CN107974889A - Concrete road surface component can be had enough to meet the need - Google Patents

Concrete road surface component can be had enough to meet the need Download PDF

Info

Publication number
CN107974889A
CN107974889A CN201711481362.7A CN201711481362A CN107974889A CN 107974889 A CN107974889 A CN 107974889A CN 201711481362 A CN201711481362 A CN 201711481362A CN 107974889 A CN107974889 A CN 107974889A
Authority
CN
China
Prior art keywords
concrete
meet
enough
road surface
need
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711481362.7A
Other languages
Chinese (zh)
Inventor
曾辉
钟国龙
王振兴
王卫新
刘毅夫
许龙迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd filed Critical BEIJING URBAN CONSTRUCTION NORTH CONSTRUCTION Co Ltd
Priority to CN201711481362.7A priority Critical patent/CN107974889A/en
Publication of CN107974889A publication Critical patent/CN107974889A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/005Individual couplings or spacer elements for joining the prefabricated units

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses one kind can have enough to meet the need concrete road surface component.This, which can have enough to meet the need concrete road surface component, includes:Polylith concrete block, it, which is laid on blotter, forms precast concrete pavement, the both ends of each block concrete block offer multiple hoisting ports, each hoisting port is both provided with hoisting port suspension hook reserved steel bar, which is formed using reinforcing bar brush antirust paint and embowment through PVC casings;Side plank sheathing, is laid in the both sides of the concrete block;And partitioning slot profiled sheet, it is arranged between the adjacent concrete block.This can have enough to meet the need the wave crest that concrete road surface component had using profiled sheet, trough just as secondary use when two blocks of prefabricated sections between occlusion strengthen road globality.

Description

Concrete road surface component can be had enough to meet the need
Technical field
The present invention relates to the realm of building construction, more particularly to one kind can have enough to meet the need concrete road surface component.
Background technology
Construction environmental requirement in all parts of the country is stringent at present, and cure process, each work order need to be carried out for place transport routes Position uses cast-in-place concrete road surface.Since the road surface is only temporary construction road, need to be abolished after construction, waste big Measure artificial, material and produce a large amount of building wastes, do not meet green construction requirement.
Can have enough to meet the need concrete road surface can be directly hoisted to after the completion of construction other construction areas as hardening road make With former road surface eliminates the expense abolished, this measure has responded the requirement of national green construction " three sections, one environmental protection ".
It is more in construction at present that road surface separation can be had enough to meet the need using brick fetal membrane or plank sheathing conduct, need to arrange work before concreting People carry out in advance brick fetal membrane build by laying bricks or stones and brick fetal membrane intensity reaches casting concrete can be carried out after requirement, concreting is completed Plastering processing is carried out to brick fetal membrane upper surface at partitioning slot afterwards.
The shortcomings that prior art:
First, brick fetal membrane is built by laying bricks or stones and intensity reaches and wants seeking time longer, it is impossible to carries out concreting immediately.
2nd, brick fetal membrane and plank sheathing are highly not easy to control, excessive influence perception effect, too low not have compartmentation.
3rd, relatively difficult to partitioning slot processing, road surface globality and perception effect are poor.
The information for being disclosed in the background section is merely intended to understanding of the increase to the general background of the present invention, without answering It has been the prior art well known to persons skilled in the art when being considered as recognizing or implying the information structure in any form.
The content of the invention
It is an object of the invention to provide it is a kind of it is simple and reasonable have enough to meet the need concrete road surface component, this can have enough to meet the need mixed Solidifying soil surface component is built by laying bricks or stones brick fetal membrane and forms strength time in contrast to saving worker for brick fetal membrane using profiled sheet, whole Body partitioning slot sensorial effects are raised with for integral smoothness effect more very one;Compare plank sheathing in contrast to profiled sheet for plank sheathing It is thinner, road shaping sensorial effects more preferably, and when material itself wave crest, the trough that have are used as secondary use just two pieces it is prefabricated Occlusion enhancing road globality between block.
To achieve the above object, the present invention provides one kind can have enough to meet the need concrete road surface component, this can have enough to meet the need concrete road Face component includes:Polylith concrete block, it, which is laid on blotter, forms precast concrete pavement, and the two of each block concrete block End offers multiple hoisting ports, and each hoisting port is both provided with hoisting port suspension hook reserved steel bar, and the hoisting port suspension hook is pre- Reinforcing bar is stayed to be formed using reinforcing bar brush antirust paint and embowment through PVC casings;Side plank sheathing, is laid in the concrete block Both sides;And partitioning slot profiled sheet, it is arranged between the adjacent concrete block.
Preferably, in above-mentioned technical proposal, the thickness of concrete block is 200mm, and the thickness of the blotter is 100mm。
Preferably, in above-mentioned technical proposal, plastic film separation layer is also equipped between concrete block and blotter.
Preferably, in above-mentioned technical proposal, partitioning slot profiled sheet is " several " font.
Compared with prior art, the present invention has the advantages that:This can have enough to meet the need concrete road surface component and use die mould Steel plate builds brick fetal membrane by laying bricks or stones and forms strength time in contrast to saving worker for brick fetal membrane, overall partitioning slot sensorial effects with it is whole More very one raises for body flatness effect;It is thinner than plank sheathing in contrast to profiled sheet for plank sheathing, road shaping sense organ effect Fruit more preferably, and material itself have wave crest, trough just as secondary use when two blocks of prefabricated sections between occlusion enhancing road Road globality.
Brief description of the drawings
Fig. 1 is the structure diagram for having enough to meet the need concrete road surface component of the present invention.
Fig. 2 is the concrete block construction schematic diagram for having enough to meet the need concrete road surface component of the present invention.
Fig. 3 is the laying structure schematic diagram for having enough to meet the need concrete road surface component of the present invention.
Embodiment
Below in conjunction with the accompanying drawings, the embodiment of the present invention is described in detail, it is to be understood that the guarantor of the present invention Protect scope and from the limitation of embodiment.
Explicitly indicated that unless otherwise other, otherwise in entire disclosure and claims, term " comprising " or its change Change such as "comprising" or " including " etc. and will be understood to comprise stated element or part, and do not exclude other members Part or other parts.
As depicted in figs. 1 and 2, the concrete structure for having enough to meet the need concrete road surface component of embodiment according to the present invention Including:Concrete block 101, side plank sheathing 102 and partitioning slot profiled sheet 103, wherein, the both ends of concrete block 101 open up There is hoisting port 104, side plank sheathing 102 is laid in the both sides of concrete block 101, and partitioning slot profiled sheet 103 is arranged on adjacent Between concrete block 101, build brick fetal membrane by laying bricks or stones using profiled sheet and form strength time in contrast to saving worker for brick fetal membrane, More very one raises for overall partitioning slot sensorial effects with integral smoothness effect;In contrast to profiled sheet for plank sheathing than wood Template is thinner, road shaping sensorial effects more preferably, and two pieces when material itself wave crest, the trough that have are used as secondary use just Occlusion enhancing road globality between prefabricated section.
Specifically, concrete block 101 is prefabricated in factory, and road arrangement of reinforcement 301 is using C10@200, the road arrangement of reinforcement 301 It is arranged under the pavement of road of concrete block 101 at 50mm, for road resistance since subgrade reaction caused by basic injustice is produced Raw pulling force.The both ends of concrete block 101 offer multiple hoisting ports 104, and each hoisting port 104 is both provided with hoisting port suspension hook Reserved steel bar 302, the hoisting port suspension hook reserved steel bar 302 pass through PVC casing structures using A18 reinforcing bar brush antirust paints and embowment Into.
As shown in figure 3, polylith concrete block 101 is laid on formation concrete dirt road on 100mm thickness blotter 201 Face, blotter 201 are engaged in this profession roadside 500mm per hem width, and plastic film separation layer 202 is laid on concrete block 101 and rubble pad Between layer 201, for isolating between prefabricated section and rubble.
Preferably, the thickness of concrete block 101 is 200mm.
Partitioning slot profiled sheet 103 is arranged between adjacent concrete block 101, using profiled sheet in contrast to brick fetal membrane come Say that saving worker builds brick fetal membrane by laying bricks or stones and form strength time, it is more preferable in overall partitioning slot sensorial effects and integral smoothness effect; Thinner than plank sheathing in contrast to profiled sheet for plank sheathing, road is molded sensorial effects more preferably, and partitioning slot profiled sheet 103 For " several " font, the wave crest having, trough just as secondary use when two blocks of prefabricated sections between occlusion enhancing road it is overall Property.
Smooth, about 200mm lower than undisturbed soil around is tamped on construction site basis, and flatness reaches ± 15mm, spread after smooth If one layer 100 thick rubble.
The concrete grade of concrete block 101 is C30 concrete, and vibration compacting, spreads 5kg/m2 diamond dust after the completion of pouring Disk floating is whole, and cover film watering maintenance cannot be less than 7 days.PVC terminations are sealed with adhesive tape before pouring, with thin after the completion of pouring Sand fills real.
It is used in turn:First to carrying out smooth compacting using position basic unit, flatness and compactness are laid with after reaching requirement 100mm thickness rubbles, are reeved using crane after the completion of bed course processing and are lifted.
To sum up, this can have enough to meet the need concrete road surface component and builds brick by laying bricks or stones in contrast to saving worker for brick fetal membrane using profiled sheet Fetal membrane simultaneously forms strength time, and more very one raises for overall partitioning slot sensorial effects with integral smoothness effect;In contrast to wood Profiled sheet is thinner than plank sheathing for template, and road is molded sensorial effects more preferably, and wave crest, trough that material itself has are proper Occlusion enhancing road globality when well as secondary use between two blocks of prefabricated sections.
It is foregoing to the present invention specific exemplary embodiment description be in order to illustrate and illustration purpose.These descriptions It is not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to the above instruction, can be much changed And change.The purpose of selecting and describing the exemplary embodiment is that explain that the certain principles of the present invention and its reality should With so that those skilled in the art can realize and utilize the present invention a variety of exemplaries and Various chooses and changes.The scope of the present invention is intended to be limited by claims and its equivalents.

Claims (4)

1. one kind can have enough to meet the need concrete road surface component, it is characterised in that including:
Polylith concrete block, it, which is laid on blotter, forms precast concrete pavement, and the both ends of each block concrete block are opened Equipped with multiple hoisting ports, each hoisting port is both provided with hoisting port suspension hook reserved steel bar, the hoisting port suspension hook reserved steel bar Formed using reinforcing bar brush antirust paint and embowment through PVC casings;
Side plank sheathing, is laid in the both sides of the concrete block;And
Partitioning slot profiled sheet, it is arranged between the adjacent concrete block.
2. according to claim 1 have enough to meet the need concrete road surface component, it is characterised in that the thickness of the concrete block is 200mm, the thickness of the blotter is 100mm.
3. according to claim 1 have enough to meet the need concrete road surface component, it is characterised in that concrete block and the rubble pad Plastic film separation layer is also equipped between layer.
4. according to claim 1 have enough to meet the need concrete road surface component, it is characterised in that the partitioning slot profiled sheet is " several " font.
CN201711481362.7A 2017-12-29 2017-12-29 Concrete road surface component can be had enough to meet the need Pending CN107974889A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711481362.7A CN107974889A (en) 2017-12-29 2017-12-29 Concrete road surface component can be had enough to meet the need

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711481362.7A CN107974889A (en) 2017-12-29 2017-12-29 Concrete road surface component can be had enough to meet the need

Publications (1)

Publication Number Publication Date
CN107974889A true CN107974889A (en) 2018-05-01

Family

ID=62005314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711481362.7A Pending CN107974889A (en) 2017-12-29 2017-12-29 Concrete road surface component can be had enough to meet the need

Country Status (1)

Country Link
CN (1) CN107974889A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029810A (en) * 2019-05-15 2019-07-19 中铁建设集团有限公司 It is a kind of to have enough to meet the need template system for the construction of contrary sequence method horizontal member

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1643879A (en) * 1926-04-22 1927-09-27 Meyer Emil De Cement-block pavement
WO2007001167A1 (en) * 2005-06-29 2007-01-04 Pressplate B.V. Paving element system provided with a flexibla joint
CN202323605U (en) * 2011-11-14 2012-07-11 苏州市广卫特种水泥制品有限公司 Channel plate
CN203684027U (en) * 2013-12-24 2014-07-02 深圳市建工集团股份有限公司 Prefabricated assembled temporary road for building operations
CN204000523U (en) * 2014-06-23 2014-12-10 北京博大经开建设有限公司 The prefabricated road surface of a kind of Novel reinforced concrete
CN207775647U (en) * 2017-12-29 2018-08-28 北京城建北方建设有限责任公司 Concrete road surface component can be had enough to meet the need

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1643879A (en) * 1926-04-22 1927-09-27 Meyer Emil De Cement-block pavement
WO2007001167A1 (en) * 2005-06-29 2007-01-04 Pressplate B.V. Paving element system provided with a flexibla joint
CN202323605U (en) * 2011-11-14 2012-07-11 苏州市广卫特种水泥制品有限公司 Channel plate
CN203684027U (en) * 2013-12-24 2014-07-02 深圳市建工集团股份有限公司 Prefabricated assembled temporary road for building operations
CN204000523U (en) * 2014-06-23 2014-12-10 北京博大经开建设有限公司 The prefabricated road surface of a kind of Novel reinforced concrete
CN207775647U (en) * 2017-12-29 2018-08-28 北京城建北方建设有限责任公司 Concrete road surface component can be had enough to meet the need

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029810A (en) * 2019-05-15 2019-07-19 中铁建设集团有限公司 It is a kind of to have enough to meet the need template system for the construction of contrary sequence method horizontal member

Similar Documents

Publication Publication Date Title
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN101787710A (en) Integrally-assembled buttressed retaining wall and construction method thereof
CN213952303U (en) Basement outer wall post-cast strip assembled protection wall construction structures
CN107574842A (en) Basement post-pouring zone advance water stop construction method
CN108086113A (en) A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN205893845U (en) Precast concrete makes up road surface
CN106560559B (en) A kind of leakage preventing structure and construction method for city river
CN109440571A (en) The construction method for building road is faced in a kind of laying of prefabricated board
CN110438914A (en) Water tank culvert and its construction method are crossed on soft soil foundation
CN104005313A (en) Construction method for asphalt concrete pavement separation zone kerbs
CN106245544A (en) A kind of L-type assembled steel reinforced concrete guard wall type general channels hole
CN207775647U (en) Concrete road surface component can be had enough to meet the need
CN205474892U (en) General passageway entrance to a cave of L type assembled reinforced concrete barricade type
CN105437354B (en) The method of binding face tile when a kind of prefabricated concrete floor and wallboard
CN107974889A (en) Concrete road surface component can be had enough to meet the need
CN207062759U (en) Structure is longitudinally continuous using the floorings of UHPC clad cans
CN210288465U (en) Assembled retaining wall post-cast strip plugging member
CN108661087A (en) The waterproof construction and construction method of tower crane in a kind of basement bottom board
CN208293344U (en) Kerbstone, gutter and the molding pavement structure of top course one-time-concreting
CN216973019U (en) Prefabricated assembled temporary parking lot construction structure
CN109811613A (en) A kind of interim ground installation and its integral construction method
CN205894118U (en) Pier protective structure
CN109056449A (en) A kind of recyclable interim sidewalk and construction method
CN210013190U (en) Rock-fill concrete stacked structure and rock-fill concrete dam body
CN102888862B (en) Construction method of waterproof composite layer of lower counter member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180501