CN108038654A - Pipe gallery charging administration system - Google Patents
Pipe gallery charging administration system Download PDFInfo
- Publication number
- CN108038654A CN108038654A CN201710961398.9A CN201710961398A CN108038654A CN 108038654 A CN108038654 A CN 108038654A CN 201710961398 A CN201710961398 A CN 201710961398A CN 108038654 A CN108038654 A CN 108038654A
- Authority
- CN
- China
- Prior art keywords
- module
- client
- unit
- data
- payment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007600 charging Methods 0.000 title claims abstract description 26
- 238000004891 communication Methods 0.000 claims abstract description 6
- 238000007726 management method Methods 0.000 claims description 24
- 238000012795 verification Methods 0.000 claims description 11
- 238000004458 analytical method Methods 0.000 claims description 9
- 238000007639 printing Methods 0.000 claims description 9
- 238000012545 processing Methods 0.000 claims description 8
- 230000011218 segmentation Effects 0.000 claims description 6
- 238000013523 data management Methods 0.000 claims description 4
- 230000005611 electricity Effects 0.000 claims 1
- 238000013461 design Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 6
- 230000006872 improvement Effects 0.000 description 4
- 238000011161 development Methods 0.000 description 3
- 230000018109 developmental process Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 239000000567 combustion gas Substances 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 230000008929 regeneration Effects 0.000 description 1
- 238000011069 regeneration method Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
- G06Q40/125—Finance or payroll
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Accounting & Taxation (AREA)
- Marketing (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Finance (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Technology Law (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses pipe gallery charging administration system, including project management unit, customer information unit, pay imformation unit, inquiry payment unit, premium notice unit, rights management unit, financial management unit and data backup unit;Project management unit includes:Piping lane basic data module and charging system module, piping lane basic data module includes the basic data of structure electric power, feedwater, communication and burning line project, including item types, position and specification, charging system module is used to design the difference according to circuit types, position and specification, and the different charging modes of pay charge way.The present invention is suitable for the toll administration of pipe gallery, in the actual operation of pipe gallery, improves the efficiency of management, reduces and link up cost, makes operation charge more efficiently convenient.
Description
Technical field
The present invention relates to pipe gallery technical field, and in particular to pipe gallery charging administration system.
Background technology
In recent years since the continuous development of urban construction, continuous excavate of ground surface works also result in Urban Underground integrated pipe
Line is subject to different degrees of infringement, some serious security incidents occurs, causes people's life, the heavy losses of property.
State lives Jian Budeng departments and proposes emphasis using pipe gallery construction as Future Development, the construction of underground pipe gallery for this
Ground surface works excavated volume can be reduced, not only solves Urban Traffic Jam Based, also greatly facilitates electric power, communication, combustion gas, confession
The maintenance and maintenance of the urban operating mechanisms such as draining.Complicated all kinds of pipelines are focused in unified piping lane and are managed, will
All kinds of different pipelines are applied in same underground pipe gallery jointly will greatly utilize space, with pipe gallery construction
Continuous popularization, the continuous improvement of new technology, the requirement of the management of the on-line monitoring alarm to pipe gallery also can be higher and higher,
With realize the remote on-line monitoring of pipe gallery, intelligent operation maintenance, the real time implementation of alarm response disposal, precision, digitlization,
Intelligent, automation target.
For this reason, country proposes the unified management mechanism on underground pipe gallery, it specify that and make pipe gallery construction
For the emphasis of Future Development, complicated all kinds of pipelines are focused in unified piping lane and are managed, will be all kinds of different
Pipeline is applied in same underground pipe gallery jointly utilizes space by very big, ground surface works excavated volume is reduced, with comprehensive
The continuous popularization of piping lane construction is closed, the continuous improvement of new technology, the requirement of the chargeable service to pipe gallery also can be higher and higher,
But there is no the correlation technique for sharing charge in pipe gallery field, country also shares charge specification and mark without appearance is corresponding
It is accurate.
The content of the invention
The object of the present invention is to provide pipe gallery charging administration system, suitable for the toll administration of pipe gallery, comprehensive
In the actual operation for closing piping lane, the efficiency of management is improved, reduces and links up cost, makes operation charge more efficiently convenient.
The present invention is achieved in that pipe gallery charging administration system, including project management unit, customer information list
Member, pay imformation unit, inquiry payment unit, premium notice unit, rights management unit, financial management unit and data backup
Unit.
The project management unit includes:Piping lane basic data module and charging system module, the piping lane basic data
Module includes the basic data of structure electric power, feedwater, communication and burning line project, including item types, position and specification, institute
State charging system module be used for design according to the difference of circuit types, position and specification, and the different chargings of pay charge way
Mode;
The customer information unit includes:Client's basic information module and client's details module, client's essential information
Module is used for the profile for adding, editing and checking client, and client's details module is for adding, Bian Jihe
Check the details of client, and the cooperation in piping lane project and input situation;
The pay imformation unit includes:Charge specification module, payment logging modle, cost model to be paid and charge operation mould
Block;The charge specification module is used to adding, edit and checking piping lane fee for service project and the detail of toll amount, described to pay
Expense logging modle is used to check item types, position, client and the payment of period situation record, and the cost model to be paid is used
In checking in the cycle project situation and amount of money situation that need to pay the fees, the charge operation module is used for toll administration person and assists visitor
Complete the operation of payment in family;
The inquiry payment unit includes:Inquiry payment port and bill printing module;The bill printing module is used to pay the fees
Clearing and the printing of bill afterwards, the inquiry payment port is used for enquiry fee use and situation of paying the fees, including client can pass through end
Hold the port of self-service query and payment;
The premium notice unit includes:Premium notice module and payment alarm module;The premium notice module is used for visitor
Family sends short message, wechat and call charging notice, and the payment alarm module is used to remind toll administration person and client to need to locate
The payment project of reason;
The rights management unit includes:Item data management person, toll administration person and examination & verification administrator;The project data pipe
Reason person is responsible for the administrative staff of processing item data content, including add, edit and delete authority, toll administration person is responsible for processing
The administrative staff specifically to charge, including typing payment information, operate printed invoice authority, and examination & verification administrator is responsible for project data
The examination & verification of content, and supervision and examination & verification to charge processing.
Further, the financial management unit includes:Financial statistics module, financial analysis module and financial statement mould
Block;The financial statistics module is used for the statistics to charge data, including by item types, position, time and client segmentation, institute
Financial analysis module is stated for the analysis to charge data, including by item types, position, time and client segmentation, the wealth
Business Reports module is used to generate financial statement, is consulted for related management personnel;
Further, the data backup unit is used for going through for stored items content, customer information, pay imformation and premium notice
History data, and data query and data export are provided.
The invention has the advantages that suitable for the toll administration of pipe gallery, can in the actual operation of pipe gallery
The expense item and charge computering method of Ru Lang each side owner is specified, the efficiency of management is improved, reduces and link up cost, allow operation to charge
It is more efficiently convenient.
Brief description of the drawings
Fig. 1 is the system schematic of the present invention.
Embodiment
The embodiment of the present invention is described in further detail with reference to embodiment:
As shown in Figure 1, pipe gallery charging administration system, including project management unit, customer information unit, pay imformation list
Member, inquiry payment unit, premium notice unit, rights management unit, financial management unit and data backup unit.
Project management unit includes:Piping lane basic data module and charging system module, piping lane basic data module include
Build the basic data of electric power, feedwater, communication and burning line project, including item types, position and specification, charging system mould
Block is used to design the difference according to circuit types, position and specification, and the different charging modes of pay charge way;Item types
Include pipeline, rainwater box culvert, feedwater water delivery engineering, direct drinking water project, regeneration Hydraulic Projects, rainwater engineering, sewage work, natural
Gas engineering, power engineering, communication engineering etc.;Customer information unit includes:Client's basic information module and client's details mould
Block, client's basic information module are used for the profile for adding, editing and checking client, and client's details module is used for
Add, edit and check the details of client, and the cooperation in piping lane project and input situation;Client includes middle League of Nations
System, China Telecom, China Mobile, municipal unit and combustion gas unit etc.;
Pay imformation unit includes:Charge specification module, payment logging modle, cost model to be paid and charge operation module;Receive
Expense specification module is used to adding, edit and checking piping lane fee for service project and the detail of toll amount, and payment logging modle is used
In checking item types, position, client and the payment of period situation record, cost model to be paid, which is used to check in the cycle, to be needed
The project situation and amount of money situation of payment, charge operation module are used for the operation that toll administration person assists client to complete payment;Look into
Asking payment unit includes:Inquiry payment port and bill printing module;Bill printing module is used for the clearing after paying the fees and bill
Printing, inquiry payment port be used for enquiry fee use and pay the fees situation, including client can pass through terminal self-service query and payment
Port;Premium notice unit includes:Premium notice module and payment alarm module;Premium notice module is used to send client short
Letter, wechat and call charging notice, payment alarm module are used to remind toll administration person and client's payment project to be treated;
Rights management unit includes:Item data management person, toll administration person and examination & verification administrator;Item data management person is responsible for
The administrative staff of processing item data content, including add, edit and delete authority, toll administration person is responsible for handling specific charge
Administrative staff, including typing payment information operates printed invoice authority, and examination & verification administrator is responsible for examining project data content
Core, and supervision and examination & verification to charge processing.
Financial management unit includes:Financial statistics module, financial analysis module and financial statement module;Financial statistics module
It is used for for the statistics to charge data, including by item types, position, time and client segmentation, financial analysis module to receiving
Take the analysis of data, including by item types, position, time and client segmentation, financial statement module is used to generate financial statement,
Consulted for related management personnel;Data backup unit is used for stored items content, customer information, pay imformation and premium notice
Historical data, and data query and data export are provided.
The above is only the preferred embodiment of the present invention, it is noted that is come for those of ordinary skill in the art
Say, without departing from the technical principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
When being considered as within protection scope of the present invention.
Claims (3)
1. pipe gallery charging administration system, it is characterised in that including project management unit, customer information unit, pay imformation
Unit, inquiry payment unit, premium notice unit, rights management unit, financial management unit and data backup unit;The item
Mesh administrative unit includes:Piping lane basic data module and charging system module, the piping lane basic data module include structure electricity
Power, feedwater, the basic data of communication and burning line project, including item types, position and specification, the charging system module
For designing the difference according to circuit types, position and specification, and the different charging modes of pay charge way;Client's letter
Interest statement member includes:Client's basic information module and client's details module, client's basic information module are used to add, compile
Collect and check the profile of client, client's details module is used to adding, edit and checking that client's is detailed
Information, and the cooperation in piping lane project and input situation;The pay imformation unit includes:Charge specification module, payment
Logging modle, cost model to be paid and charge operation module;The charge specification module is used to adding, edit and checking piping lane item
The detail of mesh charging item and toll amount, the payment logging modle are used to check item types, position, client and period
Payment situation record, the cost model to be paid is used to check in the cycle project situation and amount of money situation that need to pay the fees, institute
State charge operation module and be used for the operation that toll administration person assists client to complete payment;The inquiry payment unit includes:Inquiry
Payment port and bill printing module;The bill printing module is used for the clearing after paying the fees and the printing of bill, the inquiry
Payment port is used for enquiry fee use and situation of paying the fees, including client can pass through terminal self-service query and the port paid the fees;It is described to pay
Expense notification unit includes:Premium notice module and payment alarm module;The premium notice module be used for client is sent short message,
Wechat and call charging notice, the payment alarm module are used to remind toll administration person and client's financial terms to be treated
Mesh;The rights management unit includes:Item data management person, toll administration person and examination & verification administrator;The project data pipe
Reason person is responsible for the administrative staff of processing item data content, including add, edit and delete authority, toll administration person is responsible for processing
The administrative staff specifically to charge, including typing payment information, operate printed invoice authority, and examination & verification administrator is responsible for project data
The examination & verification of content, and supervision and examination & verification to charge processing.
2. pipe gallery charging administration system according to claim 1, it is characterised in that the financial management unit bag
Include:Financial statistics module, financial analysis module and financial statement module;The financial statistics module is used for the system to charge data
Meter, including by item types, position, time and client segmentation, the financial analysis module is used for the analysis to charge data, bag
Include by item types, position, time and client segmentation, the financial statement module is used to generate financial statement, for related management
Personnel consult.
3. pipe gallery charging administration system according to claim 1, it is characterised in that the data backup unit is used for
Stored items content, customer information, the historical data of pay imformation and premium notice, and data query and data export are provided.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710961398.9A CN108038654A (en) | 2017-10-17 | 2017-10-17 | Pipe gallery charging administration system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710961398.9A CN108038654A (en) | 2017-10-17 | 2017-10-17 | Pipe gallery charging administration system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108038654A true CN108038654A (en) | 2018-05-15 |
Family
ID=62093479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710961398.9A Pending CN108038654A (en) | 2017-10-17 | 2017-10-17 | Pipe gallery charging administration system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108038654A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108694559A (en) * | 2018-05-17 | 2018-10-23 | 武汉科技大学 | A kind of city integrated piping lane intelligent toll system Internet-based |
CN109447614A (en) * | 2018-09-28 | 2019-03-08 | 岳阳市自来水公司 | Tap water marketing management system, method, terminal and storage medium |
CN113191899A (en) * | 2021-05-07 | 2021-07-30 | 北京金融资产交易所有限公司 | Fee management system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105550952A (en) * | 2016-02-15 | 2016-05-04 | 重庆昇鑫科技有限公司 | Intelligent property management system based on internet of things |
CN105912978A (en) * | 2016-03-31 | 2016-08-31 | 电子科技大学 | Lane line detection and tracking method based on concurrent pipelines |
CN106357826A (en) * | 2016-11-16 | 2017-01-25 | 四川省亚丁胡杨人力资源集团有限公司 | Paying system based on intelligent community |
CN106482785A (en) * | 2016-10-17 | 2017-03-08 | 上海瀚所信息技术有限公司 | A kind of pipe gallery monitoring and warning system |
CN107194861A (en) * | 2017-07-02 | 2017-09-22 | 四川藏区高速公路有限责任公司 | A kind of road network operation comprehensive monitoring management platform and method based on 3DGIS+BIM |
-
2017
- 2017-10-17 CN CN201710961398.9A patent/CN108038654A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105550952A (en) * | 2016-02-15 | 2016-05-04 | 重庆昇鑫科技有限公司 | Intelligent property management system based on internet of things |
CN105912978A (en) * | 2016-03-31 | 2016-08-31 | 电子科技大学 | Lane line detection and tracking method based on concurrent pipelines |
CN106482785A (en) * | 2016-10-17 | 2017-03-08 | 上海瀚所信息技术有限公司 | A kind of pipe gallery monitoring and warning system |
CN106357826A (en) * | 2016-11-16 | 2017-01-25 | 四川省亚丁胡杨人力资源集团有限公司 | Paying system based on intelligent community |
CN107194861A (en) * | 2017-07-02 | 2017-09-22 | 四川藏区高速公路有限责任公司 | A kind of road network operation comprehensive monitoring management platform and method based on 3DGIS+BIM |
Non-Patent Citations (1)
Title |
---|
YUW2000: "城市地下综合管廊入廊费收取方案", 《HTTP://WWW.360DOC.COM/CONTENT/17/0606/21/40625681_660595152.SHTML》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108694559A (en) * | 2018-05-17 | 2018-10-23 | 武汉科技大学 | A kind of city integrated piping lane intelligent toll system Internet-based |
CN109447614A (en) * | 2018-09-28 | 2019-03-08 | 岳阳市自来水公司 | Tap water marketing management system, method, terminal and storage medium |
CN113191899A (en) * | 2021-05-07 | 2021-07-30 | 北京金融资产交易所有限公司 | Fee management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dogo et al. | Blockchain and internet of things-based technologies for intelligent water management system | |
CN108877176A (en) | Internet of Things gas is wireless automatic remote transmission kilowatt meter reading-out system | |
CN101937593B (en) | Information-inducing self-service multi-control cluster-charge intelligent charge server | |
US8138950B1 (en) | Programmable parking meter and integrated paging transmitter | |
US9903894B2 (en) | Method and system for monitoring a secondary electric power distribution grid with detection of fraud and theft of electric energy and public lighting diagnostics | |
CN101938146B (en) | Intelligent power grid group charging electric source induced supply system | |
CN109598491A (en) | The public operating service platform multi-operator of electric car directly pays system | |
CN108038654A (en) | Pipe gallery charging administration system | |
CN106447799B (en) | extensive applicability and high efficiency parking lot charging system | |
CN105550952A (en) | Intelligent property management system based on internet of things | |
CN106097587A (en) | Based on cloud platform, the distributed electric vehicle charging management system of many tenants and method | |
Depuru et al. | Measures and setbacks for controlling electricity theft | |
CN103942889A (en) | Unattended parking space self-service method and system based on mobile communication | |
CN106127628A (en) | A kind of Property Management System supporting automatic charging | |
CN101526556A (en) | Method of remote metering of energy | |
CN108986323A (en) | Pre-payment Internet of Things gas meter, flow meter with IC card | |
KR101209642B1 (en) | Roadside and outdoor parking lot management system | |
CN103985163A (en) | Road-occupation parking management system | |
CN103914921B (en) | Road parking berth intellectualized management system | |
Shokoya et al. | Electricity theft mitigation in the Nigerian power sector | |
CN101271624A (en) | Parking position controller and parking position management system based on personal identity string code authentication | |
CN206805202U (en) | A kind of intelligent electric power lock based on internet | |
CN111539843B (en) | Data-driven intelligent early warning method for preventing electricity stealing | |
CN102842215B (en) | Novel multifunctional valve-control water meter reading management system for prepayment network and application method | |
TW201939447A (en) | Roadside parking charging system with Internet-of-Things function capable of performing two-way data transmission or command delivery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180515 |
|
WD01 | Invention patent application deemed withdrawn after publication |