CN108035302A CN201711031365.0A CN201711031365A CN108035302A CN 108035302 A CN108035302 A CN 108035302A CN 201711031365 A CN201711031365 A CN 201711031365A CN 108035302 A CN108035302 A CN 108035302A
Authority
CN
China
Prior art keywords
pile foundation
steel
water front
concrete prefabricated
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711031365.0A
Other languages
Chinese (zh)
Inventor
施玉青
叶茂盛
周佳毅
陈伟国
丁星星
柴先墩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201711031365.0A priority Critical patent/CN108035302A/en
Publication of CN108035302A publication Critical patent/CN108035302A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/066Quays

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of bank protection construction method for being suitable for complicated water front, the described method comprises the following steps:Pile foundation is set along the complicated water front;Side sets concrete prefabricated element near water at the top of pile foundation, and upper horizontal direction bolt and lower horizontal direction bolt, concrete prefabricated element are buried inside concrete prefabricated element and is connected by lower horizontal direction bolt with pile foundation;Pull in shore welding angle steel in side at the top of pile foundation, L-type prefabricated steel is arranged above pile foundation, prefabricated steel horizontal ends are connected by vertical bolt with angle steel, and prefabricated steel vertical end is then connected by upper horizontal direction bolt with concrete prefabricated element.The shore protection of the present invention has that short construction period, speed are fast, and construction site requires low, surrounding enviroment is influenced small, and noise, airborne dust problem are few, is had advantage by seasonal effect is small etc., also constructed with favourable modularization flat moulded prefabricatedization, suitable for advantages such as complicated water fronts.

Description

A kind of bank protection construction method for being suitable for complicated water front
Technical field
The present invention relates to a kind of bank protection construction method for being suitable for complicated water front.
Background technology
Bank protection structure is substantially based on traditional monolithic reinforced concrete structure at this stage, although design theory is ripe, applies Work is experienced, but still suffers from many deficiencies, is mainly reflected in monolithic reinforced concrete structure long construction period, speed of application Slowly, influenced by season and weather big;Construction site requires height, surrounding enviroment is influenced big;Noise, airborne dust outstanding problem, no Beneficial to environmental protection;High aspect is required labour.It is applicable at this stage, is economical, is safe, green fabricated construction enters hair The fast traffic lane of exhibition, the demand for development of active response modernization of the present invention, designs a kind of assembled shield for being suitable for complicated water front Bank.
The content of the invention
The technical problem to be solved in the present invention adheres to green, economic, safety idea of development, designs a kind of suitable for multiple The bank protection construction method of miscellaneous water front, solve current monolithic reinforced concrete structure low construction efficiency, environment influence it is big the problems such as, together When engineering require construction site low, favourable modularization flat moulded prefabricatedization construction.
In order to realize above-mentioned technical problem, the present invention uses following technical scheme:A kind of shore protection for being suitable for complicated water front Construction method, it is characterised in that the described method comprises the following steps:
A, pile foundation is set along the complicated water front;
B, side sets concrete prefabricated element near water at pile foundation top, and upper horizontal direction bolt is buried inside concrete prefabricated element with Horizontal direction bolt, concrete prefabricated element are connected by lower horizontal direction bolt with pile foundation;
C, pull in shore welding angle steel in side at the top of pile foundation, L-type prefabricated steel is arranged above pile foundation, it is vertical that prefabricated steel horizontal ends pass through Bolt is connected with angle steel, and prefabricated steel vertical end is then connected by upper horizontal direction bolt with concrete prefabricated element.
Further, the pile foundation is steel sheet pile.
Further, the upper surface of concrete prefabricated element connects with mud upper thread.
It is preferred that concrete prefabricated element, prefabricated steel, angle steel can be determined along river to size according to the flatness of water front System.In the bank section that water front is more straight, concrete prefabricated element, prefabricated steel, angle steel suitable river to size can be more pile bases Littoral line length, can make it that shore protection globality is stronger.It is concrete prefabricated element, prefabricated in the bank section that water front is more tortuous Steel plate, angle steel suitable river can be identical with single pile foundation bank line length to size, can be adapted for Various Complex bank section, it is actual suitable It is wider with scope.
Pull in shore the underground of side it is preferred that the prefabricated steel is located at shore protection.In this way, it can cause the structure of flood-control wall More stablize.
It is preferred that the armored concrete that it is C30 that the material of the concrete prefabricated element, which is strength grade,.So so that For this flood-control wall while proof strength, it manufactures cost reduction.
The positive effect of the present invention is:
1st, all components of the invention are prefabricated components, reduce monolithic reinforced concrete structure long construction period, construction speed Degree is slow, is influenced the problems such as big by season and weather, shortens construction period.
2nd, quick construction of the present invention is convenient, and the influence to surrounding enviroment is smaller, and noise is small, and airborne dust problem is small, is conducive to ring Protect in border.
3rd, bank protection structure of the invention is suitable for the complex bank section of water front, it is not necessary to for the bending prefabricated abnormity of bank section Prefabricated section.
4th, bank protection structure monolithic stability of the invention, it is possible to achieve flood control water blocking task.
Brief description of the drawings
Fig. 1 is schematic diagram of the present invention.
Figure includes:Pile foundation 1, concrete prefabricated element 2, prefabricated steel 3, angle steel 4, bolt 5, vertical bolt 51, lower water Put down to bolt 52, upper horizontal direction bolt 53, mud upper thread 6.
Embodiment
Name preferred embodiment, and become apparent from intactly illustrating the present invention with reference to attached drawing.
As shown in Figure 1, a kind of shore protection, it includes pile foundation 1, concrete prefabricated element 2 and connector, and the pile foundation 1 is located at The bottom of whole bank protection structure, is steel sheet pile.Concrete prefabricated element 2 is located at the top of pile foundation 1 side near water, pile foundation 1 and concrete Prefabricated components 2 are connected by connector.Connector includes bolt 5, angle steel 4 and prefabricated steel 3.Angle steel 4 is welded on the top of pile foundation 1 Pull in shore side, prefabricated steel 3 is L-type, is arranged in the top of pile foundation 1, and be connected with angle steel 4 by vertical bolt 51.Single concrete Bury two horizontal direction bolts in the inside of prefabricated components 2(Lower horizontal direction bolt 52, upper horizontal direction bolt 53), and pass through upper horizontal direction Bolt 53, lower horizontal direction bolt 52 are connected with prefabricated steel 3 and pile foundation 1 respectively.So far, total becomes an entirety.It is mixed The upper surface of solidifying soil prefabricated components 2 connects with mud upper thread 6.
Pile foundation can be determined according to actual place and geological condition.For example, pile foundation is the Larsen steel sheet pile of certain model, pile foundation Length along place bank is 1.38m, and the width along Yokogawa direction is 0.43m, and the length of pile foundation is 6m.During practical application, stake Size, length and the height of being unearthed of base are integrated by checking calculations such as flood-control wall monolithic stability, bearing capacity of pile foundation and determined.
In smooth coast section, concrete prefabricated element 2, prefabricated steel 3, the length on angle steel 5 along place bank are 3 pile base edges Water front length, is 4.14m.In bending bank section, above-mentioned component is isometric along place bank length and single pile foundation, is 1.38m.Coagulation Native prefabricated components are highly 0.9m, thickness 0.25m.The shore protection can be so caused to be suitable for various bank sections.
The material of concrete prefabricated element is the armored concrete that strength grade is C30, can so be made it have good Intensity.Bolt uses M20 bolts, and channel steel uses 30b channel steels, and angle steel uses 8# angle steel, can so meet structural strength.
In practical applications, according to actual place condition, it is difficult to carry out since place limits conventional bank protection structure pattern, It is considered as selecting the shore protection of the present invention.In addition, conventional bank section can also apply the bank protection structure pattern that the design provides.According to place Condition, determines suitable pile foundation length, and then determines other sizes, and safety review is finally carried out to the design structure to ensure to tie The safety of structure.And in practical applications, two level barricade can be designed according to actual conditions, to meet requirement of setting up defences.
The shore protection constructed by construction method of the present invention has the following advantages:
1st, all components of the invention are prefabricated components, reduce monolithic reinforced concrete structure long construction period, construction speed Degree is slow, is influenced the problems such as big by season and weather, shortens construction period.
2nd, quick construction of the present invention is convenient, and the influence to surrounding enviroment is smaller, and noise is small, and airborne dust problem is small, is conducive to ring Protect in border.
3rd, bank protection structure of the invention is suitable for the complex bank section of water front, it is not necessary to for the bending prefabricated abnormity of bank section Prefabricated section.
4th, bank protection structure monolithic stability of the invention, it is possible to achieve flood control water blocking task.
In the description of the present invention, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", " perpendicular Directly ", the orientation of the instruction such as " level ", " top ", " bottom ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position Relation is put, it is of the invention necessary with simplified description, rather than the device or element of instruction or hint meaning to be for only for ease of description With specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
Although the embodiment of the present invention is the foregoing described, it will be appreciated by those of skill in the art that this is only For example, protection scope of the present invention is to be defined by the appended claims.Those skilled in the art without departing substantially from On the premise of the principle of the present invention and essence, various changes or modifications can be made to these embodiments, but these changes and Modification each falls within protection scope of the present invention.

Claims (7)

  1. A kind of 1. bank protection construction method for being suitable for complicated water front, it is characterised in that the described method comprises the following steps:
    Pile foundation is set along the complicated water front;
    Side sets concrete prefabricated element near water at the top of pile foundation, and upper horizontal direction bolt and lower water are buried inside concrete prefabricated element Put down to bolt, concrete prefabricated element and be connected by lower horizontal direction bolt with pile foundation;
    Pull in shore welding angle steel in side at the top of pile foundation, L-type prefabricated steel is arranged above pile foundation, prefabricated steel horizontal ends pass through vertical spiral shell Bolt is connected with angle steel, and prefabricated steel vertical end is then connected by upper horizontal direction bolt with concrete prefabricated element.
  2. 2. the bank protection construction method as claimed in claim 1 for being suitable for complicated water front, it is characterised in that the pile foundation is steel plate Stake.
  3. 3. the bank protection construction method as claimed in claim 1 for being suitable for complicated water front, it is characterised in that concrete prefabricated element Upper surface connect with mud upper thread.
  4. 4. the bank protection construction method as claimed in claim 1 for being suitable for complicated water front, it is characterised in that the prefabricated steel position Pull in shore the underground of side in shore protection.
  5. 5. the bank protection construction method as claimed in claim 1 for being suitable for complicated water front, it is characterised in that concrete prefabricated element, Prefabricated steel, angle steel can be customized along river to size according to the flatness of water front.
  6. 6. the bank protection construction method as claimed in claim 5 for being suitable for complicated water front, it is characterised in that more straight in water front Bank section, concrete prefabricated element, prefabricated steel, angle steel suitable river to size be more pile bases littoral line length.
  7. 7. the bank protection construction method as claimed in claim 5 for being suitable for complicated water front, it is characterised in that more tortuous in water front Bank section, concrete prefabricated element, prefabricated steel, the suitable river of angle steel are identical with single pile foundation bank line length to size.
CN201711031365.0A 2017-10-30 2017-10-30 A kind of bank protection construction method for being suitable for complicated water front Pending CN108035302A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711031365.0A CN108035302A (en) 2017-10-30 2017-10-30 A kind of bank protection construction method for being suitable for complicated water front

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711031365.0A CN108035302A (en) 2017-10-30 2017-10-30 A kind of bank protection construction method for being suitable for complicated water front

Publications (1)

Publication Number Publication Date
CN108035302A true CN108035302A (en) 2018-05-15

Family

ID=62093535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711031365.0A Pending CN108035302A (en) 2017-10-30 2017-10-30 A kind of bank protection construction method for being suitable for complicated water front

Country Status (1)

Country Link
CN (1) CN108035302A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201962648U (en) * 2011-03-22 2011-09-07 贾长江 Dike flood fighting and emergency rescue water retaining steel sheet wall capable of being quickly combined
CN202416252U (en) * 2012-01-10 2012-09-05 上海友为工程设计有限公司 L-shaped flood prevention retaining wall with high piles
CN105862663A (en) * 2016-06-02 2016-08-17 江苏省水利勘测设计研究院有限公司 Bulkhead wall type supporting and blocking structure with oblique piles and relieving slabs combined
CN107059774A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 A kind of assembled high-rise pile cap revetment structure and construction method
CN107059773A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 Assembled integral revetment structure and its construction method on a kind of soft soil foundation
CN206512670U (en) * 2016-10-12 2017-09-22 上海勘测设计研究院有限公司 Stake formula is combined barricade

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201962648U (en) * 2011-03-22 2011-09-07 贾长江 Dike flood fighting and emergency rescue water retaining steel sheet wall capable of being quickly combined
CN202416252U (en) * 2012-01-10 2012-09-05 上海友为工程设计有限公司 L-shaped flood prevention retaining wall with high piles
CN105862663A (en) * 2016-06-02 2016-08-17 江苏省水利勘测设计研究院有限公司 Bulkhead wall type supporting and blocking structure with oblique piles and relieving slabs combined
CN206512670U (en) * 2016-10-12 2017-09-22 上海勘测设计研究院有限公司 Stake formula is combined barricade
CN107059774A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 A kind of assembled high-rise pile cap revetment structure and construction method
CN107059773A (en) * 2017-05-27 2017-08-18 中交第三航务工程勘察设计院有限公司 Assembled integral revetment structure and its construction method on a kind of soft soil foundation

Similar Documents

Publication Publication Date Title
CN101353896A (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN201459756U (en) Hanging-type construction ceiling coil vertical shaft
CN106320352A (en) Construction method for multifunctional steel sheet pile cofferdam
CN106884431A (en) One kind building pit foundation construction safety supporting construction
CN106168031A (en) A kind of functional steel sheet-pile cofferdam
CN105862659A (en) High-frequency debris flow shore protection and diversion method
CN206784393U (en) T-piece and underground pipe gallery foundation pit support system
CN203080536U (en) Foundation pit guard structure
CN208309513U (en) A kind of assembled shore protection suitable for complicated water front
CN108035302A (en) A kind of bank protection construction method for being suitable for complicated water front
CN108005018A (en) A kind of assembled shore protection for being suitable for complicated water front
CN207878385U (en) A kind of shore protection
CN104088288B (en) The preparation method of container caisson and application thereof
CN207062955U (en) The foundation pit supporting construction that a kind of thick long stake is combined with thin stub
CN106854864A (en) Port engineering platoon formula prestressed reinforced concrete Big Pipe Pile new construction
CN206015663U (en) A kind of precast concrete pile and dash gear civil engineering building structure
CN204510181U (en) A kind of phytal zone drilling platform
CN201459770U (en) Joint structure between two different fender bodies in deep foundation pit
CN105780722A (en) Novel vertical type bank revetment structure
CN208055978U (en) A kind of pile foundation assembled shore protection
CN105908773A (en) Two-stage socketed pile wind turbine foundation for shallow covering stratum foundation of offshore wind plant and construction method
CN207727509U (en) A kind of assembled shore protection
CN208934101U (en) A kind of pump lock foundation pit enclosure structure
CN107881983A (en) A kind of assembled shore protection and its construction method
CN209760245U (en) Multistage supporting construction of pier foundation ditch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination