicle Parts Lists is all that complete vehicle BOM is uniformly processed, vehicle system
Process is made not to be segmented continuously, and the vehicle business model of caravan determines that it on multiple and different vehicle platforms install additional
Demand and possibility, caravan vehicle manufacturing mode have the characteristics that platform truck and room piece installing partial segments manufacture, with other production
The vehicle manufacturing mode of product has differences.Above-mentioned 2 kinds of vehicle Parts Lists are applied to have on caravan vehicle significant inadaptable, face
The BOM data for facing platform truck repeats maintenance, synchronous change is difficult to control, data are inconsistent, and piece installing BOM patterns in room are single, flexibility
The problems such as not high.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of segmented caravan vehicle Parts List method for building up, the party
Method is directed to the characteristics of caravan vehicle, and platform truck Parts List and room piece installing Parts List are split, and by platform truck Parts List
It is added to as a part in room piece installing Parts List, meets the development and production demand of caravan vehicle;Have on configuration mode
It is novel flexibly, simplify the characteristics of efficient, BOM data uniformity and accuracy can obtain effective guarantee, and engineering staff is into line number
Easier according to attended operation, the response for also manufacturing link to accelerating downstream has progradation, is especially setting foot in caravan, is changing
Entrucking, the Che Qizhong in new energy vehicle field have higher promotional value.
What the present invention was realized in:A kind of segmented caravan vehicle Parts List method for building up, comprises the following steps:
S1. mutually independent platform truck Parts List database and room piece installing Parts List database are established, and is platform
Vehicle part
Part configuration search index in inventory database and room piece installing Parts List database;
S2. the search index in platform truck Parts List database sets platform truck configuration for a certain bicycle, and is
Platform truck
Unique bicycle material number is set up in configuration;
S3. platform truck index corresponding with bicycle material number is set up in room piece installing Parts List database, by platform truck
Configuration is made
It is added to for a part in room piece installing Parts List database;
S4. using the search index in room piece installing Parts List database, a certain vehicle is calculated by Boolean calculation method
Room
Piece installing Parts List, and obtain the bicycle material number of corresponding platform truck configuration;
S5. obtained by bicycle material number in platform truck Parts List database after platform truck Parts List with room piece installing
Part is clear
Single merging obtains the Parts List of caravan vehicle.
In the step S1, platform truck Parts List database and room piece installing Parts List database separate independent, difference
Possess respective data room.
In the step S2, the search index include the use of condition, material number, part grouping, installation site, dosage,
Product type.
The use condition is characterized including multiple binding characteristics.
In the step S4, created and linked by bicycle material number between room piece installing Parts List and platform truck configuration, it is real
Now mutual assembly relation.
The specific method of the linkage is caravan vehicle configuration selected first;Then room piece installing Parts List data are utilized
Storehouse parses room piece installing Parts List and bicycle material number by Boolean calculation, and obtaining platform truck further according to bicycle material number matches somebody with somebody
It puts;Eventually by platform truck configuration platform truck Parts List is parsed with Boolean calculation in platform truck Parts List database.
Segmented caravan vehicle Parts List method for building up of the present invention is directed to the characteristics of caravan vehicle, and platform truck part is clear
Single and room piece installing Parts List is split, and is added to platform truck Parts List as a part in room piece installing Parts List,
Meet the development and production demand of caravan vehicle;Have the characteristics that novelty is flexible, it is efficient to simplify on configuration mode, BOM data is consistent
Property and accuracy can obtain effective guarantee, it is easier that engineering staff carries out data maintaining operation, also to accelerating downstream production system
The response for making link has progradation;BOM maintenances are simplified, reduce BOM synchronously change control difficulty, and add room
The flexibility of vehicle BOM data can preferably adapt to various caravan models exploitation needs, promote caravan business sustainable development, especially
Set foot in caravan, refitted car, new energy vehicle field Che Qizhong have higher promotional value.
Description of the drawings
Fig. 1 is the logic diagram of segmented caravan vehicle Parts List method for building up of the present invention.
Specific embodiment
With reference to specific embodiment, the present invention is further explained.It is to be understood that these embodiments are merely to illustrate the present invention
Rather than it limits the scope of the invention.In addition, it should also be understood that, after the content of the invention stated has been read, people in the art
Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited
Scope.
Embodiment 1
Such as Fig. 1, a kind of segmented caravan vehicle Parts List method for building up comprises the following steps:
S1. mutually independent platform truck Parts List database and room piece installing Parts List database are established, and is platform
Part configuration search index in vehicle Parts List database and room piece installing Parts List database;Platform truck Parts List data
Storehouse and room piece installing Parts List database separate independently, possess respective data room respectively.
S2. the search index in platform truck Parts List database sets platform truck configuration for a certain bicycle, and is
Unique bicycle material number is set up in platform truck configuration;In the present invention, each part is determined in order to convenient, fast
Position, the search index include the use of condition, material number, part grouping, installation site, dosage, product type;In the present embodiment
In, preferably, use condition is characterized including multiple binding characteristics.
S3. platform truck index corresponding with bicycle material number is set up in room piece installing Parts List database, by platform truck
Configuration is added to as a part in room piece installing Parts List database;
S4. using the search index in room piece installing Parts List database, a certain vehicle is calculated by Boolean calculation method
Room piece installing Parts List BOM, and obtain the bicycle material number of corresponding platform truck configuration;At this point, room piece installing part is clear
It is created and linked by bicycle material number between list and platform truck configuration, mutual assembly relation is realized, to support platform truck order
Independent scheduling manufacturing process;
In the present embodiment, the specific method of the linkage is caravan vehicle configuration selected first;Then room piece installing is utilized
Parts List database parses room piece installing Parts List BOM and bicycle material number by Boolean calculation, further according to bicycle material
Number obtain platform truck configuration;It is parsed eventually by platform truck configuration in platform truck Parts List database with Boolean calculation flat
Trolley Parts List BOM.
S5. obtained by bicycle material number in platform truck Parts List database after platform truck Parts List with room piece installing
Parts List merges to obtain the Parts List of caravan vehicle;It is final to realize that room piece installing BOM data be with multiple and different platforms
Vehicle Parts List BOM is several flexibly to establish interaction relation according to actual demand, and final production produces various different structures and work(
The caravan vehicle vehicle of energy meets a variety of demands of different user.
Embodiment:
1) a vehicle Parts List system is configured
2) platform truck Parts List database and room piece installing Parts List database are established respectively;
Platform truck configuration data table 1:
Feature code | Vehicle model 1 | Vehicle model 2 |
A001 | √ | _ |
A002 | _ | √ |
B001 | √ | _ |
B002 | _ | √ |
Platform truck part search index table 2:
Raw material | Title | Use condition | Quantity |
P001 | Engine1 | A001&B001 | 1 |
P002 | Engine2 | A002&B002 | 1 |
P003 | Bracket1 | A001&B001 | 1 |
P004 | Bracket2 | A002&B002 | 1 |
Caravan configuration data table 3:
Feature code | Caravan model 3 | Caravan model 4 |
C001 | √ | _ |
C002 | _ | √ |
D001 | √ | _ |
D002 | _ | √ |
Caravan part search index table 4:
Raw material | Title | Use condition | Quantity | Part numbers |
P005 | bed1 | C001&D001 | 1 | T1 |
P006 | bed2 | C002&D002 | 1 | T1 |
P007 | Vehicle model 1 | C001&D001 | 1 | T2 |
P008 | Vehicle model 2 | C002&D002 | 1 | T2 |
3) caravan configuration is selected in upper table 3, if caravan model 3 is with C001&D001;
4) calculated in upper table 4 by Boolean calculation and obtain P005, P007;
5) the bicycle material number found in upper table 4 according to part numbers in P007 is vehicle model 1;
6) upper table 1 finds the configuration of vehicle model 1 in platform truck, i.e. A001&B001;
7) P001, P003, the scheduling process of independent startup vehicle model 1 are found by Boolean calculation in upper table 2;
8) P001, P003, P005 for finding are merged into generation caravan vehicle Parts List;
Each business module in downstream is transferred to by overall data stream, realizes the manufacturing process of quick response caravan vehicle.
The present invention is not limited to above-mentioned specific embodiments, on the basis of disclosed embodiment, the technology neck
The technical staff in domain can carry out being combined different technical characteristics with reference to objective condition, realize different technical solutions.
Claims (6)
1. a kind of segmented caravan vehicle Parts List method for building up, it is characterized in that, comprise the following steps:
S1. mutually independent platform truck Parts List database and room piece installing Parts List database are established, and is platform truck zero
Part configuration search index in part inventory database and room piece installing Parts List database;
S2. the search index in platform truck Parts List database sets platform truck configuration for a certain bicycle, and is platform
Unique bicycle material number is set up in vehicle configuration;
S3. platform truck index corresponding with bicycle material number is set up in room piece installing Parts List database, platform truck is configured
It is added to as a part in room piece installing Parts List database;
S4. using the search index in room piece installing Parts List database, a certain vehicle is calculated by Boolean calculation method
Room piece installing Parts List, and obtain the bicycle material number of corresponding platform truck configuration;
S5. obtained by bicycle material number in platform truck Parts List database after platform truck Parts List with room piece installing part
Inventory merges to obtain the Parts List of caravan vehicle.
2. segmented caravan vehicle Parts List method for building up as described in claim 1, it is characterized in that:In the step S1,
Platform truck Parts List database and room piece installing Parts List database separate independently, possess respective data room respectively.
3. segmented caravan vehicle Parts List method for building up as described in claim 1, it is characterized in that:In the step S2,
The search index includes the use of condition, material number, part grouping, installation site, dosage, product type.
4. segmented caravan vehicle Parts List method for building up as claimed in claim 3, it is characterized in that:The use condition bag
Include multiple binding characteristic characterizations.
5. segmented caravan vehicle Parts List method for building up as described in claim 1, it is characterized in that:In the step S4,
It is created and linked by bicycle material number between room piece installing Parts List and platform truck configuration, realize mutual assembly relation.
6. segmented caravan vehicle Parts List method for building up as claimed in claim 5, it is characterized in that:The linkage it is specific
Method is caravan vehicle configuration selected first;Then room is parsed by Boolean calculation using room piece installing Parts List database
Piece installing Parts List and bicycle material number obtain platform truck configuration further according to bicycle material number;Exist eventually by platform truck configuration
In platform truck Parts List database platform truck Parts List is parsed with Boolean calculation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711260426.0A CN108053155B (en) | 2017-12-04 | 2017-12-04 | Method for establishing whole vehicle part list of sectional type motor home |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711260426.0A CN108053155B (en) | 2017-12-04 | 2017-12-04 | Method for establishing whole vehicle part list of sectional type motor home |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108053155A true CN108053155A (en) | 2018-05-18 |
CN108053155B CN108053155B (en) | 2021-11-30 |
Family
ID=62122065
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711260426.0A Active CN108053155B (en) | 2017-12-04 | 2017-12-04 | Method for establishing whole vehicle part list of sectional type motor home |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108053155B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110659866A (en) * | 2019-04-15 | 2020-01-07 | 南京依维柯汽车有限公司 | Method for releasing BOM from PDM system to ERP system |
CN110989546A (en) * | 2019-10-18 | 2020-04-10 | 浙江合众新能源汽车有限公司 | Vehicle software data management method |
CN111049937A (en) * | 2019-12-31 | 2020-04-21 | 长城汽车股份有限公司 | Data processing system and data transmission method of intelligent networked automobile |
CN111125834A (en) * | 2019-12-17 | 2020-05-08 | 东风商用车有限公司 | Method and system for generating configuration component list of automobile air supply pipeline system |
CN111949670A (en) * | 2019-05-15 | 2020-11-17 | 上海汽车集团股份有限公司 | Data processing method and device |
CN112182902A (en) * | 2020-10-12 | 2021-01-05 | 东风汽车集团有限公司 | Product data management and three-dimensional auxiliary platform digital-analog assembly method and device |
CN113032457A (en) * | 2021-03-19 | 2021-06-25 | 山东英信计算机技术有限公司 | Method and device for maintaining database information of bill of material |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101334868A (en) * | 2007-06-28 | 2008-12-31 | 英业达股份有限公司 | Client part bill production system and its computer readable medium |
CN101464873A (en) * | 2007-12-20 | 2009-06-24 | 英业达股份有限公司 | Material list establishing method and system |
US7834758B2 (en) * | 2007-10-31 | 2010-11-16 | General Motors Llc | In-vehicle entertainment method and system for executing the same |
CN103593727A (en) * | 2013-10-25 | 2014-02-19 | 长安标致雪铁龙汽车有限公司 | Car manufacturing BOM management method and management system |
CN106327100A (en) * | 2016-08-31 | 2017-01-11 | 北京汽车研究总院有限公司 | Change list generation method and device |
-
2017
- 2017-12-04 CN CN201711260426.0A patent/CN108053155B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101334868A (en) * | 2007-06-28 | 2008-12-31 | 英业达股份有限公司 | Client part bill production system and its computer readable medium |
US7834758B2 (en) * | 2007-10-31 | 2010-11-16 | General Motors Llc | In-vehicle entertainment method and system for executing the same |
CN101464873A (en) * | 2007-12-20 | 2009-06-24 | 英业达股份有限公司 | Material list establishing method and system |
CN103593727A (en) * | 2013-10-25 | 2014-02-19 | 长安标致雪铁龙汽车有限公司 | Car manufacturing BOM management method and management system |
CN106327100A (en) * | 2016-08-31 | 2017-01-11 | 北京汽车研究总院有限公司 | Change list generation method and device |
Non-Patent Citations (2)
Title |
---|
李波灏: "移动之家——记早期独具专用底盘的GMC Motorhome房车", 《专用汽车》 * |
李涛: "车用空调装配车间生产作业动态调度方法研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110659866A (en) * | 2019-04-15 | 2020-01-07 | 南京依维柯汽车有限公司 | Method for releasing BOM from PDM system to ERP system |
CN110659866B (en) * | 2019-04-15 | 2023-09-08 | 南京依维柯汽车有限公司 | Method for releasing BOM from PDM system to ERP system |
CN111949670A (en) * | 2019-05-15 | 2020-11-17 | 上海汽车集团股份有限公司 | Data processing method and device |
CN111949670B (en) * | 2019-05-15 | 2024-05-07 | 上海汽车集团股份有限公司 | Data processing method and device |
CN110989546A (en) * | 2019-10-18 | 2020-04-10 | 浙江合众新能源汽车有限公司 | Vehicle software data management method |
CN111125834A (en) * | 2019-12-17 | 2020-05-08 | 东风商用车有限公司 | Method and system for generating configuration component list of automobile air supply pipeline system |
CN111049937A (en) * | 2019-12-31 | 2020-04-21 | 长城汽车股份有限公司 | Data processing system and data transmission method of intelligent networked automobile |
CN112182902A (en) * | 2020-10-12 | 2021-01-05 | 东风汽车集团有限公司 | Product data management and three-dimensional auxiliary platform digital-analog assembly method and device |
CN113032457A (en) * | 2021-03-19 | 2021-06-25 | 山东英信计算机技术有限公司 | Method and device for maintaining database information of bill of material |
CN113032457B (en) * | 2021-03-19 | 2022-12-02 | 山东英信计算机技术有限公司 | Method and device for maintaining database information of bill of material |
Also Published As
Publication number | Publication date |
---|---|
CN108053155B (en) | 2021-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108053155A (en) | Segmented caravan vehicle Parts List method for building up | |
CN104331767B (en) | For the multisystem cooperative system and method for the control of Discrete Manufacturing Enterprise production process | |
CN106325887A (en) | Service process management method based on Activiti | |
AU2018388777B2 (en) | Managing concrete mix design catalogs | |
CN103593727A (en) | Car manufacturing BOM management method and management system | |
CN101364288A (en) | Method for constructing BOM container based on SOA architecture | |
CN101859405A (en) | Method for synchronizing data between BOMs by utilizing implicit BOM model | |
CN105302803A (en) | Product BOM difference analyzing and synchronous updating method | |
CN102542396A (en) | Tire vulcanizing production control system and operation adjusting method | |
CN108509198A (en) | A kind of product electronic albums construction method based on neutral BOM | |
CN104517014B (en) | A kind of product automatic assembly design system based on Pro/E | |
CN107679788A (en) | Towards the BOM checking methods of C2B products | |
CN105868357B (en) | File managing and control system and method | |
CN101561899A (en) | MBOM increasingly receiving method with integration of design, production and management | |
CN101477656A (en) | Implementation process for scheduling production tasks in accordance with production capability gradually in production management process | |
CN105224712A (en) | A kind of disposal route of bullet train product meta-model and device | |
CN104599192A (en) | Logic centralization based global distributed global full-network model maintenance method | |
CN105512393A (en) | PDM (product data management) connection method and device for rapid design of high-speed train | |
CN102024183A (en) | Enterprise information management system | |
CN107480846A (en) | A kind of method that aeronautical product standard component demand is provided | |
CN105955209A (en) | Manufacturing industry factory equipment layout method based on data mining | |
CN101308518B (en) | Topology element name corresponding method for copy type synergic modeling system | |
CN103064877A (en) | Method for producing BOM (Bill of Material) memory model building based on XML (extensive markup language) | |
CN107292967B (en) | Method for building three-dimensional configurable BOM (Bill of Material) containing skeleton based on geometric feature mapping | |
CN105225024A (en) | The execution of management manufacturing order |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |