CN105350443B - Removable sky bridge system - Google Patents
Removable sky bridge system Download PDFInfo
- Publication number
- CN105350443B CN105350443B CN201510754169.0A CN201510754169A CN105350443B CN 105350443 B CN105350443 B CN 105350443B CN 201510754169 A CN201510754169 A CN 201510754169A CN 105350443 B CN105350443 B CN 105350443B
- Authority
- CN
- China
- Prior art keywords
- ladder
- processing unit
- data processing
- column
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012545 processing Methods 0.000 claims abstract description 38
- 238000007405 data analysis Methods 0.000 claims abstract description 15
- 238000013480 data collection Methods 0.000 claims abstract description 15
- 230000008859 change Effects 0.000 claims abstract description 10
- 239000003921 oil Substances 0.000 claims description 21
- 238000012544 monitoring process Methods 0.000 claims description 12
- 206010000210 abortion Diseases 0.000 claims description 8
- 231100000176 abortion Toxicity 0.000 claims description 8
- 230000007246 mechanism Effects 0.000 claims description 8
- 230000007306 turnover Effects 0.000 claims description 4
- 239000000346 nonvolatile oil Substances 0.000 claims description 3
- 238000004148 unit process Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 2
- 230000000875 corresponding effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000003981 vehicle Substances 0.000 description 2
- 241001310793 Podium Species 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/10—Travelling bridges, i.e. roller bridges; Sliding bridges; Rotary cylinder bridges, i.e. rotating about longitudinal axis to invert and raise the road
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of removable sky bridge system, relate to a kind of overline bridge.The present invention has a pontic and is arranged on the ladder of street excessively of pontic both sides;Pontic includes four columns and is fixed on the sky bridge plate in the middle part of four columns, is fixed with landing slab on the top of column;Roller is installed in the bottom of each column, is connected by crossbeam between two column lower ends of the same side, street;It is fixed with jack at the two ends of crossbeam;Between the column bottom of it bridge plate, crossbeam and the same side, and it is provided with support means between sky bridge plate, landing slab and column top;Crossbeam is provided with power-equipment;Power-equipment includes motor, and motor output shaft connects change speed gear box, is connected by Chain conveyer between output shaft of gear-box with roller;Motor connects a control module;Control module includes data processing unit and difference connected video capture device, data collection and analysis unit.Realization automatically moves overline bridge, overline bridge is automatically moved to the crossing needed, significantly alleviates traffic pressure.
Description
Technical field
The present invention relates to a kind of overline bridge, specifically a kind of removable overline bridge.
Background technology
Overline bridge is an important component part of road traffic system, and industrial civilization and development in science and technology make automobile become society
Can main traffic instrument, the crisscross collection of road office of gathering has been the obvious characteristic in city.In prior art, for solving pedestrian
Passing through the traffic conflict of road and vehicle pass-through, overpass is applied to busy road already.
When people and Che cross street artificial abortion and wagon flow are less, fixing overpass i.e. affects the sight line of driver, easily
Produce maloperation, and fixing overpass cost be high, can only be positioned over a position, when have other sections occur artificial abortion and
When wagon flow is too much, can only build again, virtually add cost.
Summary of the invention
In order to overcome the shortcoming of above-mentioned prior art, the present invention provides a kind of removable overline bridge can move on street,
Move to the place specified as required.
The present invention realizes with following technical scheme: a kind of removable sky bridge system, including pontic be arranged on pontic
The overhead building projection ladder of both sides;Described pontic includes four columns and is fixed on the sky bridge plate in the middle part of four columns, at column
Top is fixed with landing slab, is provided with rest area on landing slab, is formed around guard rail at landing slab;The end at each column
End is provided with roller, is connected by crossbeam between two column lower ends of the same side, street;It is fixed with very heavy at the two ends of crossbeam
Top;Between the column bottom of it bridge plate, crossbeam and the same side, and it is provided with support between sky bridge plate, landing slab and column top
Device;Crossbeam is provided with power-equipment and accumulator;Described power-equipment includes motor, and motor output shaft connects speed change
Case, is connected by Chain conveyer between output shaft of gear-box with roller;Described jack uses fully automatic hydraulic jack;
Described motor connects a control module;Described control module includes video capture device, data collection and analysis
Unit, data processing unit, monitoring unit and performance element, described video capture device, data collection and analysis unit, prison
Control unit and performance element are connected with data processing unit respectively;
Reception from the real time video image information of video capture device and is divided by data processing unit from data acquisition
The statistical data of analysis unit processes, and draws the flow of the people data of turnover, income earner's data on flows is sent to monitoring unit
;Monitoring unit carries out storing and showing after receiving the flow of the people data that data processing unit sends;
When video capture device and data collection and analysis unit, to collect this crossing artificial abortion the most, and overline bridge need not mobile
Time, data processing unit is risen by driving mechanisms control fully automatic hydraulic jack;
When video capture device and data collection and analysis unit, to collect other crossings artificial abortion the most, and overline bridge needs mobile
Time, data processing unit first passes through driving mechanisms control fully automatic hydraulic jack and falls, and data processing unit is by performing
Unit starting motor, motor drives whole overline bridge to move to the crossing that flow of the people is many by change speed gear box and Chain conveyer.
It is further: described support means includes horizontal bar, stud and brace, horizontal bar, stud and brace
Between staggered be fixed together.
Overhead building projection ladder includes interior stair and is arranged on the external staircase below interior stair;Described interior stair and external staircase all wrap
Include ladder and the pedal being sequentially arranged on ladder;In the outer end of external staircase ladder, handrail is installed;Upper at interior stair ladder
An outer tube and oil cylinder are all fixed in lower two ends, and the correspondence of two ends up and down of external staircase ladder fixes an inner tube, and inner tube is inserted in outer tube;Oil
The cylinder body of cylinder is fixed on the ladder of interior stair, and the piston of oil cylinder connects the ladder of external staircase;Described data processing unit control
Liquefaction cylinder is stretched or contracts.
The ladder upper end thereof of interior stair, on column, is vertically fixed oil cylinder on crossbeam;Described data process single
Unit controls oil cylinder and stretches or contract.
Described overhead building projection ladder has 4, the symmetrical both sides being arranged on pontic.
The invention has the beneficial effects as follows: the guide rail by roller, being arranged on street and control module, it is achieved overline bridge
Automatically move, overline bridge is automatically moved to the crossing needed, significantly alleviates traffic pressure.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the left view of Fig. 1;
Fig. 4 is enlarged drawing at the A of Fig. 1;
Fig. 5 is enlarged drawing at the B of Fig. 3;
Fig. 6 is overhead building projection ladder retraction side view;
Fig. 7 is that overhead building projection ladder stretches out top view;
Fig. 8 is control module theory diagram.
In figure: 1, overhead building projection ladder, 1-1, ladder, 1-2, pedal, 1-3, handrail, 2, column, 3, sky bridge plate, 4, landing slab,
5, guardrail, 6, brace, 7, stud, 8, horizontal bar, 9, platform stair, 9-1, platform mouth, 10, motor, 11, change speed gear box, 12, thousand
Jin top, 13, Chain conveyer, 14, roller, 15, guide rail, 16, accumulator, 17, data processing unit, 18, crossbeam, 19, solar-electricity
Pond plate, 20, rest area, 21, oil cylinder.
Detailed description of the invention
As it is shown in figure 1, a kind of removable sky bridge system has a pontic and is arranged on the ladder of street excessively of pontic both sides;Described bridge
Body includes four columns 2 and is fixed on the sky bridge plate 3 in the middle part of four columns 2, is fixed with landing slab 4 on the top of column 2,
Landing slab be formed around guard rail 5;In the bottom of each column 2, roller 14 is installed, two columns of the same side, street 2 times
Connected by crossbeam 18 between end;It is fixed with jack 12 at the two ends of crossbeam 18.
As shown in Figure 4 and Figure 5, crossbeam 18 is provided with power-equipment;Described power-equipment includes motor 10, motor
10 output shafts connect a change speed gear box 11, are connected by Chain conveyer 13 between change speed gear box 11 output shaft and roller 14.
As it is shown on figure 3, for the fastness increasing pontic, the most do not affect vehicle and pass through from pontic, at sky bridge plate 3, horizontal stroke
Between column 2 bottom of beam 18 and the same side, and it is provided with support means between sky bridge plate 3, landing slab 4 and column 2 top.This
In embodiment, described support means includes horizontal bar 8, stud 7 and brace 6, between horizontal bar 8, stud 7 and brace 6
Interlock and be fixed together, play a supporting role.
As in figure 2 it is shown, pedestrian enters overline bridge from all directions for convenience, described overhead building projection ladder 1 has 4, symmetrical
It is arranged on the both sides of pontic.
As shown in Figure 6 and Figure 7, overhead building projection ladder 1 includes interior stair and is arranged on the external staircase below interior stair;Described is interior
Stair and external staircase all include ladder 1-1 and the pedal 1-2 being sequentially arranged on ladder 1-1;Pacify in the outer end of external staircase ladder
Equipped with handrail 1-3;All fixing an outer tube and oil cylinder at the two ends up and down of interior stair ladder, the two ends up and down of external staircase ladder are corresponding
Fixing an inner tube, inner tube is inserted in outer tube;The cylinder body of oil cylinder is fixed on the ladder of interior stair, and the piston of oil cylinder connects external staircase
Ladder;Described data processing unit controls oil cylinder and stretches or contract.When flow of the people is bigger when, data processing unit controls ladder
The oil cylinder at frame two ends stretches out, and external staircase stretches out under the effect of oil cylinder, increases the width of overhead building projection ladder, facilitates pedestrian quickly to lead to
Cross;The when that flow of the people being few, data processing unit controls the oil cylinder at ladder two ends and retracts, and reduces floor space, ladder two ends
Oil cylinder is synchronized with the movement.
The ladder upper end thereof of interior stair, on column, is vertically fixed oil cylinder on crossbeam;Described data process single
Unit controls oil cylinder and stretches or contract, and when overline bridge needs mobile, data processing unit controls oil cylinder and stretches out, the terraced bottom of overhead building projection from
Ground, when overline bridge maintains static, data processing unit controls oil cylinder and stretches out, and the bottom of overhead building projection ladder lands.
As in figure 2 it is shown, leisure podium level is had a rest for pedestrian, pedestrian is through entering platform by platform stair 9 from platform mouth
Plate, is provided with rest area 20 concurrence people on landing slab 4 and has a rest.Additionally, on landing slab 4 solar panel 19, solar-electricity
Accumulator 16 is charged by pond plate 19 by controller for solar, and accumulator 16 plays additives for overcharge protection and overdischarge guarantor
Protect.
Pedestrian is disposed with multiple illuminating lamp by overline bridge night on pontic for convenience, and accumulator 16 supplies to illuminating lamp
Electricity.
As shown in Figure 8, motor connects a control module;Described control module includes video capture device, data acquisition
Analytic unit, data processing unit, monitoring unit and performance element, described video capture device, data collection and analysis list
Unit, monitoring unit are connected with data processing unit respectively.Wherein, video capture device by camera collection people flow into or out with
And the real time video image information flowed to, and real time video image information is transferred to respectively data processing unit and monitoring list
Unit;Data collection and analysis unit includes the sensor for sending signal when sensing personage's key element and to sensor transmission
Signal obtains the data acquisition unit of statistical data after being acquired, data acquisition unit sends statistical data after drawing statistical data
To data processing unit;Data processing unit is to receiving from the real time video image information of video capture device with from data
The statistical data of collection analysis unit processes, and draws the flow of the people data of turnover, and income earner's data on flows is sent to prison
Control unit;Monitoring unit receive data processing unit send flow of the people data after carry out storing and showing, receive from
The real time video image information of video capture device monitors in real time;Performance element is according to the instruction from data processing unit
Perform corresponding action.
In the present embodiment, jack 11 uses fully automatic hydraulic jack, and data processing unit 17 is by drive mechanism control
The liter of fully automatic hydraulic jack processed or fall.Data processing unit 17 and accumulator 16 are arranged on crossbeam 18, as Fig. 5 shows.
Work process: be equipped with guide rail 15 on street, the removable overline bridge in the present invention is arranged on by roller 14 and leads
On rail 15 and can move along guide rail 15.Data processing unit is to receiving the real time video image information from video capture device
Process with the statistical data from data collection and analysis unit, draw the flow of the people data of turnover, by income earner's flow number
According to being sent to monitoring unit;Monitoring unit carries out storing and showing after receiving the flow of the people data that data processing unit sends
Show.
When video capture device and data collection and analysis unit, to collect this crossing artificial abortion the most, and overline bridge need not mobile
Time, data processing unit is risen by driving mechanisms control fully automatic hydraulic jack, whole overline bridge plays the effect of support,
Reduce the load-bearing of roller, extend its service life.
When video capture device and data collection and analysis unit, to collect other crossings artificial abortion the most, and overline bridge needs mobile
Time, data processing unit first passes through driving mechanisms control fully automatic hydraulic jack and falls, and data processing unit is by performing
Mechanism starts motor, and motor drives whole overline bridge to move to the crossing that flow of the people is many by change speed gear box and Chain conveyer.
Claims (5)
1. a removable sky bridge system, including pontic and the overhead building projection ladder being arranged on pontic both sides;Described pontic includes four
Individual column (2) and be fixed on the sky bridge plate (3) at four columns (2) middle part, it is characterised in that: fix on the top of column (2)
There is landing slab (4), landing slab (4) is provided with rest area (20), be formed around guard rail (5) at landing slab;Each vertical
The bottom of post (2) is provided with roller (14), is connected by crossbeam (18) between two column (2) lower ends of the same side, street;?
The two ends of crossbeam (18) are fixed with jack (12);Between it bridge plate (3), crossbeam (18) and column (2) bottom of the same side, with
And it is provided with support means between sky bridge plate (3), landing slab (4) and column (2) top;Crossbeam (18) is provided with power-equipment
With accumulator (16);Described power-equipment includes motor (10), and motor (10) output shaft connects change speed gear box (11), change speed gear box
(11) it is connected by Chain conveyer (13) between output shaft with roller (14);Described jack (12) uses fully automatic hydraulic very heavy
Top;
Described motor connects a control module;Described control module include video capture device, data collection and analysis unit,
Data processing unit, monitoring unit and performance element, described video capture device, data collection and analysis unit, monitoring are single
Unit and performance element are connected with data processing unit respectively;
Data processing unit is to receiving from the real time video image information of video capture device with from data collection and analysis list
The statistical data of unit processes, and draws the flow of the people data of turnover, income earner's data on flows is sent to monitoring unit;Prison
Control unit carries out storing and showing after receiving the flow of the people data that data processing unit sends;
When video capture device and data collection and analysis unit, to collect this crossing artificial abortion the most, when overline bridge need not mobile,
Data processing unit is risen by driving mechanisms control fully automatic hydraulic jack;
When video capture device and data collection and analysis unit, to collect other crossings artificial abortion the most, when overline bridge needs mobile,
Data processing unit first passes through driving mechanisms control fully automatic hydraulic jack and falls, and data processing unit passes through performance element again
Starting motor, motor drives whole overline bridge to move to the crossing that flow of the people is many by change speed gear box and Chain conveyer.
Removable sky the most according to claim 1 bridge system, it is characterised in that: described support means includes horizontal bar
(8), stud (7) and brace (6), staggered between horizontal bar (8), stud (7) and brace (6) be fixed together.
Removable sky the most according to claim 1 and 2 bridge system, it is characterised in that: overhead building projection ladder (1) include interior stair and
It is arranged on the external staircase below interior stair;Described interior stair and external staircase all include ladder (1-1) and are sequentially arranged at ladder
(1-1) pedal (1-2) on;Handrail (1-3) is installed in the outer end of external staircase ladder;Equal at the two ends up and down of interior stair ladder
Fixing an outer tube and oil cylinder, the correspondence of two ends up and down of external staircase ladder fixes an inner tube, and inner tube is inserted in outer tube;The cylinder body of oil cylinder
Being fixed on the ladder of interior stair, the piston of oil cylinder connects the ladder of external staircase;Described data processing unit controls oil cylinder and stretches
Or contracting.
Removable sky the most according to claim 3 bridge system, it is characterised in that: the ladder upper end thereof of interior stair on column,
Crossbeam is vertically fixed oil cylinder;Described data processing unit controls oil cylinder and stretches or contract.
Removable sky the most according to claim 3 bridge system, it is characterised in that: described overhead building projection ladder (1) has 4, right
The both sides being arranged on pontic claimed.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510754169.0A CN105350443B (en) | 2015-11-09 | 2015-11-09 | Removable sky bridge system |
PCT/CN2016/073900 WO2017080124A1 (en) | 2015-11-09 | 2016-03-09 | Movable overpass system |
NL2017065A NL2017065B1 (en) | 2015-11-09 | 2016-06-29 | A Movable Overbridge System Specification |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510754169.0A CN105350443B (en) | 2015-11-09 | 2015-11-09 | Removable sky bridge system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105350443A CN105350443A (en) | 2016-02-24 |
CN105350443B true CN105350443B (en) | 2016-11-23 |
Family
ID=55326496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510754169.0A Active CN105350443B (en) | 2015-11-09 | 2015-11-09 | Removable sky bridge system |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN105350443B (en) |
NL (1) | NL2017065B1 (en) |
WO (1) | WO2017080124A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107620255A (en) * | 2017-10-08 | 2018-01-23 | 李召 | Movable type suitable for alleviating school doorway congestion in road phenomenon is dropped off the guests platform |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350443B (en) * | 2015-11-09 | 2016-11-23 | 中国矿业大学 | Removable sky bridge system |
CN105421215B (en) * | 2015-11-09 | 2016-11-23 | 中国矿业大学 | Removable overline bridge |
CN108333954B (en) * | 2018-03-23 | 2024-01-30 | 宁波梅山岛开发投资有限公司 | Mobile bridge electric control system frame |
CN111827082A (en) * | 2020-06-22 | 2020-10-27 | 上海绿地建设(集团)有限公司 | Steel structure special-shaped overbridge and installation method |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080244841A1 (en) * | 2007-04-09 | 2008-10-09 | Lanigan John J | Modular pedestrian bridge and system |
CN201301430Y (en) * | 2008-11-06 | 2009-09-02 | 王尚 | Movable bridge |
CN201593160U (en) * | 2009-11-26 | 2010-09-29 | 广州大学 | Movable and telescopic passenger foot bridge |
CN202337942U (en) * | 2011-09-24 | 2012-07-18 | 董世贤 | Movable overpass |
CN202416153U (en) * | 2011-12-07 | 2012-09-05 | 北京市三一重机有限公司 | Crawler-type urban pedestrian bridge |
CN105350443B (en) * | 2015-11-09 | 2016-11-23 | 中国矿业大学 | Removable sky bridge system |
CN105421215B (en) * | 2015-11-09 | 2016-11-23 | 中国矿业大学 | Removable overline bridge |
-
2015
- 2015-11-09 CN CN201510754169.0A patent/CN105350443B/en active Active
-
2016
- 2016-03-09 WO PCT/CN2016/073900 patent/WO2017080124A1/en active Application Filing
- 2016-06-29 NL NL2017065A patent/NL2017065B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107620255A (en) * | 2017-10-08 | 2018-01-23 | 李召 | Movable type suitable for alleviating school doorway congestion in road phenomenon is dropped off the guests platform |
Also Published As
Publication number | Publication date |
---|---|
CN105350443A (en) | 2016-02-24 |
WO2017080124A1 (en) | 2017-05-18 |
NL2017065B1 (en) | 2017-09-08 |
NL2017065A (en) | 2016-09-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350443B (en) | Removable sky bridge system | |
CN200989072Y (en) | Synchronous lifting and lowering underground mechanical multilayer parking equipment | |
EP2049734A1 (en) | Traffic system | |
CN108797467A (en) | A kind of tide track isolation guardrail device | |
CN105241671A (en) | Mobility scooter climbing test platform | |
CN107730915A (en) | A kind of intelligent electronic police for road traffic safety management | |
CN103774544A (en) | Assembled temporary steel bridge | |
CN105421215B (en) | Removable overline bridge | |
CN103643820A (en) | Power external sidesway lifting type three-dimensional garage | |
CN104947617A (en) | Vehicle bridge passing warning system | |
CN102797205A (en) | Facility capable of preventing overload trucks from passing | |
CN204940111U (en) | A kind of bridge detecting device | |
CN105979204A (en) | Induction based road guide rail automatic monitoring system | |
CN105200917A (en) | Bridge detecting device and method | |
CN106401230B (en) | A kind of transverse direction dual-layer stereo parking space | |
CN2734824Y (en) | Road barrier with retractable rod device | |
CN209014746U (en) | A kind of freeway traffic weather monitoring early warning system | |
CN108643076B (en) | Traffic sign post | |
CN203200628U (en) | Assembled type interchange road system of bridge floor supporting belt walking device | |
CN106706649B (en) | Vehicle detection apparatus and vehicle detection method | |
CN205573908U (en) | Portable sunroof maintenance frame | |
CN105178180B (en) | It is a kind of to be used for device of the bridge inspection vehicle by pier cap beam | |
CN220486234U (en) | Bridge overhauls platform | |
CN205171365U (en) | A device that is used for bridge inspection trolley to pass through pier bent cap | |
CN205369946U (en) | Self -propelled modularization subway station roofing steel structure installation support frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |