CN108053155A - Segmented caravan vehicle Parts List method for building up - Google Patents

Segmented caravan vehicle Parts List method for building up Download PDF

Info

Publication number
CN108053155A
CN108053155A CN201711260426.0A CN201711260426A CN108053155A CN 108053155 A CN108053155 A CN 108053155A CN 201711260426 A CN201711260426 A CN 201711260426A CN 108053155 A CN108053155 A CN 108053155A
Authority
CN
China
Prior art keywords
parts list
platform truck
piece installing
vehicle
caravan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711260426.0A
Other languages
Chinese (zh)
Other versions
CN108053155B (en
Inventor
陈秋菊
徐杨
陈凤佳
徐伟伦
刘妍恺
李冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SAIC Motor Corp Ltd
Original Assignee
SAIC Motor Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SAIC Motor Corp Ltd filed Critical SAIC Motor Corp Ltd
Priority to CN201711260426.0A priority Critical patent/CN108053155B/en
Publication of CN108053155A publication Critical patent/CN108053155A/en
Application granted granted Critical
Publication of CN108053155B publication Critical patent/CN108053155B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2228Indexing structures

Abstract

The present invention relates to vehicle production Row control field more particularly to a kind of caravan Parts List method for building up.A kind of segmented caravan vehicle Parts List method for building up, establishes mutually independent platform truck and room piece installing Parts List database;Unique bicycle material number is set up for platform truck configuration;Platform truck index corresponding with bicycle material number is set up in room piece installing Parts List database, platform truck is configured as a part and is added in room piece installing Parts List database;The room piece installing BOM of a certain vehicle is calculated by Boolean calculation method and the merging of bicycle material number obtains the Parts List of caravan vehicle.The present invention is directed to the characteristics of caravan vehicle, platform truck Parts List and room piece installing Parts List are split, and it is added to platform truck Parts List as a part in room piece installing Parts List, meet the development and production demand of caravan vehicle, simplify BOM maintenances, reduce BOM synchronously change control difficulty, and add the flexibility of caravan BOM data.

Description

Segmented caravan vehicle Parts List method for building up
Technical field
The present invention relates to vehicle production Row control field more particularly to a kind of caravan Parts List method for building up.
Background technology
The more ripe vehicle Parts List generation method that Automobile Enterprises use at present mainly divides 2 kinds:1) bicycle is independently matched somebody with somebody Vehicle Parts List BOM is put, independent BOM data is carried out to each different configuration of vehicle, different automobile types are safeguarded multiple respectively Bicycle BOM;2) method for uniformly establishing vehicle Parts List uses all parts in platform by configuration feature constraint Conditional definition, by the selection to vehicle configuration feature, derivation calculates the part being used to and corresponding bicycle BOM.This Two methods cut both ways, and are also respectively suitable for different enterprises, and it is big that the former common elements need to repeat maintenance workload, but maintenance difficulties Relatively low, small suitable for vehicle scope, automobile type configuration is simple, the relatively low enterprise of change frequency;The latter's common elements need to only safeguard once, But each part needs to define use condition, and maintenance difficulties are higher, wide suitable for vehicle scope, and automobile type configuration is complicated, change frequency The higher enterprise of rate.
The establishment model of above-mentioned 2 kinds of vehicle Parts Lists is all that complete vehicle BOM is uniformly processed, vehicle system Process is made not to be segmented continuously, and the vehicle business model of caravan determines that it on multiple and different vehicle platforms install additional Demand and possibility, caravan vehicle manufacturing mode have the characteristics that platform truck and room piece installing partial segments manufacture, with other production The vehicle manufacturing mode of product has differences.Above-mentioned 2 kinds of vehicle Parts Lists are applied to have on caravan vehicle significant inadaptable, face The BOM data for facing platform truck repeats maintenance, synchronous change is difficult to control, data are inconsistent, and piece installing BOM patterns in room are single, flexibility The problems such as not high.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of segmented caravan vehicle Parts List method for building up, the party Method is directed to the characteristics of caravan vehicle, and platform truck Parts List and room piece installing Parts List are split, and by platform truck Parts List It is added to as a part in room piece installing Parts List, meets the development and production demand of caravan vehicle;Have on configuration mode It is novel flexibly, simplify the characteristics of efficient, BOM data uniformity and accuracy can obtain effective guarantee, and engineering staff is into line number Easier according to attended operation, the response for also manufacturing link to accelerating downstream has progradation, is especially setting foot in caravan, is changing Entrucking, the Che Qizhong in new energy vehicle field have higher promotional value.
What the present invention was realized in:A kind of segmented caravan vehicle Parts List method for building up, comprises the following steps:
S1. mutually independent platform truck Parts List database and room piece installing Parts List database are established, and is platform Vehicle part
Part configuration search index in inventory database and room piece installing Parts List database;
S2. the search index in platform truck Parts List database sets platform truck configuration for a certain bicycle, and is Platform truck
Unique bicycle material number is set up in configuration;
S3. platform truck index corresponding with bicycle material number is set up in room piece installing Parts List database, by platform truck Configuration is made
It is added to for a part in room piece installing Parts List database;
S4. using the search index in room piece installing Parts List database, a certain vehicle is calculated by Boolean calculation method Room
Piece installing Parts List, and obtain the bicycle material number of corresponding platform truck configuration;
S5. obtained by bicycle material number in platform truck Parts List database after platform truck Parts List with room piece installing Part is clear
Single merging obtains the Parts List of caravan vehicle.
In the step S1, platform truck Parts List database and room piece installing Parts List database separate independent, difference Possess respective data room.
In the step S2, the search index include the use of condition, material number, part grouping, installation site, dosage, Product type.
The use condition is characterized including multiple binding characteristics.
In the step S4, created and linked by bicycle material number between room piece installing Parts List and platform truck configuration, it is real Now mutual assembly relation.
The specific method of the linkage is caravan vehicle configuration selected first;Then room piece installing Parts List data are utilized Storehouse parses room piece installing Parts List and bicycle material number by Boolean calculation, and obtaining platform truck further according to bicycle material number matches somebody with somebody It puts;Eventually by platform truck configuration platform truck Parts List is parsed with Boolean calculation in platform truck Parts List database.
Segmented caravan vehicle Parts List method for building up of the present invention is directed to the characteristics of caravan vehicle, and platform truck part is clear Single and room piece installing Parts List is split, and is added to platform truck Parts List as a part in room piece installing Parts List, Meet the development and production demand of caravan vehicle;Have the characteristics that novelty is flexible, it is efficient to simplify on configuration mode, BOM data is consistent Property and accuracy can obtain effective guarantee, it is easier that engineering staff carries out data maintaining operation, also to accelerating downstream production system The response for making link has progradation;BOM maintenances are simplified, reduce BOM synchronously change control difficulty, and add room The flexibility of vehicle BOM data can preferably adapt to various caravan models exploitation needs, promote caravan business sustainable development, especially Set foot in caravan, refitted car, new energy vehicle field Che Qizhong have higher promotional value.
Description of the drawings
Fig. 1 is the logic diagram of segmented caravan vehicle Parts List method for building up of the present invention.
Specific embodiment
With reference to specific embodiment, the present invention is further explained.It is to be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after the content of the invention stated has been read, people in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Scope.
Embodiment 1
Such as Fig. 1, a kind of segmented caravan vehicle Parts List method for building up comprises the following steps:
S1. mutually independent platform truck Parts List database and room piece installing Parts List database are established, and is platform Part configuration search index in vehicle Parts List database and room piece installing Parts List database;Platform truck Parts List data Storehouse and room piece installing Parts List database separate independently, possess respective data room respectively.
S2. the search index in platform truck Parts List database sets platform truck configuration for a certain bicycle, and is Unique bicycle material number is set up in platform truck configuration;In the present invention, each part is determined in order to convenient, fast Position, the search index include the use of condition, material number, part grouping, installation site, dosage, product type;In the present embodiment In, preferably, use condition is characterized including multiple binding characteristics.
S3. platform truck index corresponding with bicycle material number is set up in room piece installing Parts List database, by platform truck Configuration is added to as a part in room piece installing Parts List database;
S4. using the search index in room piece installing Parts List database, a certain vehicle is calculated by Boolean calculation method Room piece installing Parts List BOM, and obtain the bicycle material number of corresponding platform truck configuration;At this point, room piece installing part is clear It is created and linked by bicycle material number between list and platform truck configuration, mutual assembly relation is realized, to support platform truck order Independent scheduling manufacturing process;
In the present embodiment, the specific method of the linkage is caravan vehicle configuration selected first;Then room piece installing is utilized Parts List database parses room piece installing Parts List BOM and bicycle material number by Boolean calculation, further according to bicycle material Number obtain platform truck configuration;It is parsed eventually by platform truck configuration in platform truck Parts List database with Boolean calculation flat Trolley Parts List BOM.
S5. obtained by bicycle material number in platform truck Parts List database after platform truck Parts List with room piece installing Parts List merges to obtain the Parts List of caravan vehicle;It is final to realize that room piece installing BOM data be with multiple and different platforms Vehicle Parts List BOM is several flexibly to establish interaction relation according to actual demand, and final production produces various different structures and work( The caravan vehicle vehicle of energy meets a variety of demands of different user.
Embodiment:
1) a vehicle Parts List system is configured
2) platform truck Parts List database and room piece installing Parts List database are established respectively;
Platform truck configuration data table 1:
Feature code Vehicle model 1 Vehicle model 2
A001 _
A002 _
B001 _
B002 _
Platform truck part search index table 2:
Raw material Title Use condition Quantity
P001 Engine1 A001&B001 1
P002 Engine2 A002&B002 1
P003 Bracket1 A001&B001 1
P004 Bracket2 A002&B002 1
Caravan configuration data table 3:
Feature code Caravan model 3 Caravan model 4
C001 _
C002 _
D001 _
D002 _
Caravan part search index table 4:
Raw material Title Use condition Quantity Part numbers
P005 bed1 C001&D001 1 T1
P006 bed2 C002&D002 1 T1
P007 Vehicle model 1 C001&D001 1 T2
P008 Vehicle model 2 C002&D002 1 T2
3) caravan configuration is selected in upper table 3, if caravan model 3 is with C001&D001;
4) calculated in upper table 4 by Boolean calculation and obtain P005, P007;
5) the bicycle material number found in upper table 4 according to part numbers in P007 is vehicle model 1;
6) upper table 1 finds the configuration of vehicle model 1 in platform truck, i.e. A001&B001;
7) P001, P003, the scheduling process of independent startup vehicle model 1 are found by Boolean calculation in upper table 2;
8) P001, P003, P005 for finding are merged into generation caravan vehicle Parts List;
Each business module in downstream is transferred to by overall data stream, realizes the manufacturing process of quick response caravan vehicle.
The present invention is not limited to above-mentioned specific embodiments, on the basis of disclosed embodiment, the technology neck The technical staff in domain can carry out being combined different technical characteristics with reference to objective condition, realize different technical solutions.

Claims (6)

1. a kind of segmented caravan vehicle Parts List method for building up, it is characterized in that, comprise the following steps:
S1. mutually independent platform truck Parts List database and room piece installing Parts List database are established, and is platform truck zero Part configuration search index in part inventory database and room piece installing Parts List database;
S2. the search index in platform truck Parts List database sets platform truck configuration for a certain bicycle, and is platform Unique bicycle material number is set up in vehicle configuration;
S3. platform truck index corresponding with bicycle material number is set up in room piece installing Parts List database, platform truck is configured It is added to as a part in room piece installing Parts List database;
S4. using the search index in room piece installing Parts List database, a certain vehicle is calculated by Boolean calculation method Room piece installing Parts List, and obtain the bicycle material number of corresponding platform truck configuration;
S5. obtained by bicycle material number in platform truck Parts List database after platform truck Parts List with room piece installing part Inventory merges to obtain the Parts List of caravan vehicle.
2. segmented caravan vehicle Parts List method for building up as described in claim 1, it is characterized in that:In the step S1, Platform truck Parts List database and room piece installing Parts List database separate independently, possess respective data room respectively.
3. segmented caravan vehicle Parts List method for building up as described in claim 1, it is characterized in that:In the step S2, The search index includes the use of condition, material number, part grouping, installation site, dosage, product type.
4. segmented caravan vehicle Parts List method for building up as claimed in claim 3, it is characterized in that:The use condition bag Include multiple binding characteristic characterizations.
5. segmented caravan vehicle Parts List method for building up as described in claim 1, it is characterized in that:In the step S4, It is created and linked by bicycle material number between room piece installing Parts List and platform truck configuration, realize mutual assembly relation.
6. segmented caravan vehicle Parts List method for building up as claimed in claim 5, it is characterized in that:The linkage it is specific Method is caravan vehicle configuration selected first;Then room is parsed by Boolean calculation using room piece installing Parts List database Piece installing Parts List and bicycle material number obtain platform truck configuration further according to bicycle material number;Exist eventually by platform truck configuration In platform truck Parts List database platform truck Parts List is parsed with Boolean calculation.
CN201711260426.0A 2017-12-04 2017-12-04 Method for establishing whole vehicle part list of sectional type motor home Active CN108053155B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711260426.0A CN108053155B (en) 2017-12-04 2017-12-04 Method for establishing whole vehicle part list of sectional type motor home

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711260426.0A CN108053155B (en) 2017-12-04 2017-12-04 Method for establishing whole vehicle part list of sectional type motor home

Publications (2)

Publication Number Publication Date
CN108053155A true CN108053155A (en) 2018-05-18
CN108053155B CN108053155B (en) 2021-11-30

Family

ID=62122065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711260426.0A Active CN108053155B (en) 2017-12-04 2017-12-04 Method for establishing whole vehicle part list of sectional type motor home

Country Status (1)

Country Link
CN (1) CN108053155B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110659866A (en) * 2019-04-15 2020-01-07 南京依维柯汽车有限公司 Method for releasing BOM from PDM system to ERP system
CN110989546A (en) * 2019-10-18 2020-04-10 浙江合众新能源汽车有限公司 Vehicle software data management method
CN111049937A (en) * 2019-12-31 2020-04-21 长城汽车股份有限公司 Data processing system and data transmission method of intelligent networked automobile
CN111125834A (en) * 2019-12-17 2020-05-08 东风商用车有限公司 Method and system for generating configuration component list of automobile air supply pipeline system
CN111949670A (en) * 2019-05-15 2020-11-17 上海汽车集团股份有限公司 Data processing method and device
CN112182902A (en) * 2020-10-12 2021-01-05 东风汽车集团有限公司 Product data management and three-dimensional auxiliary platform digital-analog assembly method and device
CN113032457A (en) * 2021-03-19 2021-06-25 山东英信计算机技术有限公司 Method and device for maintaining database information of bill of material

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101334868A (en) * 2007-06-28 2008-12-31 英业达股份有限公司 Client part bill production system and its computer readable medium
CN101464873A (en) * 2007-12-20 2009-06-24 英业达股份有限公司 Material list establishing method and system
US7834758B2 (en) * 2007-10-31 2010-11-16 General Motors Llc In-vehicle entertainment method and system for executing the same
CN103593727A (en) * 2013-10-25 2014-02-19 长安标致雪铁龙汽车有限公司 Car manufacturing BOM management method and management system
CN106327100A (en) * 2016-08-31 2017-01-11 北京汽车研究总院有限公司 Change list generation method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101334868A (en) * 2007-06-28 2008-12-31 英业达股份有限公司 Client part bill production system and its computer readable medium
US7834758B2 (en) * 2007-10-31 2010-11-16 General Motors Llc In-vehicle entertainment method and system for executing the same
CN101464873A (en) * 2007-12-20 2009-06-24 英业达股份有限公司 Material list establishing method and system
CN103593727A (en) * 2013-10-25 2014-02-19 长安标致雪铁龙汽车有限公司 Car manufacturing BOM management method and management system
CN106327100A (en) * 2016-08-31 2017-01-11 北京汽车研究总院有限公司 Change list generation method and device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李波灏: "移动之家——记早期独具专用底盘的GMC Motorhome房车", 《专用汽车》 *
李涛: "车用空调装配车间生产作业动态调度方法研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110659866A (en) * 2019-04-15 2020-01-07 南京依维柯汽车有限公司 Method for releasing BOM from PDM system to ERP system
CN110659866B (en) * 2019-04-15 2023-09-08 南京依维柯汽车有限公司 Method for releasing BOM from PDM system to ERP system
CN111949670A (en) * 2019-05-15 2020-11-17 上海汽车集团股份有限公司 Data processing method and device
CN111949670B (en) * 2019-05-15 2024-05-07 上海汽车集团股份有限公司 Data processing method and device
CN110989546A (en) * 2019-10-18 2020-04-10 浙江合众新能源汽车有限公司 Vehicle software data management method
CN111125834A (en) * 2019-12-17 2020-05-08 东风商用车有限公司 Method and system for generating configuration component list of automobile air supply pipeline system
CN111049937A (en) * 2019-12-31 2020-04-21 长城汽车股份有限公司 Data processing system and data transmission method of intelligent networked automobile
CN112182902A (en) * 2020-10-12 2021-01-05 东风汽车集团有限公司 Product data management and three-dimensional auxiliary platform digital-analog assembly method and device
CN113032457A (en) * 2021-03-19 2021-06-25 山东英信计算机技术有限公司 Method and device for maintaining database information of bill of material
CN113032457B (en) * 2021-03-19 2022-12-02 山东英信计算机技术有限公司 Method and device for maintaining database information of bill of material

Also Published As

Publication number Publication date
CN108053155B (en) 2021-11-30

Similar Documents

Publication Publication Date Title
CN108053155A (en) Segmented caravan vehicle Parts List method for building up
CN104331767B (en) For the multisystem cooperative system and method for the control of Discrete Manufacturing Enterprise production process
CN106325887A (en) Service process management method based on Activiti
AU2018388777B2 (en) Managing concrete mix design catalogs
CN103593727A (en) Car manufacturing BOM management method and management system
CN101364288A (en) Method for constructing BOM container based on SOA architecture
CN101859405A (en) Method for synchronizing data between BOMs by utilizing implicit BOM model
CN105302803A (en) Product BOM difference analyzing and synchronous updating method
CN102542396A (en) Tire vulcanizing production control system and operation adjusting method
CN108509198A (en) A kind of product electronic albums construction method based on neutral BOM
CN104517014B (en) A kind of product automatic assembly design system based on Pro/E
CN107679788A (en) Towards the BOM checking methods of C2B products
CN105868357B (en) File managing and control system and method
CN101561899A (en) MBOM increasingly receiving method with integration of design, production and management
CN101477656A (en) Implementation process for scheduling production tasks in accordance with production capability gradually in production management process
CN105224712A (en) A kind of disposal route of bullet train product meta-model and device
CN104599192A (en) Logic centralization based global distributed global full-network model maintenance method
CN105512393A (en) PDM (product data management) connection method and device for rapid design of high-speed train
CN102024183A (en) Enterprise information management system
CN107480846A (en) A kind of method that aeronautical product standard component demand is provided
CN105955209A (en) Manufacturing industry factory equipment layout method based on data mining
CN101308518B (en) Topology element name corresponding method for copy type synergic modeling system
CN103064877A (en) Method for producing BOM (Bill of Material) memory model building based on XML (extensive markup language)
CN107292967B (en) Method for building three-dimensional configurable BOM (Bill of Material) containing skeleton based on geometric feature mapping
CN105225024A (en) The execution of management manufacturing order

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant