CN107974889A - Concrete road surface component can be had enough to meet the need - Google Patents
Concrete road surface component can be had enough to meet the need Download PDFInfo
- Publication number
- CN107974889A CN107974889A CN201711481362.7A CN201711481362A CN107974889A CN 107974889 A CN107974889 A CN 107974889A CN 201711481362 A CN201711481362 A CN 201711481362A CN 107974889 A CN107974889 A CN 107974889A
- Authority
- CN
- China
- Prior art keywords
- concrete
- meet
- enough
- road surface
- need
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/005—Individual couplings or spacer elements for joining the prefabricated units
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
The invention discloses one kind can have enough to meet the need concrete road surface component.This, which can have enough to meet the need concrete road surface component, includes:Polylith concrete block, it, which is laid on blotter, forms precast concrete pavement, the both ends of each block concrete block offer multiple hoisting ports, each hoisting port is both provided with hoisting port suspension hook reserved steel bar, which is formed using reinforcing bar brush antirust paint and embowment through PVC casings;Side plank sheathing, is laid in the both sides of the concrete block;And partitioning slot profiled sheet, it is arranged between the adjacent concrete block.This can have enough to meet the need the wave crest that concrete road surface component had using profiled sheet, trough just as secondary use when two blocks of prefabricated sections between occlusion strengthen road globality.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to one kind can have enough to meet the need concrete road surface component.
Background technology
Construction environmental requirement in all parts of the country is stringent at present, and cure process, each work order need to be carried out for place transport routes
Position uses cast-in-place concrete road surface.Since the road surface is only temporary construction road, need to be abolished after construction, waste big
Measure artificial, material and produce a large amount of building wastes, do not meet green construction requirement.
Can have enough to meet the need concrete road surface can be directly hoisted to after the completion of construction other construction areas as hardening road make
With former road surface eliminates the expense abolished, this measure has responded the requirement of national green construction " three sections, one environmental protection ".
It is more in construction at present that road surface separation can be had enough to meet the need using brick fetal membrane or plank sheathing conduct, need to arrange work before concreting
People carry out in advance brick fetal membrane build by laying bricks or stones and brick fetal membrane intensity reaches casting concrete can be carried out after requirement, concreting is completed
Plastering processing is carried out to brick fetal membrane upper surface at partitioning slot afterwards.
The shortcomings that prior art:
First, brick fetal membrane is built by laying bricks or stones and intensity reaches and wants seeking time longer, it is impossible to carries out concreting immediately.
2nd, brick fetal membrane and plank sheathing are highly not easy to control, excessive influence perception effect, too low not have compartmentation.
3rd, relatively difficult to partitioning slot processing, road surface globality and perception effect are poor.
The information for being disclosed in the background section is merely intended to understanding of the increase to the general background of the present invention, without answering
It has been the prior art well known to persons skilled in the art when being considered as recognizing or implying the information structure in any form.
The content of the invention
It is an object of the invention to provide it is a kind of it is simple and reasonable have enough to meet the need concrete road surface component, this can have enough to meet the need mixed
Solidifying soil surface component is built by laying bricks or stones brick fetal membrane and forms strength time in contrast to saving worker for brick fetal membrane using profiled sheet, whole
Body partitioning slot sensorial effects are raised with for integral smoothness effect more very one;Compare plank sheathing in contrast to profiled sheet for plank sheathing
It is thinner, road shaping sensorial effects more preferably, and when material itself wave crest, the trough that have are used as secondary use just two pieces it is prefabricated
Occlusion enhancing road globality between block.
To achieve the above object, the present invention provides one kind can have enough to meet the need concrete road surface component, this can have enough to meet the need concrete road
Face component includes:Polylith concrete block, it, which is laid on blotter, forms precast concrete pavement, and the two of each block concrete block
End offers multiple hoisting ports, and each hoisting port is both provided with hoisting port suspension hook reserved steel bar, and the hoisting port suspension hook is pre-
Reinforcing bar is stayed to be formed using reinforcing bar brush antirust paint and embowment through PVC casings;Side plank sheathing, is laid in the concrete block
Both sides;And partitioning slot profiled sheet, it is arranged between the adjacent concrete block.
Preferably, in above-mentioned technical proposal, the thickness of concrete block is 200mm, and the thickness of the blotter is
100mm。
Preferably, in above-mentioned technical proposal, plastic film separation layer is also equipped between concrete block and blotter.
Preferably, in above-mentioned technical proposal, partitioning slot profiled sheet is " several " font.
Compared with prior art, the present invention has the advantages that:This can have enough to meet the need concrete road surface component and use die mould
Steel plate builds brick fetal membrane by laying bricks or stones and forms strength time in contrast to saving worker for brick fetal membrane, overall partitioning slot sensorial effects with it is whole
More very one raises for body flatness effect;It is thinner than plank sheathing in contrast to profiled sheet for plank sheathing, road shaping sense organ effect
Fruit more preferably, and material itself have wave crest, trough just as secondary use when two blocks of prefabricated sections between occlusion enhancing road
Road globality.
Brief description of the drawings
Fig. 1 is the structure diagram for having enough to meet the need concrete road surface component of the present invention.
Fig. 2 is the concrete block construction schematic diagram for having enough to meet the need concrete road surface component of the present invention.
Fig. 3 is the laying structure schematic diagram for having enough to meet the need concrete road surface component of the present invention.
Embodiment
Below in conjunction with the accompanying drawings, the embodiment of the present invention is described in detail, it is to be understood that the guarantor of the present invention
Protect scope and from the limitation of embodiment.
Explicitly indicated that unless otherwise other, otherwise in entire disclosure and claims, term " comprising " or its change
Change such as "comprising" or " including " etc. and will be understood to comprise stated element or part, and do not exclude other members
Part or other parts.
As depicted in figs. 1 and 2, the concrete structure for having enough to meet the need concrete road surface component of embodiment according to the present invention
Including:Concrete block 101, side plank sheathing 102 and partitioning slot profiled sheet 103, wherein, the both ends of concrete block 101 open up
There is hoisting port 104, side plank sheathing 102 is laid in the both sides of concrete block 101, and partitioning slot profiled sheet 103 is arranged on adjacent
Between concrete block 101, build brick fetal membrane by laying bricks or stones using profiled sheet and form strength time in contrast to saving worker for brick fetal membrane,
More very one raises for overall partitioning slot sensorial effects with integral smoothness effect;In contrast to profiled sheet for plank sheathing than wood
Template is thinner, road shaping sensorial effects more preferably, and two pieces when material itself wave crest, the trough that have are used as secondary use just
Occlusion enhancing road globality between prefabricated section.
Specifically, concrete block 101 is prefabricated in factory, and road arrangement of reinforcement 301 is using C10@200, the road arrangement of reinforcement 301
It is arranged under the pavement of road of concrete block 101 at 50mm, for road resistance since subgrade reaction caused by basic injustice is produced
Raw pulling force.The both ends of concrete block 101 offer multiple hoisting ports 104, and each hoisting port 104 is both provided with hoisting port suspension hook
Reserved steel bar 302, the hoisting port suspension hook reserved steel bar 302 pass through PVC casing structures using A18 reinforcing bar brush antirust paints and embowment
Into.
As shown in figure 3, polylith concrete block 101 is laid on formation concrete dirt road on 100mm thickness blotter 201
Face, blotter 201 are engaged in this profession roadside 500mm per hem width, and plastic film separation layer 202 is laid on concrete block 101 and rubble pad
Between layer 201, for isolating between prefabricated section and rubble.
Preferably, the thickness of concrete block 101 is 200mm.
Partitioning slot profiled sheet 103 is arranged between adjacent concrete block 101, using profiled sheet in contrast to brick fetal membrane come
Say that saving worker builds brick fetal membrane by laying bricks or stones and form strength time, it is more preferable in overall partitioning slot sensorial effects and integral smoothness effect;
Thinner than plank sheathing in contrast to profiled sheet for plank sheathing, road is molded sensorial effects more preferably, and partitioning slot profiled sheet 103
For " several " font, the wave crest having, trough just as secondary use when two blocks of prefabricated sections between occlusion enhancing road it is overall
Property.
Smooth, about 200mm lower than undisturbed soil around is tamped on construction site basis, and flatness reaches ± 15mm, spread after smooth
If one layer 100 thick rubble.
The concrete grade of concrete block 101 is C30 concrete, and vibration compacting, spreads 5kg/m2 diamond dust after the completion of pouring
Disk floating is whole, and cover film watering maintenance cannot be less than 7 days.PVC terminations are sealed with adhesive tape before pouring, with thin after the completion of pouring
Sand fills real.
It is used in turn:First to carrying out smooth compacting using position basic unit, flatness and compactness are laid with after reaching requirement
100mm thickness rubbles, are reeved using crane after the completion of bed course processing and are lifted.
To sum up, this can have enough to meet the need concrete road surface component and builds brick by laying bricks or stones in contrast to saving worker for brick fetal membrane using profiled sheet
Fetal membrane simultaneously forms strength time, and more very one raises for overall partitioning slot sensorial effects with integral smoothness effect;In contrast to wood
Profiled sheet is thinner than plank sheathing for template, and road is molded sensorial effects more preferably, and wave crest, trough that material itself has are proper
Occlusion enhancing road globality when well as secondary use between two blocks of prefabricated sections.
It is foregoing to the present invention specific exemplary embodiment description be in order to illustrate and illustration purpose.These descriptions
It is not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to the above instruction, can be much changed
And change.The purpose of selecting and describing the exemplary embodiment is that explain that the certain principles of the present invention and its reality should
With so that those skilled in the art can realize and utilize the present invention a variety of exemplaries and
Various chooses and changes.The scope of the present invention is intended to be limited by claims and its equivalents.
Claims (4)
1. one kind can have enough to meet the need concrete road surface component, it is characterised in that including:
Polylith concrete block, it, which is laid on blotter, forms precast concrete pavement, and the both ends of each block concrete block are opened
Equipped with multiple hoisting ports, each hoisting port is both provided with hoisting port suspension hook reserved steel bar, the hoisting port suspension hook reserved steel bar
Formed using reinforcing bar brush antirust paint and embowment through PVC casings;
Side plank sheathing, is laid in the both sides of the concrete block;And
Partitioning slot profiled sheet, it is arranged between the adjacent concrete block.
2. according to claim 1 have enough to meet the need concrete road surface component, it is characterised in that the thickness of the concrete block is
200mm, the thickness of the blotter is 100mm.
3. according to claim 1 have enough to meet the need concrete road surface component, it is characterised in that concrete block and the rubble pad
Plastic film separation layer is also equipped between layer.
4. according to claim 1 have enough to meet the need concrete road surface component, it is characterised in that the partitioning slot profiled sheet is
" several " font.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711481362.7A CN107974889A (en) | 2017-12-29 | 2017-12-29 | Concrete road surface component can be had enough to meet the need |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711481362.7A CN107974889A (en) | 2017-12-29 | 2017-12-29 | Concrete road surface component can be had enough to meet the need |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107974889A true CN107974889A (en) | 2018-05-01 |
Family
ID=62005314
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711481362.7A Pending CN107974889A (en) | 2017-12-29 | 2017-12-29 | Concrete road surface component can be had enough to meet the need |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107974889A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029810A (en) * | 2019-05-15 | 2019-07-19 | 中铁建设集团有限公司 | It is a kind of to have enough to meet the need template system for the construction of contrary sequence method horizontal member |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1643879A (en) * | 1926-04-22 | 1927-09-27 | Meyer Emil De | Cement-block pavement |
WO2007001167A1 (en) * | 2005-06-29 | 2007-01-04 | Pressplate B.V. | Paving element system provided with a flexibla joint |
CN202323605U (en) * | 2011-11-14 | 2012-07-11 | 苏州市广卫特种水泥制品有限公司 | Channel plate |
CN203684027U (en) * | 2013-12-24 | 2014-07-02 | 深圳市建工集团股份有限公司 | Prefabricated assembled temporary road for building operations |
CN204000523U (en) * | 2014-06-23 | 2014-12-10 | 北京博大经开建设有限公司 | The prefabricated road surface of a kind of Novel reinforced concrete |
CN207775647U (en) * | 2017-12-29 | 2018-08-28 | 北京城建北方建设有限责任公司 | Concrete road surface component can be had enough to meet the need |
-
2017
- 2017-12-29 CN CN201711481362.7A patent/CN107974889A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1643879A (en) * | 1926-04-22 | 1927-09-27 | Meyer Emil De | Cement-block pavement |
WO2007001167A1 (en) * | 2005-06-29 | 2007-01-04 | Pressplate B.V. | Paving element system provided with a flexibla joint |
CN202323605U (en) * | 2011-11-14 | 2012-07-11 | 苏州市广卫特种水泥制品有限公司 | Channel plate |
CN203684027U (en) * | 2013-12-24 | 2014-07-02 | 深圳市建工集团股份有限公司 | Prefabricated assembled temporary road for building operations |
CN204000523U (en) * | 2014-06-23 | 2014-12-10 | 北京博大经开建设有限公司 | The prefabricated road surface of a kind of Novel reinforced concrete |
CN207775647U (en) * | 2017-12-29 | 2018-08-28 | 北京城建北方建设有限责任公司 | Concrete road surface component can be had enough to meet the need |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029810A (en) * | 2019-05-15 | 2019-07-19 | 中铁建设集团有限公司 | It is a kind of to have enough to meet the need template system for the construction of contrary sequence method horizontal member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592426B (en) | The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system | |
CN101787710A (en) | Integrally-assembled buttressed retaining wall and construction method thereof | |
CN213952303U (en) | Basement outer wall post-cast strip assembled protection wall construction structures | |
CN107574842A (en) | Basement post-pouring zone advance water stop construction method | |
CN108086113A (en) | A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area | |
CN205893845U (en) | Precast concrete makes up road surface | |
CN106560559B (en) | A kind of leakage preventing structure and construction method for city river | |
CN109440571A (en) | The construction method for building road is faced in a kind of laying of prefabricated board | |
CN110438914A (en) | Water tank culvert and its construction method are crossed on soft soil foundation | |
CN104005313A (en) | Construction method for asphalt concrete pavement separation zone kerbs | |
CN106245544A (en) | A kind of L-type assembled steel reinforced concrete guard wall type general channels hole | |
CN207775647U (en) | Concrete road surface component can be had enough to meet the need | |
CN205474892U (en) | General passageway entrance to a cave of L type assembled reinforced concrete barricade type | |
CN105437354B (en) | The method of binding face tile when a kind of prefabricated concrete floor and wallboard | |
CN107974889A (en) | Concrete road surface component can be had enough to meet the need | |
CN207062759U (en) | Structure is longitudinally continuous using the floorings of UHPC clad cans | |
CN210288465U (en) | Assembled retaining wall post-cast strip plugging member | |
CN108661087A (en) | The waterproof construction and construction method of tower crane in a kind of basement bottom board | |
CN208293344U (en) | Kerbstone, gutter and the molding pavement structure of top course one-time-concreting | |
CN216973019U (en) | Prefabricated assembled temporary parking lot construction structure | |
CN109811613A (en) | A kind of interim ground installation and its integral construction method | |
CN205894118U (en) | Pier protective structure | |
CN109056449A (en) | A kind of recyclable interim sidewalk and construction method | |
CN210013190U (en) | Rock-fill concrete stacked structure and rock-fill concrete dam body | |
CN102888862B (en) | Construction method of waterproof composite layer of lower counter member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180501 |