CN107989638A - A kind of push pipe receives water-stopping method - Google Patents

A kind of push pipe receives water-stopping method Download PDF

Info

Publication number
CN107989638A
CN107989638A CN201711462004.1A CN201711462004A CN107989638A CN 107989638 A CN107989638 A CN 107989638A CN 201711462004 A CN201711462004 A CN 201711462004A CN 107989638 A CN107989638 A CN 107989638A
Authority
CN
China
Prior art keywords
pipe
stopping method
push pipe
jacking
tunnelling machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711462004.1A
Other languages
Chinese (zh)
Inventor
刘杰
陈强
陈卓
谢东旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
Original Assignee
China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 2 Engineering Group Co Ltd filed Critical China Railway No 2 Engineering Group Co Ltd
Priority to CN201711462004.1A priority Critical patent/CN107989638A/en
Publication of CN107989638A publication Critical patent/CN107989638A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of push pipe to receive water-stopping method, comprises the following steps:The step of installation push pipe receives antipriming in advance:The antipriming includes sealing heavy curtain, and the sealing heavy curtain is arranged on to the edge for receiving hole;The sealing heavy curtain forms enclosure space with push pipe outer wall, reception hole inner wall, building enclosure;Grouting pipe is further included, one end of the grouting pipe is connected with the enclosure space, the other end is in communication with the outside;The step of forming sealing ring:When pipe jacking tunnelling machine enters received well but does not completely disengage the soil body, slurries are injected into the enclosure space using the grouting pipe, the sealing ring for being used for sealing is formed between hole inner wall and pipe jacking tunnelling machine receiving.It is an object of the invention to:The problem of Sand being received for pipe jacking tunnelling machine, there is provided a kind of push pipe receives water-stopping method.The water-stopping method can solve the problems, such as Sand in pipe jacking tunnelling machine receive process.

Description

A kind of push pipe receives water-stopping method
Technical field
The invention belongs to pipe jacking construction technique field, and in particular, to a kind of push pipe receives water-stopping method.
Background technology
Push bench process is a kind of underground engineering no-dig technique pipelaying techniques.Specifically, using pipe jacking tunnelling machine pore-forming, overcome The frictional force of pipeline and surrounding soil, the pipeline of prefabricated shaping is headed into from active well, and the earthwork is transported, finally from received well Ejection, the pipeline for forming continuous liner structure are laid with.
In push pipe receive process, due to jacking pipe joints mass motion, pipe jacking tunnelling machine is caused in rich water weak soil When being received in stratum, easily there is the construction risk of Sand.Surrounding enviroment may be damaged when serious, cause pipeline Damage, ground collapse etc., the solution to this problem just seems particularly important.Therefore, it is necessary to water burst is received to pipe jacking tunnelling machine Sand phenomenon is gushed to be controlled.
The content of the invention
It is an object of the invention to:The problem of Sand being received for pipe jacking tunnelling machine, there is provided a kind of push pipe, which receives, to be stopped Water method.The water-stopping method can solve the problems, such as Sand in pipe jacking tunnelling machine receive process.
To achieve these goals, the technical solution adopted by the present invention receives water-stopping method for a kind of push pipe, including following Step:
The step of installation push pipe receives antipriming in advance:The antipriming includes sealing heavy curtain, by the sealing curtain Curtain is arranged on the edge for receiving hole;The sealing heavy curtain forms enclosure space with push pipe outer wall, reception hole inner wall, building enclosure; Grouting pipe is further included, one end of the grouting pipe is connected with the enclosure space, the other end is in communication with the outside;
The step of forming sealing ring:When pipe jacking tunnelling machine enters received well but does not completely disengage the soil body, the note is utilized Slurry pipeline injects slurries into the enclosure space, and the sealing for being used for sealing is formed between hole inner wall and pipe jacking tunnelling machine receiving Circle.The slip casting into enclosure space by grouting pipe, it is possible to prevente effectively from the problem of Sand, ensures that pipe jacking tunnelling machine receives Safety.
Preferably, the slurries are dual slurry or yellow mud, play the role of cementing and filling pore, improve soil Intensity and bearing capacity.
Preferably, when pipe jacking tunnelling machine is apart from building enclosure 10-30cm, building enclosure is cut off, easy to determine Push pipe reaches posture.
Preferably, when cutting off building enclosure, first in center digging, then divide four pieces to cut, be easy to and save abolish Time.
Preferably, if in Concrete is abolished, there is Sand phenomenon, then fast jacking push pipe tunnels Machine, tightens the sealing heavy curtain and encases pipe jacking tunnelling machine, recycles the grouting pipe injection slurries, avoids Sand.
Preferably, before slurries are injected, first inject polyurethane and blocked, plugging effect is more preferable.
Preferably, stop 6 hours after the completion of closure, examined by jacking pipe joints preformed hole and the grouting pipe Look into the presence or absence of infiltration phenomenon, when without obvious infiltration, then carry out it is secondary appear, injecting treatment is otherwise repeated, avoids gushing Water gushes sand.
Preferably, after pipe jacking tunnelling machine enters received well termination stabilization zone, start decompression step by step, avoid top power The deformation of senior general's building enclosure top is crossed, causes penetrating passage.
Preferably, after pipe jacking tunnelling machine is separated with jacking pipe joints, block between jacking pipe joints and reception hole Gap, avoids Sand completely.
Preferably, portal steel loop is set in the inner wall for receiving hole, in the end set tube coupling steel loop of jacking pipe joints, And welded the portal steel loop with tube coupling steel loop, the plugging effect of welding is preferable.
In conclusion by adopting the above-described technical solution, compared with the prior art, the beneficial effects of the invention are as follows:This Invention is using one of sealing heavy curtain+grouting pipe in received well portal steel loop come to pipe jacking tunnelling machine surrounding and portal Sealing ring is formed between steel loop;And control pipe jacking tunnelling machine jacking parameter and sequence of construction in reception period.It can effectively solve to push up The generation of Sand in pipe receive process, prevents from damaging surrounding enviroment, causes pipeline damage, ground collapse etc..And And this method is easy to operate, positive effect is workable, easy for construction, and on surrounding enviroment without influence, comprehensive cost is low, right All it is very helpful in similar underground engineering.
Brief description of the drawings
Fig. 1 is the structure diagram for the antipriming that the present invention is based on.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not For limiting the present invention.
The present embodiment discloses a kind of push pipe and receives water-stopping method, comprises the following steps:
First, installation push pipe receives antipriming in advance, and the antipriming includes sealing heavy curtain 1, by the sealing heavy curtain 1 It is arranged on the edge for receiving hole;The sealing heavy curtain 1 forms enclosure space with push pipe outer wall, reception hole inner wall, building enclosure;Also Including grouting pipe 2, one end of the grouting pipe 2 is connected with the enclosure space, the other end is in communication with the outside.
2nd, after pipe jacking tunnelling machine enters received well termination stabilization zone 1m, decompression step by step is started.Apart from building enclosure During 50cm, soil pressure is reduced to 0Mpa, avoids top power from crossing the deformation of senior general's building enclosure top, causes penetrating passage.
3rd, when pipe jacking tunnelling machine is apart from building enclosure 20cm, cut off last layer of reinforcing bar of building enclosure and abolish last One layer concrete.When cutting off building enclosure, first in center digging, then four pieces are divided to cut, easy to determine that push pipe reaches posture and section About abolish the time.
4th, received well is entered but when not completely disengaging the soil body in pipe jacking tunnelling machine, using the grouting pipe 2 to the envelope Injection slurries in space are closed, the sealing ring for being used for sealing is formed between hole inner wall and pipe jacking tunnelling machine receiving, prevents and gushes Water gushes sand dangerous situation, ensures that pipe jacking tunnelling machine receives safety.The slurries are dual slurry or yellow mud.Dual slurry, i.e. two fluid grouting, will Waterglass replaces with calcium chloride solution in injection soil, and two kinds of solution react rapidly generation silica gel and gel of calcium silicate, play glue The effect of knot and filling pore, improves the intensity and bearing capacity of soil.
5th, after pipe jacking tunnelling machine is separated with jacking pipe joints, jacking pipe joints are blocked immediately and receive the gap between hole. The inner wall for receiving hole sets portal steel loop 3, in the end set tube coupling steel loop of jacking pipe joints, and with steel plate by the portal steel loop 3 are welded with tube coupling steel loop, first spot welding cyclization, then comprehensive full weld.
In step 3 abolishes Concrete, there is Sand phenomenon, then fast jacking pipe jacking tunnelling machine, tighten institute State sealing heavy curtain 1 and encase pipe jacking tunnelling machine, recycle the grouting pipe 2 to inject slurries.If necessary, injection slurries it Before, first inject polyurethane and blocked.Stop 6 hours after the completion of closure, pass through jacking pipe joints preformed hole and the Grouting Pipe Road 2 checks for infiltration phenomenon, when without obvious infiltration, then carry out it is secondary appear, injecting treatment is otherwise repeated.
A kind of push pipe disclosed by the invention described further below receives antipriming, as shown in Figure 1, the sealing heavy curtain 1 Tilted to the direction of push pipe jacking.The sealing heavy curtain 1 includes steel loop 11 and rubber ring 12, and the rubber ring 12 is arranged on described The inner side of steel loop 11.The height of the rubber ring 12 is more than the height of the steel loop 11.Sealing heavy curtain is according to portal steel loop girth It is circular layout, the long 240mm of steel loop, the long 596mm of rubber ring.As shown in Figure 1, the grouting pipe 2 includes two, it is separately positioned on The above and below of push pipe.The grouting pipe 2 is cast in the side wall of received well.What the grouting pipe 2 was in communication with the outside One end is provided with valve 21.Grouting pipe is uniformly installed in portal steel loop surrounding, eight grouting pipes, each Grouting Pipe are set altogether Road aperture 120mm.
Specifically, as shown in Figure 1, the inner wall for receiving hole is provided with portal steel loop 3.Portal steel loop thickness is according to main body Structural requirement, 900mm, length and width dimensions are determined according to push pipe channel size, are circular layout, steel loop wall thickness 14mm.The reception hole Inner wall be provided with two rows of shield tail brush rings 4, the shield tail brush ring 4 is tilted to the direction of push pipe jacking, and in two rows of shield tail brush rings 4 Between be clamped with immersion oil fat water-absorbing sponge 41.Twice shield tail brush is set close to limiter, and spacing 10cm, is circular layout.Grease uses WR90 types hand applies shield tail grease, and water-absorbing sponge sponge or cotton-wadded quilt, are circular layout.The inner wall for receiving hole sets limited Position device 5, the limiter 5 have to the inclined inclined-plane in direction of push pipe jacking.In portal steel loop surrounding, uniformly installation eight limits Position device, limiter are made of thickness 14mm, long 20cm iron plates.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of push pipe receives water-stopping method, it is characterised in that comprises the following steps:
The step of installation push pipe receives antipriming in advance:The antipriming includes sealing heavy curtain (1), by the sealing heavy curtain (1) it is arranged on the edge for receiving hole;The sealing heavy curtain (1) forms closing sky with push pipe outer wall, reception hole inner wall, building enclosure Between;Grouting pipe (2) is further included, one end of the grouting pipe (2) is connected with the enclosure space, the other end connects with extraneous It is logical;
The step of forming sealing ring:When pipe jacking tunnelling machine enters received well but does not completely disengage the soil body, the Grouting Pipe is utilized Road (2) injects slurries into the enclosure space, and the sealing for being used for sealing is formed between hole inner wall and pipe jacking tunnelling machine receiving Circle.
2. push pipe according to claim 1 receives water-stopping method, it is characterised in that:The slurries are dual slurry or yellow mud.
3. push pipe according to claim 1 receives water-stopping method, it is characterised in that:In pipe jacking tunnelling machine apart from building enclosure During 10-30cm, building enclosure is cut off.
4. push pipe according to claim 3 receives water-stopping method, it is characterised in that:When cutting off building enclosure, first at center Digging, then divide four pieces to cut.
5. push pipe according to claim 3 receives water-stopping method, it is characterised in that:If in Concrete is abolished, go out Existing Sand phenomenon, then fast jacking pipe jacking tunnelling machine, tightens the sealing heavy curtain (1) and encases pipe jacking tunnelling machine, then profit Slurries are injected with the grouting pipe (2).
6. push pipe according to claim 5 receives water-stopping method, it is characterised in that:Before slurries are injected, first injection is poly- Urethane is blocked.
7. push pipe according to claim 6 receives water-stopping method, it is characterised in that:Stop 6 hours after the completion of closure, lead to Cross jacking pipe joints preformed hole and the grouting pipe (2) checks for infiltration phenomenon, when without obvious infiltration, then carry out two It is secondary to appear, injecting treatment is otherwise repeated.
8. push pipe according to claim 3 receives water-stopping method, it is characterised in that:Enter received well end in pipe jacking tunnelling machine Behind head stabilization zone, start decompression step by step.
9. push pipe according to claim 1 receives water-stopping method, it is characterised in that:In pipe jacking tunnelling machine and jacking pipe joints point From rear, the gap between closure jacking pipe joints and reception hole.
10. push pipe according to claim 9 receives water-stopping method, it is characterised in that:In the inner wall for receiving hole, portal is set Steel loop (3), is welded in the end set tube coupling steel loop of jacking pipe joints, and by the portal steel loop (3) with tube coupling steel loop.
CN201711462004.1A 2017-12-28 2017-12-28 A kind of push pipe receives water-stopping method Pending CN107989638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711462004.1A CN107989638A (en) 2017-12-28 2017-12-28 A kind of push pipe receives water-stopping method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711462004.1A CN107989638A (en) 2017-12-28 2017-12-28 A kind of push pipe receives water-stopping method

Publications (1)

Publication Number Publication Date
CN107989638A true CN107989638A (en) 2018-05-04

Family

ID=62041603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711462004.1A Pending CN107989638A (en) 2017-12-28 2017-12-28 A kind of push pipe receives water-stopping method

Country Status (1)

Country Link
CN (1) CN107989638A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113074002A (en) * 2021-03-23 2021-07-06 上海市城市建设设计研究总院(集团)有限公司 Method for connecting batch jacking gapped discrete steel structure pipe joint and tunnel portal

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011600A (en) * 2010-10-28 2011-04-13 上海建工集团股份有限公司 Watertight device of heading machine for passing in and out door opening
CN203441506U (en) * 2013-08-20 2014-02-19 北京深林开物市政工程有限公司 Tube pushing machine hole-out slurry stopping sealing receiving device
CN104060634A (en) * 2014-07-01 2014-09-24 国家电网公司 Water stopping method and structure for reserved hole of pipe jacking work well
CN104455724A (en) * 2014-09-30 2015-03-25 中铁十八局集团有限公司 Tube push bench receiving device and method under high-water-pressure condition
CN104763436A (en) * 2015-03-09 2015-07-08 中国地质大学(武汉) Method and device for receiving pipe jacking machine under condition of high water pressure complicated geological conditions
CN105257299A (en) * 2015-11-04 2016-01-20 中铁十八局集团有限公司 Slurry-balanced pipe jacking machine receiving device and technology under high water condition

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011600A (en) * 2010-10-28 2011-04-13 上海建工集团股份有限公司 Watertight device of heading machine for passing in and out door opening
CN203441506U (en) * 2013-08-20 2014-02-19 北京深林开物市政工程有限公司 Tube pushing machine hole-out slurry stopping sealing receiving device
CN104060634A (en) * 2014-07-01 2014-09-24 国家电网公司 Water stopping method and structure for reserved hole of pipe jacking work well
CN104455724A (en) * 2014-09-30 2015-03-25 中铁十八局集团有限公司 Tube push bench receiving device and method under high-water-pressure condition
CN104763436A (en) * 2015-03-09 2015-07-08 中国地质大学(武汉) Method and device for receiving pipe jacking machine under condition of high water pressure complicated geological conditions
CN105257299A (en) * 2015-11-04 2016-01-20 中铁十八局集团有限公司 Slurry-balanced pipe jacking machine receiving device and technology under high water condition

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113074002A (en) * 2021-03-23 2021-07-06 上海市城市建设设计研究总院(集团)有限公司 Method for connecting batch jacking gapped discrete steel structure pipe joint and tunnel portal

Similar Documents

Publication Publication Date Title
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN105927231B (en) Inclined shaft passes through rich water densification drifting sand layer circulation-induced curtain-grouting method
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN103277120B (en) A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls
CN103410161B (en) Oblique control slip casting steel anchor tube framework and construction method thereof
CN107605498B (en) Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN105351001B (en) A kind of method based on gob side entry retaining region reinforcement gas pumping
CN106351662A (en) Partitioned phased grouting reinforcement method, construction method and application
CN102787846A (en) Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN106812540B (en) Shield initial plain wall sealing water-stopping reinforcing structure and construction process
CN109538216A (en) Pass through mined out and subsidence area constructing tunnel technique
CN110344834A (en) Nearly section water-rich silty sand layers shield machine receives construction method
CN203924137U (en) A kind of diaphragm wall serious leakage plugging structure
CN105464685A (en) Cave-pile method bored tunnel waterproof curtain and construction method thereof
CN114109442B (en) Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method
CN105909265A (en) Heaving-prevention retrusive deep-hole grouting system and method for passing through existing shield tunnel
CN103604000B (en) River sea bottom steel push pipe docking method of construction
CN107989638A (en) A kind of push pipe receives water-stopping method
CN108360542A (en) Waterproof between piles curtain combination stake side sleeve valve barrel grouting water stop construction method
CN105240023B (en) A kind of method of Curve Pipe Jacking supporting construction enlarging shield-tunneling construction subway station
CN109914390A (en) It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN110409476A (en) Retaining Structure of Extra-deep Excavation side wall water leakage treatment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: China Railway Second Bureau Construction Co., Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant before: China Railway No. 2 Engineering Group Co., Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190807

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant before: China Railway Second Bureau Construction Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180504