CN108049886A - Shield method service channel slag-tapping system - Google Patents

Shield method service channel slag-tapping system Download PDF

Info

Publication number
CN108049886A
CN108049886A CN201810029109.6A CN201810029109A CN108049886A CN 108049886 A CN108049886 A CN 108049886A CN 201810029109 A CN201810029109 A CN 201810029109A CN 108049886 A CN108049886 A CN 108049886A
Authority
CN
China
Prior art keywords
slag
tapping system
rotary joint
screw conveyor
service channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810029109.6A
Other languages
Chinese (zh)
Other versions
CN108049886B (en
Inventor
丁修恒
何邦亮
文毅然
庄岩
石雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co ltd Of Crec Urban Rail Transit Engineering Co
Wuxi Metro Group Co ltd
Shanghai Civil Engineering Co Ltd of CREC
Ningbo Rail Transit Group Co Ltd
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Urban Rail Transit Engineering Branch of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Urban Rail Transit Engineering Branch of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201810029109.6A priority Critical patent/CN108049886B/en
Publication of CN108049886A publication Critical patent/CN108049886A/en
Application granted granted Critical
Publication of CN108049886B publication Critical patent/CN108049886B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/124Helical conveying means therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of shield method service channel slag-tapping systems, it is provided with the screw conveyor of rotary joint, it joins end to end to form " V " shape supply unit using rotary joint between adjacent two sections of screw conveyors, joining end to end also with rotary joint between adjacent " V " supply unit forms the slag-tapping system that multistage screw conveyor is connected in series;Stretching, extension or contraction of the slag-tapping system in delivered length can be made by rotating rotary joint;First section screw conveyor in slag-tapping system with shield host mobility and is used as slag-tapping system entrance, and latter end screw conveyor is connected with the platform machine rested in tunnel as slag-tapping system outlet section, realizes the distance variable of transport dregs.The construction that the present invention adapts to shield method service channel is slagged tap requirement, is ensured that the work section of shield host gathers, is improved construction efficiency.

Description

Shield method service channel slag-tapping system
Technical field
The present invention relates to shield method tunnel construction technical field, more specifically shield method branch structure goes out slag system System.
Background technology
The service channel being arranged between two tunnels, be such as arranged on service channel between uplink and downlink play it is thin Dissipate, escape the effects that, when fire occurs, if train runs out of steam and can not drive towards platform and be forced to stop in a wherein tunnel When in running tunnel, passenger can be nearby by service channel into non-fire running tunnel, then evacuates to safe area;Contact For passage also for convenience of when going wrong in a tunnel, rescue personnel can be fast by service channel from an other tunnel Speed achievees the purpose that Quick rescue into the scene of the accident;Therefore service channel is the important leverage in tunnel.
In Freezing Method for Cross-passage Construction, tradition is to use the construction method that freezing is reinforced in ground strengthening vertical and hole, still Service channel in urban subway tunnel is usually located at the busy road in city in the following, this traditional methods, which seriously exists, interferes ground Face communal facility, duration are compared with the problems such as long, risk is big, uneconomical.
City track traffic engineering branch company of Shanghai Civil Engineering Co., Ltd. of Crec by comparing various arrangement and method for construction, The technical solution of service channel shield construction is proposed, service channel development machine has stronger geological adaptability, both can be with Can also be tunneled in weak soil in ground consisting of hard rock, be not a concern level of ground water height, can in a variety of underground gas environment work Make, greatly avoid down town building and destroyed caused by surface subsidence, the program can greatly shorten the duration, reduce cost.
It in shield method tunnel construction, slags tap for earth pressure balanced shield, EPBS construction, is to be turned dregs using belt conveyor It is transported in slag-soil truck;Slag tap for slurry balance shield construction, extended using hose reel or hydraulic pressure steel bushing.But That in shield method Freezing Method for Cross-passage Construction, shield host and rear mating trolley are separate design, shield host with lining cutting assembly not Disconnected to move ahead, mating trolley is rested in tunnel, is not moved ahead into service channel, therefore is caused in shield method tunnel construction therewith The existing mode of slagging tap be not applied for the construction of shield method service channel;Wherein, belt conveyor is regular length, it is impossible to suitable Preferably continuous extended dregs operative line;Hose reel is the conveying for being not suitable for flowing plasticity dregs to convey liquid;Hydraulic pressure steel Although sleeve can extend, it is smaller, it is necessary to spreading repeatedly that it extends ratio, it is impossible to adapt to the work rhythm of shield host.
The content of the invention
The present invention is to avoid the deficiency present in the above-mentioned prior art, provides a kind of shield method service channel and goes out slag system System is slagged tap requirement with the construction for adapting to shield method service channel, is ensured that the work section of shield host gathers, is improved construction efficiency.
The present invention adopts the following technical scheme that solve technical problem:
Shield method service channel slag-tapping system of the present invention, feature are:
The screw conveyor of rotary joint is provided with, rotary joint head and the tail phase is utilized between adjacent two sections of screw conveyors Company forms " V " shape supply unit, joins end to end between adjacent " V " supply unit also with rotary joint and forms multistage spiral transferring Send the slag-tapping system that machine is connected in series;Stretching, extension or contraction of the slag-tapping system in delivered length can be made by rotating rotary joint;Institute The first section screw conveyor in slag-tapping system is stated with shield host mobility and is used as slag-tapping system entrance, latter end screw conveyor It is connected with the platform machine rested in tunnel as slag-tapping system outlet section, realizes the distance variable of transport dregs.
Shield method service channel slag-tapping system of the present invention, feature are lain also in:
It is set in the bottom of service channel along the preceding line direction of shield host and track, the bottom of each " V " supply unit is set Carriage supports are utilized respectively on the sliding rail, the balladeur train can be moved along the track.
Shield method service channel slag-tapping system of the present invention, feature are lain also in:
Connection nozzle position between each section of screw conveyor sets the nozzle laterally protruded out, will using rotary joint The nozzle that a pair laterally protrudes out is docked;The rotary joint is the link position setting casing in two sections of nozzles, and is installed additional Sealing ring sets rolling bearing in casing, realizes that the closing between two sections of nozzles is connected using casing and sealing ring, using turning Dynamic bearing realizes the relative rotation of two sections of nozzles.
Compared with the prior art, the present invention has the beneficial effect that:
The distance of host between rear mating trolley of the invention that effectively solves is unearthed discontinuously under continually changing operating mode Problem is continuously tunneled so as to fulfill shield, is ensured the controllable of surface subsidence, is drastically increased construction efficiency.
Description of the drawings
Fig. 1 is present system elevational schematic view;
Fig. 2 illustrates for present system plane;
Fig. 3 is rotary joint structure schematic diagram in present system;
Figure label:1 service channel, 2 uplink tunnels, 3 downlink tunnels, 4 shield hosts, 5 trolleys, 6a first section spirals Conveyer, 6b second segment screw conveyors, the 3rd section of screw conveyor of 6c, 7 first balladeur trains, 8 tracks, 9 latter end screw conveyors; 10 nozzles, 11 casings, 12 sealing rings, 13 rolling bearings.
Specific embodiment
The structure type of shield method service channel slag-tapping system is in the present embodiment:
The screw conveyor of rotary joint is provided with, rotary joint head and the tail phase is utilized between adjacent two sections of screw conveyors Company forms " V " shape supply unit, joins end to end between adjacent " V " supply unit also with rotary joint and forms multistage spiral transferring Send the slag-tapping system that machine is connected in series;Stretching, extension or contraction of the slag-tapping system in delivered length can be made by rotating rotary joint;Institute The first section screw conveyor in slag-tapping system is stated with shield host mobility and is used as slag-tapping system entrance, latter end screw conveyor It is connected with the platform machine rested in tunnel as slag-tapping system outlet section, realizes the distance variable of transport dregs;It is logical in contact The bottom in road sets along the preceding line direction of shield host and sets track, and the bottom of each " V " supply unit is utilized respectively carriage supports On the sliding rail, balladeur train can be moved along the track.
In specific implementation as depicted in figs. 1 and 2, service channel 1 is the shape between uplink tunnel 2 and downlink tunnel 3 Into communication channel.Shield host 4 enters from uplink tunnel 2, is moved ahead and tunneled in service channel 1 using shield host 4, with shield The trolley 5 that host 4 is separately set is rested in uplink tunnel 2, with constantly moving ahead for shield host 4, shield host 4 and trolley The distance between 5 is increasingly longer.
First section screw conveyor 6a is arranged on shield host in slag-tapping system, and entrance accepts slagging tap for shield host Mouthful, first section helical feed machine tail end and the head end of second segment screw conveyor 6b are attached using rotary joint, second segment spiral shell Rotation conveyer 6b is connected to form the first " V " shape supply unit using rotary joint with the 3rd section of screw conveyor 6c, first " V " The bottom of shape supply unit is provided with the first balladeur train 7;First balladeur train 7 is used to support the first " V " shape supply unit, and can be in track It is slid on 8;Follow-up each " V " shape supply unit the same manner arrangement, latter end screw conveyor 9 are connected with platform machine 5, and outlet is made For slag-tapping system slag-drip opening, arrow show export direction in Fig. 2.
Shown in Fig. 3, in order to realize the connection of rotary joint, the connection nozzle position between each section of screw conveyor, if The nozzle 10 laterally protruded out is put, is docked the nozzle that a pair laterally protrudes out using rotary joint;Rotary joint is at two sections The link position of nozzle sets casing 11, and installs sealing ring 12 additional, and rolling bearing 13 is set in casing 11, utilizes 11 He of casing Sealing ring 12 realizes the closing connection between two sections of nozzles, and the relative rotation of two sections of nozzles is realized using rolling bearing 13.

Claims (3)

1. a kind of shield method service channel slag-tapping system, it is characterized in that:
It is provided with the screw conveyor of rotary joint, is joined end to end shape using rotary joint between adjacent two sections of screw conveyors It joins end to end into " V " shape supply unit, between adjacent " V " supply unit also with rotary joint and forms multistage screw conveyor The slag-tapping system being connected in series;Stretching, extension or contraction of the slag-tapping system in delivered length can be made by rotating rotary joint;It is described go out First section screw conveyor in slag system with shield host mobility and is used as slag-tapping system entrance, and latter end screw conveyor is with stopping The platform machine stayed in tunnel is connected as slag-tapping system outlet section, realizes the distance variable of transport dregs.
2. shield method service channel slag-tapping system according to claim 1, it is characterized in that:
It is set in the bottom of service channel along the preceding line direction of shield host and track, the bottom difference of each " V " supply unit is set Using carriage supports on the sliding rail, the balladeur train can be moved along the track.
3. shield method service channel slag-tapping system according to claim 1, it is characterized in that:
Connection nozzle position between each section of screw conveyor sets the nozzle that laterally protrudes out, using rotary joint by a pair The nozzle laterally protruded out is docked;The rotary joint is the link position setting casing in two sections of nozzles, and installs sealing additional Circle, sets rolling bearing in casing, realizes that the closing between two sections of nozzles is connected using casing and sealing ring, utilizes rotation axis Hold the relative rotation for realizing two sections of nozzles.
CN201810029109.6A 2018-01-12 2018-01-12 Slag discharging system of shield method connecting channel Active CN108049886B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810029109.6A CN108049886B (en) 2018-01-12 2018-01-12 Slag discharging system of shield method connecting channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810029109.6A CN108049886B (en) 2018-01-12 2018-01-12 Slag discharging system of shield method connecting channel

Publications (2)

Publication Number Publication Date
CN108049886A true CN108049886A (en) 2018-05-18
CN108049886B CN108049886B (en) 2023-12-15

Family

ID=62126682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810029109.6A Active CN108049886B (en) 2018-01-12 2018-01-12 Slag discharging system of shield method connecting channel

Country Status (1)

Country Link
CN (1) CN108049886B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109399095A (en) * 2018-11-15 2019-03-01 北京城建集团有限责任公司 Shaftless screw conveying device
CN109915164A (en) * 2019-03-01 2019-06-21 北京市轨道交通建设管理有限公司 A kind of soil body conveyer method of tunnel connection channel
CN110410095A (en) * 2019-08-16 2019-11-05 中铁隧道局集团有限公司 TBM tunnel construction material dregs transportation method
CN112412482A (en) * 2020-12-23 2021-02-26 安徽铜都流体科技股份有限公司 Joint shaft type pipeline extension device for shield machine

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202493271U (en) * 2011-12-10 2012-10-17 中铁隧道装备制造有限公司 Open type shield slag-tapping switching mechanism
CN103867212A (en) * 2014-03-24 2014-06-18 辽宁三三工业有限公司 Shaft-end deslagging spiral conveyer
CN103863834A (en) * 2012-12-13 2014-06-18 梅特索纸业公司 Method and apparatus for unloading stockpile
WO2014164545A1 (en) * 2013-03-12 2014-10-09 Cool Planet Energy Systems, Inc. Staged biomass fractionator
CN104114763A (en) * 2012-02-22 2014-10-22 美卓造纸机械(瑞典)有限公司 Arrangement, system and method for handling non-wood plant material
CN204783040U (en) * 2015-07-06 2015-11-18 中铁工程装备集团有限公司 Prevent twin screw conveyor that gushs
CN106050241A (en) * 2016-05-23 2016-10-26 重庆大学 Construction method for single-construction-channel dual-line same direction and same platform subway stations
CN206580204U (en) * 2017-03-22 2017-10-24 江苏新宝物流机器人有限责任公司 Sealed universal material conveyor
CN207715156U (en) * 2018-01-12 2018-08-10 中铁上海工程局集团有限公司 Shield method service channel slag-tapping system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202493271U (en) * 2011-12-10 2012-10-17 中铁隧道装备制造有限公司 Open type shield slag-tapping switching mechanism
CN104114763A (en) * 2012-02-22 2014-10-22 美卓造纸机械(瑞典)有限公司 Arrangement, system and method for handling non-wood plant material
CN103863834A (en) * 2012-12-13 2014-06-18 梅特索纸业公司 Method and apparatus for unloading stockpile
WO2014164545A1 (en) * 2013-03-12 2014-10-09 Cool Planet Energy Systems, Inc. Staged biomass fractionator
CN103867212A (en) * 2014-03-24 2014-06-18 辽宁三三工业有限公司 Shaft-end deslagging spiral conveyer
CN204783040U (en) * 2015-07-06 2015-11-18 中铁工程装备集团有限公司 Prevent twin screw conveyor that gushs
CN106050241A (en) * 2016-05-23 2016-10-26 重庆大学 Construction method for single-construction-channel dual-line same direction and same platform subway stations
CN206580204U (en) * 2017-03-22 2017-10-24 江苏新宝物流机器人有限责任公司 Sealed universal material conveyor
CN207715156U (en) * 2018-01-12 2018-08-10 中铁上海工程局集团有限公司 Shield method service channel slag-tapping system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109399095A (en) * 2018-11-15 2019-03-01 北京城建集团有限责任公司 Shaftless screw conveying device
CN109915164A (en) * 2019-03-01 2019-06-21 北京市轨道交通建设管理有限公司 A kind of soil body conveyer method of tunnel connection channel
CN109915164B (en) * 2019-03-01 2020-06-19 中铁十四局集团有限公司 Soil body transferring method for tunnel contact channel
CN110410095A (en) * 2019-08-16 2019-11-05 中铁隧道局集团有限公司 TBM tunnel construction material dregs transportation method
CN110410095B (en) * 2019-08-16 2021-10-08 中铁隧道局集团有限公司 Material residue soil transportation method for tunnel construction of Tunnel Boring Machine (TBM)
CN112412482A (en) * 2020-12-23 2021-02-26 安徽铜都流体科技股份有限公司 Joint shaft type pipeline extension device for shield machine

Also Published As

Publication number Publication date
CN108049886B (en) 2023-12-15

Similar Documents

Publication Publication Date Title
CN108049886A (en) Shield method service channel slag-tapping system
AU2020351946B2 (en) Communication tunnel boring machine
CN107725053B (en) Lane is reserved for one's own use without pillar mining method in exploiting field suitable for gently inclined seam
WO2018082714A1 (en) Shield tunneling machine for tunnel connecting passageway and connecting passageway tunneling method thereof
CN103711499A (en) Shield tunneling machine split starting construction method
CN109184706B (en) Split starting method for large-diameter shield tunneling machine
CN207715156U (en) Shield method service channel slag-tapping system
CN104533433B (en) Starting method of small-radius curve tunnel
CN107031663B (en) Walking platform and walking method of shield machine marshalling train and matched trailer behind shield machine
CN103993887B (en) Tilting two halves rectangle tube coupling shield structure and assemble method thereof for Rectangular Tunnel Construction
CN109339811A (en) A kind of rock tunnel(ling) machine rollback method for dismounting
CN102865099B (en) Under-building, under-railway and under-water mining filling process
CN204002795U (en) Tilting two halves rectangle tube coupling shield structure for a kind of Rectangular Tunnel Construction
CN103485786A (en) Steeply inclined coal seam strike long-wall mechanization mining method
CN208236417U (en) A kind of super big diameter mud water balance shield machine
CN110410095B (en) Material residue soil transportation method for tunnel construction of Tunnel Boring Machine (TBM)
CN108071403A (en) A kind of tunneling separate launching equipment
CN102979532B (en) A kind of assistance with hill road coordinates the development method of belt inclined shaft haulage
CN105401951A (en) Common gangue removal method and system for dual rock roadways of coal mine
CN112983448A (en) Novel DSIS TBM
CN106640020A (en) Method for increasing air permeability of high-gassy low-air-permeability coal seam
CN110905824A (en) Tunnel slag discharging device, system and method
CN112030773B (en) Construction method for bridging between open pit coal mine stope and refuse dump
CN209892197U (en) Spraying dust device that coal mine engineering tunnelling machine used
CN211115991U (en) Coal mine production system under intelligent mining condition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181106

Address after: 200436 No. 278, three JIANGCHANG Road, Jingan District, Shanghai

Applicant after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Applicant after: SHANGHAI CIVIL ENGINEERING CO.,LTD. OF CREC URBAN RAIL TRANSIT ENGINEERING CO.

Applicant after: Ningbo Rail Transit Group Co.,Ltd.

Applicant after: WUXI METRO GROUP Co.,Ltd.

Address before: 200436 Zhabei District, Shanghai JIANGCHANG three road 272, 278

Applicant before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Applicant before: SHANGHAI CIVIL ENGINEERING CO.,LTD. OF CREC URBAN RAIL TRANSIT ENGINEERING CO.

GR01 Patent grant
GR01 Patent grant