CN108049583A CN201711490438.2A CN201711490438A CN108049583A CN 108049583 A CN108049583 A CN 108049583A CN 201711490438 A CN201711490438 A CN 201711490438A CN 108049583 A CN108049583 A CN 108049583A
Authority
CN
China
Prior art keywords
plate
connecting portion
ceramic tile
prefabricated ceramic
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711490438.2A
Other languages
Chinese (zh)
Inventor
潘�清
周东珊
钟诚
余广
王金泉
黄慧
尤陈刚
王骝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201711490438.2A priority Critical patent/CN108049583A/en
Publication of CN108049583A publication Critical patent/CN108049583A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/072Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
    • E04F13/073Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for particular building parts, e.g. corners or columns
    • E04F13/0733Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for particular building parts, e.g. corners or columns for corners

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

It is fixed the invention discloses a kind of corner brace and receives side member, prefabricated ceramic tile external corner and its installation method, wherein corner brace, which fixes receipts side member, includes frame body, the first plate connecting portion, the Second Board connecting portion, the 3rd plate connecting portion, wherein:For connect the first plate the first plate connecting portion, for connect the Second Board the Second Board connecting portion, extend outwardly from frame body for connecting with the Second Board stitching portion the 3rd plate connecting portion of first plate and the Second Board in the first plate, the direction that the direction of first plate connecting portion extension extends with the Second Board connecting portion is mutually perpendicular to, and the outermost end in the direction of the 3rd plate connecting portion extension has the first hook part for overlapping the first prefabricated ceramic tile plate and the second hook part for overlapping the second prefabricated ceramic tile plate.Technical solution using the present invention can cause component to be produced in factory industry metaplasia, only need simply to be installed at finishing scene, realize rapid construction.

Description

Corner brace, which is fixed, receives side member, prefabricated ceramic tile external corner and its installation method
Technical field
Fixed the present invention relates to a kind of decorative element more particularly to a kind of corner brace receive side member, prefabricated ceramic tile external corner and its Installation method.
Background technology
External corner is generally applicable to indoor and outdoor metope facing, can be widely applied to public building and residential architecture.Current Decoration process in, when needing that external corner is installed, first have to the ceramic tile of edge installing leveling, and cause corner Ceramic tile at two intersecting lateral faces keeps vertical.Due to usually requiring to mount ceramic tile, the installation of ceramic tile external corner by cement mortar Process is relatively complicated, low construction efficiency, and place can be accumulated and left more dirty and messy due to raw material.
The content of the invention
The defects of for the prior art, the purpose of embodiments of the invention is to provide a kind of installation, more easily corner brace is consolidated Surely side member, prefabricated ceramic tile external corner and its installation method are received.
It is fixed the present invention provides a kind of corner brace and receives side member, the corner brace, which is fixed, to be received side member and include frame body, the One plate connecting portion, the Second Board connecting portion, the 3rd plate connecting portion.Wherein:
For connect the first plate the first plate connecting portion, for connect the Second Board of the Second Board connect Socket part, the 3rd plate company for connecting first plate and the Second Board with the Second Board stitching portion in the first plate Socket part extends outwardly from frame body, the direction of the first plate connecting portion extension and the direction of the Second Board connecting portion extension It is mutually perpendicular to, the outermost end in the direction of the 3rd plate connecting portion extension has the first card for overlapping the first prefabricated ceramic tile plate Hook part and the second hook part for overlapping the second prefabricated ceramic tile plate.
In one alternate embodiment, it is provided at least one in the first plate connecting portion and the Second Board connecting portion For connecting the fixedly connected part of the first plate or the Second Board.
In one alternate embodiment, the fixedly connected part is screw.
In one alternate embodiment, in the first plate connecting portion, the Second Board connecting portion, the 3rd plate connecting portion extremely A few glue-line for being provided with to bond the first plate or the Second Board.
In one alternate embodiment, the frame body is hollow frame body.
In one alternate embodiment, the direction of the 3rd plate connecting portion extension and the direction of the first plate connecting portion extension In 45 ° of angle.
The present invention also provides a kind of prefabricated ceramic tile external corner, the prefabricated ceramic tile external corner is fixed including foregoing corner brace Receive side member, the first prefabricated ceramic tile plate, the second prefabricated ceramic tile plate, the corner brace fix receive side member include frame body, First plate connecting portion, the Second Board connecting portion, the 3rd plate connecting portion, wherein:
First prefabricated ceramic tile plate is connected on the first plate connecting portion, and the second prefabricated ceramic tile plate is connected to the Second Board On connecting portion, the 3rd plate connecting portion is arranged on the stitching portion of the first prefabricated ceramic tile plate and the second prefabricated ceramic tile plate, and the 3rd First hook part of plate connecting portion overlaps the first prefabricated ceramic tile plate, the second hook part overlap joint second of the 3rd plate connecting portion Prefabricated ceramic tile plate, so that the first plate connecting portion and the 3rd plate connecting portion fix the first prefabricated ceramic tile plate;Second Plate connecting portion and the 3rd plate connecting portion fix the second prefabricated ceramic tile plate.
In one alternate embodiment, the first prefabricated ceramic tile plate and second prefabricated tile panel at least one bag in the block It includes:Together with wood moulding substrate, ceramic thin plate, the wood moulding substrate and ceramic thin plate composite laminate.
The present invention also provides a kind of prefabricated ceramic tile external corner installation method, the described method includes:By the first prefabricated tile panel The backboard of block is fixedly connected with the first plate connecting portion, and the near-end side of the first prefabricated ceramic tile plate is connected with the 3rd plate First hook part in portion is overlapped and fixed;The backboard of second prefabricated ceramic tile plate is fixedly connected with the Second Board connecting portion, and Second hook part of the near-end side of the second prefabricated ceramic tile plate and the 3rd plate connecting portion is overlapped and fixed.
In one alternate embodiment, the backboard of the first prefabricated ceramic tile plate is consolidated with the first plate connecting portion by screw Fixed connection;The backboard of second prefabricated ceramic tile plate is fixedly connected with the Second Board connecting portion by screw.
In one alternate embodiment, the backboard of the first prefabricated ceramic tile plate is glued with the first plate connecting portion by glue-line Knot;The backboard of second prefabricated ceramic tile plate is bonded with the Second Board connecting portion by glue-line.
In one alternate embodiment, the method further includes:Together with wood moulding substrate and ceramic thin plate composite laminate To form the first prefabricated ceramic tile plate;By together with wood moulding substrate and ceramic thin plate composite laminate to form the second prefabricated tile panel Block.
Embodiment using the present invention, using corner brace fix receive side member by ceramic tile wood plastics composite into plate form entirety Plate, therefore more convenient, speed of application is installed faster.Side member and the conjunction of external corner fixing piece are received further, since external corner is fixed Two be one, therefore adds the convenience of installation.Since installation method provided in an embodiment of the present invention is to the specialized skill of worker Art requirement is lower, reduces the difficulty of construction.
Technical solution using the present invention can cause all components to be produced in factory industry metaplasia, only be needed at finishing scene Simple, quick installation is carried out, scene, without the too many construction time, realizes quick without masterful technique worker Construction, and avoid the messy situation in traditional fitment operation scene.
Description of the drawings
Fig. 1 is the exploded pictorial stereogram of prefabricated ceramic tile external corner in first embodiment of the invention;
Fig. 2 is the combination schematic isometric of prefabricated ceramic tile external corner in first embodiment of the invention;
Fig. 3 a, 3b, 3c, 3d, 3e are the combination of first, second, third and fourth, the five prefabricated ceramic tile external corners of embodiment of the invention respectively The shape that schematic diagram, wherein corner brace fix the frame body for receiving side member is had nothing in common with each other.
Specific embodiment
As shown in Figure 1, corner brace is shown in the decomposition diagram of prefabricated ceramic tile external corner in the first embodiment of the invention It is fixed to receive side member 100, the first plate 200, the Second Board 300.
Corner brace, which fixes receipts side member 100, includes frame body 110, the first plate connecting portion 120, the Second Board connecting portion 130th, the 3rd plate connecting portion 140.Wherein:
For connect the first plate 200 the first plate connecting portion 120, for connecting described in the Second Board 300 The Second Board connecting portion 130, for connecting first plate and second with 300 stitching portion of the Second Board in the first plate 200 The 3rd plate connecting portion 140 of plate extends outwardly from frame body 110.In the present embodiment, frame body 110th, the component that the first plate connecting portion 120, the Second Board connecting portion 130, the 3rd plate connecting portion 140 are integrally formed, example It can be such as molded by metal casting.Frame body 110 is columnar part, in the first embodiment, during the frame body is Empty frame body, hollow frame body can cause component weight mitigation and structure it is firm.
First plate connecting portion 120, the Second Board connecting portion 130, the 3rd plate connecting portion 140 are plate-shaped member.The One plate connecting portion 120 and the 3rd plate connecting portion 140 can be as the installation foundation of the first plate 200, the Second Board connections Installation foundation of 130 and the 3rd plate connecting portion 140 of portion as the Second Board 300.The extension of 3rd plate connecting portion 140 is most Outer end has hook part.
Since the first plate connecting portion 120, the Second Board connecting portion 130 are respectively used to the first plate 200 of installation, the second plate The backboard of block 300, the first plate 200, the Second Board 300 are the two blocks of ceramic tiles to form external corner, therefore, the first plate connecting portion The direction that the direction of 120 extensions extends with the Second Board connecting portion 130 is mutually perpendicular to.
The outermost end in the direction of the 3rd plate connecting portion 140 extension has to overlap the first of the first prefabricated ceramic tile plate Hook part 141 and the second hook part 142 for overlapping the second prefabricated ceramic tile plate.In the first embodiment, the 3rd plate connects The extending direction of socket part 140 and the first plate connecting portion 120 extension direction, the 3rd plate connecting portion 140 extending direction with The direction that the Second Board connecting portion 130 extends is in 45 degree of angles.The plate mid portion of 3rd plate connecting portion 140 is located at the Between one plate 200, the Second Board 300, the first hook part 141 and the second hook part 142 of end are respectively used to overlap One plate 200, the Second Board 300.
In the first embodiment, the direction of the 3rd plate connecting portion 140 extension and the side of 120 connecting portion of the first plate extension To the angle in 45 °, the direction with the extension of 130 connecting portion of the Second Board is in 45 ° of angle.3rd plate connecting portion 140 is used for Support is applied to the side of the first plate 200, the Second Board 300, so as to be connected with the first plate connecting portion 120, the Second Board Portion 130 is together fixed the first plate 200, the Second Board 300.
It is provided with to connect first at least one in first plate connecting portion 120 and the Second Board connecting portion 130 The fixedly connected part of plate 200 or the Second Board 300.A variety of retaining elements may be employed in fixedly connected part, in first embodiment In, the fixedly connected part is screw 401, is respectively provided on the first plate connecting portion 120 and the Second Board connecting portion 130 logical Hole, the screw 401 screw in the first plate 200, the Second Board 300 through the through hole, so as to by the first plate connecting portion 120 It is connected with the first plate 200, the Second Board connecting portion 120 is connected with the Second Board 100.
At least one setting in first plate connecting portion 120, the Second Board connecting portion 130, the 3rd plate connecting portion 140 It is useful for bonding the glue-line of the first plate 200 or the Second Board 300.In the first embodiment, the first plate connecting portion 120, Two plate connecting portions 130, the 3rd plate connecting portion 140 are designed on the surface contacted with the first plate 200 or the Second Board 300 Glue-line, so as to the first plate connecting portion 120, the Second Board connecting portion 130, the 3rd plate connecting portion 140 and the first plate 200 or The Second Board 300 bonds, in the first embodiment, the first plate connecting portion 120,130 and first plate of the Second Board connecting portion 200 or the Second Board 300 except through screw connect outside, further bonded by glue-line, so as to enhance bonding strength.
A kind of prefabricated ceramic tile external corner is also disclosed in the first embodiment of the present invention, the prefabricated ceramic tile external corner includes foregoing Corner brace fix receive side member 100, the first prefabricated ceramic tile plate 200, the second prefabricated ceramic tile plate 300.The corner brace, which is fixed, to be received Side member 100 includes frame body 110, the first plate connecting portion 120, the Second Board connecting portion 130, the 3rd plate connecting portion 140.Wherein:
First prefabricated ceramic tile plate 20 is connected on the first plate connecting portion 120, and the second prefabricated ceramic tile plate 300 is connected to On the Second Board connecting portion 130, the 3rd plate connecting portion 140 is arranged on the first prefabricated 200 and second prefabricated ceramic tile of ceramic tile plate The stitching portion of plate 300, the first hook part 141 the first prefabricated ceramic tile plate 200 of overlap joint of the 3rd plate connecting portion 140, the 3rd Second hook part 142 of plate connecting portion 140 overlaps the second prefabricated ceramic tile plate 300, so that the first plate connecting portion 120 The first prefabricated ceramic tile plate 200 is fixed with the 3rd plate connecting portion 140;130 and the 3rd plate connecting portion of the Second Board connecting portion 140 fix the second prefabricated ceramic tile plate 300.
First prefabricated ceramic tile plate and the second prefabricated tile panel it is in the block it is at least one including:Wood moulding substrate, ceramic thin plate, Together with the wood moulding substrate and ceramic thin plate composite laminate.In the first embodiment, the first prefabricated ceramic tile plate 200, second Prefabricated ceramic tile plate 300 is processed to obtain by standard plate, and the standard plate is i.e. by wood moulding substrate 201 and ceramic thin plate 202 composite laminates are formed together.As shown in figure 3, wood moulding substrate 201 is prefabricated as the first prefabricated ceramic tile plate 200 or the second The backboard of ceramic tile plate 300, ceramic thin plate 202 is then as the first prefabricated 200 or the second prefabricated ceramic tile plate 300 of ceramic tile plate Panel.
As shown in Figure 1, for the ease of installation, the first prefabricated ceramic tile plate 200, the side of the second prefabricated ceramic tile plate 300 It is respectively provided with groove 203 and the chamfering 204 that processing is formed.For example, the first plate connecting portion 120 is prefabricated with first at groove 203 Ceramic tile plate 200 connects, the first prefabricated ceramic tile plate 200, the second prefabricated ceramic tile plate 300 side chamfering 204 and the 3rd Plate connecting portion 140 is engaged.
Fig. 3 a, 3b, 3c, 3d, 3e are the combination of first, second, third and fourth, the five prefabricated ceramic tile external corners of embodiment of the invention respectively The shape that schematic diagram, wherein corner brace fix the frame body 110 for receiving side member is had nothing in common with each other.Fig. 3 a, 3b, 3c, 3d, 3e are sections Schematic diagram shows the shape of 110 cross section of different frames body.As previously mentioned, frame body 110 is hollow frame Body, in embodiments, frame body 110 is hollow columnar metal frame body, such as aluminium alloy or steel alloy cylindrical frame Body.Hollow 110 section of frame body can be there are many design pattern, and the design of hollow frame can save material, mitigate weight Amount, while firmer structure can also be provided.
Correspondingly, a kind of prefabricated ceramic tile external corner installation method is disclosed in the embodiment of the present invention.The described method includes:
Step 510, the backboard of the first prefabricated ceramic tile plate is fixedly connected with the first plate connecting portion, and it is prefabricated by first The near-end side of ceramic tile plate overlaps and fixes with the first hook part of the 3rd plate connecting portion.The near-end side refers to distance Nearer the first prefabricated ceramic tile plate side of the backboard of first prefabricated ceramic tile plate and the first plate connecting portion fixed connection place.
Step 520, the backboard of the second prefabricated ceramic tile plate is fixedly connected with the Second Board connecting portion, and it is prefabricated by second The near-end side of ceramic tile plate overlaps and fixes with the second hook part of the 3rd plate connecting portion.
In another embodiment, a kind of prefabricated ceramic tile external corner installation method is disclosed in the embodiment of the present invention.It is described Method includes:
Step 610, after the wood moulding substrate and ceramic thin plate are compound, a standard plate is formed.Wood moulding substrate and ceramics Thin plate can be carried out compound by modes such as high temperature, pressing, splicing.
Step 620, the standard plate edge is subjected to machining by size is related to, forms groove and chamfering, so as to The first prefabricated ceramic tile plate or the second prefabricated ceramic tile plate is made.Groove and chamfering can be formed by Milling Process, groove For accommodating the first plate connecting portion, the chamfering of the first prefabricated ceramic tile plate is used for the 3rd plate connecting portion close to the first hook The plate face cooperation of portion one side;The chamfering of second prefabricated ceramic tile plate is used for the 3rd plate connecting portion close to the second hook part one side Plate face cooperation.The chamfering can be 45 degree.
Step 630, the backboard of the first prefabricated ceramic tile plate is bonded with the first plate connecting portion by glue-line;Second pre- porcelain making The backboard of brick plate is bonded with the Second Board connecting portion by glue-line.Connect to increase the first prefabricated ceramic tile plate and the first plate The bonding strength of socket part, the second prefabricated ceramic tile plate and the Second Board connecting portion, in this step, is first glued it. Glue-line can be coated on the backboard of prefabricated ceramic tile plate or on the corresponding contact face of plate connecting portion, in the present embodiment, the It is both provided with to bond the glue-line of the first plate or the Second Board on one plate connecting portion, the Second Board connecting portion, is glued work Sequence can be carried out outside the venue in advance, can further improve efficiency.
Step 640, the first hook part of the near-end side of the first prefabricated ceramic tile plate and the 3rd plate connecting portion is overlapped And it bonds;Second hook part of the near-end side of the second prefabricated ceramic tile plate and the 3rd plate connecting portion is overlapped and bonded.Together Upper described, in order to increase the first prefabricated ceramic tile plate and the 3rd plate connecting portion, the second prefabricated ceramic tile plate and the 3rd plate connects The bonding strength of socket part in this step, is first glued it.
Step 650, the backboard of the first prefabricated ceramic tile plate is fixedly connected with the first plate connecting portion by screw;By The backboard of two prefabricated ceramic tile plates is fixedly connected with the Second Board connecting portion by screw.First plate connecting portion, the Second Board It is preset with to pass through the through hole of screw on connecting portion, after the completion of foregoing adhesion step, by screw through the through hole point Not Xuan Ru the first prefabricated ceramic tile plate and the second prefabricated ceramic tile plate, achieve a fixed connection.The screw can be tapping screw.
In the present embodiment, since corner brace is fixed the back side that edge closing bar is compounded in glue and screw wood moulding substrate, The effect for fixing two pieces of prefabricated ceramic tile plates has been not only acted as, and has improved the wallboard strength at external corner.
Embodiment described above only expresses the several embodiments of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (12)

1. a kind of corner brace, which is fixed, receives side member, which is characterized in that the corner brace, which fixes receipts side member, includes frame body, the first plate Block connecting portion, the Second Board connecting portion, the 3rd plate connecting portion, wherein:
For connect the first plate the first plate connecting portion, for connect the Second Board of the Second Board connection Portion connects for connecting first plate with the Second Board stitching portion in the first plate with the 3rd plate of the Second Board Portion extends outwardly from frame body, the direction phase that the direction that the first plate connecting portion extends extends with the Second Board connecting portion Mutually vertical, the outermost end in the direction of the 3rd plate connecting portion extension has to overlap the first hook of the first prefabricated ceramic tile plate Portion and the second hook part for overlapping the second prefabricated ceramic tile plate.
2. corner brace according to claim 1, which is fixed, receives side member, which is characterized in that the first plate connecting portion and the Second Board It is provided with to connect the fixedly connected part of the first plate or the Second Board at least one in connecting portion.
3. corner brace according to claim 2, which is fixed, receives side member, which is characterized in that the fixedly connected part is screw.
4. the corner brace according to any one of claim 1-3, which is fixed, receives side member, which is characterized in that the first plate connects At least one in portion, the Second Board connecting portion, the 3rd plate connecting portion is provided with to bond the first plate or the Second Board Glue-line.
5. corner brace according to claim 4, which is fixed, receives side member, which is characterized in that the frame body is hollow frame Body.
6. corner brace according to claim 5, which is fixed, receives side member, which is characterized in that the direction of the 3rd plate connecting portion extension Direction with the extension of the first plate connecting portion is in 45 ° of angle.
7. a kind of prefabricated ceramic tile external corner, which is characterized in that the prefabricated ceramic tile external corner is included such as any one in claim 1-6 The corner brace, which is fixed, receives side member, the first prefabricated ceramic tile plate, the second prefabricated ceramic tile plate, and the corner brace, which is fixed, receives side member Including frame body, the first plate connecting portion, the Second Board connecting portion, the 3rd plate connecting portion, wherein:
First prefabricated ceramic tile plate is connected on the first plate connecting portion, and the second prefabricated ceramic tile plate is connected to the Second Board connection In portion, the 3rd plate connecting portion is arranged on the stitching portion of the first prefabricated ceramic tile plate and the second prefabricated ceramic tile plate, the 3rd plate First hook part of connecting portion overlaps the first prefabricated ceramic tile plate, and the second hook part overlap joint second of the 3rd plate connecting portion is prefabricated Ceramic tile plate, so that the first plate connecting portion and the 3rd plate connecting portion fix the first prefabricated ceramic tile plate;The Second Board Connecting portion and the 3rd plate connecting portion fix the second prefabricated ceramic tile plate.
8. prefabricated ceramic tile external corner according to claim 7, which is characterized in that the first prefabricated ceramic tile plate and the second pre- porcelain making Brick plate it is in the block it is at least one including:Wood moulding substrate, ceramic thin plate, the wood moulding substrate and ceramic thin plate composite laminate are one It rises.
9. a kind of prefabricated ceramic tile external corner installation method, which is characterized in that the described method includes:
The backboard of first prefabricated ceramic tile plate is fixedly connected with the first plate connecting portion, and by the near of the first prefabricated ceramic tile plate End side and the first hook part of the 3rd plate connecting portion are overlapped and fixed;
The backboard of second prefabricated ceramic tile plate is fixedly connected with the Second Board connecting portion, and by the near of the second prefabricated ceramic tile plate End side and the second hook part of the 3rd plate connecting portion are overlapped and fixed.
10. prefabricated ceramic tile external corner installation method according to claim 9, which is characterized in that by the first prefabricated ceramic tile plate Backboard be fixedly connected with the first plate connecting portion by screw;The backboard of second prefabricated ceramic tile plate is connected with the Second Board Portion is fixedly connected by screw.
11. prefabricated ceramic tile external corner installation method according to claim 10, which is characterized in that the first prefabricated ceramic tile plate Backboard is bonded with the first plate connecting portion by glue-line;The backboard of second prefabricated ceramic tile plate passes through glue with the Second Board connecting portion Layer bonds.
12. the prefabricated ceramic tile external corner installation method according to claim 9 or 10, which is characterized in that the method further includes: By together with wood moulding substrate and ceramic thin plate composite laminate to form the first prefabricated ceramic tile plate;By wood moulding substrate and ceramic thin plate Composite laminate is together to form the second prefabricated ceramic tile plate.
CN201711490438.2A 2017-12-30 2017-12-30 Corner brace, which is fixed, receives side member, prefabricated ceramic tile external corner and its installation method Pending CN108049583A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711490438.2A CN108049583A (en) 2017-12-30 2017-12-30 Corner brace, which is fixed, receives side member, prefabricated ceramic tile external corner and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711490438.2A CN108049583A (en) 2017-12-30 2017-12-30 Corner brace, which is fixed, receives side member, prefabricated ceramic tile external corner and its installation method

Publications (1)

Publication Number Publication Date
CN108049583A true CN108049583A (en) 2018-05-18

Family

ID=62129923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711490438.2A Pending CN108049583A (en) 2017-12-30 2017-12-30 Corner brace, which is fixed, receives side member, prefabricated ceramic tile external corner and its installation method

Country Status (1)

Country Link
CN (1) CN108049583A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356350A (en) * 2018-07-31 2019-02-19 浙江亚厦装饰股份有限公司 Shingle nail integrated installation assembly and wall surface decorating method
CN109403575A (en) * 2018-07-31 2019-03-01 浙江亚厦装饰股份有限公司 Shingle nail integrated installation assembly and wall surface decorating method
CN109602161A (en) * 2019-01-18 2019-04-12 广东金意陶陶瓷集团有限公司 A kind of desktop of composite construction and desk based on the desktop
CN109703118A (en) * 2019-01-18 2019-05-03 广东金意陶陶瓷集团有限公司 A kind of composite plate structure
CN110295713A (en) * 2018-12-18 2019-10-01 绿城装饰工程集团有限公司 A kind of external corner strip elasticity connected structure and revetment external corner protect structure
CN112443133A (en) * 2020-11-25 2021-03-05 浙江亚厦装饰股份有限公司 Assembly die suitable for external corners of ceramic tiles with multiple specifications and use method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140053487A1 (en) * 2012-08-21 2014-02-27 Ali TATARI Prefabricated tile system with modular backing board
CN203846716U (en) * 2014-05-26 2014-09-24 北新集团建材股份有限公司 Exposed corner connection member
CN204626850U (en) * 2015-02-27 2015-09-09 宋皞鑫 A kind of keel for installing decorative panel at body of wall corner
CN206346414U (en) * 2016-12-15 2017-07-21 浙江亚厦装饰股份有限公司 A kind of monoblock type external corner structure
CN207974410U (en) * 2017-12-30 2018-10-16 浙江亚厦装饰股份有限公司 Corner brace, which is fixed, receives side member and the prefabricated ceramic tile external corner including it

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140053487A1 (en) * 2012-08-21 2014-02-27 Ali TATARI Prefabricated tile system with modular backing board
CN203846716U (en) * 2014-05-26 2014-09-24 北新集团建材股份有限公司 Exposed corner connection member
CN204626850U (en) * 2015-02-27 2015-09-09 宋皞鑫 A kind of keel for installing decorative panel at body of wall corner
CN206346414U (en) * 2016-12-15 2017-07-21 浙江亚厦装饰股份有限公司 A kind of monoblock type external corner structure
CN207974410U (en) * 2017-12-30 2018-10-16 浙江亚厦装饰股份有限公司 Corner brace, which is fixed, receives side member and the prefabricated ceramic tile external corner including it

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356350A (en) * 2018-07-31 2019-02-19 浙江亚厦装饰股份有限公司 Shingle nail integrated installation assembly and wall surface decorating method
CN109403575A (en) * 2018-07-31 2019-03-01 浙江亚厦装饰股份有限公司 Shingle nail integrated installation assembly and wall surface decorating method
CN109403575B (en) * 2018-07-31 2024-04-19 浙江亚厦装饰股份有限公司 Wall panel integrated installation assembly and wall decoration method
CN109356350B (en) * 2018-07-31 2024-08-13 浙江亚厦装饰股份有限公司 Wall panel integrated installation assembly and wall decoration method
CN110295713A (en) * 2018-12-18 2019-10-01 绿城装饰工程集团有限公司 A kind of external corner strip elasticity connected structure and revetment external corner protect structure
CN109602161A (en) * 2019-01-18 2019-04-12 广东金意陶陶瓷集团有限公司 A kind of desktop of composite construction and desk based on the desktop
CN109703118A (en) * 2019-01-18 2019-05-03 广东金意陶陶瓷集团有限公司 A kind of composite plate structure
CN112443133A (en) * 2020-11-25 2021-03-05 浙江亚厦装饰股份有限公司 Assembly die suitable for external corners of ceramic tiles with multiple specifications and use method

Similar Documents

Publication Publication Date Title
CN108049583A (en) Corner brace, which is fixed, receives side member, prefabricated ceramic tile external corner and its installation method
CN111433421B (en) Plasterboard and preparation method thereof
CN104499614B (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN105804353A (en) Architectural finish material capable of being installed rapidly
CN109811984A (en) Fully-decorated residence floor tile ground floor heat insulating and sound insulating system and its heat insulating and sound insulating structure
CN207974410U (en) Corner brace, which is fixed, receives side member and the prefabricated ceramic tile external corner including it
US20140311073A1 (en) Stucco Composite Building Panel
CN110512816A (en) A kind of self-contained construction technology of compound stone panel
CN204225324U (en) Wall thermal insulating integration point extension system
CN108824729A (en) It is suitble to the combined wall panel structure of dry construction
CN205025027U (en) Wallboard of getting ready
CN103362313A (en) Assembling method of modular combined heat preservation curtain wall plate
CN214697102U (en) Assembled integral wallboard main body for bathroom and kitchen
KR20190120632A (en) Outer wall decoration panel of building
CN211691275U (en) Reinforced composite marble plate
CN212026982U (en) Installation node structure of platform marble basic unit
KR200358631Y1 (en) Wall fixation structure for finishing material
CN211421711U (en) Connecting assembly of PC composite external wall panel system and glass curtain wall system
CN211114492U (en) Stair decoration assembly
JP3128475U (en) Cold chill tape with metal sheet
CN108824730A (en) The combined wall panel structure of dry construction
CN215368394U (en) Adaptive fast-assembling composite wallboard and fast-assembling internal corner structure
CN211666147U (en) Detachable fast-assembling structure for stone
CN217326228U (en) Connecting node structure for top of stone veneer and wood veneer
CN220150747U (en) Green energy-conserving seamless wall structure of no basic unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180518