CN108036151B - 保护市政管线的施工方法 - Google Patents
保护市政管线的施工方法 Download PDFInfo
- Publication number
- CN108036151B CN108036151B CN201711209765.6A CN201711209765A CN108036151B CN 108036151 B CN108036151 B CN 108036151B CN 201711209765 A CN201711209765 A CN 201711209765A CN 108036151 B CN108036151 B CN 108036151B
- Authority
- CN
- China
- Prior art keywords
- freezing
- construction
- pipe
- freezing pipe
- frozen
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/08—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L57/00—Protection of pipes or objects of similar shape against external or internal damage or wear
- F16L57/02—Protection of pipes or objects of similar shape against external or internal damage or wear against cracking or buckling
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/09—Component parts or accessories
- E03B7/10—Devices preventing bursting of pipes by freezing
- E03B7/12—Devices preventing bursting of pipes by freezing by preventing freezing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/11—Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
- E02D3/115—Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means by freezing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
- E02D31/14—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against frost heaves in soil
Abstract
本发明公开了一种保护市政管线的施工方法,其特征是离施工步骤包括:(1)布置冻结装置冻结管底部带有钻头,钻头一边进行旋转搅松土体同时冻结管下沉施工;(2)水泥搅拌桩施工;(3)开挖防冻胀沟;(4)开挖应力释放孔;(5)冻结施工,积极冻结期温度为‑30℃~‑32℃,维护冻结期温度为‑28℃~‑30℃;(6)融沉补偿注浆。
Description
技术领域
本发明涉及一种保护市政管线的施工方法,适用于市政领域。
背景技术
随着基本建设的发展,城市中的建(构)筑物、道路越来越密集,且大量的市政管线埋置在地下,由于用地紧张,于密集建筑群中建造工程,由于挤土桩施工所造成的邻近市政管线破坏的事例就会时有发生,因此如何防止挤土桩施工对市政管线的影响问题已引起工程人员的重视。
发明内容
本发明是提供一种保护市政管线的结构,解决传统挤土桩施工对市政管线的影响的问题。
本发明离新建建筑物15~20m距离处布置应力释放孔,应力释放孔直径为500~700mm,应力释放孔深度为18~25mm,应力释放孔内放入竹笼防止新建建筑物施工时应力释放孔出现塌孔。
离应力释放孔7~9m距离处布置冻结管,冻结管直径为90~150mm,冻结管壁厚为5~8mm。冻结管布置三排,每排冻结管布置成圆弧形,冻结施工完毕后会形成圆弧形冻墙,圆弧形冻墙相对直形冻墙可以将挤土桩施工时产生的水平挤压力转换为斜向力,有效地抵御水平挤压力。相邻排冻结管采用梅花形交叉布置,冻结管深度为16~20m,冻结管间距为500~600mm,端部相邻排冻结管之间设置测温管,测温管深度与冻结管深度相同,冻结施工时冻土扩展速度为20~25mm/d。冻结管之间的连接采用丝扣加密封剂连接,接缝处进行补焊,确保各管节间的同心度和焊接强度。
根据圆弧形冻结墙的特点,冻结管采用液氮冷冻,液氮储罐出口的温度控制在-150~-170℃,压力控制在0.05~0.1MPa,液氮使用回路中散热板进行温度调节,压力调节使用液氮储罐上的截止阀。由于液氮温度低,管内外温度差较大,易产生冷量损失,因此需对管路进行保温处理,供氮干管采用2层10mm厚的聚乙烯保温材料和3层密封薄膜交替包裹。根据试验结果,要达到冻土扩展速度为20~25mm/d液氮的供给量为每小时1.2~1.3t。冻结管压力控制在0.05~0.1MPa。
离新建建筑物35~50m距离处布置防冻胀沟,防冻胀沟宽度为600~800mm,深度根据土质情况确定,土质是粘土时,深度大于700mm且小于或等于800mm;土质是粉土时,深度大于600mm且小于或等于700mm;土质是砂土时,深度为600mm。试验发现不同土质的冻胀情况不一样,粘土最大,粉土其次,砂土最小。
为了避免土体过大的冻胀变形,对土体冻胀进行了测试,并进行施工控制。如果土体最大冻胀量超过或等于3mm,要增大冻结速度,冻土扩展速度采用25~35mm/d。
为了进一步防止施工时产生的水平挤压力影响管线接头,在管线接头部位布置三根水泥搅拌桩,水泥搅拌桩直径为450~550mm,水泥搅拌桩采用咬合布置,水泥搅拌桩内插入毛竹以抵御施工时产生的水平挤压力。
施工步骤包括:
(1)布置冻结装置
冻结管底部带有钻头,钻头一边进行旋转搅松土体同时冻结管下沉施工。
冻结钻孔偏斜是工程中遇到的难题,为了解决这个问题,本发明在钻孔过程中采用如下方法进行控制:将手电筒放入冻结管中作为观测标志,用具有光学对电器的经纬仪分段观测管内灯光的位置,根据相似三角形原理,解析出钻孔在某深度处的实际偏斜距离、偏斜方向和偏斜率,钻孔偏斜率控制在3%以内。
(2)水泥搅拌桩施工
(3)开挖防冻胀沟
(4)开挖应力释放孔
(5)冻结施工
积极冻结期温度为-30℃~-32℃,维护冻结期温度为-28℃~-30℃。
(6)融沉补偿注浆
解冻后土体会出现下沉,因此要采取融沉补偿措施。当解冻后土体下沉速率大于或等于3mm时,在冻土区域内注入水泥和水玻璃混合液,水泥和水玻璃混合液配比采用如下:水泥浆和水玻璃溶液体积比为1:1,其中水泥浆水灰比为1,水玻璃溶液采用B35~B40水玻璃和加1~2倍体积的水稀释。注浆压力为0.4~0.5MPa。
本发明操作安全可靠,保护结构的性能好。
附图说明
图1保护市政管线的结构示意图。
附图标志:1、应力释放孔,2、冻结管,3、测温管,4、防冻胀沟,5、水泥搅拌桩,6、管线。
具体实施方式
以下结合附图对本实施例进行详细描述。
本实施例离新建建筑物18m距离处布置应力释放孔1,应力释放孔1直径为600mm,应力释放孔1深度为20mm。
离应力释放孔8m距离处布置冻结管2,冻结管2直径为100mm,冻结管2壁厚为6mm。冻结管2布置三排,每排冻结管2布置成圆弧形,冻结施工完毕后会形成圆弧形冻墙。相邻排冻结管2采用梅花形交叉布置,冻结管2深度为18m,冻结管2间距为550mm,端部相邻排冻结管2之间设置测温管3,测温管3深度与冻结管2深度相同,冻结施工时冻土扩展速度为20~25mm/d。冻结管2之间的连接采用丝扣加密封剂连接,接缝处进行补焊,确保各管节间的同心度和焊接强度。
冻结管2采用液氮冷冻,液氮储罐出口的温度控制在-160℃,压力控制在0.08MPa,液氮使用回路中散热板进行温度调节,压力调节使用液氮储罐上的截止阀。对管路进行保温处理,供氮干管采用2层10mm厚的聚乙烯保温材料和3层密封薄膜交替包裹。液氮的供给量为每小时1.2~1.3t。冻结管2压力控制在0.08MPa。
离新建建筑物38m距离处布置防冻胀沟4,防冻胀沟4宽度为700mm,深度为650mm。
如果土体最大冻胀量超过或等于3mm,要增大冻结速度,冻土扩展速度采用25~35mm/d。
在管线6接头部位布置三根水泥搅拌桩5,水泥搅拌桩5直径为500mm,水泥搅拌桩5采用咬合布置,水泥搅拌桩5内插入毛竹。
施工步骤包括:
(1)布置冻结装置
冻结管2底部带有钻头,钻头一边进行旋转搅松土体同时冻结管2下沉施工。
采用如下方法进行控制钻孔偏斜:将手电筒放入冻结管2中作为观测标志,用具有光学对电器的经纬仪分段观测管内灯光的位置,根据相似三角形原理,解析出钻孔在某深度处的实际偏斜距离、偏斜方向和偏斜率,钻孔偏斜率控制在3%以内。
(2)水泥搅拌桩5施工
(3)开挖防冻胀沟4
(4)开挖应力释放孔1
(5)冻结施工
积极冻结期温度为-30℃~-32℃,维护冻结期温度为-28℃~-30℃。
(6)融沉补偿注浆
当解冻后土体下沉速率大于或等于3mm时,在冻土区域内注入水泥和水玻璃混合液,水泥和水玻璃混合液配比采用如下:水泥浆和水玻璃溶液体积比为1:1,其中水泥浆水灰比为1,水玻璃溶液采用B35~B40水玻璃和加1~2倍体积的水稀释。注浆压力为0.4~0.5MPa。
Claims (1)
1.一种保护市政管线的施工方法,其特征是离新建建筑物15~20m距离处布置应力释放孔,应力释放孔直径为500~700mm,应力释放孔深度为18~25mm;离应力释放孔7~9m距离处布置冻结管,冻结管直径为90~150mm,冻结管壁厚为5~8mm;冻结管布置三排,每排冻结管布置成圆弧形,冻结施工完毕后会形成圆弧形冻墙;相邻排冻结管采用梅花形交叉布置,冻结管深度为16~20m,冻结管间距为500~600mm,端部相邻排冻结管之间设置测温管,测温管深度与冻结管深度相同,冻结施工时冻土扩展速度为20~25mm/d;冻结管之间的连接采用丝扣加密封剂连接,接缝处进行补焊,确保各管节间的同心度和焊接强度;冻结管压力控制在0.05~0.1MPa;离新建建筑物35~50m距离处布置防冻胀沟;在管线接头部位布置三根水泥搅拌桩,水泥搅拌桩直径为450~550mm,水泥搅拌桩采用咬合布置,水泥搅拌桩内插入毛竹;
施工步骤包括:
(1)布置冻结装置
冻结管底部带有钻头,钻头一边进行旋转搅松土体同时冻结管下沉施工;
(2)水泥搅拌桩施工
(3)开挖防冻胀沟
(4)开挖应力释放孔
(5)冻结施工
积极冻结期温度为-30℃~-32℃,维护冻结期温度为-28℃~-30℃;
(6)融沉补偿注浆
当解冻后土体下沉速率大于或等于3mm时,在冻土区域内注入水泥和水玻璃混合液,水泥和水玻璃混合液配比采用如下:水泥浆和水玻璃溶液体积比为1:1,其中水泥浆水灰比为1,水玻璃溶液采用B35~B40水玻璃和加1~2倍体积的水稀释;注浆压力为0.4~0.5MPa。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711209765.6A CN108036151B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的施工方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711209765.6A CN108036151B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的施工方法 |
CN201610311186.1A CN105862932B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的结构 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610311186.1A Division CN105862932B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108036151A CN108036151A (zh) | 2018-05-15 |
CN108036151B true CN108036151B (zh) | 2019-06-04 |
Family
ID=56631891
Family Applications (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711209752.9A Active CN107989121B (zh) | 2016-04-30 | 2016-04-30 | 保护城市市政管线的冻结结构 |
CN201711212375.4A Active CN107989079B (zh) | 2016-04-30 | 2016-04-30 | 保护城市市政管线的结构 |
CN201711209771.1A Active CN107989152B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的冻结结构 |
CN201711209765.6A Active CN108036151B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的施工方法 |
CN201610311186.1A Active CN105862932B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的结构 |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711209752.9A Active CN107989121B (zh) | 2016-04-30 | 2016-04-30 | 保护城市市政管线的冻结结构 |
CN201711212375.4A Active CN107989079B (zh) | 2016-04-30 | 2016-04-30 | 保护城市市政管线的结构 |
CN201711209771.1A Active CN107989152B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的冻结结构 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610311186.1A Active CN105862932B (zh) | 2016-04-30 | 2016-04-30 | 保护市政管线的结构 |
Country Status (1)
Country | Link |
---|---|
CN (5) | CN107989121B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3066204B1 (fr) | 2017-05-11 | 2020-12-04 | Vinci Construction | Procede et dispositif de congelation d'un massif de sol |
CN108330968A (zh) * | 2018-04-26 | 2018-07-27 | 佳琳 | 一种锚杆加液氮冻土墙基坑围护结构及其施工方法 |
CN108330991A (zh) * | 2018-04-26 | 2018-07-27 | 佳琳 | 一种土钉加液氮冻土墙基坑围护结构及其施工方法 |
CN108797601A (zh) * | 2018-06-13 | 2018-11-13 | 王海霖 | 一种桩锚与液氮冻土墙复合支护系统的施工方法 |
CN108797603A (zh) * | 2018-06-13 | 2018-11-13 | 王海霖 | 一种防护网与液氮冻土墙复合支护结构及其施工方法 |
CN108797606A (zh) * | 2018-06-13 | 2018-11-13 | 王海霖 | 一种防护网与液氮冻土墙复合支护系统的施工方法 |
CN108797602A (zh) * | 2018-06-13 | 2018-11-13 | 王海霖 | 一种桩锚与液氮冻土墙复合支护结构及其施工方法 |
CN108797605A (zh) * | 2018-06-13 | 2018-11-13 | 王海霖 | 一种结合液氮冻土墙的桩锚式复合支护结构及其施工方法 |
CN112145814B (zh) * | 2020-09-24 | 2022-04-15 | 武汉大学 | 一种用于砂卵石-卵砾石地层的泥水盾构耐磨泥浆管 |
CN112227468A (zh) * | 2020-10-26 | 2021-01-15 | 温州展业建设工程有限公司 | 一种保护城市市政管线的冻结施工方法 |
CN113832953A (zh) * | 2021-10-25 | 2021-12-24 | 广州市设计院集团有限公司 | 减少真空预压对周边环境影响的方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1614152A (zh) * | 2004-10-14 | 2005-05-11 | 上海隧道工程股份有限公司 | 软土层水平冻结法连接通道的施工方法 |
RU2384672C1 (ru) * | 2009-02-11 | 2010-03-20 | Александр Иванович Абросимов | Охлаждаемая свайная опора для сооружений, возводимых на вечномерзлом грунте |
CN103334757A (zh) * | 2013-06-11 | 2013-10-02 | 中国矿业大学(北京) | 一种冻结管、冻结器及采用冻结法开挖岩土的方法 |
CN104806253A (zh) * | 2015-05-15 | 2015-07-29 | 中铁二局股份有限公司 | 一种矩形顶管通道之间开洞的施工方法 |
CN104895059A (zh) * | 2015-03-31 | 2015-09-09 | 中铁时代建筑设计院有限公司 | 冻结水泥土搅拌桩及其施工方法 |
CN105257297A (zh) * | 2015-11-04 | 2016-01-20 | 中铁十八局集团有限公司 | 一种管间精准控制冻土帷幕的施工方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2164274C2 (ru) * | 1998-01-27 | 2001-03-20 | Шемелин Геннадий Иванович | Устройство для охлаждения и замораживания грунта |
RU2153558C2 (ru) * | 1998-11-02 | 2000-07-27 | Кубанский государственный аграрный университет | Противооползневое сооружение для защиты подземных трубопроводов |
CN101871218B (zh) * | 2010-02-03 | 2012-04-18 | 上海隧道工程股份有限公司 | 地下车站空间的非开挖施工方法及其弧形冻结管施工设备 |
CN204199335U (zh) * | 2014-09-29 | 2015-03-11 | 中国建筑第八工程局有限公司 | 一种减小phc管桩施工挤土效应的泄压井 |
-
2016
- 2016-04-30 CN CN201711209752.9A patent/CN107989121B/zh active Active
- 2016-04-30 CN CN201711212375.4A patent/CN107989079B/zh active Active
- 2016-04-30 CN CN201711209771.1A patent/CN107989152B/zh active Active
- 2016-04-30 CN CN201711209765.6A patent/CN108036151B/zh active Active
- 2016-04-30 CN CN201610311186.1A patent/CN105862932B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1614152A (zh) * | 2004-10-14 | 2005-05-11 | 上海隧道工程股份有限公司 | 软土层水平冻结法连接通道的施工方法 |
RU2384672C1 (ru) * | 2009-02-11 | 2010-03-20 | Александр Иванович Абросимов | Охлаждаемая свайная опора для сооружений, возводимых на вечномерзлом грунте |
CN103334757A (zh) * | 2013-06-11 | 2013-10-02 | 中国矿业大学(北京) | 一种冻结管、冻结器及采用冻结法开挖岩土的方法 |
CN103334757B (zh) * | 2013-06-11 | 2015-04-15 | 中国矿业大学(北京) | 一种冻结管、冻结器及采用冻结法开挖岩土的方法 |
CN104895059A (zh) * | 2015-03-31 | 2015-09-09 | 中铁时代建筑设计院有限公司 | 冻结水泥土搅拌桩及其施工方法 |
CN104806253A (zh) * | 2015-05-15 | 2015-07-29 | 中铁二局股份有限公司 | 一种矩形顶管通道之间开洞的施工方法 |
CN105257297A (zh) * | 2015-11-04 | 2016-01-20 | 中铁十八局集团有限公司 | 一种管间精准控制冻土帷幕的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107989152B (zh) | 2020-06-05 |
CN107989079B (zh) | 2020-06-12 |
CN107989121A (zh) | 2018-05-04 |
CN108036151A (zh) | 2018-05-15 |
CN105862932B (zh) | 2018-08-17 |
CN107989121B (zh) | 2020-06-05 |
CN105862932A (zh) | 2016-08-17 |
CN107989152A (zh) | 2018-05-04 |
CN107989079A (zh) | 2018-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108036151B (zh) | 保护市政管线的施工方法 | |
CN104695964B (zh) | 地铁盾构隧道冰冻进洞方法 | |
CN104963334B (zh) | 用注浆冻结管加固冻结联络通道抑制冻胀融沉的施工方法 | |
JP2021534337A (ja) | 連絡通路の凍結工法及び凍結システム | |
CN105909260B (zh) | 用于保护地下水环境的地铁车站止水结构及其施工方法 | |
CN105908765B (zh) | 用于保护地下水环境的明挖隧道止水结构及施工方法 | |
CN103277103B (zh) | 一种立井开凿穿越巨厚富水基岩非全深冻结方法 | |
CN106121686B (zh) | 用于保护地下水环境的暗挖隧道止水结构及其施工方法 | |
CN111593726A (zh) | 富水地层地下隧道下穿敏感管线对接既有结构mjs+人工冻结联合加固方法 | |
CN110847151B (zh) | 一种冻结法修复隧道下穿空洞方法 | |
CN109296371A (zh) | Mjs法与水平冻结法联合加固承压富水砂性地层交叠车站下穿段的体系及其施工方法 | |
CN205669398U (zh) | 用于保护地下水环境的暗挖隧道止水结构 | |
CN109667540A (zh) | 一种土壤源热泵地源井施工工艺方法 | |
CN107938647B (zh) | 保护市政管线的冻结施工方法 | |
CN104963341A (zh) | 一种耦合式地源热泵混合回填工艺及回填料 | |
CN111945704A (zh) | 倾斜布置多排冻结管对富水粉砂地层加固的方法 | |
CN205804382U (zh) | 用于保护地下水环境的明挖隧道止水结构 | |
CN204780857U (zh) | 一种注浆冻结管 | |
CN205576892U (zh) | 一种保护市政管线的构造 | |
Kirsch et al. | Ground freezing for tunnelling under historical structures | |
CN117306492A (zh) | 适用于地下连续墙槽壁的液氮冻土加固施工方法 | |
CN115324588A (zh) | 一种市政地下工程施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201120 Address after: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province Patentee after: Gu Yaobin Address before: 325000, 302, Jingshan Hill, Ouhai District, Zhejiang, Wenzhou, 11 rooms Patentee before: Ye Xiangzhu |
|
TR01 | Transfer of patent right |