CN108018773B CN201711327163.0A CN201711327163A CN108018773B CN 108018773 B CN108018773 B CN 108018773B CN 201711327163 A CN201711327163 A CN 201711327163A CN 108018773 B CN108018773 B CN 108018773B
Authority
CN
China
Prior art keywords
bridge
step type
frame
forge piece
floorings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201711327163.0A
Other languages
Chinese (zh)
Other versions
CN108018773A (en
Inventor
杨晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Roaby Technology Industrial Group Co., Ltd.
Original Assignee
李清花
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李清花 filed Critical 李清花
Priority to CN201711327163.0A priority Critical patent/CN108018773B/en
Publication of CN108018773A publication Critical patent/CN108018773A/en
Application granted granted Critical
Publication of CN108018773B publication Critical patent/CN108018773B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/124Folding or telescopic bridges; Bridges built up from folding or telescopic sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/005Piers, trestles, bearings, expansion joints or parapets specially adapted for portable or sectional bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of self-propelled telescopic interim overline bridge, belongs to road traffic facility field.It is by fly stair, hoistable platform, the body of a bridge, supporting cylinder, what support frame and wheel formed, part structure having the same below the hoistable platform and hoistable platform at overline bridge both ends, it is symmetric, the body of a bridge can shorten interim overline bridge when not in use, fly stair can be put on hoistable platform, entire length can be reduced, save space, it is readily transported the interim overline bridge of bed rearrangement, the device is before the mounting, floorings are the state folded, when installation, two people are needed to operate simultaneously, next fly stair is put in one end of installation site, then wherein one end of the fixed overline bridge of a people, another people pulls the other end, until entire pontic is fully deployed, unload another balcony stair, starting hydraulic pump makes supporting cylinder enter working condition at this time, after the body of a bridge rises to operational height, pedestrian can climb up overline bridge by fly stair and walk To road opposite.

Description

A kind of self-propelled telescopic interim overline bridge
Technical field
The present invention relates to a kind of self-propelled telescopic interim overline bridges, specifically use the interim day of special construction Bridge, the body of a bridge can be flexible in length direction, belong to road traffic facility field.
Background technique
With the development of society, the increase of urban population quantity, the quantity of private car is consequently increased, and gives urban road band Carry out very big burden, traffic congestion has been normality, especially in festivals or holidays and commuter time, give pressure caused by traffic police very big, In prior art, crosses street for solution pedestrian and conflict with what vehicle travelled on road, overpass early has occurred in The busiest section in many cities, but existing overline bridge be mostly it is fixed, such as encounter removal and expansion repaired roads it is necessary to day of dismantling Bridge causes very big waste, if building new overline bridge not in time, very big problem can be brought to traffic, can not be solved very well Road congestion phenomenon.
Summary of the invention
In view of the above-mentioned deficiencies, the present invention provides a kind of self-propelled telescopic interim overline bridges.
The present invention is achieved by the following technical solutions: a kind of self-propelled telescopic interim overline bridge, is by day bridge Ladder, hoistable platform, the body of a bridge, supporting cylinder, support frame and wheel composition, the hoistable platform and hoistable platform at overline bridge both ends with Lower part structure having the same, is symmetric, the body of a bridge by handrail A, handrail B, frame A, frame B, floorings A and Floorings B composition, there is cylindrical slider and track, the cylindrical slider is mounted on frame A's on the frame A It on track, is connected by a hinge between cylindrical slider and frame B, is connected by a hinge between frame A and frame B, floorings A One end have forge piece of step type structure, forge piece of step type structure has through hole on perpendicular to body of a bridge length direction, perpendicular to bridge floor There is rectangular notch structure on direction, one end opposite with forge piece of step type structure is coupling part, can be with hoistable platform, floorings B Coupling part is connected by a hinge, and one end of floorings B has forge piece of step type structure, and forge piece of step type structure is in the direction perpendicular to bridge floor Upper to have rectangular preiection structure, rectangular preiection structure has through hole, floorings B step type knot on perpendicular to body of a bridge length direction The rectangular preiection structure of structure and the rectangular notch structure of floorings A forge piece of step type structure just cooperate, and floorings A and floorings B are logical Hinge connection is crossed, one end opposite with floorings B forge piece of step type structure is coupling part, can be with the connection of hoistable platform, floorings A Part is connected by a hinge, and one end of handrail A has forge piece of step type structure, and forge piece of step type structure has on perpendicular to body of a bridge length direction Through hole has rectangular notch structure on the direction perpendicular to bridge floor, and one end opposite with forge piece of step type structure is coupling part, can It is connected by a hinge with frame A, one end of handrail B has forge piece of step type structure, and forge piece of step type structure is on the direction perpendicular to bridge floor With rectangular preiection structure, rectangular preiection structure has through hole on perpendicular to body of a bridge length direction, handrail B forge piece of step type structure The rectangular notch structure of rectangular preiection structure and handrail A forge piece of step type structure just cooperates, and handrail A is connected by a hinge with handrail B, One end opposite with handrail B forge piece of step type structure is coupling part, can be connected with the coupling part of hoistable platform, handrail A by hinge It connects, there are two frame B between every two frame A, is connected by a hinge between two frame B, the lower surface of hoistable platform is square Shape and installation is there are four supporting cylinder and four support frames, the bottom end of support frame is equipped with wheel, and four supporting cylinders are equal For cloth in four corners of hoistable platform lower surface, support frame is located proximate to the center of hoistable platform, but does not interfere support hydraulic pressure The movement of cylinder, fly stair have balustrade, and fly stair and balustrade are aluminum alloy materials, and stairwell surface has thickness For the rubber pad of 5mm.
The usefulness of the invention is that the body of a bridge can shorten interim overline bridge when not in use, and fly stair can be put into liter It dropping on platform, it is possible to reduce entire length saves space, is readily transported the interim overline bridge of bed rearrangement, in the congested in traffic period, people Group's densely band, when road construction, which can temporarily build, does overline bridge use, passes through convenient for pedestrian, convenient and efficient, can effectively solve Certainly traffic congestion phenomenon.
Detailed description of the invention
Accompanying drawing 1 is the structural representation of the present invention, and attached drawing 2 is body of a bridge partial enlarged view, and attached drawing 3 is the mechanism of floorings A Schematic diagram, attached drawing 4 are the structure schematic diagram of floorings B, and attached drawing 5 is the structural schematic diagram of frame A, and attached drawing 6 is handrail A's Structural schematic diagram, attached drawing 7 are the structural schematic diagram of handrail B.
In figure, 1, the body of a bridge, 101, handrail A, 102, frame A, 103, floorings A, 104, floorings B, 105, frame B, 106, handrail B, 107, cylindrical slider, 2, hoistable platform, 3, balustrade, 4, fly stair, 5, support frame, 6, wheel, 7, Supporting cylinder.
It can be seen that the shape of floorings A Yu floorings B cooperation position from attached drawing 4.
Specific embodiment
A kind of self-propelled telescopic interim overline bridge, be by fly stair 4, hoistable platform 2, the body of a bridge 1, supporting cylinder 7, What support frame 5 and wheel 6 formed, 2 or less the part structure having the same of hoistable platform 2 and hoistable platform at overline bridge both ends is in Symmetrical, the body of a bridge is by handrail A101, handrail B106, frame A102, frame B105, floorings A103 and floorings B104 composition, there is cylindrical slider 107 and track, the cylindrical slider 107 is mounted on the frame A102 It on the track of frame A102, is connected by a hinge between cylindrical slider 107 and frame B105, cylindrical slider 107 can be in-orbit It slides on road, is connected by a hinge between frame A102 and frame B105, frame B105 can be rotated around frame A102, floorings One end of A103 has forge piece of step type structure, and forge piece of step type structure has through hole on perpendicular to body of a bridge length direction, perpendicular to bridge There is rectangular notch structure on the direction in face, one end opposite with forge piece of step type structure is coupling part, can be with hoistable platform 2, bridge floor The coupling part of plate B104 is connected by a hinge, and one end of floorings B104 has forge piece of step type structure, and forge piece of step type structure is vertical In having rectangular preiection structure on the direction of bridge floor, rectangular preiection structure has through hole, bridge on perpendicular to body of a bridge length direction The rectangular preiection structure of panel B104 forge piece of step type structure and the rectangular notch structure of floorings A103 forge piece of step type structure just cooperate, Floorings A103 is connected by a hinge with floorings B104, and one end opposite with floorings B104 forge piece of step type structure is interconnecting piece Point, it can be connected by a hinge with the coupling part of hoistable platform, floorings A103, one end of handrail A has forge piece of step type structure, rank Trapezoidal-structure has through hole on perpendicular to body of a bridge length direction, there is rectangular notch structure on the direction perpendicular to bridge floor, with The opposite one end of forge piece of step type structure is coupling part, can be connected by a hinge with frame A, and one end of handrail B106 has step type Structure, forge piece of step type structure have rectangular preiection structure on the direction perpendicular to bridge floor, and rectangular preiection structure is perpendicular to the body of a bridge There are through hole, the rectangular preiection structure of handrail B106 forge piece of step type structure and the rectangle of handrail A101 forge piece of step type structure on length direction Gap structure just cooperates, and handrail A101 is connected by a hinge with handrail B106, and opposite with handrail B106 forge piece of step type structure one End is coupling part, can be connected by a hinge with the coupling part of hoistable platform 2, handrail A101, between every two frame A102 It there are two frame B105, is connected by a hinge between two frame B105, the lower surface of hoistable platform 2 is rectangle and is equipped with four A supporting cylinder 7 and four support frames 5, for supporting cylinder 7 when not working, length is less than the length of support frame 5, support The bottom end of frame 5 is equipped with wheel 6, the device can be made lighter when walking, four supporting cylinders 7 are evenly arranged on hoistable platform 2 Four corners of lower surface, more steady, the center for being located proximate to hoistable platform 2 of support frame 5 when making to support, but do not interfere branch The movement of hydraulic cylinder 7 is supportted, fly stair 4 has balustrade 3, and fly stair 4 and balustrade 3 are aluminum alloy materials, can Mitigate the weight of fly stair, 4 surface of fly stair, which has, falls down damage when preventing pedestrian from going upstairs with a thickness of the rubber pad of 5mm Body.
Before the mounting, floorings are the state folded to the device, when installation, need two people to operate simultaneously, in installation position Next fly stair is put in the one end set, and then wherein one end of the fixed overline bridge of a people, another people pull the other end, until entire Pontic is fully deployed, and unloads another balcony stair, and starting hydraulic pump at this time makes supporting cylinder enter working condition, on the body of a bridge After being raised to operational height, pedestrian can be climbed up overline bridge by fly stair and go to road opposite.
For the ordinary skill in the art, introduction according to the present invention, do not depart from the principle of the present invention with In the case where spirit, changes, modifications that embodiment is carried out, replacement and variant still fall within protection scope of the present invention it It is interior.

Claims (4)

1. a kind of self-propelled telescopic interim overline bridge, it is characterised in that: the self-propelled telescopic interim overline bridge be by What fly stair, hoistable platform, the body of a bridge, supporting cylinder, support frame and wheel formed, the hoistable platform at overline bridge both ends and lifting The structure having the same of part below platform, is symmetric, the body of a bridge be by handrail A, handrail B, frame A, frame B, Floorings A and floorings B composition, there is cylindrical slider and track, cylindrical slider is mounted on the rail of frame A on frame A It on road, is connected by a hinge between cylindrical slider and frame B, is connected by a hinge between frame A and frame B, floorings A's One end has forge piece of step type structure, and forge piece of step type structure has through hole on perpendicular to body of a bridge length direction, in the side perpendicular to bridge floor There is rectangular notch structure upwards, one end opposite with forge piece of step type structure is coupling part, the connection with hoistable platform, floorings B Part is connected by a hinge, and one end of floorings B has forge piece of step type structure, and forge piece of step type structure has on the direction perpendicular to bridge floor There is rectangular preiection structure, rectangular preiection structure has through hole on perpendicular to body of a bridge length direction, floorings B forge piece of step type structure Bulge-structure and the rectangular notch structure of floorings A forge piece of step type structure just cooperate, and floorings A and floorings B are connected by hinge It connects, one end opposite with floorings B forge piece of step type structure is coupling part, passes through hinge with the coupling part of hoistable platform, floorings A Chain link.
2. a kind of self-propelled telescopic interim overline bridge as described in claim 1, which is characterized in that the one of the handrail A End has forge piece of step type structure, and forge piece of step type structure has through hole on perpendicular to body of a bridge length direction, in the direction perpendicular to bridge floor On have rectangular notch structure, one end opposite with forge piece of step type structure be coupling part, be connected by a hinge with frame A, handrail B's One end has forge piece of step type structure, and forge piece of step type structure has rectangular preiection structure, rectangular preiection knot on the direction perpendicular to bridge floor Structure has through hole, the rectangular preiection structure and handrail A step type knot of handrail B forge piece of step type structure on perpendicular to body of a bridge length direction The rectangular notch structure of structure just cooperates, and handrail A is connected by a hinge with handrail B, one end opposite with handrail B forge piece of step type structure For coupling part, it is connected by a hinge with the coupling part of hoistable platform, handrail A, there are two frame B between every two frame A, It is connected by a hinge between two frame B.
3. a kind of self-propelled telescopic interim overline bridge as described in claim 1, which is characterized in that the hoistable platform Lower surface is supporting cylinder and four support frames there are four rectangle and installations, and the bottom end of support frame is equipped with wheel, four branch Support hydraulic cylinder is evenly arranged on four corners of hoistable platform lower surface, the center for being located proximate to hoistable platform of support frame, but does not do Relate to the movement of supporting cylinder.
4. a kind of self-propelled telescopic interim overline bridge as described in claim 1, which is characterized in that the fly stair band There is balustrade, fly stair and balustrade are aluminum alloy materials, the rubber pad that stairwell surface has with a thickness of 5mm.
CN201711327163.0A 2017-12-13 2017-12-13 A kind of self-propelled telescopic interim overline bridge Expired - Fee Related CN108018773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711327163.0A CN108018773B (en) 2017-12-13 2017-12-13 A kind of self-propelled telescopic interim overline bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711327163.0A CN108018773B (en) 2017-12-13 2017-12-13 A kind of self-propelled telescopic interim overline bridge

Publications (2)

Publication Number Publication Date
CN108018773A CN108018773A (en) 2018-05-11
CN108018773B true CN108018773B (en) 2019-08-30

Family

ID=62073402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711327163.0A Expired - Fee Related CN108018773B (en) 2017-12-13 2017-12-13 A kind of self-propelled telescopic interim overline bridge

Country Status (1)

Country Link
CN (1) CN108018773B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565502B (en) * 2019-09-16 2024-04-12 长安大学 Folding bridge and application method thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080244841A1 (en) * 2007-04-09 2008-10-09 Lanigan John J Modular pedestrian bridge and system
JP2009281065A (en) * 2008-05-22 2009-12-03 River Corporation:Kk Connection bridge between landing bridge and ship
CN201593160U (en) * 2009-11-26 2010-09-29 广州大学 Movable and telescopic passenger foot bridge
CN202416153U (en) * 2011-12-07 2012-09-05 北京市三一重机有限公司 Crawler-type urban pedestrian bridge
CN102433832B (en) * 2011-12-07 2014-11-19 北京市三一重机有限公司 Combined overpass and bridge body module of the same
CN106758756A (en) * 2016-12-10 2017-05-31 徐州乐泰机电科技有限公司 A kind of interim overline bridge of Split type telescopic
CN106593471A (en) * 2016-12-22 2017-04-26 中铁五局集团有限公司 Moveable trestle with stepping type self-walking truss structure for large-section tunnel invert construction
CN106638272B (en) * 2017-02-27 2018-04-06 辽宁工程技术大学 A kind of automatic moving type bridge of overhead travelling crane being used for across adhesive tape conveyor

Also Published As

Publication number Publication date
CN108018773A (en) 2018-05-11

Similar Documents

Publication Publication Date Title
CN103410103B (en) Quick-beam change construction method for existing railway line of railroad
CN109457626A (en) A method of precast beam being installed in height-limit area
JP2008223341A (en) Mobile installation type pedestrian overpass
CN108018773B (en) A kind of self-propelled telescopic interim overline bridge
CN110453613A (en) A kind of cantilever method construction of Large span girder bridge box beam tunneling boring
CN105350443A (en) Movable bridge system
CN104929033A (en) Bridge structure similar to double-layer structure
RU48332U1 (en) BRIDGE
CN111472255A (en) Lifting pedestrian bridge
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN105970791A (en) Land-saving overhead type pedestrian bridge
CN112854233A (en) Deep foundation pit up-down stairs and telescopic support part and suspension part for stairs
CN219240333U (en) Trolley for construction of cover culvert
CN110158456B (en) Light base system of bridge floor sidewalk and construction method thereof
CN214882871U (en) Steel construction overpass that can build fast
CN207314692U (en) A kind of precast stair
RU40058U1 (en) BRIDGE
CN216510762U (en) Belt feeder landing stage
CN214498526U (en) Take vestibule intercommunication formula station system suitable for suspension type track traffic
CN210238254U (en) Pedestrian overpass
CN205188823U (en) Construction of light rail prestressing force bent cap and end -blocking work platform
KR101016152B1 (en) Rapid Replacement Method and Apparatus Using Pulling-Up Facility and Scaffold Truss with Wheels under the Bottom of Existing and Replacing Bridges
CN214882882U (en) Lifting pedestrian bridge
CN202064268U (en) Street crossing pedestrian bridge
KR100970959B1 (en) Method for Construction of Extension Culvert in State Guarantying Footway and Driveway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 315111 No. 45, Jing Da Road, five Township, Yinzhou District, Ningbo, Zhejiang.

Applicant after: Li Qinghua

Address before: 315153 No. 20 Shijian North Road, Shijiao Street, Haishu District, Ningbo City, Zhejiang Province

Applicant before: Li Qinghua

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191128

Address after: 315040 No.96, hibiscus Road, Ningbo high tech Zone, Ningbo, Zhejiang Province

Patentee after: Ningbo Roaby Technology Industrial Group Co., Ltd.

Address before: 315111 No. 45 Jingda Road, Five Townships, Yinzhou District, Ningbo City, Zhejiang Province

Patentee before: Li Qinghua

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190830

Termination date: 20201213