CN105350443A - Movable bridge system - Google Patents
Movable bridge system Download PDFInfo
- Publication number
- CN105350443A CN105350443A CN201510754169.0A CN201510754169A CN105350443A CN 105350443 A CN105350443 A CN 105350443A CN 201510754169 A CN201510754169 A CN 201510754169A CN 105350443 A CN105350443 A CN 105350443A
- Authority
- CN
- China
- Prior art keywords
- ladder
- processing unit
- data processing
- bridge
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/10—Travelling bridges, i.e. roller bridges; Sliding bridges; Rotary cylinder bridges, i.e. rotating about longitudinal axis to invert and raise the road
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
Abstract
The invention discloses a movable bridge system, and relates to bridges. A bridge body and crossing ladders installed on the two sides of the bridge body are included. The bridge body comprises four stand columns and a bridge plate fixed to the middle portions of the stand columns. A platform plate is fixed to the top ends of the stand columns, a roller is mounted at the bottom end of each stand column, and the lower ends of two stand columns on the same side of the street are connected through a cross beam; jacks are fixed to the two ends of the cross beam; supporting devices are arranged among the bridge plate, the cross beam and the lower portions of the stand columns on the same side, and among the bridge plate, the platform plate and the upper portions of the stand columns; a power device is arranged on the cross beam; the power device comprises a motor, a motor output shaft is connected with a gearbox, a gearbox output shaft is in transmission connection with the rollers through a chain; the motor is connected with a control module; and the control module comprises a data processing unit, a video collecting device and a data collecting analysis unit, and the video collecting device and the data collecting analysis unit are connected with the data processing unit. A bridge can be automatically moved, and can be automatically moved to a needed intersection, and the traffic pressure can be greatly relieved.
Description
Technical field
The present invention relates to a kind of overline bridge, specifically a kind of removable overline bridge.
Background technology
Overline bridge is an important component part of road traffic system, and industrial civilization and development in science and technology make automobile become the main traffic instrument of society, and the crisscross collection of road office of gathering has been the obvious characteristic in city.In prior art, for solving the traffic conflict of pedestrians travel's road and vehicle pass-through, overpass is applied to busy road already.
People and the Che cross street stream of people and wagon flow less time, namely fixing overpass affects the sight line of driver, easy generation maloperation, and fixing overpass cost is high, a position can only be positioned over, when having other sections generation stream of people and wagon flow is too much, can only build again, virtually adding cost.
Summary of the invention
In order to overcome the shortcoming of above-mentioned prior art, the invention provides a kind of removable overline bridge can move on street, moves to the place of specifying as required.
The present invention realizes with following technical scheme: a kind of removable sky bridge system, comprises pontic and the ladder of street being excessively arranged on pontic both sides; The sky bridge plate that described pontic comprises four columns and is fixed in the middle part of four columns, is fixed with landing slab on the top of column, is provided with protective guard in the surrounding of landing slab; In the bottom of each column, roller is installed, is connected by crossbeam between two column lower ends of the same side, street; Jack is fixed with at the two ends of crossbeam; It bridge plate, between crossbeam and the column bottom of the same side, and sky bridge plate, between landing slab and column top, be provided with bracing or strutting arrangement; Crossbeam is provided with power-equipment; Described power-equipment comprises motor, and motor output shaft connects gearbox, is connected between output shaft of gear-box with roller by Chain conveyer; Described jack adopts fully automatic hydraulic jack;
Described motor connects a control module; Described control module comprises video capture device, data collection and analysis unit, data processing unit, monitoring unit and performance element, and described video capture device, data collection and analysis unit, monitoring unit and performance element are connected with data processing unit respectively;
Data processing unit, to receiving from the real time video image information of video capture device and processing from the statistics of data collection and analysis unit, draws the visitors flowrate data of turnover, income earner's data on flows is sent to monitoring unit; Monitoring unit carries out storing and showing after receiving the visitors flowrate data of data processing unit transmission;
When video capture device and data collection and analysis unit collect this crossing stream of people often, when overline bridge does not need mobile, data processing unit is risen by driving mechanisms control fully automatic hydraulic jack;
When video capture device and data collection and analysis unit, to collect other crossings stream of people many, when overline bridge needs mobile, data processing unit is first fallen by driving mechanisms control fully automatic hydraulic jack, data processing unit is passing through executing agency's starter motor, and motor drives whole overline bridge to move to the crossing that visitors flowrate is many by gearbox and Chain conveyer.
It is further: described bracing or strutting arrangement comprises horizontal bar, stud and brace, horizontal bar, staggeredly between stud and brace to be fixed together.
Overhead building projection ladder comprises interior stair and is arranged on the external staircase below interior stair; The pedal that described interior stair and stair include ladder and are arranged on successively on ladder; In the outer end of external staircase ladder, handrail is installed; All fix an outer tube and oil cylinder at the two ends up and down of interior stair ladder, the correspondence of two ends up and down of external staircase ladder fixes pipe in, and interior pipe is inserted in outer tube; The cylinder body of oil cylinder is fixed on the ladder of interior stair, and the piston of oil cylinder connects the ladder of external staircase; Described data processing unit controls oil cylinder and stretches or contract.
The ladder upper end thereof of interior stair, on column, crossbeam is vertically fixed with oil cylinder; Described data processing unit controls oil cylinder and stretches or contract.
Described overhead building projection ladder has 4, the symmetrical both sides being arranged on pontic.
The invention has the beneficial effects as follows: by roller, be arranged on guide rail on street and control module, realize the automatic movement of overline bridge, overline bridge is automatically moved to the crossing of needs, greatly alleviates traffic pressure.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the left view of Fig. 1;
Fig. 4 is the A place enlarged drawing of Fig. 1;
Fig. 5 is the B place enlarged drawing of Fig. 3;
Fig. 6 is overhead building projection ladder retraction lateral view;
Fig. 7 is that overhead building projection ladder stretches out top view;
Fig. 8 is control module theory diagram.
In figure: 1, overhead building projection ladder, 1-1, ladder, 1-2, pedal, 1-3, handrail, 2, column, 3, sky bridge plate, 4, landing slab, 5, guardrail, 6, brace, 7, stud, 8, horizontal bar, 9, platform stair, 9-1, platform mouth, 10, motor, 11, gearbox, 12, jack, 13, Chain conveyer, 14, roller, 15, guide rail, 16, battery, 17, data processing unit, 18, crossbeam, 19, solar panel, 20, rest area, 21, oil cylinder.
Detailed description of the invention
As shown in Figure 1, a kind of removable sky bridge system has a pontic and is arranged on the ladder of street excessively of pontic both sides; The sky bridge plate 3 that described pontic comprises four columns 2 and is fixed in the middle part of four columns 2, is fixed with landing slab 4 on the top of column 2, is provided with protective guard 5 in the surrounding of landing slab; In the bottom of each column 2, roller 14 is installed, is connected by crossbeam 18 between two column 2 lower ends of the same side, street; Jack 12 is fixed with at the two ends of crossbeam 18.
As shown in Figure 4 and Figure 5, crossbeam 18 is provided with power-equipment; Described power-equipment comprises motor 10, and motor 10 output shaft connects a gearbox 11, and gearbox 11 output shaft is connected by Chain conveyer 13 with between roller 14.
As shown in Figure 3, in order to increase the fastness of pontic, not affecting again vehicle and passing through from pontic, at sky bridge plate 3, between crossbeam 18 and column 2 bottom of the same side, and sky bridge plate 3, between landing slab 4 and column 2 top, be provided with bracing or strutting arrangement.In the present embodiment, described bracing or strutting arrangement comprises horizontal bar 8, stud 7 and brace 6, horizontal bar 8, staggeredly between stud 7 and brace 6 to be fixed together, and plays a supporting role.
As shown in Figure 2, conveniently pedestrian enters overline bridge from all directions, and described overhead building projection ladder 1 has 4, the symmetrical both sides being arranged on pontic.
As shown in Figure 6 and Figure 7, overhead building projection ladder 1 comprises interior stair and is arranged on the external staircase below interior stair; Described interior stair and stair include ladder 1-1 and are arranged on the pedal 1-2 on ladder 1-1 successively; In the outer end of external staircase ladder, handrail 1-3 is installed; All fix an outer tube and oil cylinder at the two ends up and down of interior stair ladder, the correspondence of two ends up and down of external staircase ladder fixes pipe in, and interior pipe is inserted in outer tube; The cylinder body of oil cylinder is fixed on the ladder of interior stair, and the piston of oil cylinder connects the ladder of external staircase; Described data processing unit controls oil cylinder and stretches or contract.When visitors flowrate is larger time, data processing unit controls the oil cylinder at ladder two ends and stretches out, and external staircase stretches out under the effect of oil cylinder, increases the width of overhead building projection ladder, facilitate pedestrian quickly through; Time visitors flowrate is few, the oil cylinder that data processing unit controls ladder two ends is retracted, and reduce floor space, the oil cylinder at ladder two ends is synchronized with the movement.
The ladder upper end thereof of interior stair, on column, crossbeam is vertically fixed with oil cylinder; Described data processing unit controls oil cylinder and stretches or contract, and when overline bridge needs mobile, data processing unit controls oil cylinder and stretches out, and the bottom of overhead building projection ladder is liftoff, and when overline bridge maintains static, data processing unit controls oil cylinder and stretches out, and the bottom of overhead building projection ladder lands.
As shown in Figure 2, leisure podium level is had a rest for pedestrian, and pedestrian, through entering landing slab by platform stair 9 from platform mouth, landing slab 4 is provided with rest area 20 concurrence people and has a rest.In addition, solar panel 19 on landing slab 4, solar panel 19 is charged to battery 16 by controller for solar, and plays additives for overcharge protection and over to battery 16.
Conveniently pedestrian passes through overline bridge night, and pontic is furnished with multiple illuminating lamp, and battery 16 is powered to illuminating lamp.
As shown in Figure 8, motor connects a control module; Described control module comprises video capture device, data collection and analysis unit, data processing unit, monitoring unit and performance element, and described video capture device, data collection and analysis unit, monitoring unit are connected with data processing unit respectively.Wherein, the real time video image information that video capture device is passed in and out by the camera collection stream of people and flowed to, and real time video image information is transferred to data processing unit and monitoring unit respectively; Data collection and analysis unit comprises the sensor for sending signal when sensing personage's key element and obtains the data acquisition unit of statistics after gathering the signal that sensor sends, and data acquisition unit sends statistics to data processing unit after drawing statistics; Data processing unit, to receiving from the real time video image information of video capture device and processing from the statistics of data collection and analysis unit, draws the visitors flowrate data of turnover, income earner's data on flows is sent to monitoring unit; Monitoring unit carries out storing and showing after receiving the visitors flowrate data of data processing unit transmission, and the real time video image information received from video capture device is monitored in real time; Performance element performs corresponding action according to the instruction from data processing unit.
In the present embodiment, jack 11 adopts fully automatic hydraulic jack, and data processing unit 17 is by the liter of driving mechanisms control fully automatic hydraulic jack or fall.Data processing unit 17 and battery 16 are arranged on crossbeam 18, as Fig. 5 shows.
The course of work: be equipped with guide rail 15 on street, the removable overline bridge in the present invention to be arranged on guide rail 15 by roller 14 and can to move along guide rail 15.Data processing unit, to receiving from the real time video image information of video capture device and processing from the statistics of data collection and analysis unit, draws the visitors flowrate data of turnover, income earner's data on flows is sent to monitoring unit; Monitoring unit carries out storing and showing after receiving the visitors flowrate data of data processing unit transmission.
When video capture device and data collection and analysis unit, to collect this crossing stream of people many, when overline bridge does not need mobile, data processing unit is risen by driving mechanisms control fully automatic hydraulic jack, whole overline bridge is played to the effect of support, reduce the load-bearing of roller, extend its application life.
When video capture device and data collection and analysis unit, to collect other crossings stream of people many, when overline bridge needs mobile, data processing unit is first fallen by driving mechanisms control fully automatic hydraulic jack, data processing unit is passing through executing agency's starter motor, and motor drives whole overline bridge to move to the crossing that visitors flowrate is many by gearbox and Chain conveyer.
Claims (5)
1. a removable sky bridge system, comprises pontic and the ladder of street being excessively arranged on pontic both sides; Described pontic comprises four columns (2) and is fixed on the sky bridge plate (3) at four column (2) middle parts, it is characterized in that: be fixed with landing slab (4) on the top of column (2), is provided with protective guard (5) in the surrounding of landing slab; In the bottom of each column (2), roller (14) is installed, is connected by crossbeam (18) between two column (2) lower ends of the same side, street; Jack (12) is fixed with at the two ends of crossbeam (18); It bridge plate (3), between crossbeam (18) and column (2) bottom of the same side, and sky bridge plate (3), between landing slab (4) and column (2) top, be provided with bracing or strutting arrangement; Crossbeam (18) is provided with power-equipment; Described power-equipment comprises motor (10), and motor (10) output shaft connects gearbox (11), is connected between gearbox (11) output shaft with roller (14) by Chain conveyer (13); Described jack (12) adopts fully automatic hydraulic jack;
Described motor connects a control module; Described control module comprises video capture device, data collection and analysis unit, data processing unit, monitoring unit and performance element, and described video capture device, data collection and analysis unit, monitoring unit and performance element are connected with data processing unit respectively;
Data processing unit, to receiving from the real time video image information of video capture device and processing from the statistics of data collection and analysis unit, draws the visitors flowrate data of turnover, income earner's data on flows is sent to monitoring unit; Monitoring unit carries out storing and showing after receiving the visitors flowrate data of data processing unit transmission;
When video capture device and data collection and analysis unit collect this crossing stream of people often, when overline bridge does not need mobile, data processing unit is risen by driving mechanisms control fully automatic hydraulic jack;
When video capture device and data collection and analysis unit, to collect other crossings stream of people many, when overline bridge needs mobile, data processing unit is first fallen by driving mechanisms control fully automatic hydraulic jack, data processing unit is passing through executing agency's starter motor, and motor drives whole overline bridge to move to the crossing that visitors flowrate is many by gearbox and Chain conveyer.
2. removable sky according to claim 1 bridge system, is characterized in that: described bracing or strutting arrangement comprises horizontal bar (8), stud (7) and brace (6), horizontal bar (8), staggeredly between stud (7) and brace (6) to be fixed together.
3. removable sky according to claim 1 and 2 bridge system, is characterized in that: overhead building projection ladder (1) comprises interior stair and is arranged on the external staircase below interior stair; Described interior stair and stair include ladder (1-1) and are arranged on the pedal (1-2) on ladder (1-1) successively; Handrail (1-3) is installed in the outer end of external staircase ladder; All fix an outer tube and oil cylinder at the two ends up and down of interior stair ladder, the correspondence of two ends up and down of external staircase ladder fixes pipe in, and interior pipe is inserted in outer tube; The cylinder body of oil cylinder is fixed on the ladder of interior stair, and the piston of oil cylinder connects the ladder of external staircase; Described data processing unit controls oil cylinder and stretches or contract.
4. removable sky according to claim 3 bridge system, is characterized in that: the ladder upper end thereof of interior stair, on column, crossbeam is vertically fixed with oil cylinder; Described data processing unit controls oil cylinder and stretches or contract.
5. removable sky according to claim 3 bridge system, is characterized in that: described overhead building projection ladder (1) has 4, the symmetrical both sides being arranged on pontic.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510754169.0A CN105350443B (en) | 2015-11-09 | 2015-11-09 | Removable sky bridge system |
PCT/CN2016/073900 WO2017080124A1 (en) | 2015-11-09 | 2016-03-09 | Movable overpass system |
NL2017065A NL2017065B1 (en) | 2015-11-09 | 2016-06-29 | A Movable Overbridge System Specification |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510754169.0A CN105350443B (en) | 2015-11-09 | 2015-11-09 | Removable sky bridge system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105350443A true CN105350443A (en) | 2016-02-24 |
CN105350443B CN105350443B (en) | 2016-11-23 |
Family
ID=55326496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510754169.0A Active CN105350443B (en) | 2015-11-09 | 2015-11-09 | Removable sky bridge system |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN105350443B (en) |
NL (1) | NL2017065B1 (en) |
WO (1) | WO2017080124A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017080123A1 (en) * | 2015-11-09 | 2017-05-18 | 中国矿业大学 | Movable overpass |
WO2017080124A1 (en) * | 2015-11-09 | 2017-05-18 | 中国矿业大学 | Movable overpass system |
CN108333954A (en) * | 2018-03-23 | 2018-07-27 | 宁波梅山岛开发投资有限公司 | A kind of mobile crane span structure electric-control system frame |
CN111827082A (en) * | 2020-06-22 | 2020-10-27 | 上海绿地建设(集团)有限公司 | Steel structure special-shaped overbridge and installation method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107620255A (en) * | 2017-10-08 | 2018-01-23 | 李召 | Movable type suitable for alleviating school doorway congestion in road phenomenon is dropped off the guests platform |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080244841A1 (en) * | 2007-04-09 | 2008-10-09 | Lanigan John J | Modular pedestrian bridge and system |
CN201593160U (en) * | 2009-11-26 | 2010-09-29 | 广州大学 | Movable and telescopic passenger foot bridge |
CN202337942U (en) * | 2011-09-24 | 2012-07-18 | 董世贤 | Movable overpass |
CN202416153U (en) * | 2011-12-07 | 2012-09-05 | 北京市三一重机有限公司 | Crawler-type urban pedestrian bridge |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201301430Y (en) * | 2008-11-06 | 2009-09-02 | 王尚 | Movable bridge |
CN105350443B (en) * | 2015-11-09 | 2016-11-23 | 中国矿业大学 | Removable sky bridge system |
CN105421215B (en) * | 2015-11-09 | 2016-11-23 | 中国矿业大学 | Removable overline bridge |
-
2015
- 2015-11-09 CN CN201510754169.0A patent/CN105350443B/en active Active
-
2016
- 2016-03-09 WO PCT/CN2016/073900 patent/WO2017080124A1/en active Application Filing
- 2016-06-29 NL NL2017065A patent/NL2017065B1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080244841A1 (en) * | 2007-04-09 | 2008-10-09 | Lanigan John J | Modular pedestrian bridge and system |
CN201593160U (en) * | 2009-11-26 | 2010-09-29 | 广州大学 | Movable and telescopic passenger foot bridge |
CN202337942U (en) * | 2011-09-24 | 2012-07-18 | 董世贤 | Movable overpass |
CN202416153U (en) * | 2011-12-07 | 2012-09-05 | 北京市三一重机有限公司 | Crawler-type urban pedestrian bridge |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017080123A1 (en) * | 2015-11-09 | 2017-05-18 | 中国矿业大学 | Movable overpass |
WO2017080124A1 (en) * | 2015-11-09 | 2017-05-18 | 中国矿业大学 | Movable overpass system |
CN108333954A (en) * | 2018-03-23 | 2018-07-27 | 宁波梅山岛开发投资有限公司 | A kind of mobile crane span structure electric-control system frame |
CN108333954B (en) * | 2018-03-23 | 2024-01-30 | 宁波梅山岛开发投资有限公司 | Mobile bridge electric control system frame |
CN111827082A (en) * | 2020-06-22 | 2020-10-27 | 上海绿地建设(集团)有限公司 | Steel structure special-shaped overbridge and installation method |
Also Published As
Publication number | Publication date |
---|---|
NL2017065B1 (en) | 2017-09-08 |
CN105350443B (en) | 2016-11-23 |
NL2017065A (en) | 2016-09-27 |
WO2017080124A1 (en) | 2017-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350443A (en) | Movable bridge system | |
EP2049734B1 (en) | Traffic system | |
CN108797467A (en) | A kind of tide track isolation guardrail device | |
JP2007120077A (en) | Erection method of elevated road bridge, and its facility | |
CN105241671A (en) | Mobility scooter climbing test platform | |
CN108487679A (en) | A kind of electronic intelligence bus platform that hydraulic pressure auxiliary telescopic keeps off the rain | |
CN203295997U (en) | Road forced no-passing device | |
CN202575899U (en) | Device for overhauling contact systems | |
CN105421215A (en) | Movable overbridge | |
CN103643820A (en) | Power external sidesway lifting type three-dimensional garage | |
CN202440730U (en) | Crossroad building structure requiring no traffic light | |
CN208516829U (en) | Rubber-tyred subway tracklaying crane | |
CN201574605U (en) | Double-layer parking platform | |
CN205804142U (en) | A kind of steelframe overpass | |
CN209836874U (en) | Traffic engineering is adjustable rail guard for construction | |
CN216108027U (en) | Pedestrian overpass membrane structure steel structure | |
CN204728191U (en) | A kind of portable steel slab bridge | |
CN213330231U (en) | Overpass type public parking space based on three-dimensional space construction | |
CN209927430U (en) | Public road bridge roof beam telescoping device test system | |
CN112281668B (en) | Road and bridge extension construction cross line protection structure and construction method thereof | |
CN211665456U (en) | Urban intersection pedestrian street crossing system | |
CN213267518U (en) | Bridge engineering construction support equipment | |
CN203373654U (en) | Combined platform bridge | |
CN219992289U (en) | Highway bridge restriction device | |
CN217419439U (en) | Urban road and traffic engineering rail guard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |