CN108035109A - The ironing machine preparation method of whole boiling hot waistband bathrocephaly - Google Patents

The ironing machine preparation method of whole boiling hot waistband bathrocephaly Download PDF

Info

Publication number
CN108035109A
CN108035109A CN201711202378.XA CN201711202378A CN108035109A CN 108035109 A CN108035109 A CN 108035109A CN 201711202378 A CN201711202378 A CN 201711202378A CN 108035109 A CN108035109 A CN 108035109A
Authority
CN
China
Prior art keywords
groove
electric hot
hot plate
ironing machine
bathrocephaly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711202378.XA
Other languages
Chinese (zh)
Other versions
CN108035109B (en
Inventor
赵成燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jihua 3514 Leather and Footware Co Ltd
Original Assignee
Jihua 3514 Leather and Footware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jihua 3514 Leather and Footware Co Ltd filed Critical Jihua 3514 Leather and Footware Co Ltd
Priority to CN201711202378.XA priority Critical patent/CN108035109B/en
Publication of CN108035109A publication Critical patent/CN108035109A/en
Application granted granted Critical
Publication of CN108035109B publication Critical patent/CN108035109B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06CFINISHING, DRESSING, TENTERING OR STRETCHING TEXTILE FABRICS
    • D06C15/00Calendering, pressing, ironing, glossing or glazing textile fabrics
    • D06C15/10Calendering, pressing, ironing, glossing or glazing textile fabrics between flat plates of a press

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Irons (AREA)
  • Treatment Of Fiber Materials (AREA)

Abstract

The present invention provides a kind of ironing machine preparation method of whole boiling hot waistband bathrocephaly, transformed based on the bottom core electric hot plate in existing shoemaking bottom workshop, including the following steps carried out successively:First, milling groove:The groove set along electric hot plate width is milled out using lathe on the ironed face of electric hot plate;2nd, fluorine processing is sprayed:The ironed face of electric hot plate to milling out groove carries out spray fluorine processing, uniformly sprays the solution of polytetrafluoroethylene (PTFE);3rd, stent is made:It is fixedly installed to form stent using two pieces of iron plates, electric hot plate length direction is configured to be fixedly arranged on the stent with horizontal plane.Simple in structure using ironing machine made from this method, cost is low, effectively increases the work efficiency and product quality of ironed belt buckle.The ironing machine that the present invention obtains is suitable for the bathrocephaly of ironed various establishment waistbands.

Description

The ironing machine preparation method of whole boiling hot waistband bathrocephaly
Technical field
The invention belongs to ironing machine manufacturing field, is related to a kind of preparation method of ironing machine, specifically a kind of whole boiling hot The ironing machine preparation method of waistband bathrocephaly.
Background technology
At present, it is during waistband is worked out in manufacture, it is necessary to ironed to waistband band body progress, and the waistband band body worked out is by washing The fire-retardant silk of synthetic fibre is worked out, and the band body both ends worked out are bathrocephaly, which need to pass through 320 ° -350 ° of high fever ironing machine Carry out whole scald.The ironing machine of ironed belt buckle generally uses the bottom core electric heating in shoemaking bottom workshop in shoe-making field in the prior art Plate, concrete structure as shown in Figure 1, including be about 30cm, wide about 16cm, thickness about 2cm class ellipse electric hot plate 1, the electricity The middle part of hot plate 1 is equipped with the circular hole 2 that diameter is about 5cm, and the electric hot plate 1 is embedded with electrothermal tube, passes through back in itself Attaching plug electrified regulation.Staff's fixed electric hot plate 1 on the other hand is needed in ironed waistband bathrocephaly, it is on the other hand that waistband is trapezoidal Several end faces of head are ironed in being carried out on the ironed face of electric hot plate 1 successively respectively, and not only work efficiency is extremely low for aforesaid operations, and pole Waistband easily is scorched, influences the quality of product.
The content of the invention
It is more convenient to obtain it is an object of the present invention to provide a kind of ironing machine preparation method of whole boiling hot waistband bathrocephaly The ironing machine of the ironed waistband bathrocephaly of staff.
In order to solve the above technical problems, the technical solution used in the present invention is:
A kind of ironing machine preparation method of whole boiling hot waistband bathrocephaly, is carried out based on the bottom core electric hot plate in existing shoemaking bottom workshop Transformation, it includes the following steps carried out successively:
First, milling groove:The groove set along electric hot plate width is milled out using lathe on the ironed face of electric hot plate;
2nd, fluorine processing is sprayed:The ironed face of electric hot plate to milling out groove carries out spray fluorine processing, and it is molten uniformly to spray polytetrafluoroethylene (PTFE) Liquid;
3rd, stent is made:Hung down using the first plate body and the fixed setting of the second plate body into stent, electric hot plate length direction with horizontal plane Directly it is configured to be fixedly arranged on the stent.
As the restriction to step 1 of the present invention:The groove milled out in the step 1 includes the first groove, the second groove, First groove is set completely through the width of electric hot plate, and three that the height away from stent installation end is electric hot plate length/ One;Second groove is separated by circular hole, is divided into the both sides of circular hole.
Limited as to the further of step 1 of the present invention:First groove and the second groove are wide 4mm, depth 4mm U-shaped groove.
As the restriction to step 3 of the present invention:The step 3 includes the following steps carried out successively:
1)First plate body is lain against on horizontal workbench, the second plate body is welded in the first plate body relative to table vertical Upper formation stent;
2)Make the first groove be located at lower section, electric hot plate is vertical on the first plate body;
3)Electric hot plate is fixedly arranged on the second plate body using bolt.
Limited as to the further of step 3 of the present invention:The step 2)With step 3)Between also have step 2 ') the Thermal insulation board is set between electric hot plate between two plate bodys.
Limited as to the further of step 3 of the present invention:The thermal insulation board is the asbestos board of 1.2cm thickness.
As a result of above-mentioned technical solution, compared with prior art, the present invention acquired technological progress is:
(1)The present invention transformed using existing electric hot plate, cost is low, and improved electric hot plate can effectively improve it is ironed The work efficiency of belt buckle, while ensure that ironed waistband quality, improve qualification rate;
(2)Electric hot plate has carried out the processing of spray fluorine after milling out groove in the present invention, ensures that electric hot plate is clean, is not easy dirty, Jin Erbao Demonstrate,prove it is ironed during belt buckle tidiness;
(3)The groove of the present invention is arranged to wide 4mm, and the U-type groove of deep 4mm, not only Convenient waist-belt head is ironed, while ensure that boiling hot The depth of system, further improves the ironed product quality of belt buckle;
(4)The present invention is equipped with thermal insulation board, prevents electric hot plate from scalding staff towards the second plate body heat conduction, ensures staff Personal safety.
In conclusion simple in structure using ironing machine produced by the present invention, cost is low, effectively increases ironed belt buckle Work efficiency and product quality.
The ironing machine that the present invention obtains is suitable for the bathrocephaly of ironed various establishment waistbands.
The present invention is described in further detail below in conjunction with specific embodiment.
Brief description of the drawings
Fig. 1 is the structure diagram of ironing machine electric hot plate 1 in the prior art;
Fig. 2 is the structure diagram of the ironing machine electric hot plate 1 obtained using the embodiment of the present invention.
In figure:1st, electric hot plate, 2, circular hole, the 3, first groove, the 4, second groove, the 5, first plate body, the 6, second plate body, 7, every Hot plate.
Embodiment
The ironing machine preparation method of the whole boiling hot waistband bathrocephaly of embodiment
The present embodiment is transformed based on the bottom core electric hot plate in shoemaking bottom workshop in the prior art, including carry out successively with Lower step:
First, milling groove:The groove set along 1 width of electric hot plate is milled out using lathe on the ironed face of electric hot plate 1.
The groove milled out in this step is as shown in Fig. 2, complete including the first groove 3, the second groove 4, first groove 3 The width for penetrating through electric hot plate 1 is set;Second groove 4 is separated by circular hole 2, forms two sections of small grooves, and be divided into circular hole 2 Both sides;And 3 and second groove 4 of the first groove is wide 4mm, the U-shaped groove of depth 4mm.
2nd, fluorine processing is sprayed:The ironed face of electric hot plate to milling out groove carries out spray fluorine processing, uniformly sprays polytetrafluoroethylene (PTFE) Solution.Fluorine is sprayed in this step can keep 1 surface cleaning of electric hot plate, be not easy dirty, and then ensure the clean and tidy of ironed product Degree.
3rd, stent is made:Set using two pieces of iron plate fixed settings into stent, 1 length direction of electric hot plate with horizontal plane It is fixedly arranged on putting on the stent.
Two pieces of iron plates in this step are the first plate body 5 and the second plate body 6, and the following steps including carrying out successively:
1)First plate body 5 is lain against on horizontal workbench, the second plate body 6 is welded in the first plate relative to table vertical Stent is formed on body 5;First plate body 5 is identical two block lengths cube with the second plate body 6, specifically using long 20cm, width The iron plate of 12cm, thickness 1.2cm.
2)The first groove 3 is made to be located at lower section(Even the first groove 3 is set close to the first plate body 5 of stent), by electric hot plate 1 It is vertical on the first plate body 5.
2 ') thermal insulation board 7 is set between the second plate body 6 and electric hot plate 1, and the thermal insulation board 7 is the asbestos board of thickness 1.2cm.
3)Electric hot plate 1, thermal insulation board 7 are fixedly arranged on the second plate body 6 using bolt.
Operation principle using ironing machine manufactured in the present embodiment is:Electric hot plate 1 is powered, and staff holds belt buckle, One end that belt buckle has bathrocephaly is initially positioned in the second groove 4, and belt buckle is located at the second groove 4 away from circular hole 2 One end, then at the uniform velocity slides belt buckle, ironed horizontal component, waistband is tilted when reaching 2 end of circular hole towards one end of circular hole 2 Head, ironed trapezoidal portions.

Claims (6)

1. a kind of ironing machine preparation method of whole boiling hot waistband bathrocephaly, carries out by base of the bottom core electric hot plate in existing shoemaking bottom workshop Transformation, it is characterised in that:It includes the following steps carried out successively:
First, milling groove:In electric hot plate(1)Ironed face on milled out using lathe along electric hot plate(1)The groove that width is set;
2nd, fluorine processing is sprayed:Electric hot plate to milling out groove(1)Ironed face carry out spray fluorine processing, uniformly spray polytetrafluoroethylene (PTFE) Solution;
3rd, stent is made:Utilize the first plate body(5)With the second plate body(6)Stent, electric hot plate is fixedly installed into(1)Length direction It is configured to be fixedly arranged on the stent with horizontal plane.
2. the ironing machine preparation method of whole boiling hot waistband bathrocephaly according to claim 1, it is characterised in that:The step 1 In the groove that mills out include the first groove(3), the second groove(4), first groove(3)Completely through electric hot plate(1)Width Degree is set, and the height away from stent installation end is electric hot plate(1)/ 3rd of length;Second groove(4)By circular hole(2) Partition, is divided into circular hole(2)Both sides.
3. the ironing machine preparation method of whole boiling hot waistband bathrocephaly according to claim 2, it is characterised in that:Described first is recessed Groove(3)With the second groove(4)It is wide 4mm, the U-shaped groove of depth 4mm.
4. the ironing machine preparation method of the whole boiling hot waistband bathrocephaly according to Claims 2 or 3, it is characterised in that:The step Rapid three following steps including carrying out successively:
1)By the first plate body(5)Lie against on horizontal workbench, the second plate body(6)It is welded in relative to table vertical One plate body(5)Upper formation stent;
2)Make the first groove(3)Positioned at lower section, by electric hot plate(1)It is vertical at the first plate body(5)On;
3)Using bolt by electric hot plate(1)It is fixedly arranged on the second plate body(6)On.
5. the ironing machine preparation method of whole boiling hot waistband bathrocephaly according to claim 4, it is characterised in that:The step 2) With step 3)Between also have step 2 ') in the second plate body(6)Between with electric hot plate(1)Between thermal insulation board is set(7).
6. the ironing machine preparation method of whole boiling hot waistband bathrocephaly according to claim 5, it is characterised in that:The thermal insulation board (7)For the asbestos board of 1.2cm thickness.
CN201711202378.XA 2017-11-27 2017-11-27 Ironing machine preparation method for ironing belt trapezoid head Active CN108035109B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711202378.XA CN108035109B (en) 2017-11-27 2017-11-27 Ironing machine preparation method for ironing belt trapezoid head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711202378.XA CN108035109B (en) 2017-11-27 2017-11-27 Ironing machine preparation method for ironing belt trapezoid head

Publications (2)

Publication Number Publication Date
CN108035109A true CN108035109A (en) 2018-05-15
CN108035109B CN108035109B (en) 2021-03-19

Family

ID=62092912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711202378.XA Active CN108035109B (en) 2017-11-27 2017-11-27 Ironing machine preparation method for ironing belt trapezoid head

Country Status (1)

Country Link
CN (1) CN108035109B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101121170A (en) * 2007-09-10 2008-02-13 张家港市超声电气有限公司 Ultrasonic cleaning groove and its processing method
KR20080110253A (en) * 2007-06-15 2008-12-18 한현수 Press machine of uneven shape
CN202440701U (en) * 2012-02-16 2012-09-19 徐华 Grooved electric iron
CN103255517A (en) * 2013-05-03 2013-08-21 常熟市林芝电子有限责任公司 Spinning fiber bundle ironing device
CN203986259U (en) * 2014-04-30 2014-12-10 南京际华三五0三服装有限公司 Scald belt loop mould
CN205688247U (en) * 2016-06-14 2016-11-16 武汉理工大学华夏学院 A kind of iron board
CN206680783U (en) * 2017-03-29 2017-11-28 姚莲琴 A kind of button for western-style clothes pocket cover scalds mould

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080110253A (en) * 2007-06-15 2008-12-18 한현수 Press machine of uneven shape
CN101121170A (en) * 2007-09-10 2008-02-13 张家港市超声电气有限公司 Ultrasonic cleaning groove and its processing method
CN202440701U (en) * 2012-02-16 2012-09-19 徐华 Grooved electric iron
CN103255517A (en) * 2013-05-03 2013-08-21 常熟市林芝电子有限责任公司 Spinning fiber bundle ironing device
CN203986259U (en) * 2014-04-30 2014-12-10 南京际华三五0三服装有限公司 Scald belt loop mould
CN205688247U (en) * 2016-06-14 2016-11-16 武汉理工大学华夏学院 A kind of iron board
CN206680783U (en) * 2017-03-29 2017-11-28 姚莲琴 A kind of button for western-style clothes pocket cover scalds mould

Also Published As

Publication number Publication date
CN108035109B (en) 2021-03-19

Similar Documents

Publication Publication Date Title
CN108035109A (en) The ironing machine preparation method of whole boiling hot waistband bathrocephaly
CN108103752A (en) A kind of fabric perms machine automatically
CN207022235U (en) A kind of energy-saving electromagnetic heating equipment
CN105291675B (en) A kind of silver-colored bowl specification preparation method of embossment
CN204825455U (en) Clothing scalds platform
CN106167851A (en) A kind of hub heat treatment device and processing method
CN107419496A (en) A kind of smoothing wrinkle shaping equipment for clothing making
CN109898312A (en) A kind of garment production clamping plate type ready-made clothes ironing apparatus
CN204000374U (en) A kind of electromagnetism pressing machines
CN104032554A (en) Hanging ironing machine
CN208392143U (en) A kind of heat-insulation foam material grooving apparatus
CN215481788U (en) Clothing production is with whole machine that scalds that has cooling structure
CN206887607U (en) A kind of highly dense woven fabric fabric cutting means of multilayer
CN207878148U (en) A kind of boiling hot platform connects boiler all-in-one machine
CN206204377U (en) T91/T92 boiler water-wall tubes arrange the annealing device of Assembling weld seam
CN205767906U (en) A kind of solar battery back film laminating machine heating plate
CN204409781U (en) Vamp tenderizing machine
CN218026823U (en) Hand-held garment steamer
CN220265750U (en) Medium frequency induction quenching equipment
CN205629148U (en) Copper strips heating device
CN204752794U (en) Seamless steel pipe's electric heater unit
CN210031249U (en) Ironing device for garment processing
CN212919784U (en) Bending and shaping equipment for bamboo product processing
CN217052710U (en) Thread end processing device for knitwear production
CN108917392A (en) A kind of metal preheating cabinet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant