CN108022038A - The scheduling management method and device of order - Google Patents

The scheduling management method and device of order Download PDF

Info

Publication number
CN108022038A
CN108022038A CN201711115104.7A CN201711115104A CN108022038A CN 108022038 A CN108022038 A CN 108022038A CN 201711115104 A CN201711115104 A CN 201711115104A CN 108022038 A CN108022038 A CN 108022038A
Authority
CN
China
Prior art keywords
order
information
wastewater
discharge
sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711115104.7A
Other languages
Chinese (zh)
Inventor
周律
徐昆
贾奇博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201711115104.7A priority Critical patent/CN108022038A/en
Publication of CN108022038A publication Critical patent/CN108022038A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention proposes a kind of the scheduling management method and device of order, wherein, this method includes:Obtain multiple orders;Multiple orders are split according to the manufacturing technique requirent of sequence information and different product and/or merging treatment, and new order sequence is generated according to handling result;Determine the discharge of wastewater information of each order in new order sequence;The Order Sorting for wastewater discharge minimum of sening as an envoy to is calculated according to discharge of wastewater information and new order sequence as a result, and according to Order Sorting result progress production.This method is combined order by the way of order merges and/or splits, and the order after combination is scheduled according to the order after combination and discharge of wastewater information, while production efficiency is improved, it may be such that the wastewater discharge produced in production process reaches minimum, reduce the production cost of enterprise.

Description

The scheduling management method and device of order
Technical field
The present invention relates to order management technical field, the scheduling management method and device of more particularly to a kind of order.
Background technology
At present, the gap mode of production is usually in the field such as pharmacy, Agricultural Materials, knitting dyeing and fine chemistry industry Middle application.In general, in the enterprise using Batch Process mode, product processes process is complicated, have wastewater discharge it is big, The characteristics of intractability height and serious energy loss.
It is continuously increased with the pressure of water scarcity, the emission reduction of waste water how is effectively realized in batch production enterprise Saving with energy is highly important.
It in batch production enterprise, such as can substitute a part of fresh in knitting dyeing, the reuse of dyeing waste water Water, this just need using batch production technique carry out knitting kind fabric dyeing enterprise need every one of draining to dye vat into The accurate management of row.In correlation technique, system is dispatched generally according to the manual discharge of wastewater of knowhow, this mode lacks pair The analysis of intermittent generation Drainage feature, be easy to cause that the utilization ratio of water resource is low, can not effectively reduce the waste water of enterprise Processing cost.Also, in the actual production process, the production sequence of different orders to production efficiency and discharge of wastewater number Have an impact, therefore, in batch production enterprise, how scheduling is optimized to product order, the production for improving enterprise is imitated Rate and reduction discharge of wastewater are particularly significant for enterprise.
The content of the invention
It is contemplated that above-mentioned technical problem is solved at least to a certain extent.
For this reason, the present invention first purpose be the scheduling management method for proposing a kind of order, using order merge and/ Or the mode split is combined order, and the order after combination is carried out according to the order after combination and discharge of wastewater information Scheduling, while production efficiency is improved, may be such that the wastewater discharge produced in production process reaches minimum, reduces enterprise Production cost.
Second object of the present invention is the scheduling managing device for proposing a kind of order.
In order to achieve the above object, embodiment proposes a kind of scheduling management method of order according to a first aspect of the present invention, bag Include:Obtain multiple orders;According to the manufacturing technique requirent of sequence information and different product to the multiple order carry out split and/ Or merging treatment, and new order sequence is generated according to handling result;Determine the waste water row of each order in the new order sequence Put information;The Order Sorting knot for wastewater discharge minimum of sening as an envoy to is calculated according to the discharge of wastewater information and the new order sequence Fruit, and production is carried out according to Order Sorting result.
The scheduling management method of the order of the embodiment of the present invention, according to sequence information and the manufacturing technique requirent of different product Multiple orders are split and/or merging treatment, and new order sequence is generated according to handling result;Determine in new order sequence The discharge of wastewater information of each order, ordering for wastewater discharge minimum of sening as an envoy to is calculated according to discharge of wastewater information and new order sequence Single sequence according to Order Sorting result as a result, and carry out production.Thus, by the way of order merges and/or splits Order is combined, and the order after combination is scheduled according to the order after combination and discharge of wastewater information, is being improved While production efficiency, it may be such that the wastewater discharge produced in production process reaches minimum, reduce the production cost of enterprise.
Second aspect of the present invention embodiment proposes a kind of scheduling managing device of order, including:Acquisition module, for obtaining Take multiple orders;First processing module, is ordered for the manufacturing technique requirent according to sequence information and different product to the multiple Singly split and/or merging treatment, and new order sequence is generated according to handling result;Determining module is described new for determining The discharge of wastewater information of each order in order sequence;Second processing module, for according to the discharge of wastewater information and described New order sequence calculates the Order Sorting for wastewater discharge minimum of sening as an envoy to as a result, and carrying out product life according to Order Sorting result Production.
The scheduling managing device of the order of the embodiment of the present invention, according to sequence information and the manufacturing technique requirent of different product Multiple orders are split and/or merging treatment, and new order sequence is generated according to handling result;Determine in new order sequence The discharge of wastewater information of each order, ordering for wastewater discharge minimum of sening as an envoy to is calculated according to discharge of wastewater information and new order sequence Single sequence according to Order Sorting result as a result, and carry out production.Thus, by the way of order merges and/or splits Order is combined, and the order after combination is scheduled according to the order after combination and discharge of wastewater information, is being improved While production efficiency, it may be such that the wastewater discharge produced in production process reaches minimum, reduce the production cost of enterprise.
The additional aspect and advantage of the present invention will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of the present invention will become in the description from combination accompanying drawings below to embodiment Substantially and it is readily appreciated that, wherein:
Fig. 1 is the flow chart according to the scheduling management method of the order of one embodiment of the invention;
Fig. 2 is the exemplary plot of sequence information administration interface;
Fig. 3 is the exemplary plot at waste water information management interface;
Fig. 4 is the exemplary plot at car body-in-white interface;
Fig. 5 is the exemplary plot at information management interface of processing raw material;
Fig. 6 is the exemplary plot at auxiliary agent information management interface;
Fig. 7 is the exemplary plot at enterprise's production cost information management interface;
Fig. 8 is the flow chart according to the scheduling management method of the order of a specific embodiment of the invention;
Fig. 9 is the structure diagram according to the scheduling managing device of the order of one embodiment of the invention;
Figure 10 is the structure diagram of determining module 130;
Figure 11 is the structure diagram according to the scheduling managing device of the order of another embodiment of the present invention.
Embodiment
The embodiment of the present invention is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or has the function of same or like element.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining the present invention, and is not considered as limiting the invention.
In the description of the present invention, it is to be understood that term " multiple " refers to two or more;Term " first ", " second " is only used for description purpose, and it is not intended that instruction or hint relative importance.
Below with reference to the accompanying drawings the scheduling management method and device of order according to embodiments of the present invention are described.
Fig. 1 is the flow chart according to the scheduling management method of the order of one embodiment of the invention., wherein it is desired to explanation It is that the scheduling management method of the order is suitable for the enterprise using batch production.
As shown in Figure 1, the scheduling management method of order according to embodiments of the present invention, comprises the following steps.
S11, obtains multiple orders.
In one embodiment of the invention, multiple orders can be obtained from order database.
Wherein, order can include but is not limited to customer name address and contact method, order classification and numbering, raw material class Not, the information such as weight, delivery date, product classification and code name, particular/special requirement.
, wherein it is desired to understand, in application process, information that user can be by sequence information administration interface to order It is managed.
By taking intermittent printing and dyeing production as an example, the exemplary plot of its corresponding sequence information administration interface, as shown in Fig. 2, passing through Fig. 2 can be seen that user and can be increased newly by sequence information administration interface, change, delete, importing order.It is to be appreciated that figure It just show the partial information of the order added in 2, user can check other information by slider bar
S12, splits multiple orders according to the manufacturing technique requirent of order and different product and/or merging treatment, And new order sequence is generated according to handling result.
, can be according to the production technology of different fabrics when order is the order of dry goods in the implementation of the present invention It is required that and multiple orders are split for fabric color, color depth and weight and/or merging treatment.
Specifically, after multiple orders are obtained, the first order can be divided into according to the manufacturing technique requirent of different fabrics Set and the second order set.
Wherein, the order in the first order set, needs to use high temperature cylinder in process of producing product.Second order set In order, need to use room temperature cylinder in process of producing product.
After multiple orders to be divided into the first order set and the second order set, for ordering in the first order set It is single, order fractionation and/or order merging treatment can be carried out according to the different of fabric color, color depth and weight.
Similarly, for the order in the first order set, can be ordered according to the difference of fabric color, color depth and weight Single fractionation and/or order merging treatment.
, wherein it is desired to understand, fabric color, color depth and weight can obtain in order.
For example, it is assumed that order is the order of dry goods, for the current order in the first order set, can determine whether to work as Whether the weight in preceding order, which exceedes dye vat, carries cloth weight, if so, then being split to current order;If it is not, then will currently it order It is single to be merged with other orders.
In one embodiment of the invention, the manufacturing technique requirent according to order and different product to multiple orders into Row is split with after merging treatment, can rebuild new order sequence according to the fractionation of order and merging treatment result.
, wherein it is desired to understand, can be in order database in order to which subsequently accurate product can be provided to order client The middle correspondence preserved between old order and new order.
S13, determines the discharge of wastewater information of each order in new order sequence.
In one embodiment of the invention, after new order sequence is generated, it may be determined that each order in new order sequence Order type and processing classification, and obtain and order type and process the corresponding discharge of wastewater information of classification.
Wherein, order type and processing classification are related with the product of required production.
For example, order be dry goods order when, order type can be divided into all kinds of knitted fabrics or Tatting fabric, processing type can be divided into nature fabric and dye the processing of solid color fabric, by stamp by dyeing process Process makes fabric face have processing of floral designs fabric etc..Wherein, discharge of wastewater information can include but is not limited to use draining The information such as amount, polluter, concentration, electrical conductivity, colourity, pH value, temperature.
, wherein it is desired to understand, discharge of wastewater information is pre-stored in the discharge of wastewater database of built in advance.It is logical The discharge of wastewater information pre-saved is crossed, the scheduling of order can be given to provide feedback and verification, and for follow-up discharge of wastewater and just Ground separate-recycling scheduling provides technical support.
By taking intermittent printing and dyeing production as an example, dyeing and printing process, substantially needs 12-15 roads technique, can establish and targetedly produce Technique waste water indices (main to include with displacement, polluter, concentration, electrical conductivity, colourity, pH value, temperature etc.) data Storehouse, and user can be checked by waste water information management interface and manage discharge of wastewater information, wherein, waste water information management interface Exemplary plot, as shown in Figure 3.As seen in Figure 3, user can by waste water information management interface management waste water information, and And user can pass through waste water information management interface understanding displacement, polluter, concentration, electrical conductivity, colourity, pH value, temperature Deng.
By being managed to the discharge of wastewater information of production technology, work hard to find can be found from the discharge of waste water Skill problem, reduces the harm brought to product quality.
Also, when discharge of wastewater information includes water temperature information, the waste water of different temperatures can also be isolated Come, the waste water of different temperatures is separated, so as to be recycled to waste heat therein, not only save the energy but also be waste water Biochemical treatment create a stable condition.
S14, according to discharge of wastewater information and new order sequence calculate wastewater discharge minimum of sening as an envoy to Order Sorting as a result, And production is carried out according to Order Sorting result.
In one embodiment of the invention, can be by discharge of wastewater information on the premise of product order delivery date is met With new order sequence inputting to the Optimal Operation Model pre-established, wastewater discharge minimum is determined by Optimal Operation Model Order Sorting result.
In one embodiment of the invention, in order to can accurately be produced to the product of order, arranged according to order Before sequence result carries out production, for each order in Order Sorting result, the corresponding order of current order can be obtained The production information of drawing a design of sample, and determine that current order processes required order technique information according to production information of drawing a design, so Afterwards, production is carried out according to the corresponding order technique information of each order and Order Sorting result.
Wherein, order technique information can include but is not limited to processing technology, the classification that processes raw material, auxiliary agent information etc..
, wherein it is desired to understand, user can pass through car body-in-white interface management processing technology.
By taking intermittent printing and dyeing production as an example, its corresponding car body-in-white interface, as shown in figure 4, can be seen by Fig. 4 Go out, user can be increased newly by car body-in-white interface, change, delete, importing processing technology, and user can be believed by technique Cease administration interface and understand technique numbering, dyeing installation, bath raio, fuel numbering, sample test parameter, auxiliary agent numbering, fabric consume. It is to be appreciated that just show the partial information for the technique added in Fig. 4, user can check other letters by slider bar Breath.
, wherein it is desired to understand bright, user can be processed raw material by the information management interface management that processes raw material.
By taking intermittent printing and dyeing production as an example, its corresponding information management interface that processes raw material, as shown in figure 5, can by Fig. 5 To find out, user can be increased newly by dyestuff information management interface, change, delete, importing processing dyestuff, and user can pass through dye Expect that information management interface understands dyestuff numbering, title, classification, upper dyestuff, major pollutant.
, wherein it is desired to understand bright, user can pass through auxiliary agent information management interface management auxiliary agent.
By taking intermittent printing and dyeing production as an example, its corresponding auxiliary agent information management interface, as shown in fig. 6, can be seen by Fig. 6 Go out, user can be increased newly by auxiliary agent information management interface, change, delete, import processing aid, and user can be believed by auxiliary agent Cease administration interface enzymolysis auxiliary agent numbering, title, chemical composition.
In one embodiment of the invention, the cost of enterprise is managed in order to facilitate user, enterprise can also be provided Industry production cost information management interface, with by the administration interface to water consume cost, energy consumption cost, cost of labor, equipment cost, The project such as penalty cost and other costs is managed.
Wherein, the exemplary plot at enterprise's production cost information management interface, as shown in Figure 7.It is to be appreciated that in Fig. 7 only The partial information of enterprise's production cost is shown, user can check other cost information by slider bar.
The scheduling management method of the order of the embodiment of the present invention, according to sequence information and the manufacturing technique requirent of different product Multiple orders are split and/or merging treatment, and new order sequence is generated according to handling result;Determine in new order sequence The discharge of wastewater information of each order, ordering for wastewater discharge minimum of sening as an envoy to is calculated according to discharge of wastewater information and new order sequence Single sequence according to Order Sorting result as a result, and carry out production.Thus, by the way of order merges and/or splits Order is combined, and the order after combination is scheduled according to the order after combination and discharge of wastewater information, is being improved While production efficiency, it may be such that the wastewater discharge produced in production process reaches minimum, reduce the production cost of enterprise.
Fig. 8 is the flow chart according to the scheduling management method of the order of a specific embodiment of the invention., wherein it is desired to say Bright, which is described by taking intermittent printing and dyeing enterprise as an example, for intermittent printing and dyeing enterprise, in dyeing process In if Order Sorting it is improper, it is necessary to repeatedly replace dye vat color, the discharge of wastewater information that the fabrics of different colours produces is different, That is, waste water displacement and water quality will be different.
As shown in figure 8, the scheduling management method of order according to embodiments of the present invention, comprises the following steps.
S81, obtains multiple orders.
S82, splits multiple orders according to the manufacturing technique requirent of order and different product and/or merging treatment, And new order sequence is generated according to handling result.
, can be according to the production technology of different fabrics when order is the order of dry goods in the implementation of the present invention It is required that and multiple orders are split for fabric color, color depth and weight and/or merging treatment.
S83, determines the discharge of wastewater information of each order in new order sequence.
In one embodiment of the invention, after new order sequence is generated, it may be determined that each order in new order sequence Order type and processing classification, and obtain and order type and process the corresponding discharge of wastewater information of classification.
, wherein it is desired to explanation, the foregoing explanation to step S11-S13 are also applied for step S81-S83, herein Repeat no more.
S84, it is minimum minimum with variation water quality to calculate wastewater discharge of sening as an envoy to according to discharge of wastewater information and new order sequence Order Sorting result.
That is, order sequence can be arranged according to the discharge of wastewater information of each order in new order sequence Sequence, during determining that wastewater discharge is minimum and variation water quality is minimum, corresponding Order Sorting result.
As a kind of example, it can optimize with sequence of the MATLAB softwares to new order sequence, for example, can adopt Optimized with sequence of the genetic algorithm to new order sequence.
For example, can be on the premise of product order delivery date be met, order species and processing classification are as the first mesh Scalar functions, wastewater discharge minimizes and variation water quality is minimised as the second object function and is modeled.Directly invoke Matlab The basic genetic algorithmic carried in function library carries out multiple-objection optimization solution.
S85, for each order in Order Sorting result, instruction of drawing a design is sent to sample laboratory technician.
Specifically, for each order in Order Sorting result, after instruction of drawing a design is received, sample laboratory technician is to working as Preceding order carries out experiment of drawing a design, and uploads production information of drawing a design.
S86, obtains the production information of drawing a design of the corresponding order sample of current order, and determines to work as according to production information of drawing a design The preceding required order technique information of Order Processing.
S87, production is carried out according to the corresponding order technique information of each order and Order Sorting result.
The embodiment is by splitting and combine order and generate new order sequence, and combines discharge of wastewater information to newly ordering Simple sequence carries out Order Sorting, and carries out production according to ranking results, thereby, it is possible to drip to realize distribution production very well, greatly Width reduce colour mixture order switch instances generation, reduce it is unnecessary wash cylinder water, reduce discharge of wastewater, improve produce While efficiency, it may be such that the wastewater discharge produced in production process reaches minimum, reduce the production cost of enterprise.
By taking certain domestic typical case's knitting printing and dyeing enterprise as an example, it is assumed that enterprise's annual output is 30000t.Now with a workshop One day, all totally 20 production orders were object.Wherein, order gross weight 2.33t.Dye vat uses overflow dyeing cylinder, single order Production time is differed for 10~12h, and bath raio is different according to different fabric types, generally 8:1~10:Between 1.Produced 12~15 water inlets, draining are needed in journey, ton product water consumption 120t, fresh water demand is 2796t in theory.
After the order planning management method of the embodiment, than not using this method to reduce originally water consumption and outer waste discharge Water 1239.4t, reduces tap water and cost-effective 6060.242 yuan of efflux wastewater.This production common 23.3t of order, thus it is per ton Order can save tap water 53.19t, cost-effective 260.10 yuan per ton.Enterprise's year output is 30,000 t, can be saved altogether 159.57 ten thousand t tap water and discharge of wastewater, cost-effective 780.29 ten thousand yuan.
Again by taking a domestic other typical cotton knitting printing and dyeing enterprise as an example, 58 dye vats of actual motion, year processing fabric 3 Ten thousand t.280 orders in June, 2015 are chosen, gross weight 16.5t, order inhomogeneities is more obvious.By calculating, all order It is single to merge 190 new orders of generation by order fractionation or order, wherein being total to comprising the new order produced by merging order Meter 90.And wherein order merge type it is more various, the situation for merging into 1 new order from 2~5 orders have and with Original order is associated.Also carry out splitting so as to meet the actual raw energy of dye vat there is also the order compared with " big " at the same time, share 2 A " big " is singly split into 6 " small " orders.
Compared with enterprise's history scheduling result, Optimization Scheduling is greatly reduced washes cylinder number completely.In ordering for extraction Under the conditions of list, the scheduling more traditional artificial than enterprise of cylinder water consumption is washed in order handoff procedure and has saved 70.4m3, account for that to wash cylinder water total The 18.6% of amount.At the same time, by the Optimized Operation of order, the water quality stability of stripping water and turbid wastewater is respectively increased 61.3% and 26.8%.In addition, if after introducing washings direct reuse boils drift process, order cloth saving per ton may be such that 19.2m3Water consumption.And after Optimized Operation, the order that the fabric of same color dyes in same dye vat adds 2.97t, and these orders can be removed from and wash cylinder;Reduce 1.3t along color production order with colour system difference color depth, and with colour system not Reduce 6046kg against color production order with color depth, the colour mixture condition of production of different colour systems reduces 1.3t.
The scheduling management method of the order of the embodiment of the present invention, according to sequence information and the manufacturing technique requirent of different product Multiple orders are split and/or merging treatment, and new order sequence is generated according to handling result;Determine in new order sequence The discharge of wastewater information of each order, ordering for wastewater discharge minimum of sening as an envoy to is calculated according to discharge of wastewater information and new order sequence Single sequence according to Order Sorting result as a result, and carry out production.Thus, by the way of order merges and/or splits Order is combined, and the order after combination is scheduled according to the order after combination and discharge of wastewater information, is being improved While production efficiency, it may be such that the wastewater discharge produced in production process reaches minimum, reduce the production cost of enterprise.
In order to realize above-described embodiment, the present invention also proposes a kind of scheduling managing device of order.
Fig. 9 is the structure diagram according to the scheduling managing device of the order of one embodiment of the invention.
As shown in figure 9, the scheduling managing device of order according to embodiments of the present invention is included at acquisition module 110, first Module 120, determining module 130 and Second processing module 140 are managed, wherein:
Acquisition module 110 is used to obtain multiple orders.
First processing module 120 is used to carry out multiple orders according to the manufacturing technique requirent of sequence information and different product Fractionation and/or merging treatment, and new order sequence is generated according to handling result.
Determining module 130 is used for the discharge of wastewater information for determining each order in new order sequence.
Second processing module 140 is used to calculate wastewater discharge minimum of sening as an envoy to according to discharge of wastewater information and new order sequence Order Sorting as a result, and according to Order Sorting result carry out production.
In one embodiment of the invention, as shown in Figure 10, determining module 130 can include:
Determination unit 131 is used to determine the order type of each order and processing classification in new order sequence.
Acquiring unit 132 is used to obtain discharge of wastewater information corresponding with order type and processing classification.
In one embodiment of the invention, on the basis of shown in Fig. 9, as shown in figure 11, which can also include 3rd processing module 150, wherein:
3rd processing module 150 is used for each order being directed in Order Sorting result, obtains that current order is corresponding orders The production information of drawing a design of single sample, and determine that current order processes required order technique information according to production information of drawing a design.
Second processing module 140 is specifically used for:According to the corresponding order technique information of each order and Order Sorting result Carry out production.
In one embodiment of the invention, when order is the order of dry goods, first processing module 120 is specifically used In:Multiple orders are split and/or merged with fabric color, color depth and weight according to the manufacturing technique requirent of different fabrics Processing.
In the implementation of the present invention, Second processing module 140 is specifically used for:By discharge of wastewater information and new order sequence Row input the Order Sorting knot that wastewater discharge minimum to the Optimal Operation Model pre-established, is determined by Optimal Operation Model Fruit.
, wherein it is desired to explanation, the explanation of the foregoing scheduling management method to order are also applied for the embodiment Order scheduling managing device, details are not described herein again.
The scheduling managing device of the order of the embodiment of the present invention, according to sequence information and the manufacturing technique requirent of different product Multiple orders are split and/or merging treatment, and new order sequence is generated according to handling result;Determine in new order sequence The discharge of wastewater information of each order, ordering for wastewater discharge minimum of sening as an envoy to is calculated according to discharge of wastewater information and new order sequence Single sequence according to Order Sorting result as a result, and carry out production.Thus, by the way of order merges and/or splits Order is combined, and the order after combination is scheduled according to the order after combination and discharge of wastewater information, is being improved While production efficiency, it may be such that the wastewater discharge produced in production process reaches minimum, reduce the production cost of enterprise.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description Point is contained at least one embodiment of the present invention or example.In the present specification, schematic expression of the above terms is not It must be directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be in office Combined in an appropriate manner in one or more embodiments or example.In addition, without conflicting with each other, the skill of this area Art personnel can be tied the different embodiments or example described in this specification and different embodiments or exemplary feature Close and combine.
In addition, term " first ", " second " are only used for description purpose, and it is not intended that instruction or hint relative importance Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or Implicitly include at least one this feature.In the description of the present invention, " multiple " are meant that two or more, unless separately There is clearly specific limit.
Any process or method described otherwise above description in flow chart or herein is construed as, and represents to include Module, fragment or the portion of the code of the executable instruction of one or more the step of being used for realization specific logical function or process Point, and the scope of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discuss suitable Sequence, including according to involved function by it is basic at the same time in the way of or in the opposite order, carry out perform function, this should be of the invention Embodiment person of ordinary skill in the field understood.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for Instruction execution system, device or equipment (such as computer based system including the system of processor or other can be held from instruction The system of row system, device or equipment instruction fetch and execute instruction) use, or combine these instruction execution systems, device or set It is standby and use.For the purpose of this specification, " computer-readable medium " can any can be included, store, communicate, propagate or pass Defeated program is for instruction execution system, device or equipment or the dress used with reference to these instruction execution systems, device or equipment Put.The more specifically example (non-exhaustive list) of computer-readable medium includes following:Electricity with one or more wiring Connecting portion (electronic device), portable computer diskette box (magnetic device), random access memory (RAM), read-only storage (ROM), erasable edit read-only storage (EPROM or flash memory), fiber device, and portable optic disk is read-only deposits Reservoir (CDROM).In addition, computer-readable medium can even is that the paper that can print described program on it or other are suitable Medium, because can be for example by carrying out optical scanner to paper or other media, then into edlin, interpretation or if necessary with it His suitable method is handled electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each several part of the present invention can be realized with hardware, software, firmware or combinations thereof.Above-mentioned In embodiment, software that multiple steps or method can be performed in memory and by suitable instruction execution system with storage Or firmware is realized.If, and in another embodiment, can be with well known in the art for example, realized with hardware Any one of row technology or their combination are realized:With the logic gates for realizing logic function to data-signal Discrete logic, have suitable combinational logic gate circuit application-specific integrated circuit, programmable gate array (PGA), scene Programmable gate array (FPGA) etc..
Those skilled in the art are appreciated that to realize all or part of step that above-described embodiment method carries Suddenly it is that relevant hardware can be instructed to complete by program, the program can be stored in a kind of computer-readable storage medium In matter, the program upon execution, including one or a combination set of the step of embodiment of the method.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing module, can also That unit is individually physically present, can also two or more units be integrated in a module.Above-mentioned integrated mould Block can both be realized in the form of hardware, can also be realized in the form of software function module.The integrated module is such as Fruit is realized in the form of software function module and as independent production marketing or in use, can also be stored in a computer In read/write memory medium.
Storage medium mentioned above can be read-only storage, disk or CD etc..Although have been shown and retouch above The embodiment of the present invention is stated, it is to be understood that above-described embodiment is exemplary, it is impossible to be interpreted as the limit to the present invention System, those of ordinary skill in the art can be changed above-described embodiment, change, replace and become within the scope of the invention Type.

Claims (10)

1. the scheduling management method of a kind of order, it is characterised in that comprise the following steps:
Obtain multiple orders;
The multiple order is split according to the manufacturing technique requirent of sequence information and different product and/or merging treatment, And new order sequence is generated according to handling result;
Determine the discharge of wastewater information of each order in the new order sequence;
According to the discharge of wastewater information and the new order sequence calculate wastewater discharge minimum of sening as an envoy to Order Sorting as a result, And production is carried out according to Order Sorting result.
2. the method as described in claim 1, it is characterised in that the waste water for determining each order in the new order sequence Emission information, including:
Determine the order type of each order and processing classification in the new order sequence;
Obtain discharge of wastewater information corresponding with the order type and the processing classification.
3. the method as described in claim 1, it is characterised in that it is described according to Order Sorting result carry out production it Before, further include:
For each order in Order Sorting result, the production information of drawing a design of the corresponding order sample of current order is obtained, and Determine that the current order processes required order technique information according to production information of drawing a design;
It is described that production is carried out according to Order Sorting result, including:
Production is carried out according to the corresponding order technique information of each order and the Order Sorting result.
4. the method as described in claim 1, it is characterised in that when the order is the order of dry goods, the basis is ordered The multiple order is split the manufacturing technique requirent of single information and different product and/or merging treatment, including:
Multiple orders are split and/or closed with fabric color, color depth and weight according to the manufacturing technique requirent of different fabrics And handle.
5. such as claim 1-4 any one of them methods, it is characterised in that described according to the discharge of wastewater information and described New order sequence calculate send as an envoy to wastewater discharge minimum Order Sorting as a result, including:
By the discharge of wastewater information and the new order sequence inputting to the Optimal Operation Model pre-established, by described excellent Change the Order Sorting result that scheduling model determines wastewater discharge minimum.
A kind of 6. scheduling managing device of order, it is characterised in that including:
Acquisition module, for obtaining multiple orders;
First processing module, tears the multiple order open for the manufacturing technique requirent according to sequence information and different product Point and/or merging treatment, and according to handling result generate new order sequence;
Determining module, for determining the discharge of wastewater information of each order in the new order sequence;
Second processing module, wastewater discharge is sent as an envoy to most for being calculated according to the discharge of wastewater information and the new order sequence Small Order Sorting according to Order Sorting result as a result, and carry out production.
7. device as claimed in claim 6, it is characterised in that the determining module, including:
Determination unit, for determining the order type of each order and processing classification in the new order sequence;
Acquiring unit, for obtaining discharge of wastewater information corresponding with the order type and the processing classification.
8. device as claimed in claim 6, it is characterised in that further include:
3rd processing module, for for each order in Order Sorting result, obtaining the corresponding order sample of current order Production information of drawing a design, and determine that the current order processes required order technique information according to production information of drawing a design;
The Second processing module, is specifically used for:
Production is carried out according to the corresponding order technique information of each order and the Order Sorting result.
9. device as claimed in claim 6, it is characterised in that when the order is the order of dry goods, at described first Module is managed, is specifically used for:
Multiple orders are split and/or closed with fabric color, color depth and weight according to the manufacturing technique requirent of different fabrics And handle.
10. such as claim 6-9 any one of them devices, it is characterised in that the Second processing module, is specifically used for:
By the discharge of wastewater information and the new order sequence inputting to the Optimal Operation Model pre-established, by described excellent Change the Order Sorting result that scheduling model determines wastewater discharge minimum.
CN201711115104.7A 2017-11-13 2017-11-13 The scheduling management method and device of order Pending CN108022038A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711115104.7A CN108022038A (en) 2017-11-13 2017-11-13 The scheduling management method and device of order

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711115104.7A CN108022038A (en) 2017-11-13 2017-11-13 The scheduling management method and device of order

Publications (1)

Publication Number Publication Date
CN108022038A true CN108022038A (en) 2018-05-11

Family

ID=62079780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711115104.7A Pending CN108022038A (en) 2017-11-13 2017-11-13 The scheduling management method and device of order

Country Status (1)

Country Link
CN (1) CN108022038A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876263A (en) * 2018-08-27 2018-11-23 刘明隆 Automobile manufacture intelligence scheduled production processing method
CN111047415A (en) * 2019-12-18 2020-04-21 苏州市伽顿服饰有限公司 Clothing accessory order processing method, system, electronic equipment and storage medium
CN111062772A (en) * 2019-11-13 2020-04-24 联想(北京)有限公司 Self-adaptive order aggregation method and electronic equipment
CN111461473A (en) * 2019-01-22 2020-07-28 深圳市赢领智尚科技有限公司 APS (active safety System) clothing scheduling method and system
CN111598439A (en) * 2020-05-14 2020-08-28 北京思特奇信息技术股份有限公司 Order allocation method, system and electronic equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100088136A1 (en) * 2008-10-03 2010-04-08 International Business Machines Corporation System and method for determining carbon emission-conscious order fulfillment alternatives with multiple supply modes
CN106371409A (en) * 2016-08-27 2017-02-01 绍兴兴明染整有限公司 Dyeing and finishing production line management system and management method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100088136A1 (en) * 2008-10-03 2010-04-08 International Business Machines Corporation System and method for determining carbon emission-conscious order fulfillment alternatives with multiple supply modes
CN106371409A (en) * 2016-08-27 2017-02-01 绍兴兴明染整有限公司 Dyeing and finishing production line management system and management method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
北京市环境保护科学研究所: "水污染防治手册", vol. 1, 31 August 1989, 上海科学技术出版社, pages: 862 - 864 *
周律 等: "通过优化生产调度实现印染生产节水的方法与实践", vol. 33, no. 11, pages 110 - 115 *
孙丽;袁增伟;姜伟立;毕军;: "基于水资源节约的印染企业订单排序优化模型及应用", no. 08, pages 1514 - 1520 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876263A (en) * 2018-08-27 2018-11-23 刘明隆 Automobile manufacture intelligence scheduled production processing method
CN111461473A (en) * 2019-01-22 2020-07-28 深圳市赢领智尚科技有限公司 APS (active safety System) clothing scheduling method and system
CN111461473B (en) * 2019-01-22 2023-03-31 深圳市赢领智尚服饰科技有限公司 APS (active safety System) clothing scheduling method and system
CN111062772A (en) * 2019-11-13 2020-04-24 联想(北京)有限公司 Self-adaptive order aggregation method and electronic equipment
CN111062772B (en) * 2019-11-13 2024-03-05 联想(北京)有限公司 Self-adaptive order aggregation method and electronic equipment
CN111047415A (en) * 2019-12-18 2020-04-21 苏州市伽顿服饰有限公司 Clothing accessory order processing method, system, electronic equipment and storage medium
CN111047415B (en) * 2019-12-18 2023-06-16 苏州市伽顿服饰有限公司 Clothing accessory order processing method, system, electronic equipment and storage medium
CN111598439A (en) * 2020-05-14 2020-08-28 北京思特奇信息技术股份有限公司 Order allocation method, system and electronic equipment

Similar Documents

Publication Publication Date Title
CN108022038A (en) The scheduling management method and device of order
Haque et al. Industrial water management and sustainability: development of SIWP tool for textile industries of Bangladesh
CN102385363B (en) ERP-based intelligent intensive control system of continuous dyeing production line
KR102345225B1 (en) Systems and methods for registration of cuts
CN108764663A (en) A kind of power customer portrait generates the method and system of management
CN105354375A (en) Design method of expert knowledge base oriented to intelligent garment manufacturing
CN106528129A (en) Web application interface generation system and method
CN111813661B (en) Global service data drive automatic test method, device, equipment and medium
CN105956016A (en) Associated information visualization processing system
CN109446494A (en) A kind of water utilities calculation method based on Report Engine
CN105956018A (en) Massive associated data analysis and visualization implementation method based on cloud computing platform
Carli et al. On the evolution of the Castel Goffredo hosiery cluster: a life cycle perspective
CN114819585A (en) Textile industry production order information management method and system
CN115906650A (en) Standard working hour prediction method and prediction system for short-flow modular processing procedure of clothes
Alsamarah et al. Reducing waste in garment factories by intelligent planning of optimal cutting orders
Moriguchi Acceleration and enhancement of reliability of simulated annealing for optimizing thinning schedule of a forest stand
Chakraborty A detailed study on environmental sustainability in knit composite industries of Bangladesh
CN110532501A (en) Textile product printing and dyeing workshop section's water footprints accounting method based on modularity theory
Khan et al. Computer simulation of production systems for woven fabric manufacture
CN104778740A (en) Dam construction progress three-dimensional simulation method
CN109711558A (en) For the method and device of the machine learning model of feature construction containing latent instability
Vorobec et al. The Context of the Circular Economy Model Implementation, Based on Indicators of the European Union in/for Ukraine by Means of Fuzzy Methods
CN110298068B (en) Knowledge mining-based clothing style personalized design method
Yaxyaeva Efficiency and Development Forecasts of Implementation of the Concept" Lean Production" in Textile Enterprises.
Wang et al. The design of intelligent production line for clothing industry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination