CN108509198A - A kind of product electronic albums construction method based on neutral BOM - Google Patents

A kind of product electronic albums construction method based on neutral BOM Download PDF

Info

Publication number
CN108509198A
CN108509198A CN201810224465.3A CN201810224465A CN108509198A CN 108509198 A CN108509198 A CN 108509198A CN 201810224465 A CN201810224465 A CN 201810224465A CN 108509198 A CN108509198 A CN 108509198A
Authority
CN
China
Prior art keywords
bom
templates
node
neutral
ebom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810224465.3A
Other languages
Chinese (zh)
Other versions
CN108509198B (en
Inventor
赵峰
丁新星
张贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu XCMG Guozhong Laboratory Technology Co Ltd
Original Assignee
Construction Machinery Branch of XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Machinery Branch of XCMG filed Critical Construction Machinery Branch of XCMG
Priority to CN201810224465.3A priority Critical patent/CN108509198B/en
Publication of CN108509198A publication Critical patent/CN108509198A/en
Application granted granted Critical
Publication of CN108509198B publication Critical patent/CN108509198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • G06F8/38Creation or generation of source code for implementing user interfaces
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • G06F8/34Graphical or visual programming

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Computer Interaction (AREA)
  • Document Processing Apparatus (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of product electronic albums construction method based on neutral BOM, it is characterised in that:Include the following steps:S1, EBOM templates are parsed, and establishes the structure of BOM templates according to levels father and son n-th-trem relation n in EBOM;S2, EBOM templates and neutrality BOM templates are compared, and neutrality BOM templates is optimized to generate instantiation neutrality BOM according to comparing result;S3, the directory tree that atlas is generated using instantiation neutrality BOM and material are detailed.The device have the advantages that:The working efficiency that atlas engineer can be greatly promoted ensures the quick and precisely generation of atlas from working time and accuracy.

Description

A kind of product electronic albums construction method based on neutral BOM
Technical field
The invention belongs to field of mechanical technique, and in particular to a kind of product electronic albums construction method based on neutral BOM.
Background technology
The advantage that neutral BOM has its original when in face of user demand:
1. neutrality BOM mainly considers that user is easy to understand, and lays particular emphasis on compared with EBOM for the structure of product and parts Embody the function of product and parts.
2. the component number that neutrality BOM is included is different:In neutral BOM, the parts that product is included usually are wanted Less than the EBOM of design phase.Designing BOM needs the product from top layer, is unfolded step by step according to the membership of parts, it is known that Each part of the bottom.Neutral BOM emphasis expresses the information of each functional unit from service angle, it is not necessary that function list The structure of member be unfolded layer by layer and describe.
3.EBOM is between the superior and the subordinate there is stringent membership, and the superior and the subordinate can pass through functional unit in neutral BOM Between logical communication link get up.
Parts mainly design in 4.EBOM and part producing procedural information, neutral BOM mainly can manage user The introduction of the product and parts function, performance, position relationship of solution further includes required Service Properties, such as outsourcing piece, rapid wear Part, spare part etc..
In conclusion majority manufacturing enterprise directly uses the user oriented demands of EBOM to make product atlas not at present The needs that user can be fully met, based on neutral BOM structure product atlas be build service-type firm and strategic transformation must Through road.
Currently, service-oriented, repair neutral BOM structures are highly developed in aerospace field, in automobile and engineering Machinery industry is also already in full swing, but neutrality BOM structures are when in face of the product of the large and small batch of yield, multi items at present, effect Rate is low.
Current neutrality BOM forming types include mainly two kinds:
One is generated with model-driven neutrality BOM.BOM structure personnel need to ressemble using threedimensional model, generate Then new model utilizes the hierarchical relationship up and down of model to form the neutral BOM of some example;This method is in structure efficiency side Face is extremely inefficient, and producer needs to do the assembly working of a large amount of models and requirement to personnel is also higher.
Another BOM that the example all materials are first established in design system such as PDM, is then adjusted by structure personnel by hand The layer of structure of whole material establishes the neutral BOM of the example.This method can be created in batches when creating the service view of material It builds, but also needs when coping with structural adjustment to consume a large amount of manpower.
In addition, both methods when in face of the product of multi-configuration, more examples can not flexible conversion, especially for not When with example, each example generation is required for repeating to build BOM, heavy workload, inefficiency, and accuracy is poor.
Invention content
It is an object of the invention to overcome deficiency in the prior art, a kind of product electronic chart based on neutral BOM is provided Volume construction method, can quickly generate neutral BOM using existing EBOM, can once build multiple example profits after neutral BOM With to achieve the purpose that quickly generate product atlas.
To solve prior art problem, the invention discloses a kind of product electronic albums construction method based on neutral BOM, Include the following steps:
S1, EBOM templates are parsed, and establishes the structure of BOM templates according to levels father and son n-th-trem relation n in EBOM;
S2, EBOM templates and neutrality BOM templates are compared, and according to comparing result optimize neutrality BOM templates thus Generate instantiation neutrality BOM;
S3, the directory tree that atlas is generated using instantiation neutrality BOM and material are detailed.
Preferably, each material in EBOM templates is also read in step S1, while establishing BOM templates The name of material of item forms the name of material of template interior joint.
Preferably, in step 1, the node in BOM templates should also be adjusted as follows:
For as minimum service unit, be not required to show that the node of its subordinate merges processing;
For after fractionation deconsolidation process could be carried out as the node of minimum service unit;
When carrying out service unit recombination based on demand for services, increase new material node.
Preferably, step S2 further includes following steps:
S21, it is compared according to the structure of BOM templates to generate new structure;
S22, the neutral BOM that the Service Properties set in template are assigned to instantiation;
S23, the corresponding new material information of the material node being not present in original template will occur and be added in template, and The definition of service regulation and attribute need to be carried out to it.
Preferably, step S21 further includes following content:
The section can be transferred to by COM code information in EBOM as the material node of minimum service unit for itself Point, if any subordinate's then not display structure;The stylish increased material node of service unit recombination is carried out for being based on demand for services, no Coding information is generated, but forms new structure;For could be assigned under it as the material node of minimum service unit after fractionation Grade splits the new COM code of node, forms new structure.
Preferably, in step S22, the Service Properties set in template are assigned to the neutral BOM's of instantiation Specific method is:The locations of structures of analysis node in a template is compared with the material position in EBOM, for same position And the material of same names, the information such as COM code in the Service Properties and EBOM that have been set in template are transferred to the section Point.
The device have the advantages that:The working efficiency that atlas engineer can be greatly promoted, from working time and standard Ensure the quick and precisely generation of atlas in true property.
Description of the drawings
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is a kind of schematic diagram for EBOM templates that the present invention is applied to;
Fig. 3 is the schematic diagram for the neutral BOM templates that the present invention generates;
Fig. 4 is the Structure Comparison schematic diagram of BOM templates and EBOM templates in the present invention;
Fig. 5 is the schematic diagram that attribute information is inherited in the present invention;
Fig. 6 is the schematic diagram that template is reversely supplemented in the present invention;
Fig. 7 is the schematic diagram for the product electronic albums that the present invention generates.
Specific implementation mode
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention Technical solution, and not intended to limit the protection scope of the present invention.
Abbreviation paraphrase:
BOM --- Bill of Material bill of materials;
PLM --- Product Lifecycle Management Production Lifecycle Managements;
EBOM --- Engineering Bill of Material engineering BOMs;
MBOM --- Manufacturing Bill of Material manufacturing BOMs;
Key Term paraphrase:
A kind of neutral BOM templates --- tree structure similar with BOM, but material is only included in the material information of tree node Title (hereinafter referred to as template);
Neutral BOM --- it is directed to a certain example product, illustrates the services such as product complete machine and zero parts such as expendable part, spare part The bill of materials of attribute;
The material attribute of Service Properties --- service-oriented demand, such as outsourcing piece, vulnerable part.
As shown in Figure 1, a kind of product electronic albums construction method based on neutral BOM, main includes example neutrality BOM's The structure of structure and example atlas.Its particular content is as follows:
S1, EBOM is obtained, a kind of EBOM as shown in Figure 2 parses EBOM templates, according to levels father and son Xiang Guan in EBOM System establishes the structure of BOM templates, as shown in Figure 3;The name of material of each material items in EBOM templates is also read simultaneously, Form the name of material of template interior joint.When establishing BOM templates, need to adjust the node in template as follows:
As shown in figure 4, for as minimum service unit, be not required to show that the node of its subordinate merges processing;For Deconsolidation process could be carried out after fractionation as the node of minimum service unit;When carrying out service unit recombination based on demand for services, Increase new material node.
After establishing BOM templates, Service Properties setting is carried out to template interior joint.First, it is according to analysis with name of material Its material variety belonged to;Secondly, when the material of same name is when tree structure different levels repeatedly occur, this method can It is distinguished according to the location of the material, convenient for judging the true classification of material ownership.
S2, EBOM templates and neutrality BOM templates are subjected to data comparison, and neutrality BOM templates is optimized according to comparing result To generate instantiation neutrality BOM.Data comparison includes mainly three aspects:Structure Comparison, attribute information are inherited and template is anti- To supplement.
It, can be as the material node of minimum service unit, by COM code in EBOM for itself during Structure Comparison Information is transferred to the node, if any subordinate's then not display structure;For being based on increasing newly when demand for services carries out service unit recombination The material node added does not generate coding information, but forms new structure;For could be as the object of minimum service unit after fractionation Expect node, assigns its new COM code, form new structure, as shown in Figure 4.
During attribute information is inherited, the locations of structures of analysis node in a template is carried out with the material position in EBOM It compares, for the material of same position and same names, the material in the Service Properties and EBOM that have been set in template is compiled The information such as code are transferred to the node, as shown in Figure 5.
Template reversely during supplement, the corresponding new material information of the material node being not present in original template will occur It is added in template, and the definition of service regulation and attribute need to be carried out to it, as shown in Figure 6.
S3, using established instantiation neutrality BOM, the chapters and sections and mesh its structure being converted to automatically in document content Record, in structure the information of each node be automatically converted to the material in document content it is detailed (including COM code, title, quantity, Service Properties etc.), you can atlas is quickly generated, as shown in Figure 7.
In the process, first by carrying out secondary development to word document, enable to automatically write information that (this is secondary Existing development interface is developed and used, can directly apply, therefore not be further detailed).The object of neutrality BOM is instantiated by reading Expect node hierarchical information, be corresponding in turn to the corresponding chapters and sections catalogue of atlas, such as total title that the total nodes of BOM are atlas document, BOM mono- Grade node is the two level title of document, and so on.Meanwhile next layer of material information for reading BOM nodes is inserted document The middle parts list that title is corresponded to as the node.
By instantiating neutrality BOM and being compared with building mode before, it is found that the construction method that the application is proposed exists Advantage is occupied in atlas structure efficiency.Data shown in table 1 are that atlas construction work people is carried out by taking 3 product examples of homologous series as an example Its result compares:
1 sample product of table work man day statistics
Product 1 Product 2 Product 3
Material quantity (a) 3815 3545 3992
Conventional method (people * days) 30 30 30
This method (people * days) 15 5 5
By the above contrast test it is found that method proposed by the invention can efficiently and effectively improve producing efficiency, energy Enough making demands for meeting user well.After neutral BOM structure can fast accurate tissue products illustrate structure, make product Atlas can show product with the angle of user, meet the use needs of user, improve customer satisfaction.
In the present invention, the secondary development of word document is to utilize existing development interface, can directly be applied, and is existing Technology, therefore be not further detailed.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (6)

1. a kind of product electronic albums construction method based on neutral BOM, it is characterised in that:
Include the following steps:
S1, EBOM templates are parsed, and establishes the structure of BOM templates according to levels father and son n-th-trem relation n in EBOM;
S2, EBOM templates and neutrality BOM templates are compared, and neutrality BOM templates is optimized to generate according to comparing result Instantiate neutrality BOM;
S3, the directory tree that atlas is generated using instantiation neutrality BOM and material are detailed.
2. a kind of product electronic albums construction method based on neutral BOM according to claim 1, it is characterised in that:Step In rapid S1, the name of material of each material items in EBOM templates is also read while establishing BOM templates, formed in template The name of material of node.
3. a kind of product electronic albums construction method based on neutral BOM according to claim 2, it is characterised in that:Step In rapid 1, the node in BOM templates should also be adjusted as follows:
For as minimum service unit, be not required to show that the node of its subordinate merges processing;
For after fractionation deconsolidation process could be carried out as the node of minimum service unit;
When carrying out service unit recombination based on demand for services, increase new material node.
4. a kind of product electronic albums construction method based on neutral BOM according to claim 3, it is characterised in that:Step Rapid S2 further includes following steps:
S21, it is compared according to the structure of BOM templates to generate new structure;
S22, the neutral BOM that the Service Properties set in template are assigned to instantiation;
S23, the corresponding new material information of the material node being not present in original template will occur and be added in template, and need pair It carries out the definition of service regulation and attribute.
5. a kind of product electronic albums construction method based on neutral BOM according to claim 4, it is characterised in that:Step Rapid S21 further includes following content:
The node can be transferred to by COM code information in EBOM, such as the material node of minimum service unit for itself There is subordinate's then not display structure;The stylish increased material node of service unit recombination is carried out for being based on demand for services, is not generated Coding information, but form new structure;For after fractionation its subordinate's object could be assigned as the material node of minimum service unit Expect new COM code, forms new structure.
6. a kind of product electronic albums construction method based on neutral BOM according to claim 4, it is characterised in that:Step In rapid S22, the specific method that the Service Properties set in template are assigned to the neutral BOM of instantiation is:Analysis node is in mould Locations of structures in plate is compared with the material position in EBOM, for the material of same position and same names, by template In the information such as COM code in the Service Properties and EBOM that have been set be transferred to the node.
CN201810224465.3A 2018-03-19 2018-03-19 Neutral BOM-based product electronic album construction method Active CN108509198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810224465.3A CN108509198B (en) 2018-03-19 2018-03-19 Neutral BOM-based product electronic album construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810224465.3A CN108509198B (en) 2018-03-19 2018-03-19 Neutral BOM-based product electronic album construction method

Publications (2)

Publication Number Publication Date
CN108509198A true CN108509198A (en) 2018-09-07
CN108509198B CN108509198B (en) 2022-03-15

Family

ID=63377710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810224465.3A Active CN108509198B (en) 2018-03-19 2018-03-19 Neutral BOM-based product electronic album construction method

Country Status (1)

Country Link
CN (1) CN108509198B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109471991A (en) * 2018-11-15 2019-03-15 北京神舟航天软件技术有限公司 A kind of product BOM multiple view tissue and methods of exhibiting
CN110989546A (en) * 2019-10-18 2020-04-10 浙江合众新能源汽车有限公司 Vehicle software data management method
CN113408853A (en) * 2021-05-19 2021-09-17 山东大学 Neutral BOM construction method and system based on engineering and manufacturing bill of materials
CN113592264A (en) * 2021-07-19 2021-11-02 山东大学 Method and system for constructing service BOM

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101364288A (en) * 2008-09-03 2009-02-11 于万钦 Method for constructing BOM container based on SOA architecture
KR101155445B1 (en) * 2009-01-06 2012-06-15 권영범 Method for material requirements decision using modulation bom
CN104346143A (en) * 2013-07-26 2015-02-11 同济大学 Data conversion method from EBOM (Engineering Bill of Material) to MBOM (Maintenance Bill of Material)

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101364288A (en) * 2008-09-03 2009-02-11 于万钦 Method for constructing BOM container based on SOA architecture
KR101155445B1 (en) * 2009-01-06 2012-06-15 권영범 Method for material requirements decision using modulation bom
CN104346143A (en) * 2013-07-26 2015-02-11 同济大学 Data conversion method from EBOM (Engineering Bill of Material) to MBOM (Maintenance Bill of Material)

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
558我发发: ""福田汽车配件电子图册培训材料"", 《HTTPS://WWW.DOC88.COM/P-9975241031379.HTML》 *
张汉口: ""面向服务架构的复杂产品维修BOM管理支持系统研究"", 《中国优秀硕士学位论文全文数据库信息科技辑》 *
郭建飞等: ""物料清单视图演绎及在产品数据管理中的实现"", 《计算机集成制造系统》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109471991A (en) * 2018-11-15 2019-03-15 北京神舟航天软件技术有限公司 A kind of product BOM multiple view tissue and methods of exhibiting
CN110989546A (en) * 2019-10-18 2020-04-10 浙江合众新能源汽车有限公司 Vehicle software data management method
CN113408853A (en) * 2021-05-19 2021-09-17 山东大学 Neutral BOM construction method and system based on engineering and manufacturing bill of materials
CN113408853B (en) * 2021-05-19 2023-02-28 山东大学 Neutral BOM construction method and system based on engineering and manufacturing bill of materials
CN113592264A (en) * 2021-07-19 2021-11-02 山东大学 Method and system for constructing service BOM

Also Published As

Publication number Publication date
CN108509198B (en) 2022-03-15

Similar Documents

Publication Publication Date Title
CN108509198A (en) A kind of product electronic albums construction method based on neutral BOM
CN113033001B (en) Three-dimensional digital factory modeling method and system for digital twin application
CN107403272B (en) Product configuration method and system supporting multi-stage platform
CN104573185B (en) The processing method and processing device of High-sped Trains index
CN104123422B (en) Design method before a kind of system of utilization data base management system
CN107067170A (en) A kind of cost accounting and quotation system based on assembling decomposition texture
KR20150021097A (en) Computer implemented method for defining an input product
CN106408435A (en) Process compiling system and process compiling method
CN105718669A (en) Method for establishing aviation brake fastener library based on CATIA
CN101789045A (en) Realization method of MDA modeling tool orienting to manufacturing field
CN105631581A (en) Structured process design method for discrete manufacturing industry
CN108614891A (en) Space product data packet is built and consistency desired result method
CN103971187A (en) Automatic production plan generation method and system based on RFID
CN108694260A (en) Application process of the BIM technology in Steel Bridge processing and manufacturing
CN104850068B (en) A kind of intelligent modeling method of complicated production manufacture process
CN104899426A (en) Processing method and apparatus for high speed train indicator system
CN106408178A (en) Multi-dimensional data snapshot-based product BOM management method and device
CN105824279A (en) Method for establishing flexible and effective CMDB (Configuration Management Database) of machine room monitoring system
CN105447605A (en) APS production model-oriented dynamic modeling method
WO2008023655A1 (en) Production system creating system and production system creating method
CN107203678A (en) A kind of parts automatic assembly method mapped based on geometric properties
CN100489864C (en) Material list integrating method via computer software
Mansoori et al. On construction-specific product structure design and development: the BIM enhancement approach
CN101464873A (en) Material list establishing method and system
Zhou et al. How to facilitate the integration between building information modelling and life cycle assessment tools in building sector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220715

Address after: No.26 tuolanshan Road, Xuzhou Economic and Technological Development Zone, Xuzhou City, Jiangsu Province

Patentee after: Jiangsu XCMG Guozhong Laboratory Technology Co.,Ltd.

Address before: 221004 26 Jinshan Road, Jinshan Bridge Economic Development Zone, Xuzhou, Jiangsu

Patentee before: XCMG CONSTRUCTION MACHINERY Co.,Ltd.