CN108005397A - Armored concrete elevator shaft construction safety protecting method - Google Patents

Armored concrete elevator shaft construction safety protecting method Download PDF

Info

Publication number
CN108005397A
CN108005397A CN201711203315.6A CN201711203315A CN108005397A CN 108005397 A CN108005397 A CN 108005397A CN 201711203315 A CN201711203315 A CN 201711203315A CN 108005397 A CN108005397 A CN 108005397A
Authority
CN
China
Prior art keywords
elevator shaft
floor
net
concrete slab
way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711203315.6A
Other languages
Chinese (zh)
Inventor
尹友非
王利明
陈亚东
候林欣
王茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201711203315.6A priority Critical patent/CN108005397A/en
Publication of CN108005397A publication Critical patent/CN108005397A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of armored concrete elevator shaft construction safety protecting method, two-way concrete slab net is set in the elevator shaft at every floor and two-way concrete slab net is anchored in the armored concrete of elevator and is erected in wall, the plank sheathing then completely spread on the net in two-way concrete slab forms security protection operating platform.The invention can ensure that the safe construction in elevator shaft, while can shorten the construction period, save substantial amounts of labour and circulation material.

Description

Armored concrete elevator shaft construction safety protecting method
Technical field
The invention belongs to architecture construction equipment, more particularly to a kind of armored concrete elevator shaft construction is anti-with safety Maintaining method, this method are suitable for the elevator shaft construction of multilayer, high level, high-rise building.
Background technology
With the development of the city, building site is more and more nervous, and depth of building is also continuously increased, and high-rise, Super High is built Build more and more.The common practice of construction of lift well is:Scaffold in hoistway is set up since elevator pit, scaffolding height passes through Safety calculates, but must not exceed 50m, if it exceeds when calculating the height set up, box out should be installed on floor position hoistway wall Girder steel, the upward segmented-erection scaffold from girder steel.According to conventional construction method, the security protection in elevator shaft is difficult to accomplish Position, while a large amount of labours, a large amount of circulation materials are put into, increase cost, extend the duration.
The content of the invention
The object of the present invention is to provide a kind of armored concrete elevator shaft construction safety protecting method, this method can protect The safe construction in elevator shaft is demonstrate,proved, while can be shortened the construction period, saves substantial amounts of labour and circulation material.
As above conceive, the technical scheme is that:A kind of armored concrete elevator shaft construction safety protecting method, It is characterized in that:Two-way concrete slab net is set in the elevator shaft at every floor and two-way concrete slab net is anchored in elevator Armored concrete is erected in wall, and the plank sheathing then completely spread on the net in two-way concrete slab forms security protection operating platform.
The specific forming step of above-mentioned security protection operating platform is:
1. setting two-way concrete slab net at first floor top elevation in elevator shaft, first floor floor structure coagulation is then poured Soil, by the two-way concrete slab net end anchorage set in elevator shaft in hoistway wall;
2. after first floor top board structure concreting, construct the second Rotating fields when, the first floor top plate in elevator shaft Two-way concrete slab at absolute altitude completely spreads plank sheathing on the net;
3. in a floor structure in construction, the wooden model that has completely been spread in elevator shaft construction worker's lift stand hoistway Operated on plate, when a upper floor structure possesses concreting condition, in elevator shaft on a floor top elevation Place is once again set up two-way concrete slab net;
4. repeating the first step to the 3rd step, until agent structure binds, make to form full envelope at every floor in elevator shaft The hard protection safe operation platform closed.
This invention removes the fall safety hidden danger of personnel during elevator shaft construction, ensures that the person of construction worker is pacified Entirely, the duration is shortened, circulation material dosage is saved, reduces artificial input, has saved construction cost.
Brief description of the drawings
Fig. 1 is the floor map that the present invention constructs;
Fig. 2 is the profile that the present invention constructs.
In figure:1. elevator borehole wall;2. two-way concrete slab net;3. the plank sheathing that two-way concrete slab is completely spread on the net.
Embodiment
For that can further appreciate that present disclosure, feature and effect, make below by embodiment further detailed State, implementation below is descriptive, is not limited, it is impossible to limit protection scope of the present invention with this.The invention Specific implementation step it is as follows:
The first step:When floor structure is constructed, since the first floor, two-way steel is set in elevator shaft at first floor top elevation Muscle net 2, then pours first floor floor structure concrete, by the two-way concrete slab net end anchorage set in elevator shaft in elevator In wall 1;
Second step:After first floor top board structure concreting, construct the second Rotating fields when, the first floor in elevator shaft Plank sheathing 3 is completely spread on two-way concrete slab net 2 at top elevation, plank sheathing is spread and hoistway wall top is tight, leave no gaps;
3rd step:In a floor structure in construction, completely spread in elevator shaft construction worker's lift stand hoistway Plank sheathing on operated, when a upper floor structure possesses concreting condition, in elevator shaft on a floor top Two-way concrete slab net 2 is once again set up at plate absolute altitude;
4th step:The first step is repeated to the 3rd step, until agent structure binds, makes to be formed at every floor in elevator shaft Totally enclosed hard protection safe operation platform;
5th step:When main structure construction finishes, before carrying out elevator installation, elevator is successively removed downwards since top layer The plank sheathing completely spread in road;
6th step:After the plank sheathing in top layer elevator shaft is removed, next layer of top layer is expired in elevator shaft Scaffolding is installed, operating personnel station will be pre-buried two-way in top layer elevator shaft on scaffolding on the plank sheathing of paving Bar-mat reinforcement 2 pastes hoistway wall and is cut off with reinforced shear;
7th step:The 5th step to the 6th step is repeated, is successively removed downwards by top layer, until protection is torn open in whole elevator shaft Except finishing.
It should be appreciated that for those of ordinary skills, can according to the above description be improved or converted, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (2)

  1. A kind of 1. armored concrete elevator shaft construction safety protecting method, it is characterised in that:Elevator at every floor Two-way concrete slab net is set in road and two-way concrete slab net is anchored in the armored concrete of elevator and is erected in wall, then in two-way steel The plank sheathing that muscle is completely spread on the net forms security protection operating platform.
  2. 2. armored concrete elevator shaft construction safety protecting method according to claim 1, it is characterised in that:It is above-mentioned The specific forming step of security protection operating platform is:
    1. setting two-way concrete slab net at first floor top elevation in elevator shaft, first floor floor structure concrete is then poured, will The two-way concrete slab net end anchorage set in elevator shaft is in hoistway wall;
    2. after first floor top board structure concreting, construct the second Rotating fields when, the first floor top elevation in elevator shaft The two-way concrete slab at place completely spreads plank sheathing on the net;
    3. in a floor structure in construction, on the plank sheathing that has completely been spread in elevator shaft construction worker's lift stand hoistway Operated, when a upper floor structure possesses concreting condition, in elevator shaft at a floor top elevation again Secondary setting two-way concrete slab net;
    4. repeating the first step to the 3rd step, until agent structure binds, make to be formed at every floor in elevator shaft totally enclosed Hard protection safe operation platform.
CN201711203315.6A 2017-11-27 2017-11-27 Armored concrete elevator shaft construction safety protecting method Pending CN108005397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711203315.6A CN108005397A (en) 2017-11-27 2017-11-27 Armored concrete elevator shaft construction safety protecting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711203315.6A CN108005397A (en) 2017-11-27 2017-11-27 Armored concrete elevator shaft construction safety protecting method

Publications (1)

Publication Number Publication Date
CN108005397A true CN108005397A (en) 2018-05-08

Family

ID=62053849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711203315.6A Pending CN108005397A (en) 2017-11-27 2017-11-27 Armored concrete elevator shaft construction safety protecting method

Country Status (1)

Country Link
CN (1) CN108005397A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403608A (en) * 2018-11-20 2019-03-01 广州景兴建筑科技有限公司 A kind of building elevator shaft mouth security protection platform
CN109441115A (en) * 2018-12-29 2019-03-08 中建四局第五建筑工程有限公司 A kind of elevator fence operation platform structure and construction method
CN109736581A (en) * 2019-01-03 2019-05-10 中国十七冶集团有限公司 A kind of construction elevator safeguard structure and construction method
CN115217345A (en) * 2022-07-31 2022-10-21 中冶建工集团有限公司 Hard protection synchronous installation construction method for elevator shaft

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503910A (en) * 2008-12-26 2009-08-12 中铁建工集团有限公司 Security protection method and device for elevator hoistway in house building course
KR101111234B1 (en) * 2008-10-07 2012-02-21 김송강 Elevator infrastructure establishment construction workbench
JP2012241473A (en) * 2011-05-23 2012-12-10 Daifuzi Co Ltd Support material for temporary scaffold plate and method of installing temporary scaffold using the same
CN205025123U (en) * 2015-09-11 2016-02-10 中建八局第三建设有限公司 Standardized protector that elevartor shaft is kept apart firmly
CN205444955U (en) * 2016-03-14 2016-08-10 中国建筑第二工程局有限公司 Protection device for be used for elevator well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101111234B1 (en) * 2008-10-07 2012-02-21 김송강 Elevator infrastructure establishment construction workbench
CN101503910A (en) * 2008-12-26 2009-08-12 中铁建工集团有限公司 Security protection method and device for elevator hoistway in house building course
JP2012241473A (en) * 2011-05-23 2012-12-10 Daifuzi Co Ltd Support material for temporary scaffold plate and method of installing temporary scaffold using the same
CN205025123U (en) * 2015-09-11 2016-02-10 中建八局第三建设有限公司 Standardized protector that elevartor shaft is kept apart firmly
CN205444955U (en) * 2016-03-14 2016-08-10 中国建筑第二工程局有限公司 Protection device for be used for elevator well

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403608A (en) * 2018-11-20 2019-03-01 广州景兴建筑科技有限公司 A kind of building elevator shaft mouth security protection platform
CN109441115A (en) * 2018-12-29 2019-03-08 中建四局第五建筑工程有限公司 A kind of elevator fence operation platform structure and construction method
CN109736581A (en) * 2019-01-03 2019-05-10 中国十七冶集团有限公司 A kind of construction elevator safeguard structure and construction method
CN115217345A (en) * 2022-07-31 2022-10-21 中冶建工集团有限公司 Hard protection synchronous installation construction method for elevator shaft

Similar Documents

Publication Publication Date Title
CN108005397A (en) Armored concrete elevator shaft construction safety protecting method
Krentowski et al. Sudden collapse of a 19th-century masonry structure during its renovation process
CN108331336A (en) The integrated lifting steel plateform system and its construction method of floor synchronous construction
Gromysz Rectification an 11-storey vertically deflected residential building
CN206352388U (en) A kind of special scaffold of dual operation platform elevator
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN107143141A (en) External wall of high-rise building warming plate construction
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN204551485U (en) Semi-inverse method throws support formula foundation ditch combined enclosure structure
Li et al. Study on construction technology of hydraulic climbing formwork for super high-rise building under aluminum formwork system
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN216810958U (en) Cantilever formwork for pouring cantilever structure of refuge layer
Jakšic et al. Masonry construction remedial measures in case of a multi-story housing facility caused by floor extension process
Andresen Investigation of a collapsed scaffold structure
CN106368426A (en) Auxiliary supporting system for super high-rise building climbing equipment
Dhapekar et al. Structural Health Monitoring of Historical Monuments by Rapid Visual Screening: Case Study of Bhand Deval Temple, Arang, Chhatisgarh, India
CN103498476B (en) Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method
CN106284397B (en) A kind of diagonal brace concrete column solid protection deep-excavation tower crane base apparatus
Cardoso Haussmannian building repair, rehabilitation and strengthening: case study from France
Zargar et al. Top-Down Construction Method: A Case Study of Commercial Building in Tehran
CN109024290A (en) A kind of bowl fastening type full framing and its construction method for continuous beam
CN204139634U (en) The safe enclosed construction in a kind of fast-type hole
Galindo Aires Actions to Improve the Accessibility of the Recoletos Urban Station (Madrid)
Rosenboom et al. Seismic strengthening of a 19th century banking temple
CN114687361B (en) Construction method for flood discharge tunnel entrance side slope anti-slip slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180508

WD01 Invention patent application deemed withdrawn after publication