CN107984609A - A kind of stair method for prefabricating - Google Patents

A kind of stair method for prefabricating Download PDF

Info

Publication number
CN107984609A
CN107984609A CN201711289353.8A CN201711289353A CN107984609A CN 107984609 A CN107984609 A CN 107984609A CN 201711289353 A CN201711289353 A CN 201711289353A CN 107984609 A CN107984609 A CN 107984609A
Authority
CN
China
Prior art keywords
stair
region
reinforcing bar
lightweight module
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711289353.8A
Other languages
Chinese (zh)
Inventor
陈小平
杨再祥
雷勇
王德军
周永波
王涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Blueprint New Material Ltd Co
Original Assignee
Guizhou Blueprint New Material Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Blueprint New Material Ltd Co filed Critical Guizhou Blueprint New Material Ltd Co
Priority to CN201711289353.8A priority Critical patent/CN107984609A/en
Publication of CN107984609A publication Critical patent/CN107984609A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a kind of stair method for prefabricating, this method realizes the prefabricated of stair using reinforced concrete mating mold, for assembled architecture.Method for prefabricating provided by the present invention passes through the interval between Concrete Filled lightweight module, between lightweight module and reinforcing bar and between reinforcing bar, and the reinforcing bar and lightweight module being placed in stairway die are coated by concrete, it ensure that the ability of weighing of stair under the action of reinforcing bar and concrete, lightweight module is filled in stair, reduce the dosage of concrete, reduce the weight of stair.It efficiently avoid the situation for occurring cavity in stair.

Description

A kind of stair method for prefabricating
Technical field
The present invention relates to a kind of stair method for prefabricating, the prefabricated profiled stair of this method are mainly used for assembled architecture.
Background technology
With the development of modern industrial technology, building house can be manufactured in batch completely as machine production.As long as Prefabricated house component, transport to assemble in site and get up just into i.e. assembled architecture.Assembled architecture refers to prefabricated The building that component is formed in assemble in site.This building has the characteristics that:
1. substantial amounts of building subassembly is machined by Workshop Production, component species mainly has:Side fascia, lining, overlapping Plate, balcony, air-conditioning plate, stair, precast beam, prefabricated post etc..
2. the substantial amounts of assembling work in scene, greatly reduces than original cast-in-place operation.
3. using building, finishing integrated design, construction, perfect condition is that finishing can synchronously be carried out with main body construction.
4. the informationization of standardization and the management of design, component get over standard, production efficiency is higher, and corresponding component cost is just It can decline, coordinate the digital management of factory, the cost performance of whole assembled architecture can be higher and higher.
5. meet the requirement of green building.
Stair are as one of component more important in assembled architecture, with layer function above and below connection, therefore to stair Method for prefabricating research is of great significance.
The content of the invention
Present invention purpose in this is to provide a kind of stair method for prefabricating, and the prefabricated profiled stair of this method are ensureing building The lighter in weight of stair while terraced load-bearing capacity.
To achieve the object of the present invention, the stair method for prefabricating provided realizes stair using reinforced concrete mating mold It is prefabricated, for assembled architecture, which comprises the following steps that:
S1:Rule in stairway die, indicate the region for laying lightweight module, and by prefabricated profiled lightweight mould Block is laid in region;
S2:Reinforcing bar is laid around lightweight module, the reinforcing bar extends stairway die along stairway die length direction;Institute State and gap is left between reinforcing bar and the region for laying lightweight module, or the reinforcing bar is used to lay lightweight with described The outer surface contact in the region of module;
S3:The casting concrete into stairway die, makes concrete fill up whole stairway die;
S4:Stand, stand 12~24h, treat that stair are molded;
S5:Molding stair are taken out, dry shaping.
This method indicates the region for laying lightweight module in advance, and lightweight module is laid in region, and gently Reinforcing bar is laid around matter module, finally casting concrete again.First lay lightweight module and reinforcing bar, after-pouring concrete.By mixed Interval between solidifying soil light filling module, between lightweight module and reinforcing bar and between reinforcing bar, and be placed in stairway die Reinforcing bar and lightweight module are coated by concrete, and the ability of weighing of stair, lightweight are ensure that under the action of reinforcing bar and concrete Module is filled in stair, reduces the dosage of concrete, reduces the weight of stair.
Specifically, when carrying out step S3, stairway die is swung.During casting concrete, swinging stairway die makes concrete Filling evenly, more fully, efficiently avoid the situation for occurring cavity in stair.
Specifically, described in step S1 be used to lay and leave between the region of lightweight module and stairway die inner wall between Every.The interval between region and stairway die inner wall can be filled in concreting process, so that by lightweight module All it is coated in concrete, has not only protected lightweight module, but also prevent the landing of lightweight module.
Specifically, the region for being used to lay lightweight module described in step S1 is at least one layer, every layer include one or More sub-regions;It is spaced and lays between more sub-regions.
The beneficial effects of the invention are as follows:By between Concrete Filled lightweight module, between lightweight module and reinforcing bar and Interval between reinforcing bar, and the reinforcing bar and lightweight module that are placed in stairway die are coated by concrete, in reinforcing bar and concrete Under the action of ensure that the abilities of weighing of stair, lightweight module is filled in stair, reduces the dosage of concrete, reduce building The weight of ladder.It efficiently avoid the situation for occurring cavity in stair.
Brief description of the drawings
Fig. 1 is each component layout diagram in the prefabrication process of method for prefabricating of the present invention;
Fig. 2 is one of stereogram through the prefabricated profiled stair of method provided by the present invention;
Two of Fig. 3 for the stereogram through the prefabricated profiled stair of method provided by the present invention;
In figure:1- stairway dies, 2- regions, 3- reinforcing bars, 4- intervals, 5- mark time, 6- rest ledges, 11- end caps, 12- bottoms; The direction of arrow represents concreting direction in Fig. 1, i.e., is poured from top to bottom into stairway die 1.
Embodiment
Claimed technical solution of the invention is described in further detail with reference to attached drawing herein.
As shown in Figure 1,2 and 3, claimed technical solution of the invention is a kind of method for prefabricating of stair, this method The prefabricated of stair is realized using reinforced concrete mating mold, for assembled architecture.Realized using existing stairway die, tool Body step is as follows:
S1:Rule in stairway die 1, indicate the region 2 for laying lightweight module, and by prefabricated profiled lightweight Module is laid in region 2;
S2:Reinforcing bar is laid, reinforcing bar 3 is laid around lightweight module, reinforcing bar 3 extends along the length direction of stairway die 1 Stairway die 1, the end cap 11 at corresponding 1 both ends of stairway die, which is equipped with, is used for the through hole that reinforcing bar 3 passes through;Extend stairway die 1 reinforcing bar 3 is connecting pin, due to being connected with other components, such as wall, and another stair.Reinforcing bar 3 lays lightweight module with being used for The interval 4 of 5cm, 8cm or 13cm can be left between region 2, can not also be stayed, reinforcing bar 3 is laid lightweight module with being used for Region 2 outer surface contact;
S3:The concrete being stirred is poured into stairway die 1 from top to bottom, concrete is filled up whole stairway die 1, Fill up interval 4 at the same time;
S4:Stand, after concrete fills up stairway die 1, stop pouring, stand a period of time, such as 12h, 18h, or 24h, treats that stair are molded;
S5:Molding stair are taken out, dry shaping.
In order to enable the concrete poured to fill up whole stairway die 1, hollow situation is avoided the occurrence of, in casting concrete During swing stairway die 1, make the Concrete Filled poured evenly.
In order to enable the concrete poured all to coat lightweight module, avoid lightweight module from being exposed in air, prevent Only it slides, and when being indicated to region 2, is left between the left and right inner wall of region 2 and stairway die 1, upper and lower inner wall 6cm, 10cm or 15cm interval.Therefore step S1 can also be in the above method:A layer concrete first is poured to stairway die 1, The bottom 12 of stairway die 1 is pre-formed a layer concrete, realize the interval between 1 bottom inner wall of region 2 and stairway die, Then rule again in stairway die 1, indicate the region 2 for laying lightweight module, and by prefabricated profiled lightweight module It is laid in region 2.Region 2 only need to be from having interval between 1 or so inner wall of stairway die, the height of the lightweight module of placement is small It can be achieved that there is interval between region 2 and 1 or so inner wall of stairway die and upper inner wall in the height of stairway die 1.
The region for being used to lay lightweight module in sign is at least one layer, and every layer includes one or more subregions;It is multiple 3cm, 7cm or 10cm is spaced between subregion to lay.
The stair of any type structure can be prefabricated into using above method, as band marks time 5, without marking time 5;Band rest ledge 6, without rest ledge 6.
The lightweight module laid in region 2 can be gypsum module, foam concrete module, haydite concrete module, Air entrained concrete module or EPS modules.It is pre-formed, is directly laid in region 2.
The above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, those of ordinary skill in the art are to this hair The modification or equivalent substitution that bright technical solution is made, without departing from the spirit and scope of technical scheme, contain Cover in scope of the presently claimed invention.

Claims (5)

  1. A kind of 1. stair method for prefabricating, it is characterised in that:This method realizes the prefabricated of stair using reinforced concrete mating mold, For assembled architecture, which comprises the following steps that:
    S1:Rule in stairway die, indicate the region for laying lightweight module, and by prefabricated profiled lightweight module cloth In region;
    S2:Reinforcing bar is laid, reinforcing bar is laid around lightweight module, the reinforcing bar extends stair mould along stairway die length direction Tool;Gap is left between the reinforcing bar and the region for laying lightweight module, or the reinforcing bar is used for cloth with described If the outer surface contact in the region of lightweight module;
    S3:The casting concrete into stairway die, makes concrete fill up whole stairway die;
    S4:Stand, stand 12~24h, treat that stair are molded;
    S5:Molding stair are taken out, dry shaping.
  2. A kind of 2. stair method for prefabricating according to claim 1, it is characterised in that:When carrying out step S3, stair are swung Mould.
  3. A kind of 3. stair method for prefabricating according to claim 1 or 2, it is characterised in that:It is used for cloth described in step S1 It is if spaced between the region of lightweight module and stairway die inner wall.
  4. A kind of 4. stair method for prefabricating according to claim 1 or 2, it is characterised in that:It is used for cloth described in step S1 If the region of lightweight module is at least one layer, every layer includes one or more subregions;It is spaced and lays between more sub-regions.
  5. A kind of 5. stair method for prefabricating according to claim 3, it is characterised in that:It is used to lay gently described in step S1 The region of matter module is at least one layer, and every layer includes one or more subregions;It is spaced and lays between more sub-regions.
CN201711289353.8A 2017-12-07 2017-12-07 A kind of stair method for prefabricating Pending CN107984609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711289353.8A CN107984609A (en) 2017-12-07 2017-12-07 A kind of stair method for prefabricating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711289353.8A CN107984609A (en) 2017-12-07 2017-12-07 A kind of stair method for prefabricating

Publications (1)

Publication Number Publication Date
CN107984609A true CN107984609A (en) 2018-05-04

Family

ID=62036529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711289353.8A Pending CN107984609A (en) 2017-12-07 2017-12-07 A kind of stair method for prefabricating

Country Status (1)

Country Link
CN (1) CN107984609A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661257A (en) * 2018-06-21 2018-10-16 中国五冶集团有限公司 A kind of construction method of building stair
CN109079994A (en) * 2018-08-31 2018-12-25 重庆中航建设(集团)有限公司 The production method of prefabricated ladder step
CN111576762A (en) * 2020-05-07 2020-08-25 广东博意建筑设计院有限公司 Prefabricated cavity stair and production construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226186A (en) * 1995-02-21 1996-09-03 Nippon Kaiser Kk Concrete plate and its manufacture
JP2003253838A (en) * 2002-03-06 2003-09-10 Tokuhiro Oida Prefabricated stair
CN101629440A (en) * 2008-07-18 2010-01-20 深圳海龙建筑制品有限公司 Integrally prefabricated composite external wall panel and manufacturing method thereof
CN202831439U (en) * 2012-08-15 2013-03-27 杨众 Preformed hollow slab type stair
CN205421759U (en) * 2016-03-29 2016-08-03 万成粮 Novel prefabricated staircase
CN205688691U (en) * 2016-06-01 2016-11-16 潍坊金艺钢结构工程技术咨询有限公司 Prefabricated assembled staircase component

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226186A (en) * 1995-02-21 1996-09-03 Nippon Kaiser Kk Concrete plate and its manufacture
JP2003253838A (en) * 2002-03-06 2003-09-10 Tokuhiro Oida Prefabricated stair
CN101629440A (en) * 2008-07-18 2010-01-20 深圳海龙建筑制品有限公司 Integrally prefabricated composite external wall panel and manufacturing method thereof
CN202831439U (en) * 2012-08-15 2013-03-27 杨众 Preformed hollow slab type stair
CN205421759U (en) * 2016-03-29 2016-08-03 万成粮 Novel prefabricated staircase
CN205688691U (en) * 2016-06-01 2016-11-16 潍坊金艺钢结构工程技术咨询有限公司 Prefabricated assembled staircase component

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661257A (en) * 2018-06-21 2018-10-16 中国五冶集团有限公司 A kind of construction method of building stair
CN109079994A (en) * 2018-08-31 2018-12-25 重庆中航建设(集团)有限公司 The production method of prefabricated ladder step
CN111576762A (en) * 2020-05-07 2020-08-25 广东博意建筑设计院有限公司 Prefabricated cavity stair and production construction method thereof

Similar Documents

Publication Publication Date Title
CN107143135B (en) Structure-integrated heat-insulation decorative external template and external wall construction method thereof
CN107984609A (en) A kind of stair method for prefabricating
CN207954218U (en) A kind of folded assembling die for beating precast concrete laminated floor slab
CN103290967B (en) A kind of multi-ribbed hollow composite floor slab and manufacture method
CN107288256A (en) Light composite heat insulation outer wall plate, particular manufacturing craft and preparation method thereof
CN106013567A (en) Fabricated stressed island reinforced concrete cavity floor system
CN106378861A (en) Prefabricated type concrete stair mould and stair manufacturing method
CN113529956A (en) Shear wall box type assembly type building structure and construction method thereof
CN111809796B (en) Assembled concrete superposed beam and construction method thereof
CN210969361U (en) Production line for precast concrete hollow anti-seismic wallboard
CN101131009A (en) Cast-in-place shaping construction method and shaping equipment
CN206957042U (en) Light composite heat insulation outer wall plate and particular manufacturing craft
RU2747282C1 (en) Method for manufacture of assembled concrete products
CN110835930B (en) Layered and block construction method and structure for large-volume high-strength castable at bottom of coke oven
CN102434005A (en) Precast beam unit construction technology
CN110421710B (en) Prefabricated concrete hollow anti-seismic wallboard production line and construction method
ITTO20070273A1 (en) SWIMMING POOL AND ITS APPLICATION METHOD
CN207295977U (en) EPS module reinforced concrete frame structure space modules
CN104441234A (en) Method for manufacturing oversized prefabricated composite floor slab containing multiple built-in fittings
CN212534856U (en) Prefabricated cavity stair
CN108661255A (en) A kind of assembling-type precast stair and its production method
CN207228407U (en) A kind of prefabricated partition wall of the staircase with installation base
CN211164523U (en) Subtract mould of heavy prefabricated staircase
CN207829331U (en) A kind of mechanical package formula precast rc slab formula stair
CN206903200U (en) Structure-integrated insulation and decoration exterior sheathing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180504